Professional Documents
Culture Documents
TMC Concrete Placing Booms - Rv0 (20!9!2016)
TMC Concrete Placing Booms - Rv0 (20!9!2016)
• 17M CPB
• 28M/32M CPB
• 33M CPB
9.3*2.45
2 HGR28 28 2 30 30 26.5 4.6
*1.8 Weight_3.6t*3
3.6*1.2 1.75*1.5 0.53
SANY 3.7
*1.2 *0.4*3 *3
8.3*2.45 L*W*H_0.8*0.8*9m*3
3 HG32C 32 3 30 30 32 5.2
*1.8
9.4*1.3 4.72*2.6
4 HG28G 28 2 11 22.7 21 3.0 3.4
*1.9 *2.51
1.08*1.1 0.88*0.88 1.6*1.3 0.52
4.0 3.7
*10.6 *10.4 *0.45*3 *3
ZOOM 9.4*1.3 8.85*3.1
5 HG32 32 3 30 22.2 27.3 4.95 4.29
LION *1.9 *2.35
Weight_1.3T*15
ZOOM 10.6*2.2 4.72*2.6
7 HG33T 33 4 22 44 28.5 3.9 4.5 N.A. N.A.
LION * 3m *2.51
L*W*H_2*2*2.8m*15
HG17M CPB
HGR28 CPB
HG32C CPB
HG28G CPB
HG32 CPB
HG33A CPB
HG33T CPB
用户应熟读本章说明,以便正确安装及使用布料机。在达到最后安装位置前
利用建筑工地的塔机安装布料机,也可选用合适的汽车吊(参考表1-1)。
Users are required to go through this section to ensure proper and smooth
erection of the tower placing boom according to the weight and height of
erection units in the table1-1, select the proper truck placing boom.
2 2
标准节MQ2 Tower section MQ2 4×1252 2.8
回转总成+转台+转台平台总成+下支座+一臂
5 Slewing assembly, Swivel device, Turret platform, 4500 2.5
Lower-support pedestal, The first boom
二臂+三臂+四臂+五臂总成Assembly of fore
6 section of the second boom, the third boom, the 3900 3.0
fourth boom and the fifth boom