MWC-CPM-2014-SP-06-F-02_REV.

01

CORPORATE PROJECT MANAGEMENT GROUP


Document Transmittal
GDM COPY

Date: Wednesday, 8 June 2022

Transmittal No. 2021-0395-MWCI-ICC-2022-T-0029


INDUSTRIAL CONTROLS
To: Circulation Control No. CS-CPM-MWCI-0029
CORPORATION
Reply required: Reply due date:

Project No.: 2021-0395


Project: Replacement of 4MVA Transformer
Contractor / Receiver:

INDUSTRIAL CONTROLS CORPORATION CONTRACT NO.: D21-0395-01-SCWFPS-PS-BPS

Item Reply Transmittal Reference


Drawing / Document No. Subject TYPE Rev Status / Code
No. No.
W
O
1 ICC-MWCI-4MVA-2021-0395-T038 Neutral Ground Resistor BROC 1 N/A 1 R
K

10

11

12

13

14

15

16

17

18

19

20

21

22

23
JUNE 08, 2022 09:00 aM
24

25
Attached extra sheet(s) if necessary
CODE 1: WORK MAY PROCEED, CODE 2: REVISE&RESUBMIT/WORK MAY PROCEED, CODE 3: REVISE AND RESUBMIT, CODE 4: REVIEW NOT REQUIRED, CODE 5: FYI
NOTE: ON NEXT SUBMISSION OF REVISIONS, ALWAYS ATTACH LATEST DOCUMENTS OR DRAWINGS WITH ANNOTATIONS.

Comments: CODE 1 - WORK MAY PROCEED

PLEASE SUBMIT ALL CODE 1 TO R and R from 8:00 am to 4:30 pm

NAME: POSITION: Signature Date

Issued by: (DCC Team) RODEL TESORERO DC 06/08/22

Acknowledged by: (PM/CM - if applicable)

Received by: (Contractor)


MWC-CPM-2014-SP-06-F-01_Rev.02A
RETURN TO DCC ON OR BEFORE
WORKING
7 7-Jun-22
DAYS TAT
CORPORATE PROJECT MANAGEMENT GROUP
CIRCULATION SLIP
Circulation Control No.: CS-CPM-MWCI-0029 PROJECT TYPE: D
Project Title: Replacement of 4MVA Transformer
Contractor / Originator: INDUSTRIAL CONTROLS CORPORATION CLUSTER: 0
Smart No. / PS Code: 2021-0395 TICKET NO: 0 PM/CM: Norman Yang
Purpose/ CIRULATION
Description Document / Drawing No. Rev. Reviewer Issued Status Name/Department/ Date
Sign Remarks
Code Discipline In Out

ICC-MWCI-4MVA-2021-0395- RODEL
Neutral Ground Resistor - 1 2 31-May-22 31-May-22
T038 DCC/PMO

JAYNARD > MAURICE


2 31-May-22
ROBERT / CM > ENG'G

Remarks:

Circulation Status Code : 1 : For Information 2 : For Approval 3 : For Review & Comment 4 : For Design 5 : For Tech'l Evaluation 6: For Cost Review 7. Remarks
Note: No. of copies of on-going circulation: 1 Page No.: 1 OF 1

MWC-CPM-2014-SP-06-F-01_Rev.02A
RETURN TO DCC ON OR BEFORE
WORKING
7 7-Jun-22
DAYS TAT
CORPORATE PROJECT MANAGEMENT GROUP
CIRCULATION SLIP
Circulation Control No. CS-CPM-MWCI-0029 PROJECT TYPE: D
Project Title: Replacement of 4MVA Transformer
Contractor / Originator: INDUSTRIAL CONTROLS CORPORATION CLUSTER: 0
Smart No. / PS Code: 2021-0395 TICKET NO: 0 PM/CM: Norman Yang
Purpose/ CIRULATION
Description Document / Drawing No. Rev. Reviewer Issued Status Date
Name/Department Sign Remarks
Code In Out
ICC-MWCI-4MVA-2021-0395- RODEL
Neutral Ground Resistor - 1 2 31-May-22 31-May-22
T038 DCC/PMO

JAYNARD > MAURICE


2 31-May-22
ROBERT / CM > ENG'G

Remarks:

Circulation Status Code : 1 : For Information 2 : For Approval 3 : For Review & Comment 4 : For Design 5 : For Tech'l Evaluation 6: For Cost Review 7. Remarks
Note: No. of copies of on-going circulation: 1 Page No.: 1 OF 1
SHENZHEN JINGDACHENG ELECTRONICS CO,. LTD
ADD: GUOYAO Industry Park, HUANGJIANG Town, DONGGUAN, GUANGDONG, CHINA
TEL:(86)15602914508 FAX:(086)755- 28158699

Acceptable
MWC-CPM-2014-SP-06-F-02_REV.01

CORPORATE PROJECT MANAGEMENT GROUP


Document Transmittal
GDM COPY

Date: Tuesday, 12 April 2022

Transmittal No. 2021-0395-MWCI-ICC-2022-T-0016


INDUSTRIAL CONTROLS
To: Circulation Control No. CS-CPM-MWCI-0018
CORPORATION
Reply required: Reply due date:

Project No.: 2021-0395


Project: Replacement of 4MVA Transformer
Contractor / Receiver:

INDUSTRIAL CONTROLS CORPORATION CONTRACT NO.: D21-0395-01-SCWFPS-PS-BPS

Item Reply Transmittal Reference


Drawing / Document No. Subject TYPE Rev Status / Code
No. No.
R
E
1 ICC-MWCI-4MVA-2021-0395-T022-NGR NEUTRAL GROUNDING RESISTOR TECHNICAL SPECIFICATION BROC - NA 2 V
I
R
2 ICC-MVWI-4MVA-2021-0395-T024_vcb MVSG VACUUM CIRCUIT BREAKER BROC - NA 3
E

10

11

12

13

14

15

16

17

18

19

20

21

22

23
MAR 30, 2022 09:00 aM
24

25
Attached extra sheet(s) if necessary
CODE 1: WORK MAY PROCEED, CODE 2: REVISE&RESUBMIT/WORK MAY PROCEED, CODE 3: REVISE AND RESUBMIT, CODE 4: REVIEW NOT REQUIRED, CODE 5: FYI
NOTE: ON NEXT SUBMISSION OF REVISIONS, ALWAYS ATTACH LATEST DOCUMENTS OR DRAWINGS WITH ANNOTATIONS.

Comments: CODE 3 - REVISE AND RESUBMIT


CODE 2 - REVISE AND RESUBMIT - WORK MAY PROCEED
PLEASE SUBMIT ALL CODE 1 TO R and R from 8:00 am to 4:30 pm

NAME: POSITION: Signature Date

Issued by: (DCC Team) RODEL TESORERO DC 04/12/22

Acknowledged by: (PM/CM - if applicable)

Received by: (Contractor)