C000-YA-WR-004001-02 - WR Concrete Foundations
C000-YA-WR-004001-02 - WR Concrete Foundations
WORK REQUISITION
CIVIL WORKS FOR CONCRETE
FOUNDATIONS C000-YA-WR-004001
WORK REQUISITION
CIVIL WORKS FOR CONCRETE FOUNDATION
This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent
NR Identification Code
WORK REQUISITION
CIVIL WORKS FOR CONCRETE
FOUNDATIONS C000-YA-WR-004001
CONTENTS
1 SCOPE ........................................................................................................................ 3
1.1 DEFINITIONS .......................................................................................................... 3
1.2 DOCUMENT REFERENCE ....................................................................................... 3
2 WORK REQUISITIONS.......................................................................................... 4
2.1 WORKS DESCRIPTION .............................................................................................. 4
2.2 PRELIMINARY WORK ................................................................................................. 4
2.3 EXCAVATION .............................................................................................................. 4
2.4 BACKFILLING ............................................................................................................. 5
2.5 REINFORCED CONCRETE WORKS FOR FOUNDATIONS, ELEVATED
STRUCTURES AND SUMPS/BASINS .......................................................................................... 6
3 MECHANICAL COMPLETION AND TECHNICAL ACCEPTANCE .................. 7
3.1 MECHANICAL COMPLETION ............................................................................................. 7
3.2 TECHNICAL ACCEPTANCE ................................................................................................ 7
4 CODES & STANDARDS .......................................................................................... 7
4.1 LIST OF CODES AND STANDARDS.................................................................................... 7
4.2 LOCAL LAW COMPLIANCE ............................................................................................... 7
5 PROJECT DOCUMENTS.......................................................................................... 8
6 MATERIALS SCOPE OF SUPPLY ......................................................................... 9
6.1 BY CONTRACTOR ....................................................................................................... 9
6.2 BY SUBCONTRACTOR ................................................................................................ 9
7 ENGINEERING SERVICES SCOPE OF SUPPLY............................................. 10
7.1 BY CONTRACTOR ..................................................................................................... 10
7.2 BY SUBCONTRACTOR .............................................................................................. 10
8 OPTIONAL WORKS .............................................................................................. 10
9 EXCLUSIONS .......................................................................................................... 10
APPENDIX 1 ................................................................................................................................. 11
LIST OF ANNEXED DOCUMENTS, DRAWINGS, SPECIFICATION AND STANDARDS
......................................................................................................................................................... 11
MOD-A4DP-E is.4
This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent
NR Identification Code
WORK REQUISITION
CIVIL WORKS FOR CONCRETE
FOUNDATIONS C000-YA-WR-004001
1 SCOPE
This specification is a part of the agreement between Tecnimont Chile, or its subsidiaries
(hereinafter mentioned CONTRACTOR), and the SUBCONTRACTOR with the aim to define the
construction procedures and requirements that the SUBCONTRACTOR shall implement to
complete the whole project according to the design provided by CONTRACTOR.
1.1 DEFINITIONS
Civil Works
N046-YA-SC-A00001-04 SITE CONSTRUCTION AND ERECTION SPECIFICATIONS - CIVIL
WORKS FOR WIND FARM
General
N046-YZ-SW-A00001-02 WORK SCOPE AND SITE OPERATING CONDITIONS
N046-YA-SC-A00003-01- SITE OPERATING CONDITION
MOD-A4DP-E is.4
This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent
NR Identification Code
WORK REQUISITION
CIVIL WORKS FOR CONCRETE
FOUNDATIONS C000-YA-WR-004001
2 WORK REQUISITIONS
1. Preliminary work
2. Excavation
• Excavations for concrete foundations
3. Filling/Embankments/Backfilling
• Structural backfilling
• Backfilling for concrete foundation
4. Reinforced concrete works for foundations, elevated structures and sumps/basins
etc.
• Concrete foundations;
2.3 EXCAVATION
2.3.1 Excavations for concrete foundations
SUBCONTRACTOR shall perform the following activities in accordance with the TECHNICAL
DOCUMENTATIONS:
a) Excavation by mechanical means (or by hand if authorized in writing by
CONTRACTOR) till the required depth for the construction of foundations and
trenches for the installation of sewers and piping;
b) Characterization in accordance with the law requirements, loading and
transportation of the material coming from excavations to an authorized disposal
area, stockpiling of material coming from excavations in a designated area inside
CONTRACTOR’s boundary. Suitable and unsuitable material for backfills shall be
stockpiled separately;
c) Before and during excavations, execution of adequate slopes or temporary
provisions to guarantee the excavation stability also in case of rain and bad
weather conditions. Repair of excavations (if any), due to inadequate temporary
provisions, shall be at SUBCONTRACTOR’s care and cost;
d) Leveling and compaction of bottom of excavation with roller or any other suitable
equipment in accordance with project specification (for the foundation bottom
MOD-A4DP-E is.4
2.4 BACKFILLING
2.4.1 Structural backfilling
Structural backfilling shall be carried out in the following cases:
• Under specific foundations
This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent
NR Identification Code
WORK REQUISITION
CIVIL WORKS FOR CONCRETE
FOUNDATIONS C000-YA-WR-004001
This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent
NR Identification Code
WORK REQUISITION
CIVIL WORKS FOR CONCRETE
FOUNDATIONS C000-YA-WR-004001
The SUBCONTRACTOR has to be well aware of permit procedures, qualifications, check, tests and
certifications necessary to meet Local Authorities requirements for the works and for the
materials of its own supply. Any activity and the assistance to the Official Inspectors charged of
the inspections is included in the scope of work.
MOD-A4DP-E is.4
This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent
NR Identification Code
WORK REQUISITION
CIVIL WORKS FOR CONCRETE
FOUNDATIONS C000-YA-WR-004001
5 PROJECT DOCUMENTS
B) In the case of conflict among Local statutory requirements, specifications, drawings and
standards, the priority of application shall be as follows:
- Local Law and regulations;
- Project Specifications
- Project Drawings
- Client Specifications and Standards
- CONTRACTOR Specifications and Standards
C) The projects drawings & documents valid for the works execution shall be the ones
stamped “Issued for Construction” and stamped, when required, by the Local Authority or
Professional Engineer
D) Project specifications and standards are to be referred for the supply, execution, control
and testing of works & material, always in conjunction with the above mentioned
drawings & documents.
MOD-A4DP-E is.4
This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent
NR Identification Code
WORK REQUISITION
CIVIL WORKS FOR CONCRETE
FOUNDATIONS C000-YA-WR-004001
6.1 By CONTRACTOR
The SUBCONTRACTOR shall unload, store and handle the material provided by the
CONTRACTOR, in accordance with the technical specifications.
The SUBCONTRACTOR shall store the material in laydown areas and shall be responsible of the
care and surveillance of all amterials.
The SUBCONTRACTOR shall handle the material with extreme caution, avoiding any damage and
deformations.
The SUBCONTRACTOR will be economically responsible for any theft and damage suffered by the
material provided on site by the CONTRACTOR.
6.2 By SUBCONTRACTOR
The SUBCONTRACTOR shall supply all materials and equipment including working surplus or
scrap, contingencies, temporary materials and consumables, necessary for the proper execution
of the WORKS, with the exception of materials and equipment provided by CONTRACTOR and
listed in chapter 6.1.
In addition, the SUBCONTRACTOR will supply the following materials:
- Filling material from excavation/shredding and screening plant/quarry, according to
design.
- Formworks, concrete, steel reinforcement bars and everything necessary for a correct
execution of the concrete casting.
- Predisposition for grounding connection of the structures to the PV Plant earthing grid.
This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent
NR Identification Code
WORK REQUISITION
CIVIL WORKS FOR CONCRETE
FOUNDATIONS C000-YA-WR-004001
7.1 By CONTRACTOR
CONTRACTOR will supply the engineering drawings issued for Construction, in a scalar way.
During the progress of the WORKS the SUBCONTRACTOR shall make sure that all documents
used for the construction are consistent with the latest revision of the TECHNICAL
DOCUMENTATION issued by CONTRACTOR. The costs for any modification and/or remaking due
to the non-fulfilment of this obligation shall be borne by the SUBCONTRACTOR.
7.2 By SUBCONTRACTOR
8 OPTIONAL WORKS
Not applicable.
9 EXCLUSIONS
The following activities are not included in the Scope of Work of SUBCONTRACTOR:
• Building permits and authorization for material storage areas within the site.
• Topographical survey.
• Geological and geotechnical survey and engineering tests.
• Detailed design of the entire PV system including the calculation reports of civil works and
the electrical parts of the photovoltaic system.
• Procurement, supply and transportation to site of Materials provided by the CONTRACTOR.
• Cut and removal of plants and heavy vegetation.
MOD-A4DP-E is.4
This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent
NR Identification Code
WORK REQUISITION
CIVIL WORKS FOR CONCRETE
FOUNDATIONS C000-YA-WR-004001
Appendix 1
LIST OF ANNEXED DOCUMENTS, DRAWINGS, SPECIFICATION AND STANDARDS
Table 1 (The documents of CONTRACTOR)
B:BINDING/
ITEM DESCRIPTION ATTACHED
R:EFERENCE
1 N046-YA-SC-A00001-04_Civil Works Specifications X B
PV CHACAICO
This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent