Page 4 of 14 ABU HATIM GROUP OF COMPANIES مجموعة شركات أبو حاتم SITE INSPECTION RECORD
PROJECT: R-215 CONSTRUCTION OF REMAINING WORK OF MAHLAH-GHOBRAT AT TAM- ISMAYA-
ROAD IN WILAYAT DAMAA AND ALTAEEN –ASH SHAGIYAH NORTH. LOCATION CAMP & SITE ACTIVITY: WADI CLEARING, ROCK SLIDE CLEARING DATE: 18/04/2023 INSPECTED BY; M.SABEEK LACK OF SAFETY REGULATION: 01. OBSERVATION REQUIRED TARGET ACTION CLOSEOUT DATE & ACTION DATE PARTY SIGNATURE Environmental soil pollution was Implementing effective PE observed on the diesel yard, concrete bed and deep tray for 23/04/2024 S.KEEPER causing pollution and attracting spillage control measures is HSEO penalties from authorities essential. PHOTO EVIDANCE:
Page 5 of 14 ABU HATIM GROUP OF COMPANIES مجموعة شركات أبو حاتم SITE INSPECTION RECORD
PROJECT: R-215 CONSTRUCTION OF REMAINING WORK OF MAHLAH-GHOBRAT AT TAM- ISMAYA-
ROAD IN WILAYAT DAMAA AND ALTAEEN –ASH SHAGIYAH NORTH. LOCATION CAMP & SITE ACTIVITY: WADI CLEARING, ROCK SLIDE CLEARING DATE: 18/04/2023 INSPECTED BY; M.SABEEK 02. OBSERVATION REQUIRED TARGET ACTION CLOSEOUT DATE & ACTION DATE PARTY SIGNATURE Bitumen drums stored under the Store bitumen drums in shaded sun, It causes degradation and areas to mitigate degradation 23/04/2024 PE potential hazards. and hazards. S.KEEPER HSEO PHOTO EVIDANCE:
03. OBSERVATION REQUIRED TARGET ACTION CLOSEOUT
DATE & ACTION DATE PARTY AHCG-IMS I- SOP 03 QF 05 HSE # 08 Rev.01 16/01/2019 Page 6 of 14 ABU HATIM GROUP OF COMPANIES مجموعة شركات أبو حاتم SITE INSPECTION RECORD
PROJECT: R-215 CONSTRUCTION OF REMAINING WORK OF MAHLAH-GHOBRAT AT TAM- ISMAYA-
ROAD IN WILAYAT DAMAA AND ALTAEEN –ASH SHAGIYAH NORTH. LOCATION CAMP & SITE ACTIVITY: WADI CLEARING, ROCK SLIDE CLEARING DATE: 18/04/2023 INSPECTED BY; M.SABEEK SIGNATURE Subcontractors, operators, and Contact the subcontractor in workers working without PPE lead charge to enforce strict PPE to a lack of safety regulation compliance for subcontractors, 29/04/2024 PM operators, and workers. PE Otherwise, issue the PPE from SE our store and deduct the cost HSEO from the subcontractor's payment. PHOTO EVIDANCE:
04. OBSERVATION REQUIRED TARGET ACTION CLOSEOUT
DATE & ACTION DATE PARTY AHCG-IMS I- SOP 03 QF 05 HSE # 08 Rev.01 16/01/2019 Page 7 of 14 ABU HATIM GROUP OF COMPANIES مجموعة شركات أبو حاتم SITE INSPECTION RECORD
PROJECT: R-215 CONSTRUCTION OF REMAINING WORK OF MAHLAH-GHOBRAT AT TAM- ISMAYA-
ROAD IN WILAYAT DAMAA AND ALTAEEN –ASH SHAGIYAH NORTH. LOCATION CAMP & SITE ACTIVITY: WADI CLEARING, ROCK SLIDE CLEARING DATE: 18/04/2023 INSPECTED BY; M.SABEEK SIGNATURE Inadequate barricading observed, Implement sturdy barricades with some areas utilizing soft throughout the site to ensure PE barricades insufficient for excavation safety. 29/04/2024 SE excavation safety. HSEO PHOTO EVIDANCE:
05. OBSERVATION REQUIRED TARGET ACTION CLOSEOUT
DATE & ACTION DATE PARTY SIGNATURE AHCG-IMS I- SOP 03 QF 05 HSE # 08 Rev.01 16/01/2019 Page 8 of 14 ABU HATIM GROUP OF COMPANIES مجموعة شركات أبو حاتم SITE INSPECTION RECORD
PROJECT: R-215 CONSTRUCTION OF REMAINING WORK OF MAHLAH-GHOBRAT AT TAM- ISMAYA-
ROAD IN WILAYAT DAMAA AND ALTAEEN –ASH SHAGIYAH NORTH. LOCATION CAMP & SITE ACTIVITY: WADI CLEARING, ROCK SLIDE CLEARING DATE: 18/04/2023 INSPECTED BY; M.SABEEK Conducting toolbox meetings Implement a protocol requiring without documentation leads to thorough documentation of all PE insufficient record-keeping and toolbox meetings, including 29/04/2024 HSEO heightens the risk of safety attendees' signatures, to oversights. (Outdated toolbox files) enhance accountability and ensure safety compliance. PHOTO EVIDANCE:
Page 9 of 14 ABU HATIM GROUP OF COMPANIES مجموعة شركات أبو حاتم SITE INSPECTION RECORD
PROJECT: R-215 CONSTRUCTION OF REMAINING WORK OF MAHLAH-GHOBRAT AT TAM- ISMAYA-
ROAD IN WILAYAT DAMAA AND ALTAEEN –ASH SHAGIYAH NORTH. LOCATION CAMP & SITE ACTIVITY: WADI CLEARING, ROCK SLIDE CLEARING DATE: 18/04/2023 INSPECTED BY; M.SABEEK The electrical distribution board is Securely cover the electrical uncovered at the worker's camp, distribution board at the PE with another distribution board worker's camp, relocate the 21/04/2024 C.BOSS located in the main walkway, distribution board from the main HSEO posing a hazard to pedestrians. walkway to ensure pedestrian safety, or isolate the DB. PHOTO EVIDANCE:
07. OBSERVATION REQUIRED TARGET ACTION CLOSEOUT
ACTION DATE PARTY DATE AHCG-IMS I- SOP 03 QF 05 HSE # 08 Rev.01 16/01/2019 Page 10 of 14 ABU HATIM GROUP OF COMPANIES مجموعة شركات أبو حاتم SITE INSPECTION RECORD
PROJECT: R-215 CONSTRUCTION OF REMAINING WORK OF MAHLAH-GHOBRAT AT TAM- ISMAYA-
ROAD IN WILAYAT DAMAA AND ALTAEEN –ASH SHAGIYAH NORTH. LOCATION CAMP & SITE ACTIVITY: WADI CLEARING, ROCK SLIDE CLEARING DATE: 18/04/2023 INSPECTED BY; M.SABEEK Excavators working at the edge of Provide comprehensive safety the hilltop pose a risk of equipment instructions and ensure PE and personnel falling. competent supervision to 21/04/2024 SE prevent excavators from HSEO operating near the edge of the hilltop. PHOTO EVIDANCE:
08. OBSERVATION REQUIRED TARGET ACTION CLOSEOUT
ACTION DATE PARTY DATE AHCG-IMS I- SOP 03 QF 05 HSE # 08 Rev.01 16/01/2019 Page 11 of 14 ABU HATIM GROUP OF COMPANIES مجموعة شركات أبو حاتم SITE INSPECTION RECORD
PROJECT: R-215 CONSTRUCTION OF REMAINING WORK OF MAHLAH-GHOBRAT AT TAM- ISMAYA-
ROAD IN WILAYAT DAMAA AND ALTAEEN –ASH SHAGIYAH NORTH. LOCATION CAMP & SITE ACTIVITY: WADI CLEARING, ROCK SLIDE CLEARING DATE: 18/04/2023 INSPECTED BY; M.SABEEK The stockyard lacks barricades and Install barricades and PE signboards, posing a safety risk. prominently display signboards 23/04/2024 S.KEEPER in the stockyard to enhance HSEO safety. PHOTO EVIDANCE: