Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Pembangunan SUTET 275 kV 2 CCT Quadruple Zebra

Gumawang - Gitet Lampung 04


LOGO
FINAL CHECK PONDASI
Kontraktor : No Tower :
No. Kontrak : Lokasi :
Tanggal : Type Pondasi :
Type Tower :

I. FINISHING PONDASI
LEG
NO URAIAN REMARKS
A B C D
1. URUGAN KEMBALI
2. MATA INTAN
3. AS TOWER, CENTERLINE
4. PATOK BATAS
5. HOUSEKEEPING

II. RECHECK SETTING STUB


STUB DEVIASI
No NOMINAL DESIGN (mm) NOMINAL ACTUAL (mm)
SETTING +/- (mm)
1 SLOPE
2 LEVELLING
3 DIAGONAL
4 A-C
5 B-D
6 BACK TO BACK
7 A-B
8 B-C
9 C-D
10 D-A

III. TEST PENTANAHAN


NILAI
STANDAR
NO URAIAN UNCONNECT CONNECT REMARKS
SESUAI
KONTRAK
1. STUB A 10 Ω Ω Ω
2. STUB B 10 Ω Ω Ω
3. STUB C 10 Ω Ω Ω
4. STUB C 10 Ω Ω Ω
NILAI RATA-RATA

PT. PLN (Persero) UIP PT. PLN ENJINIRING PT. UDAH UDUH
SUMBAGSEL
UPP SUMBAGSEL 3

_______________ _____________________ PULAN


PIC LAPANGAN PENGAWAS LAPANGAN SITE MANAGER