Energy Management

Efficient Energy Management Report


for
Damansara Assets Sdn. Bhd.
Galeria @ Kotaraya
July 2023
Introduction
• Encourage utilization of energy.
• Ensure adequate, reliable, secure and cost effective.
• Sustainable for future.
Objective
• Comply with Efficient Energy Management Regulations 2008.
• Identify energy and cost saving.
• Provide awareness as part of sustainable energy management
system.
• Identify current consumption and efficiency profile.
• Facilitation in energy efficiency and conservation measures.
• Financial prioritization for the implementation.
Scope of Work
• Audit and analyze energy consumption.
• Propose energy saving measures.
• Monitor the energy saving measures implementation.
• Supervise record keeping for efficient energy management.
• Ensure timely submission of Form A, Form B and its report to
the Energy Commission.
Baseline (2019)
760,000.00 2,000.00
740,000.00
1,950.00
720,000.00
700,000.00 1,900.00
680,000.00
1,850.00
660,000.00
640,000.00 1,800.00
620,000.00
1,750.00
600,000.00
580,000.00 1,700.00

Month
Electrical Energy (kWh) Maximum Demand (kW)

Energy Maximum EnergyCost Building Energy


Consumption Demand (RM) Index, BEI
(kWh) (kW) (kWh/m2)
Total 8,369,090.00 3,745,103.15 225.29

645,493.00 1,813.00 294,508.15 17.38


Minimum
(March) (December) (March) (March)
747,605.00 1,968.00 332,506.23 20.12
Maximum
(January) (January) (January) (January)
Average 697,424.17 1,904.25 312,258.60 18.77
1st Year (2020)
700,000.00 2,000.00
1,800.00
600,000.00
1,600.00
500,000.00 1,400.00

400,000.00 1,200.00
1,000.00
300,000.00 800.00
200,000.00 600.00
400.00
100,000.00
200.00
- -

Month
Electrical Energy (kWh) Maximum Demand (kW)

Energy Maximum Energy Cost Building Energy


Consumption Demand (RM) Index, BEI
(kWh) (kW) (kWh/m2)
Total 6,534,880.00 2,934,358.10 175.91
264,980.00 784.00 120,472.90 7.13
Minimum
(April) (April) (April) (April)
662,936.00 1,818.00 297,057.04 17.85
Maximum
(January) (January) (January) (January)
Average 544,573.33 1,510.25 244,529.84 14.66
2nd Year (2021)

Energy Maximum Energy Cost Building Energy


Consumption Demand (RM) Index, BEI
(kWh) (kW) (kWh/m2)
Total 5,451,563.00 2,459,591.70 146.75
324,589.00 970 177,865.99 8.74
Minimum
(Jun) (Jun) (Jun) (Jun)
524,564.00 1,412 233,401.06 14.12
Maximum
(May) (Apr) (May) (May)
Average 454,296.92 1,292.00 202,998.33 13.34
3rd Year (2022)

Energy Maximum Energy Cost Building Energy


Consumption Demand (RM) Index, BEI
(kWh) (kW) (kWh/m2)
Total 6,367,329.00 2,818,207.49 171.40
455,294.00 1,309 206,164.04 12.26
Minimum (Feb) (Feb) (Feb)
(December)
569,208.00 1,403 249,968,82 15.32
Maximum (July) (July) (July)
(May)
Average 530,048.18 1,359 234,850.62 14.28
4th Year (2023)

Energy Maximum Energy Cost Building Energy


Consumption Demand (RM) Index, BEI
(kWh) (kW) (kWh/m2)
Total 3,697,876.00 1,632,878.24 99.54
485,226.00 1,313 216,891.39 13.06
Minimum (Feb) (Feb) (Feb)
(Feb)
552,246.00 1,373 243,171.69 14.87
Maximum (May) (May) (May)
(May)
Average 528,268.00 1,335.00 283,153.50 14.22
Annualized Analysis KWh VS MYR
Annualized Analysis Maximum Demand
Energy Conservation Measures (Implemented)

No. Activity Implementation Status


Date
01. Sensor installation for lighting system at November 2019 Completed
management office.
02. Reschedule the timer for AHU, FCU, exhaust January 2020 Completed
fan and lighting system
03. Replacement of motion sensor for staircase May 2020 Completed
emergency lighting system.
04. Installation of solar lighting system at car park June 2020 Completed
area
05. Reschedule building operation hours from August 2020 Ongoing
8am-10pm to 8am-9pm.
06. Reschedule building operation hours from January 2021 Ongoing
8.00 am – 6.00 pm during MCO and CMCO.
Energy Conservation Measures (Plan)
No. Activity Implementation Status
Date
01. Installation of building automation 2022 Submit to HQ for
system approval
02. Installation of VSD for AHU and 2022 Submit to HQ for
Exhaust fan approval
03. Installation of solar panel at parking Not regard as EE
4B. project but RE
project
Other Matters
• Understanding the use of regression concept in calculating
energy saving
• Appointment of Energy Manager and inform the Energy
Commission
• Application for Energy Audit Conditional Grant
Reference Document
• Electrical Bills
• Efficient Energy Management Regulations 2008