Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

o

nt

z
3
J2

I
I
Erl
o<
Bl
:-
o
ti

Ii
rF

lE
t?
t"
I

F
i

Computation on the Bundwall Efficiency:


Fze
(rnh
my
rd

oY
oi

z
x
m
J-

-i
t-
ti
L

FOST capacity (as designed): 120 cu.m


Average volume of fuel stored in FOST: 84 cu.m (70% of FOST is filled)

Bundwall height (Hb) = 1.4m ; Bundwall sides (Sb) = 9 m

FOST Area = 3.14 x (2.285m)^2 = 16.403 sqm


Area of Clearance (ground to FOST bottomplate) = 2.742 sqm

Bundwall capacity = ((9 x 9) - 16.403) + 2.742) x 1.4 = 94.275 cu.m


sBX
Hd9

Bundwall efficiency (%) = 94.275/84 = 1.1223 (approx. 112%)


rBo

o5:
,-2

I>
la
a:=
IJ
a)

C
nt

o
-l
U1

>a

JANELLA ROSE B. MADRONA


-i
I

Registered Mechanical Engineer


Registration No. 0092061

You might also like