Professional Documents
Culture Documents
Nasir Mep
Nasir Mep
NASIR HASSAN
MEP DESIGN MANAGER / MEP SITE MANAGER
Contact: 00923234974409 , 0349-1387985
E-mail: nasirhassan.rasheed@yahoo.com
To seek a challenging career utilizing engineering abilities developed through my skills and
knowledge and to earn name and fame for the organization I work. More than 30-years experience in
ME&P infrastructure HVAC, Plumbing, Firefighter and Electrical Design Management Planning,
consultancy, preparation of BOQ, specification, IFC drawings , shop drawings review and approval ,
Equipment & Material Submittal review and approval, supervision of execution Operation &
maintenance for five star hotel building, Hospital buildings, airport terminals building, metro rail
station, High rise commercial and residential buildings Project, process Industrial projects 18 years
experience in Gulf states 7 years in Pakistan, Applying design standard for HVAC ASHRAE
SMECNA , ASME , & for
Firefighting NFPA , for water supply AWWA , for Sewerage System BS Codes.
Fairmay Heights
● Period – 1 years contract
● Worked as a Project Manager MEP for design, supervision, Site Inspection, Planning, Matrial
Procurement, Coordination with consultant, contractor and vendors for MEP issues.
● Project- 3B+ LG+ 3 Commercial+ 16 Residential+ Pent House & Health Club.
● Leading the MEP Design Department & supporting the project management for execution ,
Resolving site technical issue , Attending site coordination meetings with consultant ,claint &
sub contractors.
● Projects – Park Lane Tower Islamabad 3B + G &3 Floor shopping Mall + 29 Floors VIP
appartment & Hotel Guest rooms , PepsiCo plant Multan , Kia motor assembly plant Karachi ,
Eacolen package plant Lahore, Pel industrial Project Lahore.
● Supervision and Coordination with consultant, , Clint and subcontractor for MEP system
execution & Testing and commissioning HVAC Equipment , Firefighting equipment ,
Electrical equipment , plumbing equipment , Montering porcourment of
● Material & progress.
● Site execution supervision and Coordination with Civil & Architect Department &
Consultant , Review the installation Drawings , BOQ , Rework Veriation Claim ,
participating in Equipment & Material inspection & IPC preparation submit to claint .
● Project – Capital Marketing Authority CMA Tower , 4B+G +3 Mechanical Floor
71 Story Building Riyadh.
● Management Planning & Supervision of site project team , coordination with consultant and
Client Representative , Monitoring Completion Schedule & Procurement Status , Submission
of Shop Drawings & Material Submittal to the Consultant for Approval , attending meetings
with consultant Client for betterment of project execution .
● Project – Reef Tower 3B+G+1Mechanical Floor+41 Story Residential & commercial Building
Jumarih Lake Dubai , Madina tower 3B+G+ 1 mechanical floor+29 Story Residential
Building Jumarih Lake Dubai
● Management planning and execution and supervision of cross country water infrastructure
pipeline projects from thatha to Karachi, monitoring the site staff including site Engineers and
supervisors for quality and progress, implement the work Methodology & completion
schedule.
● Project – Water infrastructure pipeline 72 KM Length.
● Supervision & management of Site MEP activities day to day , prepare MR for Materials
demand , coordination with subcontractor , Leading the execution team.
● Project – 2 B+ G+ 14 story + 462 Gust Rooms Sheraton hotel & Kuwait international airport
terminal Building.
Personal Profile:
(Nasir Hassan)