Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

USN

LINGARAJ APPA ENGINEERING COLLEGE, BIDAR


ACA/R / Academic Year: 2022-23
Department of MBA
Rev: 00 Semester: 2sem

Date: 08.08.2023 Section: -

Test No: II Subject with code: 22MBA24


CIE-II Question paper
Duration: 1hr 30min Max. Marks: 50

INSTRUCTIONS: 1.Answer any two full question from each section A.

2. The Q.no 4 is compulsory from section B.

Questi Question Statement RBTL CO PO Marks


o n No
Q1.a What is graphical method? L1 CO2 PO1 3

Q1.b Discuss unbounded solution and advantages of linear programming? L2 CO2 PO1 7
Q1.c A sport club is interested in deciding a min as two types as balanced L2 CO2 PO2 10
foods for it player in such a way that the cost of food per player is
minimum and it contains at least 8 unit as vitamin A &10 units as
vitamin C. First type of food contains 2 units of vitamin C per kg cost of
first type of food in rupees 50 per kg &as second type as food in 70 per
kg formulate above problem to determine how much food type first &
second should be served to each player
2Qa. What are slack variable and surplus & artificial variable? L1 CO2 PO1 3
Describe the special type as LPP in graphical method assumption of linear
2Qb. programming L2 CO2 7

Solve LPP by graphical method


2Qc. Maximize Zi=100x1+40x2 L2 CO2 PO2 10
Subject to 5x1+2x2<1000
3x1+2x2<900
X1+2x2<500
X1+x2 >0

3Qa. What is the limitation as assignment problem? L1 CO3 PO1 3


3Qb. What is assignment problem? List out models in assignment problem L2 CO3 PO2 7
&difference between assignment problem & transportation problem?
The following information is gathered for a project
3Qc. Activity preceding activity duration L2 CO3 PO1 10
A - 1
B A 3
C A 4
D A 3
E O 2
F BCE 4
G D 9
H D 5
I H 2
J FGI 2
1) Draw network diagram
2) Determine the critical path &project duration &total following
time

Section B
1Q. Construction as project L1, L2 CO3 PO2 10
Time estimation weeks

Activity Optimistic Most ,likel Permissibl


time y e time
1-2 6 9 18
1-3 5 8 17
2-4 4 7 22
2-5 4 7 10
3-4 4 7 16
3-5 2 5 8
4-5 4 10 22