EXISTING 11KV OVERHEAD

LINE TO BE REMOVED.TOTAL
LENGTH = 50 mtrs

PROPOSED 3Cx240Sq.mm UG
CABLE (TOTAL LENGTH = 130 mtrs)

65.000
EXISTING 11KV O/H LINE
SULTANATE OF OMAN
MINISTRY OF TRANSPORT AND COMMUNICATIONS
WITH 'DOG' CONDUCTOR

EP
TO BE DISMANTLED
DIRECTORATE GENERAL OF ROADS AND LAND TRANSPORT

EP
NEAR CH:25+950 LHS
X= 685753.831
Y= 2540567.241
Z= 0

X= 685754
X= 685752.823 Y= 2540565.256
Y= 2540566.155 Z= 0
Z= 0

MAHLAH - GHUBBRAT AL TAM - ISMAIYAH ASPHALT ROAD

EP
NEW

EP
BOX CULVERT
1CELL(2x2)

IN DIMA WAATTAYEEN (ASH SHARQIYAH NORTH GOVERNORATE) PROPOSED 11KV OVERHEAD


LINE.TOTAL LENGTH = 1015 mtrs
CONSTRUCTION OF UNCOMPLETED WORKS

EP
PROPOSED 2W x 200mm CONCRETE DUCT
PROTECTION, TOTAL LENGTH= 13 Mtrs
X= 685686.507
Y= 2540560.042
Z= 0
UG CABLE
X= 685685.875
Y= 2540559.579
Z= 0

EP
RHS
X= 685729.972 X= 685730.962
Y= 2540491.962 Y= 2540490.856
Z= 0 Z= 0

X= 685729.835
Y= 2540489.89
Z= 0

EP
PROPOSED 11KV 3 POLE EXISTING 11KV OVERHEAD
STRUCTURE STOUT POLE (13 mtrs) LINE TO BE REMOVED.TOTAL EXISTING PMT TO UG CABLE CH:26+150 RHS
X= 685789.05
Y= 2540376.673
Z= 0

LENGTH = 545 mtrs BE RELOCATED

EP
PROPOSED 2W x 200mm CONCRETE DUCT
PROPOSED NEW LOCATION FOR
PROTECTION, TOTAL LENGTH= 13 Mtrs
RADEEDGE
Z= 373.465
EXISTING PMT WITH PROPOSED
"H" TERMINAL POLE
ELECTRICAL WORK LOCATION - 1 24+960 TO 26+040 : 1.295 km
WORK START DATE: 18th OCT 2023 TO COMPLETED: 11th FEB 2024
EL
4x3) (ONLY BALL

EP
EXISTING BC 2x( ET & OUTLET
80.000 70.000
RADEEDGE
Z= 362.447

60.000 CO MP LE TE D INL TOTAL LENGTH : 0.600 Km


IS
60.000 UCTED)
E.P
DOUBLE
E.P
X=Z=
POLE CH:24+950
684936.854
356.096
Y= 2541147.432
Z= 0
X= 684936.799
Y= 2541147.356
Z= 356.096
E.P
E.P
X= 356.102
Z= 684935.696
Y= 2541146.031
Z= 0
X= 684935.624
Y= 2541145.956
Z= 356.102
STONE
X= 685039.315
Y= 2541039.03
Z= 0

TO BE CONSTR TOTAL QUANTITY : 375,926 CUM


COMPLETED QUANTITY : 89,068 CUM
PROPOSED 11KV "H" EXISTING PMT TO EXISTING 11KV 3 POLE
EXISTING 11KV "H" SECTION POLE TERMINAL STOUT POLE BE RETAINED STRUCTURE BALANCE QUANTITY : 286,858 CUM
TO BE REPLACED IF REQUIRED (13 mtrs) EXISTING 11KV
DURING SHUT DOWN OVERHEAD LINE TO BE
EXISTING 11KV OVERHEAD RETAINED HILL CUTTING WORK
LINE TO BE REMOVED.TOTAL PROPOSED 11KV OVERHEAD 26+040 TO 26+920 : 0.880 km
LENGTH = 240 mtrs LINE.TOTAL LENGTH = 285 mtrs
TOTAL LENGTH : 0.880 Km
TOTAL QUANTITY : 721,058 CUM
COMPLETED QUANTITY : 389,666 CUM
BALANCE QUANTITY : 331,392 CUM

NE PROPOSED 11KV "H" WORK MATCH WITH EXISTING


BOXW LIMIT OF STA 27+915
1CE CULV SECTION POLE
LL(2 ERT PROPOSED 11KV OVERHEAD
x2)
LINE .TOTAL LENGTH = 240 mtrs
E
3 CXIST
(O EL ING EXISTING 11KV OVERHEAD LINE TO BE
2 Electrical poles

PROPOSED 11KV "H"


IS NLY L(4x2 BC
X= 686658.489 X= 686693.67
Y= 2539326.119 Y= 2539287.386
Z= 0 Z= 0

X= 686657.13
Y= 2539325.428
Z= 0

2 Electrical poles
X= 686616.011
Y= 2539369.212
Z= 0

X= 2539368.212
Y= 686614.989
Z= 0

REMOVED.TOTAL LENGTH = 730 mtrs SECTION POLE


X= 686912.247

C
Y= 2539034.447

.
Z= 0

B
X= 686576.035

TO INLET OMP ALLE5)


Y= 2539403.214
Z= 0

2 Electrical poles
X= 686575.695
Y= 2539401.733
Z= 0

2 Electrical poles
X= 2539234.999
Y= 686718.617
Z= 0

BE & LET L
CO OUT ED PROPOSED 11KV OVERHEAD EXISTING
NS LE EXISTING POWER LINE 11KV X= 686751.967
Y= 2539174.132
Z= 0

LINE .TOTAL LENGTH = 765 mtrs


2 Electrical poles
X= 686750.588
Y= 2539173.756

TR T
Z= 0

0 11KV OHL
UC
TE
150Sq.mm ACSR WOLF 65.00 X= 686841.596
Y= 2539053.418
Z= 0

D)
X= 686841.225

CONDUCTOR TO BE DISMANTLED
Y= 2539051.655
Z= 0

X= 686774.039
Y= 2539123.034
Z= 0

70.000
2 Electrical poles
X= 686772.579
Y= 2539122.905
Z= 0

70.000
X= 686778.566
Y= 2539097.455
X= 2539127.002
Y= 686751.349 Z= 0
4 poles crossing line LHS to RHS Z= 0
X= 2539129.647
Y= 686748.47
0
Z= X= 686777.09
X= 686749.279 Y= 2539097.604 X= 686778.348
Y= 2539128.05 Z= 0 Y= 2539096.02
Z= 0 Z= 0
X= 686750.034
Y= 2539126.432
Z= 0

2 Electrical poles
X= 686479.135
Y= 02539421.251
Z=

PROPOSED 11KV
75.000
"H" SECTION POLE
2 Electrical poles
X= 686429.674
Y= 2539427.552
Z= 0

X= 686428.933
Y= 2539426.306
Z= 0

PROPOSED 11KV 3 POLE X= 686353.494


Y= 02539480.313
Z=

2 Electrical
X= 686352.323poles
X= 686384.858
Y= 2539443.927

STRUCTURE STOUT POLE (13 mtrs)


Y= 2539479.454 Z= 0
Z= 0

2 Electrical poles
X= 686383.944
Y= 2539442.786
Z= 0

EP
X= 2539525.93
Y= 686307.415
Z= 0

EXISTING
HILL CUTTING X= 686142.178
Y= 0
Z= 2539667.473

X= 686141.933
Y= 2539665.997
Z= 0
2 Electrical poles,1 coordinates pole missing, Electrical crossing line RHS to LHS
X= 686658.931
Y= 2539106.581
Z= 0 ch no 27+850 RHS
X= 686659.363
Y= 2539105.233
Z= 0
X= 686659.971
Y= 02539103.917
Z=

BRIDGE
(BRIDGE 4)
E=686085.703 top crossing line 3rd
X= 686110.114
Y= 0
Z= 2539671.891

X= 2539670.378
Y= 686110.249
Z= 0

SCOPE : 2.515 Km N=2539715.603 PROPOSED 3Cx240Sq.mm


EXISTING EXISTING 11KV OVERHEAD
EXISTING UG CABLE (TOTAL
28
X= 686617.394
Y= 2539081.763
Z= 0

LINE TO BE REMOVED.TOTAL PROPOSED 2W x 200mm CONCRETE DUCT


top crossing line 2nd
X= 686063.149

11KV OHL TOWER LENGTH = 250 mtrs) PROTECTION, TOTAL LENGTH= 13 Mtrs
Y= 2539676.208
Z= 0

X= 686063.237
Y= 2539674.76
Z= 0

IN PROGRESS : 1.950 Km LENGTH = 350 mtrs


0
.00

X= 686563.958
Y= 2539103.715
Z= 0

EXISTING
130

NOT YET START : 0.565 Km 11KV OHL End of Electrical line 27+620 to 27+630
X= 686511.8
Y= 02539125.117
Z=

29
X= 686473.53 30
Y= 2539165.364 X= 686495.823 X= 686497.034 X= 686511.194
Z= 0 Y= 2539140.429 Y= 2539139.005 Y= 2539123.449
X= 2539165.148
Y= 686473.026 Z= 0 Z= 0 Z= 0
Z= 0

X= 686471.775

31
Y= 2539164.404
Z= 02539164.282
X=
Y= 686471.563
Z= 0

BC
ELECTRICAL WORK LOCATION - 2 26+920 TO 27+960 : 0.955 km
PROPOSED 11KV 3 POLE NEW 2x2)
INDEX 1CELL
x(
TO BE WORK START DATE: 12th JAN 2024 TO IN PROGRES: 18th APR 2024
STRUCTURE STOUT POLE (13 mtrs) TING
X= 685982.304
Y= 2539657.875
Z= 0 top crossing line 1st
X= 685982.821
Y= 2539656.508
Z= 0

(EXIS LISHED)
DEMO TOTAL LENGTH : 1.035 Km
BDC SUB CONTRATOR
TOTAL QUANTITY : 760,790 CUM
X= 685947.833
Y= 2539651.471
Z= 0

X= 685946.091
Y= 2539650.929

AFAQ SUB CONTRATOR


Z= 0

X= 685963.548
Y= 2539619.426
Z= 0

X= 685975.716
Y= 2539599.534 transformer
Z= 0 X= 685976.58
Y= 2539597.978
Z= 0

RAY INTERNATIONAL CONTRATOR CONNECT TO


EXISTING
X= 686005.682
Y= 2539547.99
Z= 0

EP
X= 686004.348
Y= 2539546.777
Z= 0

COMPLETED QUANTITY : 399,278 CUM


9

HILL CUTTING IS COMPLETED


41
2/

EXISTING
BALANCE QUANTITY : 361,512 CUM
F-

11KV OHL

CLIENT : MAIN CONTRACTOR: DESIGN CONSULTANT : PROJECT NAME:


MAHLAH - GHUBBRAT AL TAM - ISMAIYAH ASPHALT ROAD IN DIMA WATTAYEEN (ASH
ABU HATIM SHARQIYAH)NORTH GOVERMENT) CONSTRUCTION OF UNCOMPLETED WORK
P.O. BOX 1256, PC 130, AL ATHAIBA,
SULTANATE OF OMAN.
RENARDET S.A. & PARTNERS
DRAWING TITLE:
PHONE:+968-24597711; FAX:+968-24597722
E-mail:abuhatim@omantel.net.om
Consulting Engineers L.L.C.
PROJECT ELECTRICAL STRIP PLAN
www.abuhatim.com

You might also like