BOQs Alsaleh School
BOQs Alsaleh School
1.1.1 Site planning and levelling with excavation and Backfill : :أﻋﻣﺎل اﻟﺗﺳوﯾﺔ ﻟﻸرﺿﯾﺔ اﻟﻣﺷروع ﻣﻊ اﻟﺣﻔر واﻟردم
The Whole Project site have to be leveled according to the levels on the ground, ﻛﺎﻣل وﻓﻘﺎ ً ﻟﻠﻣﻧﺎﺳﯾب ﻋﻠﻰ اﻟطﺑﯾﻌﺔ وذﻟك ﺑﺈزاﻟﺔ اﻟﻌواﺋﻖ اﻟﺳطﺣﯾﺔ وإزاﻟﺔ اﻟﻧﺑﺎﺗﺎت واﻟطﺑﻘﺎت اﻟﺳطﺣﯾﺔ
through removing the surface obstacles, trees, soil surface layers, cutting of the ﻟﻠﺗرﺑﺔ ﺑﺎﻟﺣﻔر واﻟﻘطﻊ ﻟﻠﻣﻧﺎطﻖ اﻟﺗراﺑﯾﺔ أو اﻟﺻﺧرﯾﺔ اﻟﻣرﺗﻔﻌﺔ واﻟردم ﻟﻠﻣﻧﺎطﻖ اﻟﻣﻧﺧﻔﺿﺔ ﺑﺎﻟﺗرﺑﺔ اﻟزﻟطﯾﺔ
rising parts and backfilling the low parts with Gravel soil or that resulted from وﯾﺟب أن ﻻ ﺗزال اﻷﺷﺟﺎر إﻻ ﺑﻣواﻓﻘﺔ.أو اﻟﻧﺎﺗﺟﺔ ﻣن اﻟﺣﻔر ﻣﻊ ﻣراﻋﺔ اﻟﻣﯾول ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر
excavations. Slopes for rainwater drainage have to be considered. Trees will وﻋﻧد إزاﻟﺔ اﻷﺷﺟﺎر وﻏﯾرھﺎ ﻣن اﻷﺷﯾﺎء اﻟﻧﺎﻣﯾﺔ واﻟﺟذور اﻟﺗﻲ ﯾزﯾد ﻗطر ﺟذوﻋﮭﺎ, اﻟﻣﮭﻧدس اﻟﻣﺷرف
not be removed only with supervisor approval. When removing trees and roots ﻣﻠﯾﻣﺗر ﻋﻠﻰ اﻷﻗل ﺗﺣت ﺳطﺢ اﻷرض500 ﻓﯾﺟب اﺟﺗﺛﺎﺛﮭﺎ ﺣﺗﻰ ﻋﻣﻖ ﯾﺻل إﻟﻲ، ﻣﻠﯾﻣﺗر80 ﻋنLum
with a diameter of more than 80 mm, they should be uprooted to a depth of at وإﻋﺎدة ردم اﻻﻧﺧﻔﺎﺿﺎت اﻟﻧﺎﺟﻣﺔ ﻋن اﺳﺗﺑﻌﺎد ﻛﺗل اﻟﺣﺟﺎرة أو اﻟﻌواﺋﻖ اﻷﺧرى ﺑﺗرﺑﺔ ﻣﻧﺎﺳﺑﺔ ودﻛﮭﺎsum 1.00
least 500 mm below earth surface, Resulted excavations will be backfilled with وﯾﺷﻣل اﻟﺳﻌر إزاﻟﺔ, دون ﺗﻛﺎﻟﯾف إﺿﺎﻓﯾﺔ ورﻓﻊ اﻟﻣﺧﻠﻔﺎت اﻟﻰ اﻟﻣﻘﺎﻟب اﻟﻣﺧﺻﺻﺔ ﻣن اﻟﺳﻠطﺔ اﻟﻣﺣﻠﯾﺔ
Suitable and compacted soil without additional costs and transferring waste to اﻟﻌواﺋﻖ اﻟﺳطﺣﯾﺔ وإزاﻟﺔ اﻟﻧﺑﺎﺗﺎت واﻟطﺑﻘﺎت اﻟﺳطﺣﯾﺔ ﻟﻠﺗرﺑﺔ وأﻋﻣﺎل اﻟدك واﻟرش ﻋﻠﻰ طﺑﻘﺎت ﻟﺗﺣﻘﯾﻖ
the designated landfills of local authority. The item includes the removal of اﻟﻣﻧﺎﺳﯾب اﻟﻣﻼﺋﻣﺔ ﻟﻠوظﺎﺋف اﻟﻣﺣددة ﺑﻣﺧطط اﻟﻣوﻗﻊ اﻟﻌﺎم ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس واﻟرﺳوﻣﺎت
surface barriers, plants, surface layers of soil, compacting in layers and curing .اﻟﻣرﻓﻘﺔ ﻣﻊ ﺗﻌﻠﯾﻣﺎت ﻣﮭﻧدس اﻟﻣوﻗﻊ
with water to reach the appropriate levels of functions defined in the general site
plan according to specifications, drawings attched with the instruction of site
Soil excavation in meter cubic: :ﺣﻔر اﻟﺗرﺑﺔ ﺑﺎﻟﻣﺗر اﻟﻛﻌب
In cubic meters: digging in any type of soil for building foundations and corridors اﻟﺣﻔر ﻓﻲ أي ﻧوع ﻣن اﻧواع اﻟﺗرﺑﺔ ﻟﻸﺳﺎﺳﺎت اﻟﻣﺑﻧﻰ واﻟﻣﻣرات ﺑﻌﻣﻖ ﻻ ﯾﻘل ﻋن: ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
with a depth of not less than 1 meter. Where necessary, even the level suitable وﺣﯾﺛﻣﺎ ﯾﻠزم ﺣﺗﻰ اﻟﻣﻧﺳوب اﻟﺻﺎﻟﺢ ﻟﻠﺗﺄﺳﯾس وﻧزع اﻟﻣﯾﺎه إن وﺟدت ﻣﻊ اﻟﺣﻔﺎظ ﻋﻠﻰ ﺟواﻧب.ﻣﺗر1
for establishment and dewatering, if any, while maintaining the aspects of drilling ﻣﯾﺎه ( ﻣﻊ ﻧﻘل ﺟﻣﯾﻊ اﻟﻣﺧﻠﻔﺎت إﻟﻰ اﻟﻣواﻗﻊ اﻟﻣﻌﺗﻣدة ﻣن اﻟﺳﻠطﺔ- ﺗﻠﻔون- اﻟﺣﻔر واﻟﺗﻣدﯾدات )ﻛﮭرﺑﺎءm3
1.1.2 and extensions (electricity - telephone - water) with the transfer of all waste to وﯾﺗﺣﻣل اﻟﻣﻘﺎول أي. اﻟﻣﺣﻠﯾﺔ واﻟﺣﻔرﯾﺗم طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف3م 42.34
the sites approved by the local authority and drilling in accordance with the .أﺿرار ﻗد ﺗﺣدث ﺑﺎﻟﺧدﻣﺎت أو ﺑﺎﻟﻣﻧﺎزل ﺑﺳﺑب اﻟﺣﻔر وﺟﻣﯾﻊ ﻣﺎﯾﻠزم ﻻﻧﮭﺎء اﻟﺑﻧد
drawings, specifications and instructions of the supervising engineer. The
contractor shall bear any damages that may occur to the services or houses due
to excavation and all that is necessary to terminate the item.
Backfill around foundations, Sidewalk, water tank and areas that need to اﻟردم ﺣول ﻛرﺳﻲ اﻟﺣﺟر واﻟﻌﻧﺎﺻر اﻹﻧﺷﺎﺋﯾﺔ أﺳﻔل ﻣﺳﺗوى ﺳطﺢ اﻷرض ﻟﻠﻣﺑﻧﻰ واﻟﺧزان واﻟﻣﻣرات
be in meter cubic: واﻟﻣﻧﺎطﻖ اﻟﺗﻲ ﺗﺣﺗﺎج ﻟذﻟك ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
Backfill with valid and clean soil mixed with graded fractions stones resulted اﻟردم ﺑﺎﻟﺗرﺑﺔ اﻟﺻﺎﻟﺣﺔ واﻟﻧظﯾﻔﺔ ﻣﺧﻠوطﺔ ﺑﻛﺳر اﻷﺣﺟﺎر اﻟﻣﺗدرﺟﺔ ﺣول ﻛرﺳﻲ اﻟﺣﺟر:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
from site excavations or brought from outside to be filled around the foundations واﻟﻌﻧﺎﺻر اﻹﻧﺷﺎﺋﯾﺔ أﺳﻔل ﻣﺳﺗوى ﺳطﺢ اﻷرض وداﺧل أرﺿﯾﺎت اﻟﻣﺑﻧﻰ ﻛﺎﻣﻠﺔ ﻣن ﻧﺎﺗﺞ اﻟﺣﻔر أو ﻣن
as well as inside the building on layers not more than 30 cm using mechanical ﺳم أوﻻ ً ﺑﺄول ﻣﻊ اﻟدك اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟرش ﺑﺎﻟﻣﺎء ﺣﺗﻰ30 ﺧﺎرج اﻟﻣوﻗﻊ ﻋﻠﻰ طﺑﻘﺎ ًت ﻻ ﺗزﯾد ﻋﻠﻰ
compactor, curing with water to achieve the appropriate strength and get a ﺗﺣﻘﯾﻖ اﻟﻘوة اﻟﻣﻧﺎﺳﺑﺔ و اﻟﺣﺻول ﻋﻠﻰ ﺗرﺑﺔ ﻣﺗﻣﺎﺳﻛﺔ وطﺑﻘﺎ ً ﻟﻠﻣﻧﺎﺳﯾب اﻟﻣﺣددة ﻣﻊ اﺳﺗﺧدام اﻟدك
cohesive soil according to the specified levels. Carry out compacting of narrow ﻣﻊ ﻋدم اﻹﺿرار ﺑﺎﻟﻌﻧﺎﺻر واﻷﻋﻣﺎل اﻟﻣﻧﻔذة ﻓﻲ,ﻟﻸﻣﺎﻛن اﻟﺿﯾﻘﺔ ﺣول اﻷﺳﺎﺳﺎت واﻟﻣﺑﺎﻧﻲ اﻟﺣﺟرﯾﺔ
1.1.3 areas around foundations and external stone walls, causing no damage to the وﻧﻘل اﻟﺗرﺑﺔ اﻟزاﺋدة ﻋن اﻟردم إﻟﻰ ﺧﺎرج اﻟﻣوﻗﻊ ﻟﻠﻣﻘﺎﻟب اﻟﻌﺎﻣﺔ ﻣﻊ ﻋﻣل اﻟطرﻗﺎت واﻟﻣﺳﺎﻟك, اﻟﻣوﻗﻊm3 36.00
works implemented in the site, and transfer of excess dump soil to public dumps اﻵﻣﻧﺔ واﻟﻼزﻣﺔ ﻟﻧﻘل اﻟﻣواد واﻟﻣﻌدات ﻟزوم اﻟﺗﻧﻔﯾذ ﻓﻲ ﻧطﺎق اﻟﻣوﻗﻊ وﺗﻧظﯾف اﻟﻣوﻗﻊ ﻣن اﻟﻣﺧﻠﻔﺎت3م
off site. Safe roads for trolleys to transfer materials and equipment used for اﻟﻧﺎﺗﺟﺔ ﻋن اﻟﺗﻧﻔﯾذ وﺗﺳﻠﯾم اﻟﻣﺷروع وﻣوﻗﻌﮫ ﺧﺎﻟﯾﺎ ً ﻣن أي ﻣؤﺛرات ﻋﻠﻰ ﺳﻼﻣﺗﮫ ﻣﺳﺗﻘﺑﻼ ً ﻣن اﻧﮭﯾﺎرات
implementation within the site to be prepared. Before project handover, site has اﻟﺗرﺑﺔ ﺑﺄﻧواﻋﮭﺎ وﺧﻼﻓﮫ ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن أﻋﻣﺎل اﻟﺗﻧﻔﯾذ ورﻋﺎة اﻟﻣﯾول اﻟﻼزم ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر
to be free of waste resulting from implementation as well as other factors which . واﻟﻌﻣل ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻹﻧﺟﺎز اﻟﺑﻧد وطﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
may effect the project safety in future like landslides of various types and others,
taking in considerations preparation of slopes needed to drain rainwater. The
item includes all the necessary to complete the item in accordance with the
drawings
Remove and and reconstruction
specifications andof instructions
the school of the school
Yard supervisor..
wall for new :ھدم وإﻋﺎدة ﺑﻧﺎء ﺳور اﻟﻣدرﺳﺔ ﻟﻣوﻗﻊ اﻟﻔﺻول ﺑﺎﻟﻣﻘطوﻋﯾﺔ
classes in Lum sum: ھدم ﺳور اﻟﻣدرﺳﺔ ﻓﻲ اﻟﻣوﻗﻊ اﻟﻣﺣدد ﻟﺑﻧﺎء اﻟﻔﺻول اﻟدارﺳﯾﺔ اﻟﺟدﯾدة و اﻟﻌﻣل ﯾﺷﻣل إﻋﺎدة ﺑﻧﺎء اﻟﺳور
Remove the school wall at the site specified for the construction of the new ﻣن أطراف اﻟﻔﺻول اﻟدارﺳﯾﺔ ورﺑطﮫ ﻣﻊ اﻟﺑﻧﺎء اﻟﻣﺳﺗﺣدث ﻋﻠﻰ أن ﺗﻛون اﻟﻣواد اﻟﻣﺳﺗﺧدﻣﺔ ﺑﺣﺳب
classrooms and the work includes rebuilding the fence from the edges of the اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس وﻣﺗﻧﺎﺳﻖ ﻣﻌﻣﺎرﯾﺎ ً ﻣﻊ اﻣﺗداد اﻟﺳور اﻟﻘدﯾم وﺑﻧﻔس طرﯾﻘﺔ اﻟﺑﻧﺎء اﻟﻣﺗﺑﻌﺔ ﻟذﻟك و ﻧﻘل
Lum
1.1.4 classrooms and linking it with the new construction, provided that the materials .اﻟﻣﺧﻠﻔﺎت و ﻛل ﻣﺎ ﯾﻠزم ﻻﻧﮭﺎء اﻟﺑﻧد ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف 1
sum
used are according to specifications and standards and architecturally
consistent with the extension of the old wall and in the same way as the
construction used for that and the transfer of waste and everything necessary to
finish the item according to the instructions of the supervising engineer.
Rehabilitation of Yard school: :إﻋﺎدة ﺗﺄھﯾل ﺳور اﻟﻣدرﺳﺔ
Restoring and rehabilitating the entire school wall. The work includes removing إﻋﺎدة ﺗرﻣﯾم و ﺗﺄھﯾل ﺳور اﻟﻣدرﺳﺔ ﺑﺎﻟﻛﺎﻣل و اﻟﻌﻣل ﯾﺷﻣل إزاﻟﺔ اﻟﺑﻠوك اﻟﺗﺎﻟف وإﻋﺎدة ﺑﻧﺎءه ﻛﺎﻟﺳﺎﺑﻖ و
1.1.5 the damaged block and rebuilding it as before, as well as the areas of damage أﻣﺎﻛن اﻟﺿرر ﻓﻲ اﻟﺳور و اﻟﻛورﻧﯾش و طﻼء اﻟﻛورﻧﯾش و اﻻﻋﻣدة ﺑﺎﻟﻠون اﻟﻣطﻠوب ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت lum. Sum1.00
in the wall and cornice according to the instructions of the supervising engineer. .اﻟﻣﮭﻧدس اﻟﻣﺷرف
Mitigation of environmental impact during the project implementation -: ﺗﺧﻔﯾف اﻷﺛر اﻟﺑﯾﺋﻲ ﺧﻼل ﻓﺗرة ﺗﻧﻔﯾذ اﻟﻣﺷروع
period: ﻋﻠﻰ اﻟﻣﻘﺎول ﺗورﯾد وﺗﻧﻔﯾذ اﻷﻋﻣﺎل اﻟﺿرورﯾﺔ ﺑﺎﻟﻣوﻗﻊ ﻟﺗﺧﻔﯾف اﻷﺛر اﻟﺑﯾﺋﻲ واﻟﻣﺗﻣﺛﻠﺔ:ﺑﺎﻟﻣﻘطوﻋﯾﺔ
The contractor shall supply and carry out the necessary works at the site to -:ﺑﺎﻟﺗﺎﻟﻲ
mitigate environmental impact through implementation the following : . اﻟﺦ ﻟﻣﻧﻊ دﺧول ﻏﯾر اﻟﻌﺎﻣﻠﯾن إﻟﯾﮫ... ﺗﺳوﯾر اﻟﻣوﻗﻊ ﻛﺎﻣﻼ ً ﺑﺎﻟزﻧك أو اﻷﺧﺷﺎب أو-1
1. Site shall be completely fenced with zinc or wood, etc. to prevent entry of non- ﺗورﯾد ﻣﺳﺗﻠزﻣﺎت وأدوات اﻟﺳﻼﻣﺔ اﻟﺷﺧﺻﯾﺔ ﻣن إﺻﺎﺑﺎت اﻟﻌﻣل وﺗﺷﻣل )اﻟﺟزﻣﺎت واﻟﻘﺑﻌﺎت-2
workers. اﻟﺦ( ﺑﺎﻟﻌدد اﻟﻛﺎﻓﻲ ﻟﻠﻌﻣﺎل.. واﻟﻛﻔوف واﻟﻧظﺎرات اﻟواﻗﯾﺔ اﻟﻛﻣﺎﻣﺎت وﺳدادات اﻷذان وأﺣزﻣﺔ اﻷﻣﺎن
2 – Supply of personal safety tools against work injuries (including caps, hats, .اﻟﻌﺎدﯾﯾن واﻟﻣﺎھرة ﻋﻠﻰ ﻧﻔﻘﺔ اﻟﻣﻘﺎول ﺑﺣﺳب ﺣﺟم اﻟﻌﻣﺎﻟﺔ اﻟﺗﻲ ﯾﺗطﻠﺑﮭﺎ اﻟﻣﺷروع وإﻟزاﻣﮭم ﺑﺎﺳﺗﺧداﻣﮭﺎ
gloves, protective glasses, gaskets, earplugs, safety belts, etc.) with adequate اﻟﺦ..ﻣﺗر ﻣؤﻗت ﻣن اﻟزﻧك أو اﻟﺧﺷب أو اﻟﺑﻠك2.5 ﻣﺗر وارﺗﻔﺎع1×1.5 ﺗﺷﯾﯾد ﺣﻣﺎم ﺑﺄﺑﻌﺎد-3
numbers for ordinary and skilled workers at the contractor's expense, depending وﻣرﺣﺎض ﻋرﺑﻲ وﻣﻐﺳﻠﺔ اﻷﯾدي اﻟﻣؤﻗﺗﺔ وﺗوﻓﯾر اﻟﻣﯾﺎه ﻟﮭذا اﻟﺣﻣﺎم وﻋﻣل ﺣﻔرة )ﺑﯾﺎرة ﻣﺻﻐرة أو
on the size of the labor force required for the project. They will be oblige to use ﺗرﻧش (ﻣﻊ اﻟﻐطﺎء وإﻟزام ﺟﻣﯾﻊ اﻟﻌﻣﺎل واﻟﻣﺷرﻓﯾن ﺑﺎﺳﺗﺧداﻣﮫ وﯾﺗم إزاﻟﺔ اﻟﺣﻣﺎم وردم اﻟﺑﯾﺎرة ﯾﻌد
them. . اﺳﺗﻛﻣﺎل ﺗﻧﻔﯾذ اﻟﻣﺷروع
1.1.6 3 - Construction of a 1.5 x 1 x2.5 meter temporary bath of zinc, wood, bricks, etc اﻟﻘﯾﺎم ﺑﺗﺷوﯾن اﻟﻣواد ﺑطرﯾﻘﺔ ﻣﻧﻔﺻﻠﺔ وﺗوﻓﯾر ﻣﺳﺎﺣﺎت ﻛﺎﻓﯾﺔ ﻟﻠﺣرﻛﺔ واﻟﻣﻧﺎورة وﻛذﻟك إزاﻟﺔ-4 Lum 1
an eastern toilet, a temporary wash basin, supply of water for bathroom and .( اﻷﺧﺷﺎب ورﻓﻊ ﻛﺎﻓﺔ اﻟﻣﺧﻠﻔﺎت ﺧﻼل ﻓﺗرة اﻟﺗﻧﻔﯾذ إﻟﻰ ﺧﺎرج ﻣﻧطﻘﺔ اﻟﻌﻣل )اﻟﻣﻘﺎﻟب اﻟﻣﺧﺻﺻﺔsum
implement a covered cesspool . All workers and supervisors are obliged to use اﻻﻟﺗزام ﺑوﺿﻊ اﻟﻣﻌدات اﻟﻣزﻋﺟﺔ ﺑﻌﯾدا ً ﻋن اﻷﻣﺎﻛن اﻟﻣﺄھوﻟﺔ وﺗﺷﻐﯾﻠﮭﺎ ﻓﻲ اﻷوﻗﺎت اﻟﻣﻧﺎﺳﺑﺔ وﻛذﻟك-5
it. At the completion of the project, the bathroom shall be removed and the اﻻﻟﺗزام ﺑﺗﺧزﯾن اﻟﻣواد اﻟﺧطﯾرة ﺑﻌﯾدا ً ﻋن اﻟﻌﺎﻣﻠﯾن واﻟﻌﻣل ﻋﻠﻰ ﻋدم ﺗﻐﯾﯾر اﻟزﯾوت أو ﺗرك ﺑﻘﺎﯾﺎ اﻟﺷﺣوم
cesspool shall be backfilled. .ﻓﻲ ﻣﻧطﻘﺔ اﻟﻌﻣل
4 - Materials to be separately stored and provide sufficient areas for movement ﻣﺟﺎري ( اﻟﺗﻲ ﺗﺗﻌرض ﻟﻠﻛﺳر إﺛﻧﺎء ﺗﻧﻔﯾذ-ﻣﯾﺎه- ﺗﻠﻔون-اﻻﻟﺗزام ﺑﺈﺻﻼح اﻟﺧدﻣﺎت اﻟﻌﺎﻣﺔ )ﻛﮭرﺑﺎء-6
and handling, as well as removal of wood and all waste produced during the . اﻟﻣﺷروع أوﻻ ً ﺑﺄول
implementation period outside the work area ( public dumps). . ﺣﻘﯾﺑﺔ اﺳﻌﺎﻓﺎت أوﻟﯾﺔ ﻟﻠﻌﻣﺎﻟﺔ-7
5 - Terrible equipments will be put away from populated places and to be
operated at the appropriate times as well as the obligation to store dangerous
materials away from workers and no change of oils or leaving the grease
residues in the work area.
6 - Commitment
"Helson's to yard
school reform public services (electricity - telephone - water -
mattress: :ﻓرﺷﺔ ھﻠﺳن ﻟﺣوش اﻟﻣدرﺳﺔ
Supplying and furnishing a graded helsen layer for the courtyard and the inner ﺗورﯾد وﻓرش طﺑﻘﺔ ھﻠﺳن ﻣﺗدرج ﻟﻠﻔﻧﺎء واﻟﺳﺎﺣﺔ اﻟداﺧﻠﯾﺔ واﻟﻣوﺿﺣﺔ ﺑﺎﻟرﺳوﻣﺎت اﻟﻣوﺿﺣﺔ واﻟﻌﻣل
courtyard, as shown in the drawings, and the work includes the following: ـ: ﯾﺷﻣل اﻵﺗﻲ
1.1.7 - Leveling the site with tamping and spraying with water, and making slopes for ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ ﻣﻊ اﻟدك واﻟرش ﺑﺎﻟﻣﯾﺎه وﻋﻣل ﻣﯾول ﻟﻠﺳﺎﺣﺔ ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر ﻗﺑل ﻓرش اﻟﻛري- Lum 1
the yard to drain rainwater before laying the paver, according to the instructions ﺳم ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت5 ﺗورﯾد وﻓرش طﺑﻘﺔ ﻛري ﺑﺳﻣك-. وﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرفsum
of the supervising engineer. - Supplying and spreading a layer of paver with a .اﻟﻣﮭﻧدس اﻟﻣﺷرف
thickness of 5 cm according to the instructions of the supervising engineer.”
Planting works:- In number: The supply and implementation of Plants with 2 -: أﻋﻣﺎل اﻟﺗﺷﺟﯾر
meter length in pavement square that has dimention of ( 2M * 1.3 M). so every ﺳم ﺗﻧﻔﯾذ ﺑﻠوك ﺻم70 ﻣﺗر ﺑﻌﻣﻖ1.3 ﻣﺗر وﻋرض2 ﺗورﯾد وﺗﻧﻔﯾذ اﺣواض أﺷﺟﺎر طول: ﺑﺎﻟﻌدد
two tree in one poll. The price includes planting seedlings, agricultural soil and وﻋﻣل اﻟردﻣﯾﺎت ﻣﻊ أﻋﻣﺎل. ﺳم ﺑﺣﯾث ﯾﺗم ﻏرس ﺷﺟرﺗﯾن ﻓﻲ ﻛل ﺣوض40*20*20 ﺗﻛون ﺑﻣﻘﯾﺎس
all that is needed according to the attached and according to drawings and ( ﻧﯾس إﻟﻰ اﺳﻣﻧت ﺑﺣﯾث ﯾﺗم1:3) اﻟﺧرﺳﺎﻧﺔ ﻻﺻﻘﺔ ﻓﯾﻣﺎ ﺑﯾﻧﮭﺎ ﺑﻣوﻧﺔ ﺧرﺳﺎﻧﯾﺔ ذو ﻧﺳﺑﺔ ﺧﻠط ﺑﻣﻘدار
1.1.8 specifications and the instructions of the supervisor engineershall be in a scale أﯾﺎم ﻣﻊ ﺗﻠﺑﯾس اﻟﺑﻠوك ﻣن اﻟداﺧل واﻟﺧﺎرج إﺿﺎﻓﺔ اﻷﻟوان ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت5 رﺷﮭﺎ ﺑﺎﻟﻣﯾﺎه ﻛل ﯾوم ﺑﻣﻘدارpcs 8.00
of 25 * 10 * 50 cm. And the work of the backfill with concrete works adhesive ﻋدد اﻟﻣﮭﻧدس اﻟﻣﺷرف ﺑﻣﺎ ﯾﺗﻧﺎﺳﻖ ﻣﻊ أﻟوان اﻟﻣدرﺳﺔ وﺷﻌﺎرات اﻟﻣﻧظﻣﺔ واﻟﺛﻣن ﯾﺷﻣل ﻏرس اﻟﺷﺗﻼت
between them with concrete mortar with a mixing ratio of (1:3) fine sand with واﻟﺗرﺑﺔ اﻟزراﻋﯾﺔ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣﺧططﺎت اﻟﻣروﻓﻘﺔ وﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس
cement so that it is sprinkled with water every day by 5 days with the addition of .اﻟﻣﺷرف
colors according to the instructions of the supervising engineer in line with the
colors of the school and the logos of the organization.
Sidewalk around the building: Sidewalk around the building, height shall be at : رﺻﯾف ﺣول اﻟﻣﺑﻧﻰ
least 30 cm and width 0.8 meter to be according to the detailed drawings ﻣﺗر ﺑﺣﺳب اﻟﻣﺧططﺎت0.8 وﻋرض، ﺳم30 رﺻﯾف ﺣول اﻟﻣﺑﻧﻰ ﺑﺎرﺗﻔﺎع ﻻ ﯾﻘل ﻋن:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
attached. Excavation, backfilling, compaction and curing with water to be ﻣﻊ ﻋﻣل،ﺳم10 اﻟﺗﻔﺻﯾﻠﯾﺔ اﻟﻣرﻓﻘﺔ ﻣﻊ اﻟﺣﻔر واﻟردم واﻟدك واﻟرش وطﺑﻘﺔ ﻣن اﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺳﻣك
1.1.9 executed. A layer of plain concrete thickness of 10 cm, casted on a layer of ﻣﻊ ﻋﻣل ﺑﻼط أرﺻﻔﺔ ﻣﻠون ﻣﻊ ﻣراﻋﺎة اﻟﻣﯾول اﻟﻸزم ﻣﻊ, ﺳم10 طﺑﻘﺔ ﻣن اﻟﺻوﻟﻧﺞ ﺗﺣﺗﮭﺎ ﺑﺳﻣكm2 21.50
stone fractions 15 cm thickness. The layer of pavement cement tiles to be ﻣﺑﺎﻧﻲ ﺣﺟر ﻣرﺑوع ﻣﻊ اﻟﺗﻛﺣﯾل واﻟﺗدرﯾز وﯾﺷﻣل ﻣﻊ اﻟﺣﻔر واﻟﺗﺎﺳﯾس، ﻣﺗر4 ﻋﻣل ﻓواﺻل اﻟﺗﻣدد ﻛل2م
installed taking into account slopes , expansion joints and concrete curbstones . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت،
or squared stone as well as excavation and foundation according to the
drawings and specifications, and the instructions of the supervisor.
Moving the school’s main gate: Moving the school’s main gate from its main ﻧﻘل ﺑواﺑﺔ اﻟﻣدرﺳﺔ اﻟرﺋﯾﺳﯾﺔ ﻣن ﻣوﻗﻌﮭﺎ اﻟرﺋﯾﺳﻲ اﻟﻰ ﻣوﻗﻊ ﯾﺣددھﺎ:ﻧﻘل ﺑواﺑﺔ اﻟﻣدرﺳﺔ اﻟرﺋﯾﺳﯾﺔ
location to a location determined by the supervising engineer. The work includes ﻣﮭﻧدس اﻟﻣﺷرف ﯾﺷﻣل اﻟﻌﻣل ﻓﺗﺢ ﻓﻲ اﻟﺳور ﻟﻠﺑواﺑﺔ و ﻋﻣل أﻋﻣدة ﺧرﺳﺎﻧﯾﺔ ﻣﻊ ﺻﯾﺎﻧﺔ وﻣﻔﺎﻗدة اﻟﺑواﺑﺔ
opening the Yard wall for the gate and making concrete columns, along with -: م وذﻟك ﺑﻌﻣل اﻵﺗﻲ2.2 × م2.8 اﻟﺣدﯾد ﻟﻠﻣدرﺳﺔ ﺑﺎﻷﺑﻌﺎد
maintaining and inspecting the school’s iron gate with dimensions of 2.8m x ﻗطﻊ اﻟﺣدﯾد اﻟﺗﺎﻟف واﺳﺗﺑدال اﻟﻘطﻊ اﻟﻣﺧﻠوﻋﺔ ﻣن ﻣراﺑﯾﻊ وﻏﯾرھﺎ ﻓﻲ ﺟﺳم اﻟﺑﺎب وﺳﻣﻛرة اﻷﺟزاء-
2.2m, by doing the following: - . اﻻﺧرى ﺑﺈﺻﻼﺣﮭﺎ أو إﺳﺗﺑداﻟﮭﺎ
- Replacing rusted parts of the gates and others in the door body, and plumbing اﺳﺗﺑدال اﻟﻣﻐﺎﻟﻖ واﻟﻣﻔﺻﻼت اﻟﺗﺎﻟﻔﮫ ﺑﺄﺧري وﻋﻣل ﺛﻼث ﻣﻔﺻﻼت ﻓﻲ ﻛل ﺟﺎﻧب وﻣﺎ ﯾﻠزﻣﮭﻣﺎ وﺗورﯾد-
1.1.10 the other parts by repairing or replacing them. lum. Sum1.00
ﻗﻔﻠﯾن ﻛﺑﯾرﯾن أﺻﻠﻲ
- Replacing damaged shutters and hinges with others, making three hinges on ، ﺿﺑط اﻟوزﻧﯾﺔ وﻏﯾر ذﻟك ﻣن اﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ اﻟﻼزﻣﮫ ﻟﺿﻣﺎن اﻋﺎدة ﺗﺷﻐﯾل اﻟﺑواﺑﺔ ﺑﺎﻟﺷﻛل اﻟﻣطﻠوب-
each side and what is needed, and supplying two large original locks. وﻋﻠﻲ اﻟﻣﻘﺎول زﯾﺎرة اﻟﻣوﻗﻊ ﻗﺑل ﺗﻘدﯾم ﻋرض اﻟﺳﻌر
- Adjusting the weight and other necessary maintenance work to ensure that the ﯾﺷﻣل اﻟﺑﻧد ﻛل ﻣﺎﯾﻠزم ﺑﺣﺳب اﺻول اﻟﻌﻣل اﻟﻣﺗﻌﺎرف ﻋﻠﯾﮭﺎ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
gate is restarted as required. The contractor must visit the site before submitting
the price offer.
The item includes everything necessary according to generally accepted work
Total Amount Of Excavation and Backfilling Works إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟردم و اﻟﺣﻔر
1.2 Concrete Works : اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت
Notes : :ﻣﻠﺣوظﺔ
The prices for reinforced concrete include the following: -:أﺳﻌﺎر اﻟﺧرﺳﺎﻧﺎت ﺗﺷﻣل اﻷﺗﻲ
1- Form works and reinforcement . أﻋﻣﺎل اﻟﺷدات اﻟﺧﺷﺑﯾﺔ واﻟﺣدﯾد-1
2- Mixing the concrete and the watering up to a period of 2 weeks and all related works . اﺳﺑوﻋﯾن وﻛل اﻷﻋﻣﺎل ﺑﺣﺳب اﻟرﺳوﻣﺎت2 أﻋﻣﺎل اﻟﺧﻠطﺔ اﻟﺧرﺳﺎﻧﯾﺔﻣﻊ اﻟرش ﻟﻔﺗرة-2
mentioned in the drawings . ﻋﻣل ﻣﻛﻌﺑﺎت اﺧﺗﺑﺎر واﺧﺗﺑﺎرھﺎ-3
3- Producing sample and their testing. .ﺳم أﺳﻔل اﻟﻣﯾدات اﻟداﺧﻠﯾﺔ واﻟﺧﺎرﺟﯾﺔ15 طﺑﻘﺔ ﻛري ﺳﻣك-4
4- A layer of aggregate of 15cm thickness under the internal and the external TB's. أى طﻠﺑﺎت إﺿﺎﻓﯾﺔ ﯾطﻠﺑﮭﺎ اﻟﻣﮭﻧدس-5
5- Any additional requests by the Engineer . ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول أن ﯾورد اﻟﻣواد اﻟﺗﻲ ﺗﺗطﺎﺑﻖ ﻣﻊ اﻟﻣواﺻﻔﺎت اﻟﺧﺎﺻﺔ واﻟﻌﺎﻣﺔ6
6- The contractor shall only use materials corresponding with the general or special ﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻣﺳﺋوﻟﯾﺔ ﻧﻘل وﺗﺧزﯾن اﻟﻣواد ﺑﺎﻟطرﯾﻘﺔ اﻟﻣﻧﺎﺳﺑﺔ اﻟﺗﻰ ﻵﺗﻌرﺿﮭﺎ ﻟﻠﺗﻠف وﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻘﯾﺎم ﺑﺳرﻋﺔ ﻧﻘل-7
specifications. .اﻟﻣواد اﻟﺗﺎﻟﻔﺔ ﻣن اﻟﻣوﻗﻊ ﻣﺑﺎﺷرة ﺑﻌﺑﺎرة أﺧرى ﻣﻣﻧوع ﻣﻧﻌﺎ ﺑﺎﺗﺎ اﺳﺗﺧدام أي ﻣواد ﺗﺎﻟﻔﺔ
7- The contractor shall deliver the material to the site, store it in a proper way to prevent any ﯾﻠزم إﺳﺗﺧدام اﺳﻣﻧت ﻣﻘﺎوم ﻟﻠﻛﺑرﯾﺗﺎت ﻟﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت اﻟﻌﺎدﯾﺔ واﻟﻣﺳﻠﺣﺔ ﺑﺎﻷﺳﺎﺳﺎت واﻷرﺿﯾﺎت ﻓﻲ اﻟﻣﻧﺎطﻖ-8
damage and remove any surplus from the site after finishing. No spoiled material has to be .اﻟﺳﺎﺣﻠﯾﺔ
used. اﻟﻛري اﻟﻣﺳﺗﺧدم ﻟﻠﺻﺑﯾﺎت اﻟﻣﺳﻠﺣﺔ ﻛري ﻛﺳﺎرة وﯾﺳﺗﺧدم اﻟﮭزاز اﻟﻣﯾﻛﺎﻧﯾﻛﻲ أﺛﻧﺎء اﻟﺻب-9
8- Sulphate resistant cement shall be used for plain and reinforced concrete of the (3:2:1) ﺧرﺳﺎﻧﺔ3 م/ ﻛﺟم أﺳﻣﻧت350 ﻧﯾس و3م0.40 ﻛري و3م0.80 ﺧرﺳﺎﻧﺔ اﻟﺗﺳﻠﯾﺢ ﯾﺟب أن ﺗﺗﻛون ﻣن-10
foundations and floors in the coastal areas. . ﻛري/ ﻧﯾس/ اﺳﻣﻧت
9- Aggregate used for reinforced concrete shall be broken stones. A mechanical device shall ﺧرﺳﺎﻧﺔ3م1 ﻛﺟم أﺳﻣﻧت ﻟﻛل250 ﻧﯾس و3م0.40 ﻛري و3م0.80 اﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﯾﺟب أن ﺗﺗﻛون ﻣن-11
be used during concreting for proper compaction. . ﻛري/ ﻧﯾس/( أﺳﻣﻧت6:3:1)
10- Reinforced concrete shall generally, as long as no other specification is mentioned, . ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ ﻣن أﻋﻠﻰ ﺣدﯾد اﻟﺗﺳﻠﯾﺢ-12
consist of 0,80m3 aggregate, 0,40m3 sand and 350kg cement/m3 of concrete (1:2:3)
11- Plain concrete shall generally, as long as no other specification is mentioned, consist of
0,80m3 aggregate, 0,40m3 sand and 250kg cement/m3 of concrete (1:3:6).
12- The concealled pipes for electricity connection should be installed above the concrete
steel.
1.2.1 Plain concrete for floors 10 cm with stone fractions, Portland Cement: : إﺳﻣﻧت ﺑورﺗﻼﻧدي،ﺳم ﻣﻊ ﺻوﻟﻧﺞ10 ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻟﻸرﺿﯾﺎت
Plain concrete with a minimum thickness of 150 kg / cm 2, to be casted above a 150 وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن، ﺳم إﺳﻣﻧت ﺑورﺗﻼﻧدي10 ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻟﻸرﺿﯾﺎت ﺳﻣك-: ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
m2
stone fractions layer of not less than 10 cm thickness, according to the طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت،ﺳم10 ﻣﻊ وﺿﻊ ﻓرﺷﺔ ﻛﺳر اﺣﺟﺎر )ﺻوﻟﻧﺞ( ﺗﺣﺗﮭﺎ ﺑﺳﻣك ﻻ ﯾﻘل ﻋن،2ﺳم/ﻛﺟم 104.00
2م
drawings, specifications and instructions of the supervising engineer. .واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
1.2.2 Reinforced concrete 250 kg / cm 2, for ground beam: : اﻟﻣﯾد إﺳﻣﻧت ﺑورﺗﻼﻧدي،2ﺳم/ ﻛﺟم250 ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ
Reinforced concrete for cemells (ground beams) using Portland Cement, with ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ اﻟﻣﯾد اﻷرﺿﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
resistance of not less than 250 kg / cm 2. Item includes (shuttering, steel supply ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز، اﻟﺻب، ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد، وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ،2ﺳم/ ﻛﺟم250 ﻋنm3
and cutting, casting, vibrating concrete using a vibration machine and spattering . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت،( وﻛل ﻣﺎ ﯾﻠزم، واﻟرش3م 8.20
of water.( and all necessary) .All works to be done according to drawings,
specifications, and engineer supervisor instructions .
1.2.3 Reinforced concrete for columns and lintels of 250 kg / cm 2 Resistant : إﺳﻣﻧت ﺑورﺗﻼﻧدي2 ﺳم/ﻛﺟم250ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻸﻋﻣدة واﻷﻋﺗﺎب
Portland Cement: ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻸﻋﻣدة واﻷﻋﺗﺎب ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
Reinforced concrete for columns, lintels using Resistant Portland Cement, with ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز، اﻟﺻب، ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد، وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ،2ﺳم/ ﻛﺟم250ﻋن
resistance of not less than 250 kg / cm 2. Item includes wood formwork, steel طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت،( وﻛل ﻣﺎ ﯾﻠزم، واﻟرش ﻣﻊ إﺳﺗﺧدام اﻟﺗﻘﻣﯾص ﺑﺎﻟﺷواﻻت ﻟﻣدة ﻻ ﺗﻘل ﻋن إﺳﺑوعm3
6.20
supply and cutting, casting, vibrating concrete using a vibration machine, Curing . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف، واﻟﻣواﺻﻔﺎت3م
with water in addition to cover columns with sackcloth for not less than a week.(
and all necessary) .All works to be done according to drawings, specifications,
and supervisor instructions.
1.2.4 Reinforced concrete for ceilings and beams, 250 kg / cm 2, Portland : إﺳﻣﻧت ﺑورﺗﻼﻧدي،2ﺳم/ ﻛﺟم250 ،ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور
Cement: ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور واﻟﻣﯾد اﻟﻌﻠوﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
Reinforced concrete for ceilings and beams using Portland Cement:with ھز، اﻟﺻب، ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد، وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ،2ﺳم/ ﻛﺟم250 وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋنm3
resistance of not less than 250 kg / cm 2. Item includes (shuttering, steel supply وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت،( واﻟرش ﺑﺎﻟﻣﺎء وﻛل ﻣﺎ ﯾﻠزم، اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز3م 22.60
and cutting, casting, vibrating concrete using a vibration machine and curing of .اﻟﻣﺷرف
water.( and all necessary) .All works to be done according to drawings,
specifications, and engineer supervisor instructions.
Total Amount of Concrete reinforcement Works. إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ
1.3 Stone and Brick Works: : اﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ
Building works 3م/ﻛﺟم300 أﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ ﺗﻧﻔذ درﺟﺔ أوﻟﻰ ﻣﺗراﺑطﺔ وﺑﺎﺳﺗﺧدام اﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم وﺑﻣﺣﺗوى أﺳﻣﻧت ﻻ ﯾﻘل ﻋن.1
1. Construction works shall be carried out first-class, interconnected, Resistant Portland cement, to be used with a cement
وﯾﺟب ﺗرﻛﯾب وإﺣﻛﺎم اﻟﻠﺣﺎﻣﺎت اﻷﻓﻘﯾﺔ واﻟراﺳﯾﺔ، رﻣل ﺑﺎﻟﺣﺟم ( أو ﺑﺣﺳب ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف3 : أﺳﻣﻧت1 ) أو, رﻣل
content of not less than 300 kg / m3 of sand, or (1 cement: 3 Sand),Horizontal and vertical joints are properly implemented.
Leveling of wall faces and straightening of corners using the thread and balance. The item price include scaffolding, واﻟﻌﻣل ﯾﺷﻣل اﻟﺳﻘﺎﯾل اﻟﻼزﻣﺔ واﻟﺗﻧﻌﯾم واﻟﺟﻠﻲ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم,ﺟﯾدا ً ﻣﻊ اﺳﺗواء اﻷوﺟﮫ واﺳﺗﻘﺎﻣﺔ اﻷرﻛﺎن ﺑﺎﺳﺗﺧدام اﻟﺧﯾط واﻟﻣﯾزان
smoothness, glossiness and all necessary to finish the work. . ﻹﻧﮭﺎء اﻟﻌﻣل
2. The contractor shall submit samples of materials to be used (stones, bricks, sand, etc.) for written approval. اﻟﺦ( ﻟﻠﻣواد اﻟﻣطﻠوﺑﺔ ﻟﺗﻧﻔﯾذ اﻟﻌﻣل ﻓﻲ اﻟﻣﺷروع ﻻﻋﺗﻣﺎدھﺎ وأﺧذ ﻣواﻓﻘﺔ...رﻣل-ﯾﺎﺟور-ﺑﻠك-ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﻘدﯾم ﻋﯾﻧﺎت)اﺣﺟﺎر.2
3. All stones have to be laid on their natural length as to be pressed vertically where they are in the building. spraying with .ﺧطﯾﺔ ﻋﻠﯾﮭﺎ
water twice a day for a week.
4. Stones have to be hard, solid, free of impurities, veins, sand holes, fractions and homogeneous in terms of origin and color
ﺗﺑﻧﻰ ﺟﻣﯾﻊ اﻷﺣﺟﺎر ﻋﻠﻰ ﻣراﻗدھﺎ اﻟطﺑﯾﻌﯾﺔ ﻟﯾﻛون اﻟﺿﻐط ﻋﻣودﯾﺎ ً ﻋﻠﻰ ھذه اﻟﻣراﻗد ﻣﮭﻣﺎ ﻛﺎن ﻣوﻗﻌﮭﺎ ﻓﻲ اﻟﺑﻧﺎء وﺗرش اﻟﻣﺑﺎﻧﻲ.3
(one quarry). .ﺟﯾدا ً ﻣرﺗﯾن ﻓﻲ اﻟﯾوم وﻟﻣدة أﺳﺑوع
5. Construction must be regular in terms of straightening of construction lines, joints and height of courses which shall not ﯾﺟب أن ﺗﻛون اﻷﺣﺟﺎر ﻗوﯾﮫ وﺻﻠﺑﮫ ﺧﺎﻟﯾﺔ ﻣن اﻟﺷواﺋب واﻟﻌروق واﻟﻔﺟوات اﻟرﻣﻠﯾﺔ واﻟﻛﺳور و ﻣﺗﺟﺎﻧﺳﺔ ﻣن ﺣﯾث اﻟﻧوع.4
exceed (20-25-30)cm .Spaces between fronting and lining stones (course stones) are well filled with cement mortar and stone .(واﻟﻠون)ﻣﺣﺟر واﺣد
fractions according to the drawings and specifications and the instructions of the supervisor
(ﺳم ﻟﺳرع30-25-20) ﯾﺟب أن ﯾﻛون اﻟﺑﻧﺎء ﻣﻧﺗظﻣﺎ ً ﻣن ﺣﯾث اﺳﺗﻘﺎﻣﺔ ﺧطوط اﻟﺑﻧﺎء واﻟﻔواﺻل وارﺗﻔﺎﻋﺎت اﻟﺳروع ﻻ ﯾزﯾد ﻋن.5
6. The height of fronting stone construction without lining should not exceed 60 cm.
7. Granite stone constructions should be according to the sizes shown in the drawings. .اﻟواﺣد ﻣﻊ اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﺑﯾن اﻟﻣداﻣﯾك ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ واﻟﺷﻠف اﻟﺻﻐﯾر طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
8. The Engineer shall check and review the construction work properly (ensure that the balance and the thread is used .ﺳم ﺑدون ﺑطﺎﻧﺔ60 ﯾﺟب أن ﻻ ﯾزﯾد ارﺗﻔﺎع اﻟﺑﻧﺎء ﻟﻠواﺟﮭﺎت ﻋن.6
properly, thread is tighten and check the room diameters) . ﯾﺟب أن ﺗﻛون ﻣﺑﺎﻧﻲ اﻟﺣﺟر اﻟﺟراﻧﯾت ﺣﺳب اﻟﻣﻘﺎﺳﺎت اﻟﻣوﺿﺣﺔ ﻓﻲ اﻟرﺳوﻣﺎت.7
9. The water balance and the plumb bob to be used in all courses of the constructions (in all work stages) . ﻋﻠﻰ اﻟﻣﮭﻧدس اﺳﺗﻼم أﻋﻣﺎل اﻟﺑﻧﺎء ﺑﺷﻛل ﺻﺣﯾﺢ واﻟﺗﺄﻛد ﻣن ﻣﯾزان اﻟﺧﯾط وﺷد اﻟﺧﯾط واﻟﺗرﺑﯾﻊ واﺳﺗﻼم أﻗطﺎر اﻟﻐرف واﻟﺗﺄﻛد ﻣن.8
10.Stones specially cut for edges will be used in all openings construction either fronting or lining stone. Edge stone height
(front height) not less than 15 cm minimum.
.ﺻﺣﺔ اﻟﺑﻧﺎء
11. The cladding stones should be applied from top and bottom for consistency, smooth back stones will not be used for . ﯾﺟب اﺳﺗﺧدام ﻣﯾزان اﻟﻣﺎء ﻓﻲ ﻛل ﻣدﻣﺎك ﯾﺑﻧﻰ وﻋﻠﻰ اﻟﺑﻧﺎء اﺳﺗﺧدام اﻟﺑﻠﺑل ﻓﻲ ﻛﺎﻓﺔ ﻣراﺣل اﻟﻌﻣل.9
cladding . .ﺳم15 وﺑﺣﯾث ﻻ ﯾﻘل ﺑﻌد اﻟﺟﺑﮭﺔ اﻟﺻﻐﯾرة ﻟﻠرﻛن ﻋن. ﯾﺟب اﺳﺗﺧدام أﺣﺟﺎر اﻷرﻛﺎن ﻓﻲ ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت ﻓﻲ اﻟﺑطﺎﻧﺔ واﻟظﮭﺎرة.10
12. Concrete beams and columns have to be spattered with cement mortar with mixing ratio of 1: 2 (cement: sand) and . وﯾﻣﻧﻊ اﺳﺗﺧدام اﻷﺣﺟﺎر ذات اﻟظﮭر اﻷﻣﻠس، ﯾراﻋﻰ ﺗﻧﻔﯾذ أﺣﺟﺎر اﻟﺗﻛﺳﯾﺔ ﻣن أﻋﻠﻰ وﻣن أﺳﻔل ﺑﺷﻛل ﻛﺎف ﻣن اﺟل اﻟﺗﻣﺎﺳك.11
curing with water before stone cladding .
. رﻣل(ﻣﻊ اﻟرش ﻗﺑل اﻟﺗﻛﺳﯾﺔ ﺑﺎﻟﺣﺟر:)اﺳﻣﻧت1:2 ﯾﻠزم طرطﺷﺔ اﻟﺟﺳور واﻷﻋﻣدة ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط.12
13 - The lining part shall be constructed of stones. Gaps between fronting and lining stones have to be filled with plain
concrete of mixing (1: cement: 2.5 sand: 5 aggregate) , Aggregate shall be graded. ﯾﺟب أن ﺗﻛون اﻟﻣﺛﺎﻧﻲ)اﻟﺑطﺎﻧﺔ( ﻣن اﻟﺣﺟر وﯾﻌﺑﺄ اﻟﻔراغ اﻟذي ﺑﯾن ﺣﺟر اﻟﺗﻛﺳﯾﺔ )اﻟظﮭﺎرة( واﻟﺑطﺎﻧﺔ ﺑﺎﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺑﻧﺳﺑﺔ-13
14.Automatic concrete blocks will not be used before 28 days of fabrication. After supply to the project site, blocks should be .ﻛري( وﻋﻠﻰ إن ﯾﻛون اﻟﻛري ﻣﺗدرج5: رﻣل2.5:اﺳﻣﻧت:1) ﺧﻠط
cured with water before used for construction. ﯾوم ﻋﻠﻰ ﺗﺻﻧﯾﻌﮫ وﻋﻠﻰ اﻟﻣﻘﺎول ﺗورﯾد اﻟﺑﻠوك ﻟﻠﻣوﻗﻊ28 ﯾﻣﻧﻊ اﺳﺗﺧدام اﻟﺑﻠوك اﻻﺳﻣﻧﺗﻲ اﻟﻣﺻﻧﻊ أوﺗوﻣﺎﺗﯾﻛﯾﺎ ﻗﺑل ﻣرور.14
15. Mixing ratio of the cement mortar used for constructions with hollow cement blocks of 15 cm, 20 cm, 25 cm or more is .وﻣﻌﺎﻟﺟﺗﮫ ﺑﺎﻟﻣﺎء ﻗﺑل اﻟﺑﻧﺎء ﺑﮫ
(350 kg cement per cubic meter of sand.)
16. All the concrete block used is high pressure automatic. ﻛﺟم350ﺳم أو اﻛﺛر ھﻲ25، ﺳم20، ﺳم15 ﻧﺳﺑﺔ اﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ اﻟﻣﺳﺗﺧدﻣﺔ ﻟﻠﻣﺑﺎﻧﻲ ﺑﺎﻟﺑﻠوﻛﺎت ااﻹﺳﻣﻧﺗﯾﺔ اﻟﻣﻔرﻏﺔ ﺳﻣك.15
- Solid block (Bardeen) for bearing walls: breaking resistance not less than 70 kg / cm 2 . أﺳﻣﻧت ﻟﻛل ﻣﺗر ﻣﻛﻌب رﻣل
- Solid block (Bardeen) for non-bearing walls: breaking resistance not less than 35 kg / cm 2 . ﺟﻣﯾﻊ اﻟﺑﻠك اﻟﻣﺳﺗﺧدم اﺗوﻣﺎﺗﯾﻛﻲ ﺿﻐط ﻋﺎﻟﻲ.16
17. All construction works shall be geometrically measured ,All openings and spaces to be deducted. 2 ﺳم/ ﻛﺟم70 ﻻ ﺗﻘل ﻣﻘﺎوﻣﺔ اﻟﻛﺳر ﻟﮫ ﻋن: ﺑﻠك )ﺑردﯾن( ﺻم ﻟﻠﺟدران اﻟﺣﺎﻣﻠﺔ-
2 ﺳم/ ﻛﺟم35 ﻻ ﺗﻘل ﻣﻘﺎوﻣﺔ اﻟﻛﺳر ﻟﮫ ﻋن: ﺑﻠك )ﺑردﯾن(ﺻم ﻟﻠﺟدران ﻏﯾر اﻟﺣﺎﻣﻠﺔ-
. ﺗﻘﺎس ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ ھﻧدﺳﯾﺎ ً وﺗﺧﺻم ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت واﻟﻔراﻏﺎت.17
1.3.1 Black stone construction (basalt or granite): : ﻣﺑﺎﻧﻲ ﺣﺟر ﻣرﺑوع أﺳود )ﺑﺎزﻟت او ﺟراﻧﯾت( ﻣﻧﺷﺎر ﺗﻛﺳﯾﺔ ﺣول اﻟﻣﯾدة
Squared black stone construction 15 cm thickness for the basalt stone base ﺑﻧﺎء ﺣﺟر ﻣرﺑوع ﻟﻠﻛرﺳﻲ اﻟﻣﺑﻧﻰ وﺣﯾث ﻣﺎ ﯾﻠزم اﺣﺟﺎر )ﺑﺎزﻟت او ﺟراﻧﯾت( ﻣﻧﺷﺎر:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
obtained from the project area(basalt or granite) or similar stones. Black stones ﺳم وأن ﺗﻛون اﺣﺟﺎراﻟﺑﻧﺎء ﻣﺳﺑﻠﺔ وﺧﺎﻟﯾﺔ ﻣن15 ﻣﻘﺎوم ﻟﻠﻣﯾﺎة او اﺣﺟﺎر ﺗﻣﺎﺛﻠﺔ ﺳﻣك ﺟدار اﻟﺑﻧﺎء
have to be tailed, free of the veins and gaps, Rows height not more than 30 cm. ﺳم وان ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي ﻣﻘﺎوم30 اﻟﻌروق واﻟﻔﺟوات وارﺗﻔﺎع اﻟﺻف ﻻﯾزﯾد ﻋن
Cement mortar solty soil resistance used to be made of 3: 1 (cement: sand) . رﻣل( ﻣﻊ اﻟﺗدرﯾز واﻟﺗﻛﺣﯾل ﻟﻠﻣﺑﺎﻧﻲ ﻣن ﻣﻧﺳوب اﻻرض واﻟﺗدرﯾز:)اﺳﻣﻧت3:1 ﻟﻸﻣﻼح ﺑﻧﺳﺑﺔ
Starting from the ground level, Wall joints have to be smoothed, recessed واﻟﺗﻠﻌﯾص اﻟﺟﯾد ﻟﻠﻣﺑﺎﻧﻲ ﻣن اﺳﻔل ﻣﻧﺳوب اﻻرض ﻣﻊ اﻟرش واﻟﺗﻌﺑﺋﮫ اﻟﺟﯾده ﺑﯾن اﻟﻔراغ اﻟذي ﺑﯾن ﺣﺟرm3
pointing and then be well cured with water. Fronting and lining stones have to be ﻛري( وﻋﻠﻰ ان5: رﻣل2.5:اﺳﻣﻧت:1) اﻟﺗﻛﺳﯾﺔ )اﻟظﮭﺎرة( واﻟﺑطﺎﻧﺔ ﺑﺎﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط3م 5.00
well interconnected using longitudinal stone connecting the entire thickness of وﯾﺟب اﻟرﺑط ﺑﯾن اﻟظﮭﺎره واﻟﺑطﺎﻧﮫ ﺑﺎﺣﺟﺎر طوﻟﯾﮫ ﻣﺗداﺧﻠﮫ ﻋﻠﻰ ﻛﺎﻣل ﺳﻣك.ﯾﻛون اﻟﻛري ﻣﺗدرج
the wall every 2 linear meter, spaces have to be well filled with concrete of(1: اﻟﺣﺎﺋط ﻛل اﺛﻧﯾن ﻣﺗر طوﻟﻲ ﻓﻲ ﻛل ﺻﻔﺔ ﻣﺑﺎﻧﻲ ﻣﻊ ﻣراﻋﺎة ﺗداﺧل اﻻﺣﺟﺎر ﻋﻧد اﺗﺻﺎل ﺟدارﯾﯾن واﻟﺛﻣن
cement: 2.5 sand: 5 graded aggregate), taking into account the interconnection ﯾﺷﻣل رﻓﻊ اﻟﻛرﺳﻲ ﺣﺗﻰ اﻟﻣﻧﺎﺳﯾب اﻟﺗﺻﻣﯾﻣﯾﺔ طﺑﻘﺎ ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس
of stones when connecting two walls .All stone works have to be well and . اﻟﻣﺷرف
enough spattered with water. Item Price includes building to the design levels
according to the drawings and specifications and instructions of the supervisor.
1.3.2 The buildings of a stone chair under the Ground beam, in cubic meter:- -:ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
In cubic metres: stone chair buildings under the masonry, thickness of 60 cm, ﺳم وﯾﺟب ان ﺗﻛون ﻣن اﻷﺣﺟﺎر اﻟﺻﻠﺑﺔ60 ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺳﻣك: ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
must be made of solid stones free of veins and gaps, and the construction must : )أﺳﻣﻧت1 :3 ﺑﻧﺳﺑﺔ,واﻟﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق واﻟﻔﺟوات و أن ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم
be made with resistant Portland cement, in a ratio of 3:1 (cement: sand), and it رﻣل( وﯾﻛون ﺑﺷﻛل ﻣﻧﺗظم وﻣﺗراﺑط ﻣﻊ اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﻟﻠﻔراﻏﺎت ﻣﻊ اﻟﺗدرﯾز واﻟﺗزﻏﯾن وﻣلء اﻟﻔراﻏﺎت
must be in a regular and cohesive manner, with good filling of the voids with اﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ ﻣﻊ ﻋﻣل ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ7 ﺑﯾن اﻟوﺟﮫ واﻟﺑطﺎﻧﺔ ﺑﺎﻟﻣوﻧﺔ اﻻﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟرش ﻟﻣدةm3
seaming, cementing and filling. The spaces between the face and the lining are ﺳم ﻣن أﺳﻔل اﻟﻠﺣﺟر ﺑﻌد رش اﻷرض ﺑﺎﻟﻣﺎء واﻟﺳﻌر ﯾﺷﻣل ﻛل10 ﻣﻊ أﺣﺟﺎر ﻣﺗوﺳطﺔ اﻟﺣﺟم ﺑﻣﻘدار3م 33.60
filled with cement mortar and sprayed for a period of 7 days. The work is carried .ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
out professionally, with ordinary concrete made with medium-sized stones 10
cm from the bottom of the stone, after spraying the ground with water. The price
includes everything necessary to implement the item, and the work is done
according to the specifications, drawings, and directions of the supervising
1.3.3 Hollow concrete Block constructions 20 cm, Automatic in meter square: : أﺗوﻣﺎﺗﯾﻛﻲ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ، ﺳم20 ﻣﺑﺎﻧﻲ ﺑﻠك ﻣﻔرغ
Hollow concrete Block 20 cm thickness, used for external walls and internal ﻟﻠﻘواطﻊ اﻟداﺧﻠﯾﺔ و اﻟدراوي و، ﺳم20 ﻣﺑﺎﻧﻲ ﺑﻠك )ﺑردﯾن( إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﻣﻔرغ ﺳﻣك:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
partitions and where necessary, using cement mortar: 1: 3 (cement: sieved ، ( رﻣل ﻣﻐرﺑل:)اﺳﻣﻧت3 : 1 وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ, اﻟﻣﻣر اﻻﻣﺎﻣﻲ و اﻟراﻣب وﺣﯾﺛﻣﺎ ﯾﻠزمm2 32.00
sand),and according to drawings and specifications, and instructions of the . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت2م
supervisor
1.3.4 Solid concrete Block constructions 20 cm, Automatic: : أﺗوﻣﺎﺗﯾﻛﻲ، ﺳم20 ﻣﺑﺎﻧﻲ ﺑﻠك ﺻم
Solid concrete Block 20 cm thickness, used for external walls and where وﯾ ُﺑﻧﻰ,ﻟﻠﺟدران اﻟﺧﺎرﺟﯾﺔ وﺣﯾﺛﻣﺎ ﯾﻠزم، ﺳم20 ﻣﺑﺎﻧﻲ ﺑﻠك إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﺻم ﺳﻣك:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
necessary, using cement mortar: 1: 3 (cement: sieved sand),and according to وﺗﻌﻠﯾﻣﺎت، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت، ( رﻣل ﻣﻐرﺑل:)اﺳﻣﻧت3 : 1 ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔm2 105.00
drawings and specifications, and instructions of the supervisor. . اﻟﻣﮭﻧدس اﻟﻣﺷرف2م
Total Amount of Masonary and Block Works إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟﺣﺟر و اﻟﺑﻠوك
1.4 Plastering and Painting Works: : اﻟﺗﻠﺑﯾس واﻟدھﺎن
Notes: -: ﻣﻼﺣظﺎت
1-Plastering using Ordinary Resistant Portland cement to wet. Plastering shall consists of ، ﺗﻠﺑﯾس أﺳﻧﻣﺗﻲ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم ﻟﻸﻣﻼح واﻟرطﺑﺔ ﻣﻛون ﻣن ﺛﻼث طﺑﻘﺎت-1
three layers: - Cement spattering layer 0.5 cm thick for all ceilings and walls with a mortar
( ﻛﯾس1:2:1) ﺳم ﻋﻠﻰ ﺟﻣﯾﻊ اﻷﺳﻘف واﻟﺣواﺋط ﺑﻣوﻧﺔ ﻣﻛوﻧﺔ ﻣن اﻟﺗﺎﻟﻲ0.5 طﺑﻘﺔ طرطﺷﺔ ﺑﺳﻣك
consisting of (1: 2: 1) A Cement bag: 2 trolley of fine aggregate : 1 trolley of sand. It includes
the daily curing with water for five days . و. ﻛﻣﺎ ﯾراﻋﻰ اﻟرش اﻟﻐزﯾز ﺑﺎﻟﻣﺎء ﯾوﻣﯾﺎ ً وﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم. ﻋرﺑﯾﺔ ﻧﯾس: ﻋرﺑﯾﺗﯾن ھﻠﺳن:اﺳﻣﻧت
- Two layers ( base coat and finish coat) with a thickness of 1.5-2cm by 3: 1 (Cement: sand) , ﻧﯾس( وﯾﺷﻣل اﻟطرطﺷﺔ واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ: )أﺳﻣﻧت3:1 ﺳم ﺑﻧﺳﺑﺔ2-1.5 طﺑﻘﺗﻲ ظﮭﺎرة وﺑطﺎﻧﺔ ﺑﺳﻣك
It includes the spatter dash, the base layer and the finish layer, and curing with water three طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس، واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم
times a day, according to the drawings and specifications and instructions of the supervisor. 1- .اﻟﻣﺷرف
All the work of plastering Is a cement roughening for all walls, internal ceilings, external ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺑﯾﺎض ﺗﺧﺷﯾن إﺳﻣﻧﺗﻲ ﻟﺟﻣﯾﻊ اﻟﺟدران واﻟﺣواﺋط واﻷﺳﻘف اﻟداﺧﻠﯾﺔ واﻟﻣظﻼت.2
umbrellas, parapets and staircases of 3: 1 ratio using dots, Bands , leveling spots and
ﻣﻊ اﻟﺑؤج واﻷوﺗﺎر واﻟطوارف واﻟﺧدﻣﺔ ﺑﺎﻟﻣﺣﺎرة ﺑﻌد3:1 اﻟﺧﺎرﺟﯾﺔ واﻟدراوي واﻟﺳﻼﻟم ﺑﻣوﻧﺔ ﺑﻧﺳﺑﺔ
finishing with Plastering trowel after roughing.
2-Roofs and walls must be cleaned of wood , suspended impurities and be cured with water
.اﻟﺗﺧﺷﯾن
before plastering. ﯾﺟب ﺗﻧظﯾف اﻷﺳﻘف واﻟﺟدران ﻣن ﻗطﻊ اﻷﺧﺷﺎب واﻟﺷواﺋب اﻟﻌﺎﻟﻘﺔ ورﺷﮭﺎ ﺑﺎﻟﻣﺎء ﻗﺑل أﻋﻣﺎل.3
3-Contractor shall implement a rough cement spattering layer (450 kg cement / m3 rough .اﻟﺗﻠﺑﯾس
sand or fine aggregate) and curing with water for three days for all internal walls, ceilings, رﻣل ﺧﺷن أو ھﻠﺳن ( ﻣﻊ3م/ﻛﺟم إﺳﻣﻧت450) ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﻧﻔﯾذ طﺑﻘﺔ طرطﺷﺔ إﺳﻣﻧﺗﯾﺔ ﺧﺷﻧﺔ.4
parapets and front walls. .اﻟرش ﻟﻣدة ﺛﻼﺛﺔ أﯾﺎم ﻟﺟﻣﯾﻊ اﻟﺟدران واﻷﺳﻘف اﻟداﺧﻠﯾﺔ واﻟدراوي واﻟواﺟﮭﺎت
4. Steel mesh, width 20 cm and thickness of not less than 1 mm should be used at the
ﻣﻠم ﻋﻧد اﻟﺗﻘﺎء اﻟﺟدران اﻟﺑﻠك ﺑﺎﻟﺟدران1ﺳم وﺳﻣك ﻻ ﯾﻘل ﻋن20 ﯾﺟب ﻋﻣل ﺷﺑك ﺣدﯾد ﻋرض.5
meeting of block walls with stone walls, ceilings, columns and covering all electrical and water
pipes.
. اﻟﺣﺟر وﺑﺎﻷﺳﻘف واﻷﻋﻣدة وﻓوق ﻣواﺳﯾر اﻟﻛﮭرﺑﺎء وﯾﺛﺑت ﺑﺎﻟﻣﺳﺎﻣﯾر ﻣن اﻟﺟﮭﺗﯾن ﻗﺑل ﺗﻧﻔﯾذ اﻟطرطﺷﺔ
5. Bands, rulers, the Aluminum panel and water Balance should be used in the vertically and ﯾﺟب اﺳﺗﺧدام اﻷوﺗﺎر ﻓﻲ ﻋﻣﻠﯾﺔ اﻟوزن رأﺳﯾﺎ ً وأﻓﻘﯾﺎ ً وﻋﻣل ﻣﺳﺎطر وﻧﻘﺎط ﺗﺛﺑﯾت واﺳﺗﺧدام اﻟﻘدة.6
horizontally plastering leveling process and In accordance with established technical .واﻟﻣﯾزان وﻓﻘﺎ ً ﻟﻸﺻول اﻟﻔﻧﯾﺔ اﻟﻣﺗﺑﻌﺔ
principles. .ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﺳﻠﯾم أﻋﻣﺎل اﻟﺑؤج واﻷوﺗﺎر ﻟﻠﻣﮭﻧدس اﻟﻣﺷرف ﻗﺑل اﻟﺑدء ﻓﻲ اﻋﻣﺎل اﻟﺗﺄﺳﯾس.7
6. Dots & Bands works shall be approved by the supervisor engineer before base works ﯾﻌﻣل اﻟﺗﺷطﯾب واﻟﻧﮭو ﻟﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺗﻠﺑﯾس ﺑﺎﻟﺷﻛل اﻟﺻﺣﯾﺢ ﻣﻊ ﺿرورة إﻧﮭﺎء اﻟزواﯾﺎ اﻟداﺧﻠﯾﺔ.8
plastering is started. واﻟﺧﺎرﺟﯾﺔ اﻟﻧﺎﺗﺟﺔ ﻣن ﺗﻘﺎﺑل اﻟﺟدران ﻣﻊ ﺑﻌﺿﮭﺎ أو ﻣﻊ ﻋﻧﺎﺻر اﺧري ﺑﺷﻛل ﺟﯾد واﻻﻋﺗﻧﺎء ﺑﮭﺎ اﻋﺗﻧﺎء
7. All plastering works have to be properly finished, like finishing the internal and external
angles resulting from meeting the walls with each other or with other elements like ceilings
ﺧﺎص ﯾﻧﮭو ﺗﻠك اﻟﺗﻘﺎﺑﻼت ﻣﻊ اﻷﺧذ ﻓﻲ اﻻﻋﺗﺑﺎر إن ﺗﻘﺎﺑل اﻷﺳﻘف ﻣﻊ اﻟﺟدران ﯾﻌﻣل ﺑﺷﻛل
which shall be made a round(a quarter of circle 5 cm radius), Edges of columns and walls are .(ﺳم1 وﻋﻧد اﻟﺣروف ﻟﻸﻋﻣدة واﻟﺟدران ﯾﺗم ﺷطﻔﮭﺎ,ﺳم5ﻣﺳﺗدﯾر)رﺑﻊ داﺋرة ﻧﺻف ﻗطرھﺎ
beveled 1 cm). .(ﻟﺦ...ﺷﺑﺎﺑﯾك- اﻟﻛﻣﯾﺎت اﻟﻣدرﺟﺔ ﺑﺎﻟﺟدول ﻣﺧﺻوﻣﺔ اﻟﻔﺗﺣﺎت)اﺑواب.9
1.4.1 Plastering of ceilings, columns and stairs Portland cement : إﺳﻣﻧت ﺑورﺗﻼﻧدي،ﺗﻠﺑﯾس اﻟﺳﻘوف
Ceilings, columns and bottom surface of stairs to be plastered with Resistant ﺗﻠﺑﯾس اﻟﺳﻘوف واﻷﻋﻣدة وﺑطن اﻟﺳﻼﻟم ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﯾﺷﻣل:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
Portland cement. The item includes: Cement spattering, the base layer and the ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ3 : 1 اﻟطرطﺷﺔ واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ
finish layer are made of cement mortar of 1: 3 ratio .plastering wire mesh will be طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت، واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ، اﻟﯾومm2 130.00
used at meeting points of constructions and concrete. All works will be cured . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف2م
with water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
1.4.2 Internal Wall Plastering, Portland cement: : إﺳﻣﻧت ﺑورﺗﻼﻧدي،ﺗﻠﺑﯾس اﻟﺟدران اﻟداﺧﻠﯾﺔ
Internal Wall plastering to be done using Portland cement, The item includes: ﺗﻠﺑﯾس اﻟﺟدران واﻟﺣواﺋط اﻟداﺧﻠﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﯾﺷﻣل اﻟطرطﺷﺔ:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
Cement Spattering, the base layer and the finish layer are made of cement وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن،3 : 1 واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ
m2
mortar of 1: 3 ratio, plastering wire mesh will be used at meeting points of ، واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ، ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم،اﻟﺗﻠﺑﯾس 220.00
2م
constructions and concrete. .طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
Dots &bands are used for leveling of plastering. Plastering will be cured with
water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
1.4.3 External plastering: External plastering to be done using Portland cement The : إﺳﻣﻧت ﺑورﺗﻼﻧدي،ﺗﻠﺑﯾس ﺧﺎرﺟﻲ
Item includes Cement spattering using cement mortar of 300kg cement/m3 fine وﯾﺷﻣل اﻟطرطﺷﺔ ﺑﻣوﻧﺔ ﻣﻛوﻧﺔ ﻣن، ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي، ﺗﻠﺑﯾس ﺧﺎرﺟﻲ:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
aggregate, base layer and the final layer are made of cement mortar of 1: 3 ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ، ﻛﺟم إﺳﻣﻧت ﻟﻛل ﻣﺗر ﻣﻛﻌب ﻣن اﻟﮭﻠﺳن واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ300 m2
ratio. Dots &bands are used for leveling of plastering.spraying with water three ، ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم ﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم، وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن اﻟﺗﻠﺑﯾس3 : 1 ﺑﻧﺳﺑﺔ2 م227.00
times a day for 5 days. Plastering wire mesh will be used at meeting points of . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت,واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس
constructions and concrete. Plastering works have to be done according to
1.4.4 drawings, specifications and instructions of the supervisor.
Colored cement spattering in square meter: 4 ﺗورﯾد وﺗﻧﻔﯾذ رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ ﻟﻠواﺟﮭﺎت اﻟﺧﺎرﺟﯾﺔ واﻟﻣظﻼت: رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
Supply and implementation of a colored cement workshop for external facades اوﺟﮫ ﺑدون ﻟون و وﺟﮭﯾن ﻣﻊ اﻟﻠون اﻟﻣطﻠوب ﺑﺣﯾث ﯾﺗم ﺗﻌﺑﺋﺔ اﻟﻔراﻏﺎت و2 أوﺟﮫ ﺑﺣﯾث ﯾﻛون
and umbrellas 4 sides so that it is 2 faces without color and two sides with the وﺣﯾﺛﻣﺎ ﯾﻠزم ﺑﺣﺳب, اﻟﺧطوط ﺑﺎﻻﺳﻣﻧت و اﻟﻔواﺻل ﺑﺎﺳﺗﺧدام اداة اﻟرش ﻣﻊ اﻟﻣﺳﺢ و اﻟﺗﻌدﯾل
required color so that the spaces and lines are filled with cement and separators . اﻟﻣﺧططﺎت اﻟﺗﻔﺻﯾﻠﯾﺔ اﻟﻣرﻓﻘﺔ وﻋﻠﻰ ان ﺗﻛون ﻣواد اﻟرﺷﺔ واﻷﻟون ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرفm2 227.00
using the spraying tool with wiping and modification, and where necessary 2م
according to the attached detailed plans and that the spray materials and colors
are according to the instructions of the supervising engineer.
1.4.5 External plastering with painting by dark color : External plastering to be : ﺣول اﻟﺷﺑﺎﺑﯾك ﻣﻊ اﻟدھﺎن ﺑﻠون ﻏﺎﻣﻖ إﺳﻣﻧت ﺑورﺗﻼﻧدي،ﺗﻠﺑﯾس ﺧﺎرﺟﻲ
done using Portland cement with color thikness 4cm. and 12 cm width The Item ﺳم ﺣول اﻟﺷﺑﺎﺑﯾك4 ﻣﻊ اﻟﻠون ﺑﺳﻣﺎﻛﺔ، ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي، ﺗﻠﺑﯾس ﺧﺎرﺟﻲ:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
includes Cement spattering using cement mortar of 300kg cement/m3 fine ﻛﺟم إﺳﻣﻧت ﻟﻛل ﻣﺗر ﻣﻛﻌب ﻣن اﻟﮭﻠﺳن300 وﯾﺷﻣل اﻟطرطﺷﺔ ﺑﻣوﻧﺔ ﻣﻛوﻧﺔ ﻣن. ﺳم12 وﺑﻌرض
aggregate, base layer and the final layer are made of cement mortar of 1: 3 وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن3 : 1 ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ،واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ
ml
ratio. Dots &bands are used for leveling of plastering.spraying with water three طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت, واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس، ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم ﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم،اﻟﺗﻠﺑﯾس 116.70
مط
times a day for 5 days. Plastering wire mesh will be used at meeting points of . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،واﻟﻣواﺻﻔﺎت
constructions and concrete. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
1.5 Painting Works (أﻋﻣﺎل اﻟدھﺎﻧﺎت )اﻟرﻧﺞ
1- Surfaces must be completely dry before painting, moisture less than 15%. ,%15 ( ﯾﺟب أن ﺗﻛون ھذه اﻷﺳطﺢ ﺟﺎﻓﺔ ﺗﻣﺎﻣﺎ ً ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل اﻟدھﺎن و ﻧﺳﺑﺔ اﻟرطوﺑﺔ اﻗل ﻣن1
2- Walls, ceilings and other parts which need to be painted have to be well cleaned and free from (ﯾﺗم ﺗﻧظﯾف اﻟﺣواﺋط واﻷﺳﻘف واﻷﺟزاء اﻟﻣطﻠوب دھﺎﻧﮭﺎ ﺟﯾدا ً ﻣن اﻷﺗرﺑﺔ واﻟﻐﺑﺎر واﻟﺷواﺋب وﻣﺧﻠﻔﺎت اﻟﺑﯾﺎض2
Dust, impurities and wastes using sandstone for rubbing. Ceilings are treated by mechanical rubbing
)ﺛم ﻋﻣﻠﯾﺔ.ﺑواﺳطﺔ اﻟﺣف ﺑﺣﺟر اﻟﻣﺳن وﺗﺗم ﻣﻌﺎﻟﺟﺔ ﺑﻼطﺎت اﻷﺳﻘف ﺑواﺳطﺔ اﻟﺣف اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ
and cement mortar then, sandpaper is used for smoothening.
3- Base layer of primer is used for to all surfaces need to be painted. ( اﻟﺗﻧﻌﯾم ﺟﻣﯾﻊ اﻟﻣﺳﺎﺣﺎت ﺑورق اﻟﺻﻧﻔرة
4- After base layer is dried, putty layer is done to the entire surfaces and left to dry, sanding and . ( ﯾﺗم ﻋﻣل طﺑﻘﺔ اﻷﺳﺎس ﻟﻸﺳطﺢ اﻟﻣراد دھﺎﻧﮭﺎ ﺣﺗﻰ ﺗﺗﺷﺑﻊ3
cleaning by carton paper for the putty layer to be done. Dust on surface resulted from sanding and ( ﺑﻌد ﺟﻔﺎف طﺑﻘﺔ اﻷﺳﺎس ﯾﺗم ﻋﻠم طﺑﻘﺔ اﻟﻣﻌﺟون ﻟﻛﺎﻣل اﻟﺳطﺢ ﺣﺳب ﻧوع اﻟدھﺎن وﺗﺗرك ﻟﺗﺟف ﺛم ﺗﺗم4
softening to be cleaned, then another layer of putty with the same way is done. ﻣﻊ ﻧظﺎﻓﺔ اﻟﻐﺑﺎر ﻣن اﻟﺳطﺢ اﻟﻧﺎﺟم ﻋن أﻋﻣﺎل،اﻟﺻﻧﻔرة اﻟﺗﻧﻌﯾم ﺑواﺳطﺔ اﻟورق اﻟﻛرﺗوﻧﻲ اﻟﻣﺧﺻص ﻟﮭذا اﻟﻐرض
5- Surfaces are painted with white primer paint and left to dry, followed by two faces of the desired .اﻟﺻﻧﻔرة واﻟﺗﻧﻌﯾم وﺗﻌﺎد طﺑﻘﺔ ﺛﺎﻧﯾﺔ ﻣن اﻟﻣﻌﺟون ﺑﻧﻔس اﻟطرﯾﻘﺔ اﻷوﻟﻰ
color paint with sufficient time for each layer to dry. The final coat must be done after all other works ( ﯾﺗم دھﺎن اﻟﺳطﺢ ﺑوﺟﮫ دھﺎن ﺗﺣﺿﯾري أﺑﯾض ﺛم ﯾﺗرك ﻟﯾﺟف ﺗﻣﺎﻣﺎ ً وﯾﻠﯾﮫ وﺟﮭﯾن ﻣن اﻟدھﺎن ﺑﺎﻟﻠون اﻟﻣطﻠوب5
on the surfaces is completed.
6- The paint works shall be carried out according to the instructions of the paint manufacturer, All paint
ﻣﻊ اﻟوﻗت اﻟﻛﺎﻓﻲ ﻟﺟﻔﺎف ﻛل طﺑﻘﺔ ﻋﻠﻣﺎ ً ﺑﺄن اﻟوﺟﮫ اﻷﺧﯾر ﯾﺟب أن ﯾﺗم ﺑﻌد اﻛﺗﻣﺎل ﻛﺎﻓﺔ اﻷﻋﻣﺎل اﻷﺧرى
materials are from the same factory. .ﺑﺎﻷﺳطﺢ اﻟﻣراد دھﻧﮭﺎ
7- Interior paints consist of (6) stages. ( ﯾﺗم ﺗﻧﻔﯾذ أﻋﻣﺎل اﻟدھﺎﻧﺎت ﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﺷرﻛﺔ اﻟﻣﺻﻧﻌﺔ ﻟﻠدھﺎﻧﺎت ﻋﻠﻰ أن ﺗﻛون ﻛﺎﻓﺔ ﻣواد اﻟدھﺎن ﻣن ﻧﻔس6
8- External paints consists of (3) stages. .اﻟﻣﺻﻧﻊ
9- The appropriate putty for oil paints should be used. . ( ﻣراﺣل6 ) ( ﺗﺗﻛون اﻟطﺑﻘﺎت ﻟﻠدھﺎﻧﺎت اﻟداﺧﻠﯾﺔ ﻣن7
10- Moisture-proof plastic paint is used for exterior facades and umbrellas . . ( ﻣراﺣل3 ) ( ﺗﺗﻛون اﻟطﺑﻘﺎت ﻟﻠدھﺎﻧﺎت اﻟﺧﺎرﺟﯾﺔ ﻣن8
11- All samples of required paints must be approved before supply and implementation. Contractor
. ( ﯾﺟب اﺳﺗﻌﻣﺎل اﻟﻣﻌﺟون اﻟﻣﻧﺎﺳب واﻟﺧﺎص ﺑﺎﻟدھﺎﻧﺎت اﻟزﯾﺗﯾﺔ9
shall be responsible of violation.
12- Materials used in paints must be of the highest quality and certified by the Specifications and .(اﻟواﺟﮭﺎت اﻟﺧﺎرﺟﯾﺔ واﻟﻣظﻼت ﻟﻠطرﻗﺎت دھﺎن ﺑﻼﺳﺗﯾك ﻣﻘﺎوم ﻟﻠرطوﺑﺔ10
Metrology Authority. (ﯾﺟب ﺿرورة اﻋﺗﻣﺎد ﺟﻣﯾﻊ ﻋﯾﻧﺎت اﻟدھﺎﻧﺎت اﻟﻣطﻠوﺑﺔ اﻟﻣﺧﺗﻠﻔﺔ ﻗﺑل اﻟﺗورﯾد واﻟﺗﻧﻔﯾذ وﯾﺗﺣﻣل اﻟﻣﻘﺎول11
13- The paint shall be supplied inside its sealed original packaging, indicating the name of the .ﻣﺳؤوﻟﯾﺔ اﻟﻣﺧﺎﻟﻔﺔ
manufacturer, the type of paint, the date of production, the expiry date, the usage manual and the like. .( اﻟﻣواد اﻟﻣﺳﺗﺧدﻣﺔ ﻓﻲ اﻟدھﺎﻧﺎت ﯾﺟب أن ﺗﻛون ﻣن أﺟود اﻻﻧواع وﻣﻌﺗﻣدة ﻣن ھﯾﺋﺔ اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس12
Paints will be stored in a suitable place and in an appropriate manner. (ﯾورد اﻟدھﺎن اﻟﻰ اﻟﻣوﻗﻊ داﺧل ﻋﺑواﺗﮫ اﻷﺻﻠﯾﺔ اﻟﻣﺧﺗوﻣﺔ واﻟﻣﺑﯾن ﻋﻠﯾﮭﺎ اﺳم اﻟﺷرﻛﺔ اﻟﺻﺎﻧﻌﺔ وﻧوع اﻟدھﺎن13
14- The contractor must remove the paint stains first by first before drying and cohesion on ground or
وإرﺷﺎد اﻻﺳﺗﻌﻣﺎل وﻣﺎ ﺷﺎﺑﮭﮭﺎ ﻋﻠﻰ أن ﯾﺟري ﺗﺧزﯾﻧﮭﺎ ﻓﻲ ﻣﻛﺎن،وﺗﺎرﯾﺦ اﻹﻧﺗﺎج وﺗﺎرﯾﺦ اﻧﺗﮭﺎء اﻟﺻﻼﺣﯾﺔ
glass and have to use nylon paper or any similar on floors during the process of painting according to
the instructions of the engineer and after the completion of the paint to clean the stains on tiles and .ﻣﻧﺎﺳب وﺑطرﯾﻘﺔ ﻣﻧﺎﺳﺑﺔ
glass. ( ﻋﻠﻰ اﻟﻣﻘﺎول أن ﯾزﯾل ﺑﻘﻊ اﻟدھﺎن أوﻻ ﺑﺄول ﻗﺑل ﺟﻔﺎﻓﮭﺎ وﺗﻣﺎﺳﻛﮭﺎ ﻋﻠﻰ اﻷرض أو اﻟزﺟﺎج وﻋﻠﯾﮫ أن ﯾﻘوم14
ﺑﻔرش ﻧﺎﯾﻠون اوﺣﻼﻓﮫ ﻋﻠﻰ اﻻرﺿﯾﺎت أﺛﻧﺎء ﻋﻣﻠﯾﺔ اﻟدھﺎن ﺗﺑﻌﺎ ﻟﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس وﺑﻌد اﻧﺟﺎز اﻋﻣﺎل اﻟدھﺎن ﻋﻠﯾﮫ
1.5.1 Emulsion painting for ceilings: : دھﺎن أﻣﻠﺷن ﻟﻠﺳﻘوف
Water emulsion paint for ceilings consists of base layer and three coats of the دھﺎن أﻣﻠﺷن )ﻣﺎﺋﻲ( ﻟﻠﺳﻘوف ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
required color , three layers of putty and sanding to be done before painting and . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت، اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎتm2 130.00
according to the drawings and specifications, and the instructions of the 2م
supervisor.
1.5.2 Oil matte paint: : دھﺎن زﯾﺗﻲ ﻣطﻔﻲ
Oil matte paint for walls consists of a primer coat and three coats of the required دھﺎن زﯾﺗﻲ ﻣطﻔﻲ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻟﻠﺣواﺋط واﻟﺟدران ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
color painted above 3 coats of putty and sanding and according to the drawings وﺗﻌﻠﯾﻣﺎت، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت، أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎتm2 214.20
and specifications, and the instructions of the supervisor . اﻟﻣﮭﻧدس اﻟﻣﺷرف2م
1.6 Flooring & Tiling Works: :اﻋﻣﺎل اﻻرﺿﯾﺎت واﻟﺗﻛﺳﯾﺎت
Notes : : ﻣﻼﺣظﺎت
1.Cement mortar to be used for Installation of tiles with a mixing ratio of 3: 1. Tiles to be laid ﻣﻊ اﻟﻔرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟﻧﯾس ﺗﺣﺗﮫ وﺑﺣﯾث ﺗﻛون3:1 ﯾﺗم ﺗﻧﻔﯾذ اﻟﺑﻼط ﺑﻣوﻧﺔ أﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط.1
on a bedding of fine aggregate or sand . Joins between tiles are straight and regular
.اﻟﻔواﺻل ﻣﺳﺗﻘﯾﻣﺔ وﻣﻧﺗظﻣﺔ
2. Tiles must be automatically fabricated and regularly cut.
3. Mosaic tiles with marble fractions is automatic made, size (25 x 25) cm , Half of the . ﯾﺟب أن ﯾﻛون اﻟﺑﻼط أوﺗوﻣﺎﺗﯾﻛﻲ اﻟﺻﻧﻊ وﺑﻘص ﻣﻧﺗظم.2
thickness of this type made with white cement and is uniformed color. (ﺳم وﯾﻛون ﻧﺻف اﻟﺳﻣﺎﻛﺔ25×25) اﻟﺑﻼط اﻟﻣوزﯾﻛو ﺑﻛﺳر رﺧﺎم أوﺗوﻣﺎﺗﯾﻛﻲ اﻟﺻﻧﻊ ﻣﻘﺎس.3
4. An aluminum panel & water balance is used to ensure that the surface of tiles is leveled . ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض وﻣوﺣد اﻟﻠون
taking into account the slopes needed. اﻟﺗﺄﻛد ﻣن اﺳﺗواء ﺳطﺢ اﻟﺑﻼط أﺛﻧﺎء اﻟﺗﻧﻔﯾذﺑﺎﺳﺗﺧدام اﻟﻘدة وﻣﯾزان اﻟﻣﺎء ﻣﻊ ﻣراﻋﺎة اﻟﻣﯾول.4
5. Joints should be cleaned thoroughly from cement residues and dust, grouted with white ﯾﺟب ﺗﻧظﯾف اﻟﻔواﺻل ﺟﯾدا ً ﻣن ﺑﻘﺎﯾﺎ اﻷﺳﻣﻧت واﻷﺗرﺑﮫ وﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻷﺳﻣﻧت اﻷﺑﯾض واﻟﺟﻠﻰ.5
cement, mechanically glazed and polished, curing with water must be done for at least 4 days
. ً أﯾﺎم ﺻﺑﺎﺣﺎ ً وﻣﺳﺎء4 واﻟﺻﻘل اﻟﻣﯾﻛﺎﻧﯾﻛﻲ ﻣﻊ ﺿرورة اﻟرش ﻟﻸﻋﻣﺎل اﻟﻣﻧﻔذة ﻣدة ﻻ ﺗﻘل ﻋن
(morning & evening).
6. Floor tiling work of bathrooms, kitchens and buffets, to be installed on a damp-proof layer
ﺑﺎﻟﻧﺳﺑﺔ ﻟﺑﻼط ارﺿﯾﺔ اﻟﺣﻣﺎﻣﺎت واﻟﻣطﺎﺑﺦ واﻟﺑوﻓﯾﺎت ﯾﻠزم ﺗورﯾدوﺗﻧﻔﯾذ طﺑﻘﺔ ﻋزل )وﺟﮭﯾن ﻣن- .6
consists of a sackcloth layer between two faces of asphalt. A fine aggregate layer to be made .ً ﺛم ﺗﻧﻔﯾذ ﺑﻧد اﻟﻌﻣل وﻓﻘﺎ ً ﻟﻣﺎ ذﻛر ﻟﺣﻘﺎ, اﻟزﻓﻠت ﺑﯾﻧﮭﻣﺎ طﺑﻘﺔ ﺧﯾش( ﺗﺣت طﺑﻘﺔ اﻟﮭﻠﺳن
above the damp-proof layer. وﻣﻘﺎوﻣﺗﮫ اﻟﺷدﯾدة2 ﺳم/ ﻛﺟم300 : 250 ﺑﻼط اﻹﻧﺗرﻟوك ﯾﺗﺣﻣل اﻟﺿﻐوط واﻷﺣﻣﺎل اﻟﻌﺎﻟﯾﺔ-7
7 - Interlock tiles bear high pressures and loads 250: 300 kg / cm2 and its strong resistance to . ﻣم0.5 ﻟﻠﺗﺂﻛل أﻗل ﻣن
corrosion, less than 0.5 mm. ﺗﻘﺎس ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺑﻼط ھﻧدﺳﯾﺎ ً وﺗﺧﺻم ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت واﻟﻔراﻏﺎت-8
8- All tiling works shall be measured geometrically and all openings and spaces will be
deducted.
1.6.1 Mosaic tiles 25 x 25 cm, with marble fractions, automatic in sqare meter: أﺗوﻣﺎﺗﯾﻛﻲ)ﻟﻠﻔﺻول و اﻟﻣﻣر ﯾﺗﺿﻣن اﻟراﻣب( ﺑﺎﻟﻣﺗر، ﺑﻛﺳر اﻟرﺧﺎم، ﺳم25×25 ﺑﻼط ﻣوزاﯾﻛو
Supply and installation of Mosaic tile 25 x 25 cm, 2.5 cm thickness, mixed with : اﻟﻣرﺑﻊ
marble fractions. Half thickness to be made of white and uniform color. The وﯾﻛون ﻧﺻف اﻟﺳﻣﺎﻛﺔ، ﺑﻛﺳر اﻟرﺧﺎم أﺗوﻣﺎﺗﯾﻛﻲ، ﺳم2.5 وﺳﻣك، ﺳم25×25 ﺑﻼط ﻣوزاﯾﻛو
item includes a bedding of sand or fine aggregate. Mosaic tiles are installed on وﯾوﺿﻊ ﻋﻠﻰ ﻣوﻧﺔ،وﯾﺷﻣل ﻓرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟرﻣل )اﻟﻧﯾس( ﺗﺣﺗﮫ, وﻣوﺣد اﻟﻠون، ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾضm2 108.75
a concrete mortar of 1: 3. , Joints between tiles to be grouted using White واﻟﺟﻠﻲ واﻟﺗﻧﻌﯾم واﻟﺗﻠﻣﯾﻊ اﻟﻣﯾﻛﺎﻧﯾﻛﻲ ﻓﻲ، ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض3 : 1 إﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ2م
cement and tile surface is mechanically polished and smoothed according to . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت.اﻟﻣوﻗﻊ ﺑﻌد اﻟﺗرﻛﯾب
drawings and specifications, instructions of the supervisor engineer.
1.6.2 Skirting Tiles : :أﻋﻣﺎل اﻟوزرات اﻟﺳﯾراﻣﯾك
Supply and apply Ceramic skirts (10cm*40cm*2cm), beveled from one of the (ﺳم ﻣﺷطوﻓﺔ ﻣن اﺣد اﻟﺣروف2*40*10) ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ ﺗورﯾد وﺗرﻛﯾب وزرات ﺳﯾراﻣﯾك ﻣﻘﺎس
edges (industrial rinse) for the classess, and where necessary according to the وذﻟك ﻟﻠﻔﺻول وﺣﯾﺛﻣﺎ ﯾﻠزم ﺑﺣﺳب ﻣﺎ ﺗﺑﯾﻧﮫ اﻟرﺳوﻣﺎت ﻣﻊ إﻋﺗﻣﺎد اﻟﻌﯾﻧﺎت ﻗﺑل اﻟﺗورﯾد،()ﺷطﻔﺔ ﺻﻧﺎﻋﯾﺔ
drawings shown and with the approval of the provided samples before delivery :واﻟﺛﻣن ﯾﺷﻣل
and the price includes: . اﻟﺗﺧﺷﯾن اﻟﻸزم ﺧﻠف اﻟﻧﻌﻼت ﻓﻲ اﻟﺟدران أو اﻟﺧرﺳﺎﻧﺔ واﻟﺗﻧظﯾف-
ml
- Scrapping behind the insoles in walls or concrete and cleaning. .وذﻟك ﻟﺗرﻛﯾب وﻟﺻﻖ اﻟﻧﻌﻼت، (3:1) ﻋﻣل ﻣوﻧﺔ أﺳﻣﻧﺗﯾﺔ ﺑﻧﺳب ﺧﻠط- 77.00
ط.م
- Cement mortar with mixing ratios (1:3), in order to install and paste the insole. .ً اﻟﺗروﯾب ﺑﻣوﻧﺔ اﻷﺳﻣﻧت اﻷﺑﯾض وﺗﻌﺑﺋﺔ اﻟﻔواﺻل ﺟﯾدا-
- Wet with white cement mortar and fill joints well. اﻟرش ﺑﺎﻟﻣﺎء ﻛﻣﺎ ﯾﺷﻣل اﻟﺛﻣن ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺗﻧظﯾف واﻟﺗﺷطﯾب وﺗﺳﻠﯾم اﻟﻌﻣل ﻋﻠﻰ اﻛﻣل وﺟﮫ ﺑﺣﺳب-
- The final treatment of the final surface and heavy spraying with water and the .اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
price includes all the work of cleaning and finishing and delivery of work to the
fullest according to specifications and drawings and the instructions of the
1.6.3 Staircase and ramp of mosaic tiles for entrances (precast). : ﻣﺻﺑوب ﻟﻠﻣداﺧل,درج وﻣﻧﺣدر ﻣوزاﯾﻛواﻟﻠﻣداﺧل
Supply and tiling of staircase and ramp of mosaic tiles for entrance stairs, mixed ﺳم)ﻗﺎﺋم وﻧﺎﺋم ﻋﻠﻰ30ﺳم و15 درج وﻣﻧﺣدر ﻣوزاﯾﻛوا ﻟﻠﻣداﺧل اﻟﻣطﻌم ﺑﻛﺳر اﻟرﺧﺎم:ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ
with marble fractions,15 cm for riser and 30 cm for tread, precast molded. well ، وﯾﺟب اﻟﻌﻧﺎﯾﺔ ﺑﻧﺳب اﻟﺧﻠط،ﻣﺻﺑوب ﻟﻠﻣداﺧل، اﻟﺗواﻟﻲ( وﻣﻧﺣدر ﺧﺎص ﺑذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔml
mixing, curing, glazing and polishing. The item includes excavation, backfill, و ﯾﺷﻣل اﻟﻌﻣل اﻟﺣﻔر و اﻟردم و اﻟﺑﻧﺎء و وﺿﻊ اﻟﺷﻠف و ﺻب اﻟﺧرﺳﺎﻧﺔ و، واﻟﺟﻠﻲ واﻟﺗﻠﻣﯾﻊ،ط واﻟرش.م 10.00
construction, stone fractions layer, concrete casting and mosaic tiling according . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،ﻋﻣل اﻟﻣوزاﯾﻛو طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت
to the drawings. Specifications, and supervisor's instructions
1.7.5 Steel Doors (Provide sample to check): .(. ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ: أﺑواب ﺣدﯾد رص
Galvanized iron doors, shutter is made of steel tubes - rectangular section (1” × 2”) , ھﻧش ( ﺳﻣك2 × ھﻧش1) ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد اﻟﻣراﺑﯾﻊ:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
Thickness 1.3 mm, Steel panels are placed together in excellent technical form . Steel angle واﻟﺣﻠﻖ ﻋرﯾض رص, "ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل2 ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن دﺋري1.3
beam 2” to be welded along the perimeter of the entire door . Door frame (rectangular section ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل2 ﺳم وﺳﻣك20 ﻻﯾﻘل ﻋن
panels )width is not less than 20 cm and thickness 2 mm with three hinges. The item price ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ
m2
Includes the anti-rust paint after sanding and well abrasion, two coats of oil paint for door and وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل 6.60
locks. Frames are installed before plastering, they have to be fixed to walls by three points of .ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف20 ﻣﻠم وطول16 ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر
2م
each side at least using steel dowels 16 mm diameter and 20 cm long, planted in wall and
welded In accordance with the instructions of the supervisor engineer.
2.7 Sanding and re-painting of the protective grille. :ﺻﻧﻔرة و إﻋﺎدة دھﺎن ﺷﺑك ﺣﻣﺎﯾﺔ
Per square meter: - Sanding and repainting the protective nets using abrasives ﺻﻧﻔرة و إﻋﺎدة دھﺎن ﻟﺷﺑﺎك اﻟﺣﻣﺎﯾﺔ ﺑﺎﻟﺟﻠﺦ و اﻟﺑرﺷﺎت و اﻟﻌﻣل ﯾﺷﻣل طﻼء وﺟﮭﯾن-:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
and sprays. The work includes painting two sides with a base primer and three ﺑراﯾﻣر أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﺻﻧﻔرة وﺟﻠﺦ اﻟزواﺋد واﻟﺗﻧﻌﯾم وﻛل ﻣﺎ ﯾﻠزم وﺑﺣﺳبm2 63.00
sides in the required color, sanding, grinding the excess, smoothing, and . ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف2م
everything necessary, according to the directives of the supervising engineer.
2.8 Wooden strips sec.(1”*4”)-Meranti wood : : ﺧﺷب ﻣﯾراﻧﺗﻲ،(ھﻧش4×1) ﺷراﺋر ﺧﺷﺑﯾﺔ ﻗطﺎع
Supply and installation of wooden strips for walls, red meranti wood, width not ﺳم10 ﻋرض ﻻﯾﻘل ﻋن، ﻣﯾراﻧﺗﻲ أﺣﻣر، ﺗورﯾد وﺗرﻛﯾب ﺷراﺋر ﺧﺷﺑﯾﺔ ﻟﻠﺟدران:ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ
less than 10 cm and a thickness of not less than 2.5 cm, finely polished and م0.50 أوﺟﮭﮫ وﺗﺛﺑت ﺑﺎﻟﺑراﻏﻲ ﻛل3 ﺳم ﻣﻧﻌﻣﺔ وﻣﺻﻧﻔرة وﻣدھﻧﺔ ﺑﺎﻟورﻧﯾش2.5 وﺑﺳﻣك ﻻ ﯾﻘل ﻋن
painted 3 facets and fixed with screws every 0.50 m and a depth of not less than ﺳم ﻣن70 ﺳم ﻓﻲ اﻟﺟدران وﺗﻛون ﺧﺎﻟﯾﺔ ﻣن اﻟﻌﯾوب واﻟﺷروخ و ﺗﺛﺑت ﺑﺎرﺗﻔﺎع3 وﺑﻌﻣﻖ ﻻ ﯾﻘل ﻋنml 50.00
3 cm on walls and be free of defects and cracks. They shall be fixed at 70cm وﺷراﺋر ﻋﻠوﯾﺔ ﻟﻠﻣﻌﻣل, وﻋﻧدﻣﺳﺗوى اﻷﻋﺗﺎب ﻟﺟﻣﯾﻊ اﻟﻔﺻول واﻻدارة واﻟﻣﺧزن واﻟﻣﻛﺗﺑﺔ،م ط أﻷرﺿﯾﺎت
from floor level, the other strips are fixed at lintels level of classrooms, . ﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
administration, store, library and laboratory and according to the drawings,
specifications and instructions of supervisor engineer.
2.9 Maintenance and repainting of wooden shutters: :ﺻﯾﺎﻧﺔ و إﻋﺎدة دھﺎن اﻟﺷراﯾر اﻟﺧﺷﺑﯾﺔ
Per linear meter: Maintenance and repainting of wooden wall panels, so that ﺑﺣﯾث ﯾﺗم ﺗﻧﻌﯾﻣﮭﺎ وﺻﻧﻔرﺗﮭﺎ و دھﺎﻧﮭﺎ، ﺻﯾﺎﻧﺔ و اﻋﺎدة دھﺎن ﻟﺷراﺋر ﺧﺷﺑﯾﺔ ﻟﻠﺟدران:ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ
they are smoothed, sanded, and painted with 3-sided varnish. The item includes أوﺟﮭﮫ و اﻟﺑﻧد ﯾﺷﻣل ﺻﯾﺎﻧﺔ اﻟﻣﻧﺎطﻖ اﻟﻣﮭﺗرﺋﺔ و ﺗﻐﯾﯾرھﺎ ﺑﺷراﺋر ﻣﺷﺎﺑﮭﺔ او ﻧوﻋﯾﺔ3 ﺑﺎﻟورﻧﯾش
maintenance of worn out areas and replacing them with similar or red Meranti ﺳم ﻓﻲ اﻟﺟدران وﺗﻛون ﺧﺎﻟﯾﺔ ﻣن3 م وﺑﻌﻣﻖ ﻻ ﯾﻘل ﻋن0.50 ﻣﯾراﻧﺗﻲ أﺣﻣروﺗﺛﺑت ﺑﺎﻟﺑراﻏﻲ ﻛل ml
210.00
type panels, which are fixed with screws every 0.50 m and at a depth of not less اﻟﻌﯾوب واﻟﺷروخ و ﺗﺛﺑت ﺑﺎرﺗﻔﺎع ﻣﻧﺎﺳب ﻣن أﻷرﺿﯾﺔ ﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت مط
than 3 cm in the walls and are free of defects. The cracks are fixed at an . اﻟﻣﮭﻧدس اﻟﻣﺷرف
appropriate height from the floor according to the drawings, specifications, and
instructions of the supervising engineer.
2.10 Maintenance of iron doors: : ﺻﯾﺎﻧﺔ اﻻﺑواب اﻟﺣدﯾدﯾﺔ ﻟﻠﻔﺻول و اﻟﺑواﺑﺔ اﻟرﺋﯾﺳﯾﺔ ﻟﻠﻣدرﺳﺔ
In square meters: Maintaining and inspecting the school’s iron doors according -: ﺻﯾﺎﻧﺔ وﻣﻔﺎﻗدة اﻻﺑواب اﻟﺣدﯾدﯾﺔ ﻟﻠﻣدرﺳﺔ ﺑﺎﻷﺑﻌﺎد ﺑﺣﺳب اﻟﻛﻣﯾﺎت م وذﻟك ﺑﻌﻣل اﻵﺗﻲ: ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
to the dimensions according to the quantities, by doing the following: -
- Cutting the damaged iron, replacing the removed parts of the gates and others ﻗطﻊ اﻟﺣدﯾد اﻟﺗﺎﻟف واﺳﺗﺑدال اﻟﻘطﻊ اﻟﻣﺧﻠوﻋﺔ ﻣن ﻣراﺑﯾﻊ وﻏﯾرھﺎ ﻓﻲ ﺟﺳم اﻟﺑﺎب وﺳﻣﻛرة اﻷﺟزاء-
in the door body, and plumbing the other parts by repairing or replacing them. . . اﻻﺧرى ﺑﺈﺻﻼﺣﮭﺎ أو إﺳﺗﺑداﻟﮭﺎ و طﻼء اﻻﺑواب ﺑﻣﺎدة اﺳﺎس و ووﺟﮭﯾن زﯾﺗﻲ ﺑﻌد اﻟﺟﻠﺦ و اﻟﺳﻧﻔرة
- Replacing damaged bolts and hinges with others, making three hinges on اﺳﺗﺑدال اﻟﻣﻐﺎﻟﻖ واﻟﻣﻔﺻﻼت اﻟﺗﺎﻟﻔﮫ ﺑﺄﺧري وﻋﻣل ﺛﻼث ﻣﻔﺻﻼت ﻓﻲ ﻛل ﺟﺎﻧب وﻣﺎ ﯾﻠزﻣﮭﻣﺎ وﺗورﯾد- m2
25.50
each side and what is needed for them, and supplying an excellent quality lock. .ﻗﻔل ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة 2م
- Adjusting the weight and other necessary maintenance work to ensure that the ، ﺿﺑط اﻟوزﻧﯾﺔ وﻏﯾر ذﻟك ﻣن اﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ اﻟﻼزﻣﮫ ﻟﺿﻣﺎن اﻋﺎدة ﺗﺷﻐﯾل اﻟﺑواﺑﺔ ﺑﺎﻟﺷﻛل اﻟﻣطﻠوب-
gate is restarted as required. The contractor must visit the site before submitting وﻋﻠﻲ اﻟﻣﻘﺎول زﯾﺎرة اﻟﻣوﻗﻊ ﻗﺑل ﺗﻘدﯾم ﻋرض اﻟﺳﻌر
the price offer. .ﯾﺷﻣل اﻟﺑﻧد ﻛل ﻣﺎﯾﻠزم ﺑﺣﺳب اﺻول اﻟﻌﻣل اﻟﻣﺗﻌﺎرف ﻋﻠﯾﮭﺎ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
The item includes everything necessary according to generally accepted work
2.11 principles and the instructions of the supervising engineer
Supply and installation of a single fluorescent lighting unit, 120 cm, 40 : وات40 ﺳم120 ﺗورﯾد وﺗرﻛﯾب وﺣدة اﻧﺎرة ﻓﻠورﺳﻧت ﻣﻔرد
watts: 40 ﺳم120 ﺗورﯾد وﺗرﻛﯾب وﺣدة اﻧﺎرة ﻓﻠورﺳﻧت ﻣﻔرد: ﺑﺎﻟﻌدد
In number: Supply and installation of a single fluorescent lighting unit, 120 cm 40 ( واﻟﺗﻲ ﺗوﺿﻊPVC) وات ﻣﻊ اﻟﻣﻔﺗﺎح وﺗﺷﻣل اﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ pcs
24.00
It comes with the key and includes plastic pipes (PVC) which are placed ﻗﺑل اﻟﺻب واﻟﻌﻠب واﻏطﯾﺗﮭﺎ وﻣﺳﺎﻣﯾر اﻟﻘﻠووظ واﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ ﻋدد
Before molding, cans and their lids are secured with screws and wires .ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
From the point to the distribution board according to the specification and
2.12 standards
Supply and and with the instructions
installation of the
of a regular site engineer.
outdoor lighting unit with a semi-oval : "ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي
cover: ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي وﺗﺷﻣل اﻟﻣﻔﺗﺎح:ﺑﺎﻟﻌدد
In numbers: Supply and installation of a regular external lighting unit with a semi- واﻟﺗﻰ ﺗوﺿﻊ،( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞPVC) واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء
oval cover, including the switch and black plastic pipes (PVC). It is bent - in the ً طﺑﻘﺎ،ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ pcs
12.00
bending areas - using spring, which is placed before pouring. The cans and their . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت ﻋدد
covers are fixed with screws and wires from the point to the distribution panel,
according to the drawings, specifications, and the engineer’s instructions. Admin.
2.13 Ceiling fans: : ﻣراوح ﺳﻘف
In number: Supply and installation of fans fixed to the ceilings, excellent type, ﺗورﯾد وﺗرﻛﯾب ﻣراوح ﺗﺛﺑت ﺑﺎﻟﺳﻘوف ﻧوع ﻣﻣﺗﺎز اﺗوﻣﺎﺗﯾﻛﻲ ﻧظﺎﻣﯾن طﺎﻗﺔ ﺷﻣﺳﯾﺔ وﻛﮭرﺑﺎء ﻣﻊ: ﺑﺎﻟﻌدد
automatic, two systems solar energy and electricity systems, with the switch and اﻟﻣﻔﺗﺎح وﺟﻣٌﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﺗوﺻٌﯾل ﺣﺗﻰ ﻣﺄﺧذ اﻟﻛﮭرﺑﺎء وﺗﺷﻣل اﻟﻣواﺳﯾر واﻟﺑﻼﺳﺗﯾﻛﯾﺔ واﻟﺗﻲ ﺗوﺿﻊ
all supplies, and connection to the electrical outlet, including plastic pipes, which ﻗﺑل اﻟﺻب واﻟﻌﻠب واﻏطٌﯾﺗﮭﺎ وﺗﺛﺑٌﯾﺗﮭﺎ واﻟﻣﺳﺎﻣﯾر اﻟﻘﺎﻟووظ واﻟﺗﺳﻠﯾك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ وﯾﺗمpcs
are placed before pouring, cans and their covers, and fixed with screws and ﻋدد اﻋﺗﻣﺎد اﻟﻌﯾﻧﮫ ﻣن ﻗﺑل ادارة اﻟﻣﺷروع واﻟﺛﻣن ٌﯾﺷﻣل ﻛل ﻣﺎ ٌﯾﻠزم ﻻﻧﮭﺎء اﻟﻌﻣل ﺣﺳب اﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾٌﻣﺎت 12.00
wires from the point to the distribution panel. The sample is approved by the .اﻟﻣﮭﻧدس اﻟﻣﺷرف
project management, and the price includes everything. What is necessary to
complete the work according to the specifications and instructions of the
supervising engineer..
2.14 12 line electrical distribution board: : ﺧط12 ﻟوﺣﺔ ﺗوزﯾﻊ ﻛﮭرﺑﺎﺋﯾﺔ
In number: Sub-distribution panel (single phase) Crabtree or its equivalent with ﺗورﯾد وﺗرﻛﯾب ﻟوﺣﺔ ﺗوزﯾﻊ ﻓرﻋﯾﺔ )طور اﺣﺎدي( ﻛراﺑﺗري أو ﻣﺎ ﯾﻌﺎدﻟﮭﺎ ﺑدوﻻب ﺗرﻛب داﺧل: ﺑﺎﻟﻌددpcs
a cupboard installed inside the wall with 12 lines, according to the drawings, طﺑﻘﺎ ً ﻣﻊ ﻋﻣل اﻟﺗﻣدﯾدات اﻟﻼزﻣﺔ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت، ﺧط12 ﻋدد اﻟﺣﺎﺋط 1.00
specifications, and instructions of the supervising engineer. .وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
2.15 Socket 13 A: : A 13 ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة
Supply and installation of a socket 13A with a switch, It shall be concealed ﯾرﻛب داﺧل اﻟﺣﺎﺋط ﻣﻊ ﺟﻣﯾﻊ،( ﻣﻊ اﻟﻣﻔﺗﺎح )ﺳوﯾﺗشA 13 ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة:ﺑﺎﻟﻌدد
inside the wall with all requirements of black PVC conduits which will be bent in ،( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞPVC) اﻟﻣﺳﺗﻠزﻣﺎت ﻣن ﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾك اﻟﺳوداء
pcs
the bending points using spiral spring, wires and boxes. Screws are used for طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت، واﻟﺗوﺻﯾل ﺣﺗﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ،وأﺳﻼك وﻋﻠب ﻣﻊ اﻟﺗﺛﺑﯾت ﺑﺎﻟﻣﺳﺎﻣﺑر اﻟﻘﻼووظ 9.00
ﻋدد
fixation. Item includes all connection to the distribution board according to . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،واﻟﻣواﺻﻔﺎت
drawings and specifications , And the supervisor's instructions.
The total of rehabilitation work in Al-Saleh School اﻹﺟﻣﺎﻟﻲ ﻻﻋﻣﺎل إﻋﺎدة اﻟﺗﺄھﯾل ﻓﻲ ﻣدرﺳﺔ اﻟﺻﺎﻟﺢ
3 ﺣﻣﺎﻣﺎت3 ﺑﻧﺎء
Building of Three bathroom
3.1 Site Works اﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم
Notes : -:ﻣﻼﺣظﺎت
1. The contractor shall visit the site before elaboration of the tender and study all ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻣﺗﻘدم ﻓﻲ اﻟﻌطﺎء زﯾﺎرة ﻣوﻗﻊ اﻟﻣﻧﺷﺄة ﻗﺑل اﻟﺑدء ﻓﻲ دراﺳﺔ اﻟﻌطﺎء ودراﺳﺔ ﺟﻣﯾﻊ اﻟظروف اﻟﻣﺣﯾطﺔ ﺑﺎﻟﻣﻧﺷﺄة
circumstances that surround the site, especially eventually existing slopes at the site. واﻟﻣؤﺛرة ﻋﻠﻰ اﻷﻋﻣﺎل ﻣﺛل طرﯾﻖ إﯾﺻﺎل اﻟﻣواد اﻟﻼزﻣﺔ ﻟﻺﻧﺷﺎء و دراﺳﺔ طرﯾﻘﺔ ووﺳﯾﻠﺔ ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ اﻟﻌﺎم وﯾﺗﺣﻣل
2. During the excavation and in the case of being unable to reach the depth mentioned in the . اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ
drawings and/or finding the soil bearing capacity (structural drawing) in this depth less than ﻋﻧد اﻟﺣﻔر ﻓﻲ ﺣﺎﻟﺔ ﻋدم اﻟﻘدرة ﻟﻠوﺻول اﻟﻰ اﻟﻌﻣﻖ اﻟﺗﺻﻣﯾﻣﻲ ﺑﺎﻟرﺳوﻣﺎت ﻧﺗﯾﺟﺔ ﻟوﺟود أرض ﺻﺧرﯾﺔ أو ﻛﺎﻧت ﻣﻘﺎوﻣﺔ
the required, the contractor shall contact the project management. اﻟﺗرﺑﺔ أﻗل ﻣن اﻟﻣﻘﺎوﻣﺔ اﻟﺗﺻﻣﯾﻣﯾﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول اﻷﺗﺻﺎل ﺑﺎدارة اﻟﻣﺷروع ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت ﻟﺗﺷﻛﯾل ﻟﺟﻧﺔ
.ﻟﻠدراﺳﺔ وﺗﺣدﯾد اﻟﺣﻠول اﻟﻣﻧﺎﺳﺑﺔ وإﻋﺗﻣﺎدھﺎ ﻣن ادارة اﻟﻣﺷروع وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﻣﺧﺎﻟﻔﮫ
Notes : :ﻣﻠﺣوظﺔ
The prices for reinforced concrete include the following: -:أﺳﻌﺎر اﻟﺧرﺳﺎﻧﺎت ﺗﺷﻣل اﻷﺗﻲ
1- Form works and reinforcement . أﻋﻣﺎل اﻟﺷدات اﻟﺧﺷﺑﯾﺔ واﻟﺣدﯾد-1
2- Mixing the concrete and the watering up to a period of 2 weeks and all related works mentioned in . اﺳﺑوﻋﯾن وﻛل اﻷﻋﻣﺎل ﺑﺣﺳب اﻟرﺳوﻣﺎت2 أﻋﻣﺎل اﻟﺧﻠطﺔ اﻟﺧرﺳﺎﻧﯾﺔﻣﻊ اﻟرش ﻟﻔﺗرة-2
the drawings . ﻋﻣل ﻣﻛﻌﺑﺎت اﺧﺗﺑﺎر واﺧﺗﺑﺎرھﺎ-3
3- Producing sample and their testing. .ﺳم أﺳﻔل اﻟﻣﯾدات اﻟداﺧﻠﯾﺔ واﻟﺧﺎرﺟﯾﺔ15 طﺑﻘﺔ ﻛري ﺳﻣك-4
4- A layer of aggregate of 15cm thickness under the internal and the external TB's. أى طﻠﺑﺎت إﺿﺎﻓﯾﺔ ﯾطﻠﺑﮭﺎ اﻟﻣﮭﻧدس-5
5- Any additional requests by the Engineer . ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول أن ﯾورد اﻟﻣواد اﻟﺗﻲ ﺗﺗطﺎﺑﻖ ﻣﻊ اﻟﻣواﺻﻔﺎت اﻟﺧﺎﺻﺔ واﻟﻌﺎﻣﺔ6
6- The contractor shall only use materials corresponding with the general or special specifications. ﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻣﺳﺋوﻟﯾﺔ ﻧﻘل وﺗﺧزﯾن اﻟﻣواد ﺑﺎﻟطرﯾﻘﺔ اﻟﻣﻧﺎﺳﺑﺔ اﻟﺗﻰ ﻵﺗﻌرﺿﮭﺎ ﻟﻠﺗﻠف وﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻘﯾﺎم ﺑﺳرﻋﺔ ﻧﻘل اﻟﻣواد-7
7- The contractor shall deliver the material to the site, store it in a proper way to prevent any damage .اﻟﺗﺎﻟﻔﺔ ﻣن اﻟﻣوﻗﻊ ﻣﺑﺎﺷرة ﺑﻌﺑﺎرة أﺧرى ﻣﻣﻧوع ﻣﻧﻌﺎ ﺑﺎﺗﺎ اﺳﺗﺧدام أي ﻣواد ﺗﺎﻟﻔﺔ
and remove any surplus from the site after finishing. No spoiled material has to be used. . ﯾﻠزم إﺳﺗﺧدام اﺳﻣﻧت ﻣﻘﺎوم ﻟﻠﻛﺑرﯾﺗﺎت ﻟﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت اﻟﻌﺎدﯾﺔ واﻟﻣﺳﻠﺣﺔ ﺑﺎﻷﺳﺎﺳﺎت واﻷرﺿﯾﺎت ﻓﻲ اﻟﻣﻧﺎطﻖ اﻟﺳﺎﺣﻠﯾﺔ-8
8- Sulphate resistant cement shall be used for plain and reinforced concrete of the foundations and اﻟﻛري اﻟﻣﺳﺗﺧدم ﻟﻠﺻﺑﯾﺎت اﻟﻣﺳﻠﺣﺔ ﻛري ﻛﺳﺎرة وﯾﺳﺗﺧدم اﻟﮭزاز اﻟﻣﯾﻛﺎﻧﯾﻛﻲ أﺛﻧﺎء اﻟﺻب-9
floors in the coastal areas. / ( اﺳﻣﻧت3:2:1) ﺧرﺳﺎﻧﺔ3 م/ ﻛﺟم أﺳﻣﻧت350 ﻧﯾس و3م0.40 ﻛري و3م0.80 ﺧرﺳﺎﻧﺔ اﻟﺗﺳﻠﯾﺢ ﯾﺟب أن ﺗﺗﻛون ﻣن-10
9- Aggregate used for reinforced concrete shall be broken stones. A mechanical device shall be used . ﻛري/ ﻧﯾس
during concreting for proper compaction. (6:3:1) ﺧرﺳﺎﻧﺔ3م1 ﻛﺟم أﺳﻣﻧت ﻟﻛل250 ﻧﯾس و3م0.40 ﻛري و3م0.80 اﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﯾﺟب أن ﺗﺗﻛون ﻣن-11
10- Reinforced concrete shall generally, as long as no other specification is mentioned, consist of . ﻛري/ ﻧﯾس/أﺳﻣﻧت
0,80m3 aggregate, 0,40m3 sand and 350kg cement/m3 of concrete (1:2:3) . ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ ﻣن أﻋﻠﻰ ﺣدﯾد اﻟﺗﺳﻠﯾﺢ-12
11- Plain concrete shall generally, as long as no other specification is mentioned, consist of 0,80m3 . ﺳم5 ﺳم واﻟﻘواﻋد2.5 ﯾﺟب ﻣراﻋﺎة رﻓﻊ اﻟﺣدﯾد ﻋن اﻟﺧﺷب ﻟﻠﻣﺣﺎﻓظﺔ ﻋﻠﻰ ﻣﺳﺎﻓﺔ اﻟﺗﻐطﯾﺔ ﻓﻰ اﻟﺟﺳور واﻟﺑﻼط-13
aggregate, 0,40m3 sand and 250kg cement/m3 of concrete (1:3:6).
12- The concealled pipes for electricity connection should be installed above the concrete steel.
3.2.1 Reinforced concrete 250 kg / cm 2, for cemells (ground beams): : إﺳﻣﻧت ﺑورﺗﻼﻧدي،ﻟﻠﻣﯾد اﻷرﺿﯾﺔ،2ﺳم/ ﻛﺟم250 ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ
Reinforced concrete for footings, foundations, column necks and cemells ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ اﻟﻣﯾد اﻷرﺿﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
(ground beams) using Portland Cement, with resistance of not less than 250 kg ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز، اﻟﺻب، ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد، وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ،2ﺳم/ ﻛﺟم250ﻋن m3
/ cm 2. Item includes (shuttering, steel supply and cutting, casting, vibrating . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت،( وﻛل ﻣﺎ ﯾﻠزم،واﻟرش 2.12
3م
concrete using a vibration machine and spattering of water.( and all necessary)
.All works to be done according to drawings, specifications, and engineer
supervisor instructions .
3.2.2 Reinforced concrete for ceilings and beams, 250 kg / cm 2, Portland : إﺳﻣﻧت ﺑورﺗﻼﻧدي،2ﺳم/ ﻛﺟم250 ،ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور
Cement: ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور واﻟﻣﯾد اﻟﻌﻠوﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
Reinforced concrete for ceilings and beams using Portland Cement:with ھز، اﻟﺻب، ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد، وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ،2ﺳم/ ﻛﺟم250 وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن
m3
resistance of not less than 250 kg / cm 2. Item includes (shuttering, steel supply وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت،( واﻟرش ﺑﺎﻟﻣﺎء وﻛل ﻣﺎ ﯾﻠزم،اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز 4.38
3م
and cutting, casting, vibrating concrete using a vibration machine and curing of .اﻟﻣﺷرف
water.( and all necessary) .All works to be done according to drawings,
specifications, and engineer supervisor instructions.
3.2.3 Light reinforcement concrete for Bathrooms, Portland cement: : إﺳﻣﻧت ﺑورﺗﻼﻧدي،ﺧرﺳﺎﻧﺔ ﺧﻔﯾﻔﺔ اﻟﺗﺳﻠﯾﺢ ﻟزوم اﻟﺣﻣﺎﻣﺎت
Light reinforcement concrete with Portland cement, with not less than 200 ،2ﺳم/ ﻛﺟم200 ﺧرﺳﺎﻧﺔ ﺧﻔﯾﻔﺔ اﻟﺗﺳﻠﯾﺢ إﺳﻣﻧت ﺑورﺗﻼﻧدي ﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
kg/cm2 resistance, using Portland cement, Number of steel bars used not less ) م ﻓﻲ اﻹﺗﺟﺎھﯾن/12 ق5 ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑروﺗﻼﻧدي اﻟﻣﻘﺎوم ﻋﻠﻰ أﻻ ّ ﯾﻘل ﻋدد اﻷﺳﯾﺎخ ﻋن
than (5 bars12mm Dia/m) in both directions (top and bottom). Mechanical ﺗورﯾد، وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ، ﺳم20 ﻓرش وﻏطﺎء( ﻣﻊ وﺿﻊ ﻓرﺷﺔ ﻛﺳر أﺣﺟﺎر )ﺻوﻟﻧﺞ( ﺗﺣﺗﮭﺎ ﺳﻣك m3
Casting shall be used on a rock fractions layer of 20 cm thickness, Item طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت اﻟﺗﻔﺻﯾﻠﯾﺔ،( وﻛل ﻣﺎ ﯾﻠزم، اﻟرش، ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز، اﻟﺻب،وﻗص ووﺿﻊ اﻟﺣدﯾد 1.21
3م
includes (shuttering, steel supply and cutting, casting, vibrating concrete using a . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،اﻟﻣرﻓﻘﺔ
vibration machine and spraying of water.( and all necessary) .All works to be
done according to drawings, specifications, and engineer supervisor instructions.
Total Amount of concrete work إﺟﻣﺎﻟﻲ اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ
3.3 Stone and Brick Works اﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ
Notes : :اﻟﻣﻼﺣظﺎت
1- All stones and bricks shall be of the same type and thickness as mentioned in the drawings. . ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺣﺟر واﻟﻣﺑﺎﻧﻲ ﺑﻧﻔس اﻟﻧوﻋﯾﺔ واﻟﺳﻣك اﻟﻣوﺿﺢ ﺑﺎﻟرﺳوﻣﺎت-1
2- Sample for all types of stones and blocks shall be approved before using, the contractor ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول ﺗورﯾد ﻋﯾﻧﺔ ﻣن اﻷﺣﺟﺎر واﻟﺑﻠك اﻟﻰ ادارة اﻟﻣﺷروع ﻻﻋﺗﻣﺎدھﺎ ﻗﺑل اﻟﺑدء ﺑﺎﻟﺗﻧﻔﯾذ-2
shall get a written acceptance from the project management before using. . ﻟﻛل ﻣﺗر ﻣﻛﻌب ﻛﺣد أدﻧﻰ3:1 ﯾﺟب أن ﺗﺣﺗوي اﻟﻣوﻧﺔ اﻷﺳﻣﻧﺗﯾﺔ ﻋﻠﻰ ﻧﺳﺑﺔ-3
3- The mortar shall contain min. 1:3 /m3 . اﻟﻛﻣﯾﺎت اﻟﻣوﺟودة ﺑﺎﻟﺟدول )ﺻﺎﻓﯾﺔ( ﻣﺧﺻوم ﻓﯾﮭﺎ اﻟﻔﺗﺣﺎت اﻷﺑواب-4
4- The quantities mentioned in the BoQ are net measurements. . ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول أن ﯾورد ﻛل اﻟﻣواد اﻟﻣطﻠوﺑﺔ ﻟﻸﻋﻣﺎل وأن ﯾﻣﺗﺛل ﻟﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس-5
5- The Contractor shall supply all required materials for the works and comply with Engineers ﻣم ﻓﻰ اﻟواﺟﮭﺎت وأن ﺗﻛون اﻟﻣﯾﺎﺳم ﻣﻧﺗظﻣﺔ6 ﻣم ﻓﻰ اﻟﻛراﺳﻲ و8 ﯾﺟب ﺗوﺣﯾد اﻟﻣﯾﺎﺳم وﻻ ﯾزﯾد ﻋرض اﻟﻣﯾﺳم ﻋن-6
instructions. .رأﺳﯾﺎ وأﻓﻘﯾﺎ
6- All joints must be of the same size max. 8mm for footings and 6mm for facades. . ﻋﻣل اﻟرﺑط اﻟﻼزم ﺑﯾن اﻷﺣﺟﺎر ﻓﻰ اﻟﺑطﺎﻧﺔ واﻟظﮭﺎرة وﺗﻛون اﺣﺟﺎر اﻟﺑطﺎﻧﺔ ﻣﺳﺎوﯾﺔ ﻻﺣﺟﺎر اﻟظﮭﺎرة ﻓﻰ اﻟﺣﺟم-7
7- All stones must be of the same size and ligated well. . ﯾﺟب أن ﯾﻛون طول اﻟﺣﺟر أﻛﺑر او ﻣﺳﺎوى ﻻرﺗﻔﺎﻋﮫ-8
8- The stone length shuold be more or the same as its height. . اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﻟﻠﻣداﻣﯾك ﺑﺎﻟﻣوﻧﺔ-9
9- Adequate gap filling with mortar. ﯾﺗم اﺳﺗﺧدام اﻻﺳﻣﻧت اﻟﻣﻘﺎوم ﻟﺟﻣﯾﻊ اﻋﻣﺎل اﻟﻣﺑﺎﻧﻰ ﺗﺣت ﻣﻧﺳوب رﺿﯾﺎت اﻟدور اﻻرﺿﻰ ﻓﻰ اﻟﻣﻧﺎطﻖ اﻟﺳﺎﺣﻠﯾﺔ-10
10- Sulphate resistant cement shall be used for All stones underground works in the coastal .واﻟرطﺑﺔ
areas.
3.3.1 The buildings of a stone chair under the Ground beam, in cubic meter:- -:ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
In cubic metres: stone chair buildings under the masonry, thickness of 60 cm, must be made ﺳم وﯾﺟب ان ﺗﻛون ﻣن اﻷﺣﺟﺎر اﻟﺻﻠﺑﺔ واﻟﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق60 ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺳﻣك: ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
of solid stones free of veins and gaps, and the construction must be made with resistant رﻣل( وﯾﻛون ﺑﺷﻛل ﻣﻧﺗظم وﻣﺗراﺑط ﻣﻊ: )أﺳﻣﻧت1 :3 ﺑﻧﺳﺑﺔ,واﻟﻔﺟوات و أن ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم
Portland cement, in a ratio of 3:1 (cement: sand), and it must be in a regular and cohesive اﯾﺎم7 اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﻟﻠﻔراﻏﺎت ﻣﻊ اﻟﺗدرﯾز واﻟﺗزﻏﯾن وﻣلء اﻟﻔراﻏﺎت ﺑﯾن اﻟوﺟﮫ واﻟﺑطﺎﻧﺔ ﺑﺎﻟﻣوﻧﺔ اﻻﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟرش ﻟﻣدة
manner, with good filling of the voids with seaming, cementing and filling. The spaces ﺳم ﻣن أﺳﻔل اﻟﻠﺣﺟر ﺑﻌد رش اﻷرض10 وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ ﻣﻊ ﻋﻣل ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻣﻊ أﺣﺟﺎر ﻣﺗوﺳطﺔ اﻟﺣﺟم ﺑﻣﻘدار
between the face and the lining are filled with cement mortar and sprayed for a period of 7 . ﺑﺎﻟﻣﺎء واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرفm3
8.82
days. The work is carried out professionally, with ordinary concrete made with medium-sized 3م
stones 10 cm from the bottom of the stone, after spraying the ground with water. The price
includes everything necessary to implement the item, and the work is done according to the
specifications, drawings, and directions of the supervising engineer.
3.3.2 Black stone construction (basalt or granite) in meter cubic: :ﻣﺑﺎﻧﻲ ﺣﺟر ﻣﻧﺷﺎر أﺳود )ﺑﺎزﻟت او ﺟراﻧﯾت( ﻣﻧﺷﺎر ﺗﻛﺳﯾﺔ ﺣول اﻟﻣﯾدة ﺑﺎﻟﻣﺗر اﻟﻛﻌب
Squared black stone construction 15 cm thickness for the basalt stone base obtained from ﺑﻧﺎء ﺣﺟر ﻣﻧﺷﺎر ﻟﻠﻛرﺳﻲ اﻟﻣﺑﻧﻰ وﺣﯾث ﻣﺎ ﯾﻠزم اﺣﺟﺎر )ﺑﺎزﻟت او ﺟراﻧﯾت( ﻣﻧﺷﺎر ﻣﻘﺎوم ﻟﻠﻣﯾﺎة او:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
the project area(basalt or granite) or similar stones. Black stones have to be tailed, free of the ﺳم وأن ﺗﻛون اﺣﺟﺎراﻟﺑﻧﺎء ﻣﺳﺑﻠﺔ وﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق واﻟﻔﺟوات وارﺗﻔﺎع اﻟﺻف15 اﺣﺟﺎر ﺗﻣﺎﺛﻠﺔ ﺳﻣك ﺟدار اﻟﺑﻧﺎء
veins and gaps, Rows height not more than 30 cm. Cement mortar solty soil resistance used رﻣل( ﻣﻊ اﻟﺗدرﯾز واﻟﺗﻛﺣﯾل:)اﺳﻣﻧت3:1 ﺳم وان ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي ﻣﻘﺎوم ﻟﻸﻣﻼح ﺑﻧﺳﺑﺔ30 ﻻﯾزﯾد ﻋن
to be made of 3: 1 (cement: sand) . Starting from the ground level, Wall joints have to be ﻟﻠﻣﺑﺎﻧﻲ ﻣن ﻣﻧﺳوب اﻻرض واﻟﺗدرﯾز واﻟﺗﻠﻌﯾص اﻟﺟﯾد ﻟﻠﻣﺑﺎﻧﻲ ﻣن اﺳﻔل ﻣﻧﺳوب اﻻرض ﻣﻊ اﻟرش واﻟﺗﻌﺑﺋﮫ اﻟﺟﯾده ﺑﯾن
smoothed, recessed pointing and then be well cured with water. Fronting and lining stones ﻛري( وﻋﻠﻰ ان5: رﻣل2.5:اﺳﻣﻧت:1) اﻟﻔراغ اﻟذي ﺑﯾن ﺣﺟر اﻟﺗﻛﺳﯾﺔ )اﻟظﮭﺎرة( واﻟﺑطﺎﻧﺔ ﺑﺎﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط
have to be well interconnected using longitudinal stone connecting the entire thickness of the وﯾﺟب اﻟرﺑط ﺑﯾن اﻟظﮭﺎره واﻟﺑطﺎﻧﮫ ﺑﺎﺣﺟﺎر طوﻟﯾﮫ ﻣﺗداﺧﻠﮫ ﻋﻠﻰ ﻛﺎﻣل ﺳﻣك اﻟﺣﺎﺋط ﻛل اﺛﻧﯾن ﻣﺗر. ﯾﻛون اﻟﻛري ﻣﺗدرجm3 2.11
wall every 2 linear meter, spaces have to be well filled with concrete of(1: cement: 2.5 sand: 5 طوﻟﻲ ﻓﻲ ﻛل ﺻﻔﺔ ﻣﺑﺎﻧﻲ ﻣﻊ ﻣراﻋﺎة ﺗداﺧل اﻻﺣﺟﺎر ﻋﻧد اﺗﺻﺎل ﺟدارﯾﯾن واﻟﺛﻣن ﯾﺷﻣل رﻓﻊ اﻟﻛرﺳﻲ ﺣﺗﻰ اﻟﻣﻧﺎﺳﯾب3م
graded aggregate), taking into account the interconnection of stones when connecting two . اﻟﺗﺻﻣﯾﻣﯾﺔ طﺑﻘﺎ ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
walls .All stone works have to be well and enough spattered with water. Item Price includes
building to the design levels according to the drawings and specifications and instructions of
the supervisor.
3.3.3 Hollow concrete Block constructions 20 cm, Automatic in meter square: : أﺗوﻣﺎﺗﯾﻛﻲ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ، ﺳم20 ﻣﺑﺎﻧﻲ ﺑﻠك ﻣﻔرغ
Hollow concrete Block 20 cm thickness, used for external walls and internal partitions and ﻟﻠﻘواطﻊ اﻟداﺧﻠﯾﺔ و اﻟدراوي و اﻟﻣﻣر اﻻﻣﺎﻣﻲ و، ﺳم20 ﻣﺑﺎﻧﻲ ﺑﻠك )ﺑردﯾن( إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﻣﻔرغ ﺳﻣك:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
where necessary, using cement mortar: 1: 3 (cement: sieved sand),and spraying by water for اﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل7 ﻣﻊ اﻟرش ﻟﻣدة، ( رﻣل ﻣﻐرﺑل:)اﺳﻣﻧت3 : 1 وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ, اﻟراﻣب وﺣﯾﺛﻣﺎ ﯾﻠزمm2
7days, the work must be carried out professionally and the price includes everything . ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف2م 20.00
necessary to implement the item, and the work must be done according to the specifications,
drawings, and the directives of the supervising engineer.
3.3.4 Solid concrete Block constructions 20 cm, Automatic: : أﺗوﻣﺎﺗﯾﻛﻲ، ﺳم20 ﻣﺑﺎﻧﻲ ﺑﻠك ﺻم
Solid concrete Block 20 cm thickness, used for external walls and where necessary, using وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ,ﻟﻠﺟدران اﻟﺧﺎرﺟﯾﺔ وﺣﯾﺛﻣﺎ ﯾﻠزم، ﺳم20 ﻣﺑﺎﻧﻲ ﺑﻠك إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﺻم ﺳﻣك:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
cement mortar: 1: 3 (cement: sieved sand),and spraying by water for 7days, the work must be اﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم7 ﻣﻊ اﻟرش ﻟﻣدة، ( رﻣل ﻣﻐرﺑل:)اﺳﻣﻧت3 : 1 ﺑﻧﺳﺑﺔm2
carried out professionally and the price includes everything necessary to implement the item, .اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف 40.00
2م
and the work must be done according to the specifications, drawings, and the directives of the
supervising engineer.
Notes: :ﻣﻼﺣظﺎت
1- All external and internal walls shall receive a rough coat of cement mortar, ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺗﻼﺑﯾس اﻹﺳﻣﻧﺗﯾﺔ ﻟﺟﻣﯾﻊ اﻟﺣواﺋط اﻟداﺧﻠﯾﺔ واﻟﺧﺎرﺟﯾﺔ واﻻﺳﻘف ﺑﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ-1
300 kg cement / m3 sand. . ﻧﯾس ﻣﻊ ﻋﻣل اﻟﺑؤج واﻷوﺗﺎر واﻟطوارف واﻟﺧدﻣﺔ ﺑﺎﻟﻣﺣﺎراه ﺑﻌد اﻟﺗﺧﺷﯾن/ أﺳﻣﻧت3:1 ﻣﻛوﻧﺔ ﻣن
2- Apply steel mesh to cover joints between different building materials and ﻋﻣل ﺷﺑك ﺗﻼﺑﯾس ﻋﻧد اﻟﻔواﺻل وﻋﻧد اﺧﺗﻼف ﻣواد اﻟﺑﻧﺎء وﻛذﻟك ﻋﻣل زواﯾﺎ ﺷﺑك ﻣﻌدﻧﯾﺔ ﻋﻧد-2
install metal angles at the edges of windows, doors and columns ....etc . . اﻟﺦ....واﻟﺳﻼﻟم واﻟﻣراﯾﺎ.. ﺣروف اﻟﻧواﻓذ واﻻﺑواب واﻻﻋﻣدة
3- Sulphate resistant cement shall be used for All Plastering Works in the ﯾﺟب أن ﯾﺗم ﺟﻣﯾﻊ اﻋﻣﺎل اﻟﺗﻠﺑﯾس )أﺳﻣﻧت ﻣﻘﺎوم( ﻛﺑرﯾﺗﺎت ﻓﻰ اﻟﻣﻧﺎطﻘﺔ اﻟﺳﺎﺣﻠﯾﺔ-3
coastal areas.. ﯾﺟب إﻋﺗﻣﺎد ﺟﻣﯾﻊ ﻋﯾﻧﺎت اﻟدھﺎﻧﺎت اﻟﻣطﻠوﺑﺔ ﻗﺑل اﻻﺳﺗﺧدام-4
4- Paints shall be approved before using. ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﺣﺻول ﻋﻠﻰ ﻣواﻓﻘﺔ اﻟﻣﮭﻧدس ﻋﻠﻰ أﻋﻣﺎل اﻟﺻﻧﻔرة واﻟﺗﻧﻌﯾم واﻟﻣﻌﺟﻧﺔ ﻗﺑل ﺗﻧﻔﯾذ-5
5- The contractor shall get approval of pasting, sanding and smoothing works by . أﻋﻣﺎل اﻟدھﺎﻧﺎت
the Engineer before the painting works are started. . رﻣل/ أﺳﻣﻧت2:1 ﻣوﻧﺔ اﻟطرطﺷﺔ اﻷﺳﻣﻧﺗﯾﺔ ﺗﻛون ﺑﻧﺳﺑﺔ-6
6- The cement spray should be 1:2 cement:sand . . اﻟرش ارﺑﻊ ﻣرات ﻓﻰ اﻟﯾوم ﻷﻋﻣﺎل اﻟﺗﻼﺑﯾس-7
7- Plaster must be splashed with water daily.
3.6.3 Steel Doors (Sample needed to approve): .(. ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ: أﺑواب ﺣدﯾد رص
Galvanized iron doors, shutter is made of steel tubes - rectangular section (0.8” ( ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد2.0 * 0.8) ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
× 2”) , Thickness 1.3 mm, Steel panels are placed together in excellent "ﻋﻠﻰ2 ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن دﺋري1.3 ھﻧش ( ﺳﻣك2 × ھﻧش1) اﻟﻣراﺑﯾﻊ
technical form . Steel angle beam 2” to be welded along the perimeter of the ﻣم ﻣﻊ ﻋﻣل ﺛﻼت2 ﺳم وﺳﻣك20 واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن, ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل
entire door . Door frame (rectangular section panels )width is not less than 20 ﻣﻔﺻﻼت وﯾﺷﻣلpcs
cm and thickness 2 mm with three hinges. The item price Includes the anti-rust ﻋدد ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن اﻟدھﺎن 3.00
paint after sanding and well abrasion, two coats of oil paint for door and locks. اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث اﻟﺣﻠوق ﺑﺎﻟﺟدران
Frames are installed before plastering, they have to be fixed to walls by three ﺳم ﺗوﺿﻊ داﺧل20 ﻣﻠم وطول16 ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر
points of each side at least using steel dowels 16 mm diameter and 20 cm long, .اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
planted in wall and welded In accordance with the instructions of the supervisor
engineer.
3.6.4 Metal steel mesh for windows: :ﺷﺑك ﺣدﯾد ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ
supply and install Security steel grills for windows size (0.6*0.6m)approved type, ﻣﺗر( ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة ﺷﻠﻣﺎﻧﺎت وﻣﺻﺑﻌﺎت ﻣن اﻟﺣدﯾد0.6*0.6) ﺗورﯾد وﺗرﻛﯾب ﺷﺑك ﺣدﯾد ﺣﻣﺎﯾﺔ ﻣﻘﺎس
heavy steel frames and bars, include paint and support by appropriate nails,, the اﻟﺟﺎﻓﻲ ﻣﻊ اﻟطﻼء واﻟﺗﺛﺑﯾت ﺑﺧواﺑﯾر ﻣﻧﺎﺳﺑﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧدpcs
work must be carried out professionally and the price includes everything .ﻋدد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف 3.00
necessary to implement the item, and the work must be done according to the
specifications, drawings, and the directives of the supervising engineer.
Total Amount of Metal, Aluminum & Wood Works إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﻧﺟﺎره
3.7 Sanitary Works اﻻﻋﻣﺎل اﻟﺻﺣﯾﺔ
Notes: All pipe installations are original Indian type (zenith) or equivalent and are accepted by the supervising . ﺟﻣﯾﻊ اﻟﺗﻣدﯾد ﺑﺎﻷﻧﺎﺑﯾب ﻧوع زﻧت ھﻧدي أﺻﻠﻲ أو ﻣﺎ ﯾﻌﺎدﻟﮫ وﯾﻘﺑﻠﮫ اﻟﻣﮭﻧدس اﻟﻣﺷرف.1 -:ﻣﻼﺣظﺎت
engineer. .ﺟﻣﯾﻊ ﻣﺣﺎﺑس اﻟﺗﺣﻛم ﻛروم أﺻﻠﻲ أو ﻣﺎ ﯾﻌﺎدﻟﮫ وﯾﻘﺑﻠﮫ اﻟﻣﮭﻧد س اﻟﻣﺷرف.2
2. All control valves are Original Chrome or equivalent and are accepted by the Engineer Supervisor. ﺟﻣﯾﻊ اﻷﺣواض واﻟﻛراﺳﻲ واﻟﻘطﻊ اﻟﺻﺣﯾﺔ واﻷدوات ﻣﺻﻧوﻋﺔ ﻣن اﻟﺧزف اﻟﻣزﺟﺞ ) اﻟﺻﯾﻧﻲ ( ﻣﺎرﻛﺔ ﻣﻌﺗﻣدة وﯾﻘﺑﻠﮫ.3
3. All sinks, toilets, sanitary accessories and tools made of glazed porcelain are approved and accepted by .اﻟﻣﮭﻧدس اﻟﻣﺷرف
the supervising engineer.
(ﺗﻌﺎﻟﺞ اﻟﻣواﺳﯾر ﺿد اﻟﺻدأ ﺑﺎﻟرﻧﺞ )اﻟدھﺎن اﻟﻣﻘﺎوم ﻟﻠﺻداء.4
4. Pipes are cured against rust by (antirust paint)
5 - All drainage pipes for bathrooms are high pressure plastic (UPVC) for internal and external installations ﺣﺳب اﻷﻗطﺎر اﻟﻣﺣددة.( ﺗﻣدﯾدات داﺧﻠﯾﺔ وﺧﺎرﺟﯾﺔUPVC) ﺟﻣﯾﻊ ﻣواﺳﯾر اﻟﺻرف ﻟﻠﺣﻣﺎﻣﺎت ﺑﻼﺳﺗﯾك ﺿﻐط ﻋﺎﻟﻲ--5
and according to the specified diameters. ﻻ ﯾﺟوز ﻟﻠﻣﻘﺎول ﺗﻐطﯾﺔ أي ﺟزء ﻣن اﻟﻌﻣل ﺣﺗﻰ ﯾﺗم اﺧﺗﺑﺎره-6
6 - Contractor should not cover any part of the work until it is tested. As) ﯾﺟب ﻋﻣل رﺳوﻣﺎت ﺗﻧﻔﯾذﯾﮫ ﻟﻺﻋﻣﺎل وﺗﻌﻣﯾدھﺎ ﻗﺑل اﻟﺗﻧﻔﯾذ وﻋﻣل رﺳوﻣﺎت ﻟﻣﺎ ھو ﻣﻧﻔذ ﺑﺣﺳب ﻣراﺣل ﺗﻧﻔﯾذ اﻷﻋﻣﺎل-7
7 – Shop drawings have to be done and endorsed before implementation as well as the drawings of works ( وﺗﺣﻣﯾل ﺗﻛﻠﻔﺗﮭﺎ ﻋﻠﻰ أﺳﻌﺎر اﻟﺑﻧودBuilt Drawing
have been implemented (As Built Drawing) to be prepared and bear their cost on the item price. ﯾﺟب أن ﺗﻛون ﺻﻧﺎﻋﺔ ﻛل اﻟﻘطﻊ اﻟﺻﺣﯾﺔ ﺳﻠﯾﻣﺔ ﺧﺎﻟﯾﺔ ﻣن ﻋﯾوب اﻟﺻﻧﺎﻋﺔ واﻟﻔﺟوات واﻟﻧﺗوءات وذات ﺳطوح ﻣﻠﺳﺎء-8
8. All sanitary pieces shall be free from industrial defects, gaps, protrusions and have smooth surfaces. ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻷﺟﮭزة اﻟﺻﺣﯾﺔ اﻟﻣﺳﺗﺧدﻣﺔ ﻣﺻﻧوﻋﺔ ﻣن اﻟزھر اﻟﻧﻘﻲ اﻟﺧﺎﻟﻲ ﻣن اﻟﻣواد اﻟﻐرﯾﺑﺔ أو ﻣن اﻟﻔﺧﺎر اﻟﻣﺻﻧﻊ-9
9. All Sanitary appliances used shall be made of pure Iron cast, free of foreign substances, Or of glazed fire ﻣن اﻟطﯾن اﻟﻧﺎري ﻛل ﻣﻧﮭﺎ ﺑﺎﻟﺳﻣك اﻟﻣﻧﺎﺳب وأن ﺗﻛون ﻓﻲ اﻟﺣﺎﻟﺗﯾن ﻣطﻠﯾﺔ ﺑﺎﻟﺻﯾﻧﻲ وأن ﯾﻛون اﻟطﻼء ﻣﻧﺗظم اﻟﻠون ﺧﺎﻟﻲ ﻣن
clay, each shall be of appropriate thickness, glazing shall be regular, free of stains and crusts. Regular ﻣم وﯾﻘﺎس اﻟﺳﻣك ﺑﺎﻟﺟﮭﺎز1 اﻟﺑﻘﻊ واﻟﻘﺷور ﻣﻧﺗظم اﻟﺳطﺢ ﺧﺎﻟﻲ ﻣن اﻟﺗﻣوﺟﺎت واﻟﺗﻧﻣﯾﻼت اﻟﺷﻌرﯾﺔ وﻻ ﯾﻘل ﺳﻣك اﻟطﻼء ﻋن
surface, free of ripples, The thickness of coating is not less than1mm and be measured by special magnetic
.اﻟﻣﻐﻧﺎطﯾﺳﻲ اﻟﺧﺎص ﺑذﻟك
device.
ﯾﺟب ﺿرورة اﻋﺗﻣﺎد ﺟﻣﯾﻊ ﻋﯾﻧﺎت اﻷدوات اﻟﺻﺣﯾﺔ ﻣن ﻗﺑل اﻟﻣﮭﻧدس اﻻﺳﺗﺷﺎري ﻗﺑل اﻟﺗورﯾد واﻟﺗﺷوﯾن وﯾﺗﺣﻣل اﻟﻣﻘﺎول-10
10 - All samples of sanitary equipment should be approved by the consultant engineer prior to supply and
storing, The contractor shall be responsible for any violation. ﻣﺳؤوﻟﯾﺔ اﻟﻣﺧﺎﻟﻔﺔ
11- The Item price includes internal installations of cold and hot feeding pipes, ablution water taps, chromium ﯾﺷﻣل اﻟﺛﻣن اﻟﺗﻣدﯾدات اﻟداﺧﻠﯾﺔ ﻟﻣواﺳﯾر اﻟﺗﻐذﯾﺔ ﺑﺎرد وﺣﺎر وﺣﻧﻔﯾﺎت اﻟوﺿوء واﻟﻣﺣﺎﺑس ﻣن اﻟﻧﺣﺎس وﻣﺣﺎﺑس زاوﯾﺔ ﻣن-11
angular valves at each water feeding point, vertical drainage pipes, internal drainage pipes , internal and اﻟﻛروم ﻋﻧد ﻛل ﻧﻘطﺔ ﺗﻐذﯾﺔ ﺑﺎﻟﻣﺎء ﻣﻊ اﻟﻌزل اﻟﻛﺎﻣل ﻟﻠﻣواﺳﯾر ﺑﻣواد ﻣﻌﺗﻣدة وﻛذﻟك اﻟﺗﺻرﯾف اﻟرأﺳﻲ اﻟﻧﮭﺎﺋﻲ وﻣواﺳﯾر
external ventilation pipes , elbows and joints up to the nearest inspection room. All pipes have to be اﻟﺻرف اﻟﺻﺣﻲ اﻟداﺧﻠﯾﺔ وﻣواﺳﯾر اﻟﺗﮭوﯾﺔ اﻟداﺧﻠﯾﺔ واﻟﺧﺎرﺟﯾﺔ )أﻓﻘﯾﺎ ً ورأﺳﯾﺎ ً ﺗوﺻﯾل إﻟﻰ اﻟﺳطﺢ( واﻷﻛواع واﻟوﺻﻼت ﺣﺗﻰ
completely insulated with approved materials. . أﻗرب ﻏرﻓﺔ ﺗﻔﺗﯾش
12- Rainfall drainage pipes (For roof rainfall drainage) to be high pressure plastic (UPVC) according to .( طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎتUPVC) ﻣواﺳﯾر ﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر اﻟﻧﺎزﻟﺔ ﻣن اﻟﺳطوح ﺑﻼﺳﺗﯾك ﺿﻐط ﻋﺎﻟﻲ-12
drawings and specifications. ﻛﻣﺎ ﯾﺷﻣل اﻟﺛﻣن ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﻟﺗﺷطﯾب اﻟﻌﻣل وﺗﺳﻠﯾﻣﮫ ﻋﻠﻰ،أﻋﻣﺎل اﻟﺗﻛﺳﯾر واﻟﺗﺛﺑﯾت واﻟﺗﺣﺑﯾش ﺑﻣوﻧﺔ اﻷﺳﻣﻧت واﻟرﻣل-13
13-The item price also includes breaking, fixing and covering works with cement sand mortar and all .أﻛﻣل وﺟﮫ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
necessary to finish the work and deliver it to the fullest satisfaction according to specifications, drawings and
. أﻋﻣﺎل اﻟﺗﺷطﯾب واﻟﻣﻌﺟﻧﺔ ﺣول اﻟﺣوض ﺑﺎﻟﺳﻠﯾﻛون-14
instructions of the supervisor engineer.
14 – Finishing and putty around the basin with Silicon.
. ﺟﻣﯾﻊ اﻟﺗوﺻﯾﻼت اﻟﺧﺎﺻﺔ ﺑﺎﻷدوات اﻟﺻﺣﯾﺔ ﻣن اﻟﻧوع اﻟﻣطﻠﻲ ﺑﺎﻟﻛروم-15
15. All sanitary fittings are chromium-type. . ﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﻠﻔﺔ اﺟور اﻟﻔﺣص ﺑﻛﺎﻓﺔ اﻧواﻋﮫ-16
16. Contractor shall bear the cost of inspection fees of all kinds. . اﻟﺣد اﻷﻗﺻﻰ ﺣﺳب ﻣواﺻﻔﺎت اﻟﻣﺻﻧﻊ% 50 ﻻ ﯾﺳﻣﺢ ﺑﺎﻧﺣﻧﺎء اﻟوﺻﻼت أﻛﺑر ﻣن-17
17. Bending of joints shall not exceed . ﻋﻧد ﺗوﻗف اﻟﺗﻣدﯾد ﯾﺗم ﺳد ﻓﺗﺣﺎت اﻷﻧﺎﺑﯾب ﺑﺳدادة ﻣؤﻗﺗﺔ-18
max. 50% according to the manufacturer's specifications.
18. Pipe openings will be blocked with a temporary seal during suspension of work.
4.1 Renew Oily paint with emery and paste for interior walls: :ﻣﻊ اﻟﺼﻨﻔﺮة واﻟﻤﻌﺠﻮن ﻟﻠﺠﺪران اﻟﺪاﺧﻠ ﺔ ﺗﺠﺪ ﺪ ﻃﻼء ز
supply and implement renew oily paint with emery and paste for interior walls ( ﻃ ﻘﺎت3ﻣﻊ اﻟﻤﻌﺠﻮن واﻟﺼﻨﻔﺮة ﻟﻠﺠﺪران اﻟﺪاﺧﻠ ﺔ )ﻃ ﻘﺔ أﺳﺎس و ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﺗﺠﺪ ﺪ ﻃﻼء ز
(foundation layer and 3 layers) and use paint and paste approved excellent quality و ﺴﺘﺨﺪم ﻣﻌﺠﻮن وﻃﻼء ﻧﻮﻋ ﺔ ﻣﻌﺘﻤﺪة ﺣﺴﺐ اﻟﻠﻮن اﻟﻤﻄﻠﻮب ﻌﺪ ﻣﻮاﻓﻘﺔ ﻣﻬﻨﺪس اﻟﻤ وع و ﻨﻔﺬ
according to the required color with approval from project engineer, the work must be اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎتm2 20.00
carried out professionally and the price includes everything necessary to implement the . وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف2م
item, and the work must be done according to the specifications, drawings, and the
directives of the supervising engineer.
4.2 Renew Emulsion paint with emery and paste for ceilings: :ﺗﺠﺪ ﺪ ﻃﻼء اﻣﻠﺸﻦ ﻣﻊ اﻟﺼﻨﻔﺮة ﻟﻠﺴﻘﻒ
supply and implement renew emulsion paint with emery for ceilings (foundation layer ﻃ ﻘﺎت( و ﺴﺘﺨﺪم ﻃﻼء3ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﺗﺠﺪ ﺪ ﻃﻼء اﻣﻠﺸﻦ ﻣﻊ اﻟﺼﻨﻔﺮة ﻟﻠﺴﻘﻒ )ﻃ ﻘﺔ أﺳﺎس و
and 3 layers) and use paint approved excellent quality according to the required color ﻧﻮﻋ ﺔ ﻣﻌﺘﻤﺪة ﺣﺴﺐ اﻟﻠﻮن اﻟﻤﻄﻠﻮب ﻌﺪ ﻣﻮاﻓﻘﺔ ﻣﻬﻨﺪس اﻟﻤ وع و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮm2
with approval from project engineer, the work must be carried out professionally and ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس2م 10.00
the price includes everything necessary to implement the item, and the work must be .اﻟﻤ ف
done according to the specifications, drawings, and the directives of the supervising
engineer.
4.3 Renew Emulsion paint with emery and paste for exterior walls: :ﺗﺠﺪ ﺪ ﻃﻼء اﻣﻠﺸﻦ ﻣﻘﺎوم ﻟﻠﺮﻃ ﺔ ﻟﻠﺠﺪران اﻟﺨﺎرﺟ ﺔ
supply and implement renew emulsion paint with emery for exterior walls (foundation ( ﻃ ﻘﺎت وﺟﻪ3)ﻃ ﻘﺔ أﺳﺎس و3 ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﻃﻼء اﻣﻠﺸﻦ ﻣﻘﺎوم ﻟﻠﺮﻃ ﺔ ﻟﻠﺠﺪران اﻟﺨﺎرﺟ ﺔ
layer and 3 layers) and use paint approved excellent quality according to the required و ﺴﺘﺨﺪم ﻃﻼء ﻧﻮﻋ ﺔ ﻣﻌﺘﻤﺪة ﻌﺪ ﻣﻮاﻓﻘﺔ ﻣﻬﻨﺪس اﻟﻤ وع و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞm2
color with approval from project engineer, the work must be carried out professionally . ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف2م 10.00
and the price includes everything necessary to implement the item, and the work must
be done according to the specifications, drawings, and the directives of the supervising
engineer.
4.4 Maintenance of iron doors ﺻﯾﺎﻧﺔ اﻻﺑواب اﻟﺣدﯾدﯾﺔ
In square meters: Maintaining and inspecting the school’s iron doors according ﺻﯾﺎﻧﺔ وﻣﻔﺎﻗدة اﻻﺑواب اﻟﺣدﯾدﯾﺔ ﻟﻠﺣﻣﺎﻣﺎت ﺑﺎﻷﺑﻌﺎد ﺑﺣﺳب اﻟﻛﻣﯾﺎت م وذﻟك ﺑﻌﻣل اﻵﺗﻲ: ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
to the dimensions according to the quantities, by doing the following: - -:
- Cutting the damaged iron, replacing the removed parts of the gates and others ﻗطﻊ اﻟﺣدﯾد اﻟﺗﺎﻟف واﺳﺗﺑدال اﻟﻘطﻊ اﻟﻣﺧﻠوﻋﺔ ﻣن ﻣراﺑﯾﻊ وﻏﯾرھﺎ ﻓﻲ ﺟﺳم اﻟﺑﺎب وﺳﻣﻛرة اﻷﺟزاء-
in the door body, and plumbing the other parts by repairing or replacing them. . . اﻻﺧرى ﺑﺈﺻﻼﺣﮭﺎ أو إﺳﺗﺑداﻟﮭﺎ و طﻼء اﻻﺑواب ﺑﻣﺎدة اﺳﺎس و ووﺟﮭﯾن زﯾﺗﻲ ﺑﻌد اﻟﺟﻠﺦ و اﻟﺳﻧﻔرة
- Replacing damaged bolts and hinges with others, making three hinges on اﺳﺗﺑدال اﻟﻣﻐﺎﻟﻖ واﻟﻣﻔﺻﻼت اﻟﺗﺎﻟﻔﮫ ﺑﺄﺧري وﻋﻣل ﺛﻼث ﻣﻔﺻﻼت ﻓﻲ ﻛل ﺟﺎﻧب وﻣﺎ ﯾﻠزﻣﮭﻣﺎ وﺗورﯾد-
m2
each side and what is needed for them, and supplying an excellent quality lock. .ﻗﻔل ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة 2.20
2م
- Adjusting the weight and other necessary maintenance work to ensure that the ، ﺿﺑط اﻟوزﻧﯾﺔ وﻏﯾر ذﻟك ﻣن اﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ اﻟﻼزﻣﮫ ﻟﺿﻣﺎن اﻋﺎدة ﺗﺷﻐﯾل اﻟﺑواﺑﺔ ﺑﺎﻟﺷﻛل اﻟﻣطﻠوب-
gate is restarted as required. The contractor must visit the site before submitting وﻋﻠﻲ اﻟﻣﻘﺎول زﯾﺎرة اﻟﻣوﻗﻊ ﻗﺑل ﺗﻘدﯾم ﻋرض اﻟﺳﻌر
the price offer. .ﯾﺷﻣل اﻟﺑﻧد ﻛل ﻣﺎﯾﻠزم ﺑﺣﺳب اﺻول اﻟﻌﻣل اﻟﻣﺗﻌﺎرف ﻋﻠﯾﮭﺎ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
The item includes everything necessary according to generally accepted work
principles and the instructions of the supervising engineer
4.5 Steel Doors (Sample need to check): .(. ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ: أﺑواب ﺣدﯾد
Galvanized iron doors, shutter is made of steel tubes - rectangular section (1” × ( ھﻧش2 × ھﻧش1) ﺗورﯾدو ﺗرﻛﯾب أﺑواب ﺣدﯾد ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد اﻟﻣراﺑﯾﻊ:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
2”) , Thickness 1.3 mm, Steel panels are placed together in excellent technical "ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل2 ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن دﺋري1.3 ﺳﻣك
form . Steel angle beam 2” to be welded along the perimeter of the entire door . ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل2 ﺳم وﺳﻣك20 واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن,
Door frame (rectangular section panels )width is not less than 20 cm and ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن اﻟدھﺎن
thickness 2 mm with three hinges. The item price Includes the anti-rust paint اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث اﻟﺣﻠوق ﺑﺎﻟﺟدرانm2 4.70
after sanding and well abrasion, two coats of oil paint for door and locks. ﺳم ﺗوﺿﻊ داﺧل20 ﻣﻠم وطول16 ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر2م
Frames are installed before plastering, they have to be fixed to walls by three .اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
points of each side at least using steel dowels 16 mm diameter and 20 cm long,
planted in wall and welded In accordance with the instructions of the supervisor
engineer.
4.6 Hand Wash basin: :ﻣﻔﺎﻗدة ﻣﻐﺳﻠﺔ اﻟﯾد
In number: Supply and installation of an excellent quality porcelain hand sink, ﻣﻔﺎﻗدة و ﺗﺷﻐﯾل ﻣﻐﺳﻠﺔ ﯾد واﻟﻌﻣل ﯾﺷﻣل ﺗورﯾد ﻣﺣﺎﺑس ﻟﻠﻣﻐﺳﻠﺔ و ﺗﻧﻔﯾذ ﺗﺻرﯾف اﻟﻣﯾﺎه:ﺑﺎﻟﻌدد
along with the handles and related accessories of excellent quality. The work ھﻧش ﻣﺛﺑﺗﺔ ﺑﺎﻟﺟدران اﻟﺧﺎرﺟﯾﺔ ﻣن2.5 ﻣوﺻل ﺑﻣواﺳﯾر، ﺑﺎﺳﺗﺧدام ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﻣن ھراب وﻏﯾرهpcs
includes implementing water drainage using all the necessary supplies, such as ..ﻋدد اﻟﻣﻐﺳﻠﺔ إﻟﻰ ﻏرﻓﺔ اﻟﺗﻔﺗﯾش اﻟﺧﺎرﺟﯾﺔ و اﻟﻌﻣل ﯾﺷﻣل ﺗورﯾد اﻟﻣﻐﺳﻠﺔ ﺑﺎﻟﻣﺎء و ﻛل ﻣﺎ ﯾﻠزم ﻻﻧﮭﺎء اﻟﺑﻧد 1.00
escapes and others, connected to 2.5-inch pipes fixed to the external walls from
the sink to the external inspection room..”
4.7 Chamber size 60cm x 60cm: : ﺳم60 ×ﺳم60 " ﻏرﻓﺔ ﺗﻔﺗﯾش ﻣﻘﺎس
- Supply and implementation of an chamber with clear internal dimensions of 60 ﺳم اﻟﻰ ﻗﺎع60 وﻋﻣﻖ ﻻﯾﻘل,ﺳم60 × ﺳم60 ﺗورﯾد وﺗﻧﻔﯾذ ﻏرﻓﺔ ﺗﻔﺗﯾش ﺑﺎﺑﻌﺎد ﺻﺎﻓﯾﺔ ﻣن اﻟداﺧل-
cm x 60 cm, and a depth of no less than 60 cm to the bottom of the pipe, built of ﻣﻊ,ﺳم( ﺑﺎﺳﺗﺧدام اﻻﺳﻣﻧت اﻟﻣﻘﺎوم ﻣﻊ ﻣﺎدة اﻟﺳﯾﻛﺎ40×20×20) ﺗﺑﻧﻰ ﻣن اﻟﺑﻠك اﻟﺻم ﻣﻘﺎس,اﻻﻧﺑوب
solid blocks, size (20 x 20 x 40 cm) using resistant cement with Cica, with a وﺗﻠﺑس ﻣن اﻟداﺧل واﻟﺧﺎرج ﺑﺎﺳﻣﻧت ﻣﻘﺎوم,ﺳم ﺑﺎﺳﻣﻧت ﻣﻘﺎوم ﻣﻊ ﻣﺎدة اﻟﺳﯾﻛﺎ15 ﻗﺎﻋدة ﺧرﺳﺎﻧﯾﺔ ﺳﻣك
concrete base 15 cm thick with resistant cement with Cica. It is covered from the ﻣﻊ ﻣﺎدة اﻟﺳﯾﻛﺎ وﻋﻣل اﻟﺳواﻗﻲ ﻣﻊ ﺗﺛﺑﯾت ﻣﻘطﻊ ﻣﺎﺳورة ﺑﻼﺳﺗﯾك ﻟﻠﺳﺎﻗﯾﺔ وﻋﻣل ﻏطﺎء ﻣن اﻟﺧرﺳﺎﻧﺔpcs 3.00
inside and outside with resistant cement with sika material. The waterwheels are ﻋدد اﻟﻣﺳﻠﺣﺔ ﻣﻊ ﻋﻣل ﻣﻘﺑض ﻣن اﻟﺣدﯾد واﻟﺑﻧد ﯾﺷﻣل اﻟﺣﻔر واﻟردم طﺑﻘﺎ ﻟﻠﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس
made, a plastic pipe section is installed for the waterwheel, a reinforced ".اﻟﻣﺷرف
concrete cover is made, and an iron handle is made. The item includes
excavation and backfilling in accordance with the specifications and instructions
of the supervising engineer.”.”
4.8 External & internal sewage extensions include excavation and backfill: :ﺗﻤﺪ ﺪات اﻟ ف اﻟﺼ اﻟﺨﺎرﺟ ﺔ و اﻟﺪاﺧﻠ ﺔ ﻣﻊ اﻟﺤﻔﺮ واﻟﺮدم
Supply, install, and operate external sewage extensions include excavation and backfill 6 ﺗﻮر ﺪ وﺗﺮﻛ ﺐ و ﺸﻐ ﻞ ﺗﻤﺪ ﺪات اﻟ ف اﻟﺼ اﻟﺨﺎرﺟ ﺔ ﻣﻊ اﻟﺤﻔﺮ واﻟﺮدم ﻤﻮاﺳ ﻼﺳ ﻚ ﻗﻄﺮ
by plastic pipes dim= 6" (0.5 of total pressure) between sewage inspection rooms, ﻫ ﺶ )ﻧﺼﻒ ﺿﻐﻂ(ﺑ ﻏﺮف اﻟﺘﻔﺘ ﺶ ﺣ اﻟﺒ ﺎرة واﻟﻌﻤﻞ ﺸﻤﻞ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﻣﻦ ﻗﻄﻊ
including ventilation pipes (ventilation pipe for each bathroom), the work include ﺳﻢ ﻣﻊ ﺿ ﻂ اﻟﻤﻴﻮل وﺗﻜﻮن ﺟﻤﻴﻊ60 وﻣﺴﺘﻠﺰﻣﺎت اﻟﺴ ﺎ ﺔ و ﺘﻢ اﻟﺤﻔﺮ ﻌﻤﻖ ﻣﻨﺎﺳﺐ ﻻ ﻘﻞ ﻋﻦLum
everything necessary such as fittings, and support on walls by steel clips, excavation اﻟﻤﻮاد اﺻﻠ ﺔ ﻣﻌﺘﻤﺪة و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ 1.00
must be at less 60cm and accurate the slope, all items must be excellent quality and . اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ فSum
approved, the work must be carried out professionally and the price includes everything
necessary to implement the item, and the work must be done according to the
specifications, drawings, and the directives of the supervising engineer.
4.9 Water plastic tank with exterior feeding extensions: :ﺧزاﻧﺎت ﻣﯾﺎه ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﻊ ﺗﻣدﯾدات اﻟﺗﻐذﯾﺔ اﻟﺧﺎرﺟﯾﺔ
Supply and install water plastic tank 3 layers (approved type) on roof capacity ﻟﺗر ﻣﻊ ﻋﻣل ﻗﺎﻋدة2000 ﺗورﯾد وﺗرﻛﯾب ﺧزان ﺑﻼﺳﺗﯾك ﺛﻼث طﺑﻘﺎت )ﻋﯾﻧﺔ ﻣﻌﺗﻣدة( ﻓﻲ اﻟﺳطﺢ ﺳﻌﺔ
2000 Liters, include cement foundation under the tank thickness 15cm and ﺳم( و ﻓﺗﺣﺎت ﻓﻲ اﻟذروة ﻟﻣرور اﻟﺗﻣدﯾدات واﻟﻌﻣل ﯾﺷﻣل ﺗورﯾد15) اﺳﻣﻧﺗﯾﺔ ﺗﺣت اﻟﺧزان ﺑﺳﻣﺎﻛﺔ
vents in the walls of peak for water extensions, work include float ball, valves, ھﻧش ﻣن اﻟﺧزان اﻟﻰ اﻟﺣﻣﺎﻣﺎت واﻟﻣﻐﺎﺳل ﻣﻊ0.5 ﺗرﻛﯾب ﻋواﻣﺔ وﻣﺣﺑس وﻣواﺳﯾر ﺗﻐذﯾﺔ ﺑﻼﺳﺗﯾك ﻗطر
plastic pipes dim=0.5" from the tank to bathrooms and hand washing basins ﺗﺛﺑﯾﺗﮭﺎ ﺑﻛﻠﯾﺑﺎت اﺻﻠﯾﺔ ﻓﻲ اﻟﺟدران وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد اﺻﻠﯾﺔ ﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر pcs
1.00
with support in walls by steel clips, all items must be excellent quality and .ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف ﻋدد
approved, the work must be carried out professionally and the price includes
everything necessary to implement the item, and the work must be done
according to the specifications, drawings, and the directives of the supervising
engineer.
4.10 Rehabilitation of the septic tank: إﻋﺎدة ﺗﺄھﯾل اﻟﺑﯾﺎرة و ﺗﺷﻐﯾﻠﮭﺎ و اﻟﺗﻲ ﺗﺗﺿﻣن ﺗﻧظﯾف اﻟﻣﺧﻠﻔﺎت و اﻻﺗرﺑﺔ ﻓوق و: إﻋﺎدة ﺗﺄھﯾل اﻟﺑﯾﺎرة
Rehabilitation of the cesspool, which includes cleaning out the waste and dust ﻋﻣل ﺻﻔﺗﯾن ﻣن اﻟﺑﻠوك و اﻟﺗﻠﺑﯾس ﺣول اﻟﺑﯾﺎرة ﻟﻠﺣﻣﺎﯾﺔ و ﻋﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺿﻣﺎن ﻋدم,داﺧل اﻟﺑﯾﺎرة
above and inside the cesspool, making two layers of blocks and plastering دﺧول ﻣﯾﺎة اﻻﻣطﺎر اﻟﻰ اﻟﺑﯾﺎرة و اﻟﻌﻣل ﯾﺷﻣل ﺗﻐطﯾﺔ ﻓﺗﺣﺎت اﻟﺑﯾﺎرة ﻣن اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ و ﻋﻣل Lum
around the cesspool for protection, and doing everything necessary to ensure . اﻏطﯾﺔ ﺧرﺳﺎﻧﯾﺔ و ﻋﻣل ھواﯾﺔ ﻟﻠﺑﯾﺎرة 1.00
that rainwater does not enter the cesspool. The work includes covering the Sum
cesspool openings with reinforced concrete and Making concrete covers and
making a hobby for the yard.
4.11 Supply and installation of a regular outdoor lighting unit with a semi-oval : "ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي
cover: ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي وﺗﺷﻣل اﻟﻣﻔﺗﺎح:ﺑﺎﻟﻌدد
In numbers: Supply and installation of a regular external lighting unit with a semi- واﻟﺗﻰ ﺗوﺿﻊ،( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞPVC) واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء
pcs
oval cover, including the switch and black plastic pipes (PVC). It is bent - in the ً طﺑﻘﺎ،ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ 5.00
ﻋدد
bending areas - using spring, which is placed before pouring. The cans and their . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت
covers are fixed with screws and wires from the point to the distribution panel,
according to the drawings, specifications, and the engineer’s instructions. Admin.
4.12 Socket 13 A: : A 13 ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة
Supply and installation of a socket 13A with a switch, It shall be concealed ﯾرﻛب داﺧل اﻟﺣﺎﺋط ﻣﻊ ﺟﻣﯾﻊ،( ﻣﻊ اﻟﻣﻔﺗﺎح )ﺳوﯾﺗشA 13 ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة:ﺑﺎﻟﻌدد
inside the wall with all requirements of black PVC conduits which will be bent in ،( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞPVC) اﻟﻣﺳﺗﻠزﻣﺎت ﻣن ﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾك اﻟﺳوداء
pcs
the bending points using spiral spring, wires and boxes. Screws are used for طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت، واﻟﺗوﺻﯾل ﺣﺗﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ،وأﺳﻼك وﻋﻠب ﻣﻊ اﻟﺗﺛﺑﯾت ﺑﺎﻟﻣﺳﺎﻣﺑر اﻟﻘﻼووظ 2.00
ﻋدد
fixation. Item includes all connection to the distribution board according to . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،واﻟﻣواﺻﻔﺎت
drawings and specifications , And the supervisor's instructions.
Total summation اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل إﻋﺎدة ﺗﺄھﯾل و إﻋﺎدة ﺗرﻣﯾم اﻟﺣﻣﺎﻣﺎت ﻓﻲ ﻣدرﺳﺔ اﻟﺻﺎﻟﺢ
5 أﻋﻣﺎل ﺑﻧﺎء ﺧزان ﻣﯾﺎه ارﺿﻲ ﻣدرﺳﺔ اﻟﺻﺎﻟﺢ
Total amount of Metal & Wood Works اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﺧﺷﺑﯾﺔ
7.1 School sound loudspeaker system: ﻛل ﻣﻧظوﻣﺔ ﺗﺗﻛون ﻣن، ﻣﻧظوﻣﺔ ﺗﻛﺑﯾر ﺻوﺗﻲ ﻟﻺذاﻋﺔ اﻟﻣدرﺳﯾﺔ ﻧوﻋﯾﺔ ﻣﻣﺗﺎزه1 ﺗورﯾد وﺗرﻛﯾب ﻋدد
:اﻟﺗﺎﻟﻲ
7.1.1 Wireless Handheld Microphones for at least 150-250 m with rechargeable batteries ﻣ ﻋ اﻷﻗﻞ ﻣﻊ ﻄﺎر ﺎت ﻗﺎ ﻠﻪ150-250 ﺟ ﺪ ﺣ، ﻋﺪد ﺟﻬﺎز ﻣ ﻜﺮوﻓﻮن ﻻﺳﻠ ﻣﺤﻤﻮل ﺎﻟ ﺪpcs 1.00
ﻋدد ﻟﻠﺸﺤﻦ
7.1.2 Speakers (trumpet / conical shape) weather resistant 16 inch diameter ﻫ ﺶ16 ( ﻣﻘﺎوم ﻟﻠﻄﻘﺲ ﻗﻄﺮ ﺷ ﻞ ﻣﺨﺮو/ ﻋﺪد ﺳﻤﺎﻋﺔ ﻣﻜ اﻟﺼﻮت )ﺑﻮقpcs 2.00
ﻋدد
7.1.3 Audio amplifier (mixer) able to operate the components of system at same time, able to ﻤﻜﻦ ﺸﻐ ﻠﺔ ﻣﻦ،ﻧﻔﺲ اﻟﻮﻗﺖ ﻋﺪد ﻣﻀﺨﻢ ﺻﻮ )ﺧﻼط(ﻗﺎدر ﻋ ﺸﻐ ﻞ ﻣﻜﻮﻧﺎت اﻟﻤﻨﻈﻮﻣﺔpcs 1.00
work from battery 12V. ﻓﻮﻟﺖ12 ﻋدد ﻄﺎر ﺔ
(It is preferable that the device be able to operate from the solar system, either by 12- ﻓﻮﻟﺖ او ﻨﻈﺎم12 ) ﻔﻀﻞ ان ﻜﻮن اﻟﺠﻬﺎز ﻗﺎدر ﻋ اﻟﻌﻤﻞ ﻣﻦ اﻟﻤﻨﻈﻮﻣﺔ اﻟﺸﻤﺴ ﺔ اﻣﺎ ﺑﻨﻈﺎم
volt system or by 220-volt system together) (ﻓﻮﻟﺖ ﻣﻌﺎ220
7.1.4 With cable rolls wire (The length of the roll is 70 metres) and necessary accessories اﻟﻤﺪارس ﻣ (ﻣﻊ اﻟﺘﻮاﺑﻊ اﻟﻼزﻣﺔ ﻟ ﺸﻐ ﻞ اﻟﻤﻨﻀﻮﻣﺔ70 ﺗﻮر ﺪ ﻋﺪد ﻟﻔﻪ ﺎ ﻼت )ﻃﻮل اﻟﻠﻔﺔRoll 1.00
needs to operate the system in schools ﻟﻔﺔ
7.2.1 Integrated grounding unit for lightning rods: L.S: Supply, implementation and testing of ﺗﻮر ﺪ وﺗﻨﻔ ﺬ واﺧﺘ ﺎر وﺣﺪة ﺗﺄر ﺾ ﻣﺘ ﺎﻣﻠﺔ: ﺎﻟﻌﺪد:وﺣﺪة ﺗﺄر ﺾ ﻣﺘ ﺎﻣﻠﺔ ﻟﻤﺎﻧﻌﺎت اﻟﺼﻮاﻋﻖ
an integrated grounding unit for lightning rods, which includes excavation and م وﺗﺮﻛ ﺐ اﺛﻨ أﺳ ﺎخ2 م و ﻌﻤﻖ1.5×1.5 ﻟﻤﺎﻧﻌﺎت اﻟﺼﻮاﻋﻖ و ﺸﻤﻞ أﻋﻤﺎل اﻟﺤﻔﺮ واﻟﺮدم ﻤﺴﺎﺣﺔ
backfilling with an area of 1.5 x 1.5 m and a depth of 2 m, installing two 120 cm long ﺳﻢ ﻋ ﺻﻔﺎﺋﺢ ﻧﺤﺎﺳ ﺔ واﻟﺪﻓﻦ ﺣﻮﻟﻬﺎ ﻣﻊ اﻟﻔﺤﻢ واﻟﻤﻠﺢ واﻟﺘﻮﺻ ﻞ ﺑ120 ﻣﻦ اﻟﻨﺤﺎس ﻄﻮل
copper skewers on copper plates, burying around them with coal and salt, connecting ﺳﻢ وﻣﻦ ﺛﻢ30×30 ﺎﻟ ﻠﻴ ﺎت اﻟﺨﺎﺻﺔ وﺗﻮﺻ ﻠﻬﺎ إ ﻏﺮﻓﺔ ﺗﻔﺘ ﺶ2ﻣﻢ35 اﻷﺳ ﺎخ ﺴﻠﻚ ﻣﻜﺸﻮف
the skewers with open wire 35 mm 2 with special clips and connecting them to an اﻟﺘﻮﺻ ﻞ إ ﺑ ﺎر ﻧﺤﺎس ﻣﻊ اﻟﻠﺤﺎم واﻟﻌﺰل ﺤﺴﺐ اﻟﻤﺨﻄﻄﺎت وﻣﻦ ﺛﻢ ﺗﻮر ﺪ وﺗﻤﺪ ﺪ ﻂ
inspection room 30 x 30 cm, and then connect to a copper pipe with welding and ﻣﻊ ﺟﻤﻴﻊ ﻣﺎ. ﺳﻢ ﻣﻜﺘﻮب ﻋﻠ ﺔ ﻋ ﺎرات ﺗﺤﺬﻳ ﺔ ﻗ ﻞ اﻟﺮدم15 ﺗﺤﺬﻳﺮ ﻣﻦ اﻟ ﻼﺳ ﻚ اﻷﺻﻔﺮ ﻋﺮضpcs
1
insulation according to the plans, and then supplying and extending a yellow plastic ﻋدد ﻠﺰم ﻹﻧﻬﺎء اﻟﺒﻨﺪ ﻣﻦ ﺗﻜﺴ و ﻋﺎدة ﺤﺴﺐ اﻟﻤﺨﻄﻄﺎت وﺗﻌﻠ ﻤﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف ﻣﻊ ﻋﺮض
warning tape, 15 cm wide, with warning phrases written on it before backfilling. With ﻣﻊ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﻹﻧﻬﺎء اﻟﻌﻤﻞ. ﻋﻴﻨﺔ ﻣﻦ ﺟﻤﻴﻊ اﻟﻤﻮاد ﻗ ﻞ اﻟ ﻛ ﺐ ﻋ اﻟﻤﻬﻨﺪس ﻟﻠﻤﻮاﻓﻘﺔ ﻋﻠﻴﻬﺎ
all that is necessary to finish the item of crushing and recycling according to the plans .ﻣﻊ ﻋﻤﻞ ﻣﺄﺧﺬ ﻓﺤﺺ اﻟﻨﻮازل ﻋ ارﺗﻔﺎع ﻣ ﻦ ﻣﻦ ﺳﻄﺢ اﻷرض.IEC 60364 . وﻓﻖ اﻟ ﻮد اﻟﻘ ﺎ
and instructions of the supervising engineer, with the presentation of a sample of all
materials before installation to the engineer for approval. With everything needed to
finish the work according to the standard code. IEC 60364. With the upstream socket
working at a height of two meters from the ground.
7.2.2 Metal structure of Holder for solar panels : :ﻫ ﻞ ﻣﻌﺪ ﺣﺎﻣﻞ ﻟﻸﻟﻮاح اﻟﺸﻤﺴ ﺔ
lump sum: the supply and installation of a fixed metal structure that must meet the ﺗﻮر ﺪ وﺗﺮﻛ ﺐ ﻫ ﻞ ﻣﻌﺪ ﺛﺎ ﺖ ﺠﺐ أن ﺗﺘﻮﻓﺮ ﻓﻴﻬﺎ اﻻﺷ اﻃﺎت اﻟﺘﺎﻟ ﺔ:ﺎﻟﻤﻘﻄﻮﻋ ﺔ
following requirements :- ﺗﺮﺗ ﻂ وﺗﻠﺤﻢ ﻣﻊ ﺣﺎﻣﻞ،ﻣﻢ2 ﻫ ﺶ وﺳﻤﺎ ﺔ2 اﻟﻬ ﻞ ﻳﺘﻜﻮن ﻣﻦ اﻋﻤﺪە ﺣﺪ ﺪ ﻪ ﺷﻠﻤﺎن ﺄ ﻌﺎد-
- The structure consists of Schulman iron columns with dimensions of 2 inches and ﻣﻠﻢ وان ﺗﻜﻮن ﻘﻮە ﺗﺤﻤﻞ ﺎﻓ ﺔ ﻟﺤﻤﻞ اﻷﻟﻮاح1.80 ﻫ ﺶ وﺳﻤﺎ ﺔ1.50 اﻷﻟﻮاح ﺣﺪ ﺪ ﺷﻠﻤﺎن ﺄ ﻌﺎد
thickness of 2 mm. They are connected and welded to the Schlman iron plate holder ﻣﻢ ﺗ ﺖ ﻧﻬﺎ ﺔ اﻷﻋﻤﺪة2 ﻫ ﺶ ﺴﻤﺎ ﺔ2 وﺗﺤﻤﻞ ﺷﺪة اﻟ ﺎح اﻟﻌﺎﺗ ﺔ ﻣﻊ ﻋﻤﻞ ﻗﻮاﻋﺪ ﻣﻌﺪﻧ ﻪ ﺷﻠﻤﺎن
with dimensions of 1.50 inches and thickness of 1.80 mm and to be of sufficient bearing .اﻻﺳﻔﻞ
strength to carry the panels and withstand the intensity of high winds with the work of درﺟﺔ واﻟﻬ ﺎ ﻞ ﻜﻮن ﻣﺼﻨ ع ﻣﻦ اﻟﺤﺪ ﺪ اﻟﻤﻄﺎوع اﻟﻤﻄ ﻤﺎدة20 ﻳﺘﻢ ﺗ ﺒ ﺖ اﻻﻟﻮاح ﻋ زوا ﺔ-
Schulman metal bases 2 inches with a thickness of 2 mm that fix the end of the columns ﺛﻢ اﻟﻄﻼء ﺎﻟﻠﻮن اﻟﻤﻄﻠﻮب.( ﻣﻘﺎوﻣﺔ ﻟﻠﺼﺪاء )ﺑ ﻤﺮLum
at the bottom. ﺠﺐ أن ﺗﺼﻤﻢ اﻟﻬ ﻞ اﻟﻤﻌﺪ اﻟﺤﺎﻣﻞ ﺤ ﺚ ﺴﻤﺢ ﺎﺳ ﺪال اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ ﺴﻬﻮﻟﻪ وﻛﺬ ا- 1
Sum
- The panels are installed at an angle of 20 degrees and the structures are made of .ﻟ ﺴﻬ ﻞ ﻋﻤﻠ ﻪ اﻟﺘﻨﻈ ﻒ وﻏﺴﻞ اﻻﻟﻮاح اﻟﺸﻤﺴ ﺔ
wrought iron coated with a rust-resistant material (primer). Then paint in the desired ﻟﺘﺄﻣ اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ ﻳ ﺖ ﻗﻔﻞ ﻳ ﻂ ﺑ اﻟﻔﺘﺤﺔ اﻟﺨﻠﻔ ﺔ ﻟﻠ ح اﻟﺸﻤ واﻟﻘﺎﻋﺪة-
color واﻟﺜﻤﻦ ﺸﻤﻞ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﺤﺴﺐ اﻟﻤﺨﻄﻄﺎت واﻟﺮﺳﻮﻣﺎت اﻟﺘﻔﺼ ﻠ ﺔ اﻟﻤﺮﻓﻘﺔ وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس
- The carrier steel structure must be designed to allow easy replacement of the solar اﻟﻤ ف
panels, as well as to facilitate the process of cleaning and washing the solar panels.
- Secure the solar panels, a lock is installed between the back opening of the solar panel
and the base,The price includes all that is needed according to the attached detailed
plans and drawings and the directions of the supervising engineer
"Note ﻣﻼﺣﻈﺔ
: 1. Solar panels اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ.1
1.1.The concept of solar panel A solar cell made of semiconductor materials such as ﻣﻔﻬﻮم اﻟﻠ ح اﻟﺸﻤ.1.1
silicon is the main component of a solar panel. Many solar cells are connected to . اﻟﻠ ح اﻟﺸﻤ ﺗﻌﺘ اﻟﺨﻠ ﺔ اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻌﺔ ﻣﻦ ﻣﻮاد ﺷ ﺔ ﻣﻮﺻﻠﺔ ﺎﻟﺴﻠ ﻜﻮن اﻟﻤﻜﻮن اﻷﺳﺎ
metallic busbars to form an array of cells known as the solar panel. ﺣ ﺚ ﻳﺘﻢ ﺗﻮﺻ ﻞ اﻟﻌﺪ ﺪ ﻣﻦ اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ ﺨﻄﻮط ﺗﻮﺻ ﻞ ﻣﻌﺪﻧ ﺔ )اﻟ ﺎﺳ ﺎر( ﻟ ﺸ ﻞ ﻣﺼﻔﻮﻓﺔ
1.2.Types of solar panels made of crystalline silicon . ﻣﻦ اﻟﺨﻼ ﺎ ﺗﻌﺮف ﺎﻟﻠ ح اﻟﺸﻤ
Solar panels made of crystalline silicon cells are divided into two main types: أﻧﻮاع اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﻣﺎدة اﻟﺴﻠ ﻜﻮن اﻟﻤﺘ ﻠﻮر ﺗﻨﻘﺴﻢ اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ.1.2
1. Mono-crystalline: It consists of monocrystalline cells (containing crystals of the same :اﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﺧﻼ ﺎ اﻟﺴﻠ ﻜﻮن اﻟﻤﺘ ﻠﻮر إ ﻧﻮﻋ رﺋ ﺴ ﻫﻤﺎ
shape and dimensions and having the same optical and physical properties). ﺗﺘﻜﻮن ﻣﻦ ﺧﻼ ﺎ أﺣﺎد ﺔ اﻟﺘ ﻠﻮر )ﺗﺤﺘﻮي ﻋ ﻠﻮرات ﻣﺘﻤﺎﺛﻠﺔ:(Mono-crystalline) أﺣﺎد ﺔ اﻟﺘ ﻠﻮر.1
2. Poly-crystalline: It consists of polycrystalline cells (containing crystals of different .(ﺔ واﻟﻔ ﺎﺋ ﺔ اﻟﺸ ﻞ واﻹ ﻌﺎد وﺗﻤﺘﻠﻚ ﻧﻔﺲ اﻟﺨﺼﺎﺋﺺ اﻟ
shapes and dimensions, and differing in optical and physical properties). ﺗﺘﻜﻮن ﻣﻦ ﺧﻼ ﺎ ﻣﺘﻌﺪدة اﻟﺘ ﻠﻮر )ﺗﺤﺘﻮي ﻋ ﻠﻮرات ﻣﺨﺘﻠﻔﺔ:(Poly-crystalline) ﻣﺘﻌﺪدة اﻟﺘ ﻠﻮر.2
1.3.Components of solar panels made of silicon cells. .(ﺔ واﻟﻔ ﺎﺋ ﺔ اﻟﺨﺼﺎﺋﺺ اﻟ اﻟﺸ ﻞ واﻹ ﻌﺎد وﺗﺘﻔﺎوت
Solar panels: It is a number of solar cells connected in series to obtain the total voltage .ﻣﻜﻮﻧﺎت اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﺧﻼ ﺎ اﻟﺴﻠ ﻜﻮن.1.3
required for the panel, and is equal to the sum of the voltages for each solar cell, but ﻋ ﺎرة ﻋﻦ ﻋﺪد ﻣﻦ اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ اﻟﻤﻮﺻﻠﺔ ﻋ اﻟﺘﻮا ﻟﻠﺤﺼﻮل ﻋ اﻟﺠﻬﺪ: اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ
the total current of the panel is equal to the current of the solar cell since the cells وﻟ ﻦ اﻟﺘ ﺎر اﻟ ﻟﻠ ح ﺴﺎوي ﻧﻔﺲ، و ﺴﺎوي ﻣﺠﻤ ع اﻟﺠﻬﻮد ﻟ ﻞ ﺧﻠ ﺔ ﺷﻤﺴ ﺔ،اﻟ اﻟﻤﻄﻠﻮب ﻟﻠ ح
straight connected ﺗ ﺎر اﻟﺨﻠ ﺔ اﻟﺸﻤﺴ ﺔ ﻤﺎ أن اﻟﺨﻼ ﺎ ﻣﻮﺻﻠﺔ ﻋ اﻟﺘﻮا
1. It is required that the minimum power that can be obtained from a single panel ﻤﻜﻦ اﻟﺤﺼﻮل ﻋﻠﻴﻬﺎ ﻣﻦ اﻟﻠ ح اﻟﻮاﺣﺪ ﺗﺤﺖ ﻇﺮوف اﻟﻔﺤﺺ ﺸ ط أن ﺗﻜﻮن اﻟﻄﺎﻗﺔ اﻟﺪﻧ ﺎ اﻟ.1
under the standard test conditions is not less than the capacity of the panel. .اﻟﻤﻌ ﺎري ﺤ ﺚ ﻻ ﺗﻘﻞ ﻋﻦ ﻗﺪرة اﻟﻠ ح
2. The minimum efficiency of solar panels should not be less than 16% under standard .ﯾﺷﺗرط أن ﯾﻛون اﻟوﺟﮫ اﻷﻣﺎﻣﻲ ﻟﻠﺧﻼﯾﺎ اﻟﺷﻣﺳﯾﺔ ﻣﻘﺎوﻣﺎ ً ﻷﺛر اﻟﺻدﻣﺎت.18
measurement conditions. ﻛل إطﺎر ﻟوح ﺿوﺋﻲ ﯾﺟب أن ﯾﺟﮭز ﺑﺻﻧدوق ﻗﺎﺑل ﻟﻠﻔﺗﺢ ﻟوﺻل أو اﺳﺗﺑدال اﻟﻛﯾﺑﻼت ﻋﻧد اﻟﻠزوم وﻣﻧﮫ ﯾؤﺧذ ﻣﺧرج اﻟﻠوح.19
3. It is required that the frame of the panel be made of aluminum and be compatible with the وﯾﺣﺗوي ﻋﻠﻰ ﻓﯾوزات، ھذا اﻟﺻﻧدوق ﯾﺟب أن ﯾﻛون ﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ أو ﻣﺎ ﯾﻌﺎدﻟﮭﺎ وﯾﺗﺣﻣل اﻟﻌواﻣل اﻟﺟوﯾﺔ،اﻟﺿوﺋﻲ
material of the props. .اﻟﺣﻣﺎﯾﺔ ﻣن اﻟﺷورت اﻟﻛﮭرﺑﺎﺋﻲ واﻟﺗﯾﺎر اﻟﻌﻛﺳﻲ
4. The panels operating system 24V. .م2020 ﺳﻧﺔ ﺗﺻﻧﯾﻊ اﻟﺧﻼﯾﺎ اﻟﺷﻣﺳﯾﺔ واﻷﻟواح ﯾﺟب أﻻ ﺗﻛون ﻗﺑل.20
:ﻛل اﻟﻣﻌﻠوﻣﺎت اﻟﺗﺎﻟﯾﺔ ﯾﺟب أن ﺗﻛون ﻣﻧﺣوﺗﺔ ﻋﻠﻰ ﻛل ﻟوح ﺷﻣﺳﻲ ﺑطرﯾﻘﺔ ﻏﯾر ﻗﺎﺑﻠﺔ ﻟﻠﻣﺣﻲ.21
5. 12 V . operating system panels
.اﺳم اﻟﺟﮭﺔ اﻟﻣﺻﻧﻌﺔ.a
6.Application Class A panels (free from workmanship defects).
.اﻟرﻗم اﻟﺗﺳﻠﺳﻠﻲ ﻟﻠوح ورﻗم ﻣودﯾﻠﮫ.b
7. The fill factor must not be less than 75%. .ﺷﮭر وﺳﻧﺔ اﻟﺗﺻﻧﯾﻊ.c
8. Internal diodes designed to prevent reverse currents. .ﻣﻧﺣﻧﻰ اﻟﺗﯾﺎر واﻟﻔوﻟﺗﯾﺔ.d
9. Approved standard system IEC-61215 or IEC-61730. .(Peak Wattage) اﻟواﺗﯾﺔ اﻟﻘﺻوى.e
10. To have passed the IEC-61730 safety test, Parts 1 and 2, successfully. .(Im, Vm and FF) اﻟﺗﯾﺎر اﻷﻋظﻣﻲ واﻟﺟﮭد اﻷﻋظﻣﻲ وﻣﻌﺎﻣل اﻟﻣﻠﺊ.f
11. The short circuit current is 8.5 amperes. .ﺑﻠد اﻟﻣﻧﺷﺄ.g
13. The maximum power voltage is 29 volts. .ﺿﻣﺎن ﺟودة اﻷﻟواح اﻟﺷﻣﺳﯾﺔ ﻻ ﺗﻘل ﻋن ﺳﻧﺔ.22
14. The return of the collector is 15%. . ﺳﺎﻋﺔ/ ﻛم120 ﻗواﻋد ﺗﺛﺑﯾت اﻟﻠواﻗط ﻣﻐﻠﻔﻧﺔ وﺗﺗﺣﻣل ﺳرﻋﺔ رﯾﺎح.23
15. The degree of protection is 66 IP. . ﺳﻧﺔ25 ﻟﻣدة%80 + %30 إﻟﻰ0 ﻣن ﺳﻣﺎﺣﯾﺔ ﻗدر ة اﻟﺧروج ﻣن%90 ﺿﻣﺎن اﻷداء ﻻ ﯾﻘل ﻋن.24
16. 1X4mm2 galvanized copper wires, red for the positive and black for the negative. :ﻋﻧد ﺗرﻛﯾب اﻷﻟواح اﻟﺷﻣﺳﯾﺔ ﯾﺟب اﻟﺗﺄﻛد ﻣن ﺧﻣﺳﺔ ﻋواﻣل أﺳﺎﺳﯾﺔ ﺗﺿﻣن أداء اﻷﻟواح اﻟﺷﻣﺳﯾﺔ ﺑﻔﻌﺎﻟﯾﺔ وﻛﻔﺎءة ﻋﺎﻟﯾﺔ.25
17. The performance of the panels is guaranteed for 25 years, so that the percentage of . وﺟود ظﻼل ﻟﻌواﺋﻖ وإن ﻛﺎﻧت ﺻﻐﯾرة ﻣﺛل أﻋﻣدة اﻟﺧرﺳﺎﻧﺔ اﻟﻣﻌدﻧﯾﺔ ﺗﻘﻠل ﻛﺛﯾرا ﻣن ﻗدرة اﻟﻠوح اﻹﻧﺗﺎﺟﯾﺔ:اﻟﺗظﻠﯾل اﻟﺟزﺋﻲ أو اﻟﻛﻠﻲ.أ
ﺗﻌﺗﺑر اﻟﯾﻣن ﻣن اﻟﺑﻠدان اﻟواﻗﻌﺔ ﻓﻲ ﻧﺻف اﻟﻛرة اﻟﺷﻣﺎﻟﯾﺔ ﻟﻸرض وﯾﻌﺗﻣد ﻧوع اﻟﺗﺛﺑﯾت ﻋﻠﻰ ﻣدى وإﻣﻛﺎﻧﯾﺔ:ﺗوﺟﯾﮫ وﻣﯾﻼن اﻷﻟواح.ب
performance decrease is not less than 20% after 25 years and 10 years for any technical
ﺗوﺟﯾﮫ وﻣﯾﻼن اﻷﻟواح
defect.
ﻗد ﺗﺿﻣن زﯾﺎدة ﻓﻲ ﻣﺗوﺳط ﻋدد ﺳﺎﻋﺎت اﻹﺷﻌﺎع اﻟﺷﻣﺳﻲ ﺑﻧﺳﺑﺔ ﺗﺻل إﻟﻰ: أو ﻗواﻋد ﻣزودة ﺑﻣﺗﺗﺑﻊ ﻷﺷﻌﺔ اﻟﺷﻣس،ﻗواﻋد ﻣرﻧﺔ.ج
A. (The decrease in the efficiency of electric power production does not exceed 10% after 10
. ﻋن ﻣﺗوﺳط ﻋدد ﺳﺎﻋﺎت اﻹﺷﻌﺎع اﻟﺷﻣﺳﻲ ﻟﻠﻘواﻋد اﻟﻣﺛﺑﺗﺔ25%
years and 20% after 25 years and the date of commercial operation). وﻋﻠﻰ، واﻟﺗوﺻﯾل ﻋﻠﻰ اﻟﺗوازي ﻟﻐرض زﯾﺎدة اﻟﺗﯾﺎر، ﯾﺗم ﺗوﺻﯾل اﻷﻟواح ﻋﻠﻰ اﻟﺗواﻟﻲ ﻟﻐرض زﯾﺎدة ﻓرق اﻟﺟﮭد:ﺗوﺻﯾل اﻷﻟواح.د
.(PV Array) اﻟﺗواﻟﻲ واﻟﺗوازي ﻟﺗﻌرف ﻣﺟﻣوﻋﺔ اﻷﻟواح ﺑﻣﺻﻔوﻓﺔ اﻷﻟواح
7.2.3 solar panels 300 watt multi-cell 24V system: :24V وات ﻣﺘﻌﺪد اﻟﺨﻼ ﺎ ﻧﻈﺎم300اﻟﻮاح ﻃﺎﻗﺔ ﺷﻤﺴ ﺔ ﻗﺪرة
Number: Supplying and installing high quality solar panels and capturing solar energy وات300 ﺗﻮر ﺪ وﺗﺮﻛ ﺐ اﻟﻮاح ﺷﻤﺴ ﺔ ﻋﺎﻟ ﺔ اﻟﺠﻮدة واﻻﻟﺘﻘﺎط ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴ ﺔ ﻗﺪرة:ﺎﻟﻌﺪد
with a capacity of 300 watts and with the following specifications: ﺠﺐ أن ﻜﻮن اﻟﻠ ح ﻣﺼﻨ ع ﻣﻦ اﻟﺴﻠ ﻜﻮن اﻟﻤﺘ ﻠﻮر ﻣﺘﻌﺪد اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ- :و ﺎﻟﻤﻮاﺻﻔﺎت اﻟﺘﺎﻟ ﻪ
The panel shall be made of polycrystalline silicon solar cells. (Poly crystalline silicon solar cells )
- The minimum power that can be obtained from a single panel under standard test ﻤﻜﻦ اﻟﺤﺼﻮل ﻋﻠﻴﻬﺎ ﻣﻦ اﻟﻠ ح اﻟﻮاﺣﺪ ﺗﺤﺖ ﻇﺮوف اﻟﻔﺤﺺ اﻟﻤﻌ ﺎر ﺔ ﺠﺐ اﻻ اﻟﻄﺎﻗﺔ اﻟﺪﻧ ﺎ اﻟ-
conditions should not be less than 300 watts وات300 ﺗﻘﻞ ﻋﻦ
Operating system 24V 24V ﻧﻈﺎم اﻟ ﺸﻐ ﻞ-
- To be in conformity with international standards - IEC61215,IEC 61730 IEC61215,IEC 61730 - أن ﻜﻮن ﻣﻄﺎﺑﻖ ﻟﻠﻤﻮاﺻﻔﺎت اﻟﻌﺎﻟﻤ ﺔ-
Have successfully passed the IEC61730 Part One and Part Two safety examination or its اﻟﺠﺰﺋﻴ اﻷول واﻟﺜﺎ أو ﻣﺎ ﻌﺎدﻟﻬﻤﺎ ﺑﻨﺠﺎح IEC61730 أن ﻜﻮن ﻗﺪ اﺟﺘﺎزت ﻓﺤﺺ اﻷﻣﺎن-
equivalent ﺧﺎﻟ ﻪ ﻣﻦ اﻟﻌﻴﻮب اﻟﻤﺼﻨﻌ ﺔ،Application Class A ﻧﻮﻋ ﻪ اﻟﻠ ح ﻣﻦ اﻟﻨ ع-
Application Class A board type, free from workmanship defects .Standard Test Conditions: Air mass 1.5; Irradiance = 1000W/m2; cell temp -
pcs
- Standard Test Conditions: Air mass 1.5; Irradiance = 1000W/m2; cell temp. 25°C 25°C 4
ﻋدد
Open circuit voltage not less than 38.5V 38.5V ﺗﻮﺗﺮ اﻟﺪارة اﻟﻤﻔﺘﻮﺣﺔ ﻻ ﻘﻞ ﻋﻦ-
Short circuit current? 10A 10A ? ﺗ ﺎر اﻟﺪارة اﻟﻘﺼ ة-
Maximum power current: 8.5 amps أﻣﺒ8.5 ? : ﺗ ﺎر اﻟﻄﺎﻗﺔ اﻷﻋﻈ-
Maximum power potential: ? 29 volts ﻓﻮﻟﺖ29 ? : ﺟﻬﺪ اﻟﻄﺎﻗﺔ اﻷﻋﻈ-
Receiver yield? 15th % % 15 ? ﻣﺮدود اﻟﻼﻗﻂ-
Built-in diodes designed to prevent reverse currents دﻳﻮدات داﺧﻠ ﺔ ﻣﻦ ﺗﺼﻤ ﻢ اﻟﻠ ح ﻟﻤﻨﻊ اﻟﺘ ﺎرات اﻟﻌﻜﺴ ﺔ-
IP degree of protection? 66 IP ? 66 درﺟﺔ اﻟﺤﻤﺎ ﺔ-
- Approved Standard IEC-61215 or IEC-61730 IEC -61730 أوIEC-61215 اﻟﻨﻈﺎم اﻟﻘ ﺎ اﻟﻤﻌﺘﻤﺪ-
- The degree of inclination of the board is 45? or the nature of the area. . ?أو ﻃﺒ ﻌﺔ اﻟﻤﻨﻄﻘﺔ45 درﺟﺔ ﻣ ﻼن اﻟﻠ ح-
- 1x4mm2 galvanized copper jumper wires, red for the positive and black for the ﻟﻮن أﺣﻤﺮ ﻟﻠﻤﻮﺟﺐ وﻟﻮن أﺳﻮد ﻟﻠﺴﺎﻟﺐ1x4mm2 أﺳﻼك اﻟﺘﻮﺻﻞ ﻣﻦ اﻟﻨﺤﺎس اﻟﻤﺠﻠﻔﻦ-
negative . ﺳﻨﻮات ﻟﺠﻤﻴﻊ اﻟﻤﻮاد وﺿﺪ ﺳﻮء اﻟﺘﺼ ﻴﻊ10 ﺿﻤﺎن ﻟﻤﺪة-
negative . ﺳﻨﻮات ﻟﺠﻤﻴﻊ اﻟﻤﻮاد وﺿﺪ ﺳﻮء اﻟﺘﺼ ﻴﻊ10 ﺿﻤﺎن ﻟﻤﺪة-
10-year warranty on all materials and against improper workmanship.
ﺳﻨﺔ ﺤ ﺚ ﻻ ﺗﻘﻞ ﺴ ﺔ اﻧﺨﻔﺎض اﻷداء10ﻋ اﻟﻤﺘﻘﺪم ارﻓﺎق اﻟﺒ ﺎﻧﺎت اﻟ ﺗﻀﻤﻦ أداء اﻷﻟﻮاح ل-
- The applicant must attach the data that guarantees the performance of the panels for . وﻋ ﺳﻨﻮات ﻷي ﺧـﻠﻞ ﻓ، ﺳﻨﺔ25 ﻌﺪ%80 ﻋﻦ
10 years, so that the rate of decline in performance is not less than 80% after 25 years, %16 اﻟ ﻔﺎءة اﻟﺪﻧ ﺎ ﻟﻸﻟﻮاح اﻟﺸﻤﺴ ﺔ ﺠﺐ أﻻ ﺗﻘﻞ ﻋﻦ-
and ten years for any technical defect. %75 ( ﺠﺐ أﻻ ﻘﻞ ﻋﻦFill Factor) ﻣﻌﺎﻣﻞ اﻟﻤﻸ-
The minimum efficiency of solar panels should not be less than 16%. ﺠﺐ أن ﺠﻬﺰ ﺼﻨﺪوق ﻗﺎ ﻞ ﻟﻠﻔﺘﺢ ﻟﻮﺻﻞ واﺳ ﺪال اﻟ ﻴ ﻼت ﻋﻨﺪ اﻟﻠﺰوم وﻣﻨﻪ ﻞ إﻃﺎر ﻟ ح ﺿﻮ-
Fill factor must not be less than 75%. ﻫﺬا اﻟﺼﻨﺪوق ﺠﺐ أن ﻜﻮن ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت اﻟ ﻄﺎﻧ ﺔ أو ﻣﺎ ﻌﺎدﻟﻬﺎ. ﻳﺆﺧﺬ ﻣﺨ ج اﻟﻠ ح اﻟﻀﻮ
- Each light panel frame must be equipped with an openable box to connect and replace و ﺤﺘﻮي اﻟﺼﻨﺪوق ﻋ ﻓﻴﻮازات اﻟﺤﻤﺎ ﺔ ﻣﻦ اﻟﺸﻮرت اﻟ ﻬ ﺎ و اﻟﺘ ﺎر،و ﺘﺤﻤﻞ اﻟﻌﻮاﻣﻞ اﻟﺠ ﺔ
cables when necessary, from which the light panel output is taken. This box must be . اﻟﻌﻜ
according to British specifications or its equivalent and bear weather factors, and the 2018 ﺳﻨﺔ ﺗﺼ ﻴﻊ اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ واﻷﻟﻮاح ﺠﺐ أﻻ ﺗﻜﻮن ﻗ ﻞ-
box contains protection fuses from electrical shorts and reverse current. .ﺳﺎﻋﺔ/ ﻢ120 ﻗﻮاﻋﺪ ﺗ ﺒ ﺖ اﻟﻠﻮاﻗﻂ ﻣﺠﻠﻔﻨﺔ وﺗﺘﺤﻤﻞ ﻋﺔ ر ﺎح-
- The year of manufacture of solar cells and panels should not be earlier than 2018 :ﻄ ﻘﺔ ﻏ ﻗﺎ ﻠﺔ ﻟﻠﻤﺤـﻲ ﻞ اﻟﻤﻌﻠﻮﻣﺎت اﻟﺘﺎﻟ ﺔ ﺠﺐ أن ﺗﻜﻮن ﻣﻨﺤﻮﺗﺔ ﻋ ﻞ ﻟ ح ﺷﻤ-
- The bases for fixing the coils are galvanized and withstand a wind speed of 120 km/h. . اﺳﻢ اﻟﺠﻬﺔ اﻟﻤﺼﻨﻌﺔ-
- All of the following information must be engraved on each solar panel in an indelible اﻟﺮﻗﻢ اﻟ ﺴﻠﺴ ﻟﻠ ح ورﻗﻢ ﻣﻮد ﻠﻪ-
way: ﺷﻬﺮ وﺳﻨﺔ اﻟﺼﻨﻊ-
- The name of the manufacturer. ﻣﻨﺤ اﻟﺘ ﺎر واﻟﻔﻮﻟﺘ ﺔ-
- Serial number and model number of the board (Peak Wattage) اﻟﻮاﺗ ﺔ اﻟﻘﺼﻮى-
Month and year of manufacture (Im, Vm and FF) اﻟﺘ ﺎر اﻷﻋﻈ واﻟﺠﻬﺪ اﻷﻋﻈ وﻣﻌﺎﻣﻞ اﻟﻤ-
- current and voltage curve ﻠﺪ اﻟﻤ ﺸﺄ-
Peak Wattage
7.2.5 Note ﻣﻼﺣﻈﺔ
Supply and installation of a Gel battery type C10 - Deep cycle (high quality storage, an ) ﺗﺨ ﻦ ذات ﺟﻮدة ﻋﺎﻟ ﺔ ﻣﺎرﻛﺔ ﺗﺠﺎر ﺔ أﺻﻠ ﺔC10 - Deep cycle ﻧ عGel ﺗﻮر ﺪ وﺗﺮﻛ ﺐ ﻄﺎر ﺔ
original brand), where the cell is the main component of the battery. Such as the ﻓﻮﻟﺖ ﺑ ﻨﻤﺎ2 وﺗ ﺘﺞ اﻟﺨﻠ ﺔ ﻏﺎﻟ ﺎ ﺟﻬﺪا ﻛﻬ ﺎﺋ ﺎ ﻣﻘﺪارە, ( ﺣ ﺚ ﺗﻌﺘ اﻟﺨﻠ ﺔ اﻟﻤﻜﻮن اﻟﺮﺋ ﺴ ﺔ ﻟﻠ ﻄﺎر ﺔ
internal resistance and drain current of the cell. The battery can consist of one cell or ﺷﺤﻦ اﻷﻣﺒ ﻋ ﺧﺼﺎﺋﺺ أﺧﺮى/ و ﻌﺘﻤﺪ ﻣﻘﺪار ﺗﻔ ــﻎ،اﻷﻣﺒ اﻟﻤﺴﺘﻮﻋﺐ ﻓﻴﻬﺎ ﻳﺘﻐ ﺑﺘﻐ ﻣﺴﺎﺣﺘﻬﺎ
several cells, and the common type is six cells (6 cells x 2 volts = 12 volts) - it is of a deep- واﻟ ﻄﺎر ﺔ ﻤﻜﻦ أن ﺗﺘﻜﻮن ﻣﻦ ﺧﻠ ﺔ واﺣﺪة أو ﻋﺪة.ﻣﺜﻞ اﻟﻤﻘﺎوﻣﺔ اﻟﺪاﺧﻠ ﺔ وﺗ ﺎر اﻻﺳﺘ اف ﻟﻠﺨﻠ ﺔ
cycle type and provided with gel as a medium to transfer the reactions between the أن ﺗﻜﻮن ﻣﻦ ﻧ ع ﻋﻤ ﻘﺔ اﻟﺪورة- ( ﻓﻮﻟﺖ12 = ﻓﻮﻟﺖx 2 ﺧﻼ ﺎ6) واﻟﻨ ع اﻟﺸﺎﺋﻊ ﺳﺘﺔ ﺧﻼ ﺎ،ﺧﻼ ﺎ
lead plates. .وﻣﺰودة ﻤﺎدة اﻟﺠﻞ ﻛﻮﺳ ﻂ ﻟﻨﻘﻞ اﻟﺘﻔﺎﻋﻼت ﺑ أﻟﻮاح اﻟﺮﺻﺎص
- That the battery production period should not be more than a year. The efficiency of ﻣﻦ%90 ﻛﻔﺎءة اﻟﺸﺤﻦ واﻟﺘﻔ ــﻎ ﻻ ﺗﻘﻞ ﻋﻦ. ان ﻻ ﻜﻮن ﻗﺪ ﻣﺮ ﻋ ﻓ ة اﻧﺘﺎج اﻟ ﻄﺎر ﺔ أ ﻣﻦ ﻋﺎم-
charging and discharging is not less than 90% of the charge in the battery. - The number 50 دورة ﻋﻨﺪ3000 ﻋﺪد دورات اﻟﺸﺤﻦ واﻟﺘﻔ ــﻎ ﺠﺐ ان ﻻ ﺗﻘﻞ ﻋﻦ-.اﻟﺸﺤﻨﺔ اﻟﻤﻮﺟﻮدة ﺎﻟ ﻄﺎر ﺔ
of charging and discharging cycles should not be less than 3000 cycles at 50% of the load -: ﻣﻦ اﻟﺤﻤﻞ وﻓﻘﺄ ﻟﻠﻤﻮاﺻﻔﺎت اﻟﺘﺎﻟ ﺔ%
According to the following specifications:-
7.2.6 Moisture-proof iron solar battery base:In number: Supplying a moisture-resistant iron ﺗﻮر ﺪ ﻗﺎﻋﺪة ﻄﺎر ﺎت ﺷﻤﺴ ﺔ ﺣﺪ ﺪ ﻣﻘﺎوم: ﺎﻟﻌﺪد:ﻗﺎﻋﺪة ﻄﺎر ﺎت ﺷﻤﺴ ﺔ ﺣﺪ ﺪ ﻣﻘﺎوم ﻟﻠﺮﻃ ﺔ
solar battery base (original brand - at least one full year guarantee) and the price ﺿﻤﺎن ﺳﻨﺔ ﺎﻣﻠﺔ ﻋ اﻻﻗﻞ( واﻟﺴﻌﺮ ﺸﻤﻞ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﻹﻧﺠﺎز- ﻟﻠﺮﻃ ﺔ )ﻣﺎرﻛﺔ ﺗﺠﺎر ﺔ أﺻﻠ ﺔ
pcs
includes all that is needed to complete the item according to the specifications and .ﻋدد اﻟﺒﻨﺪ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت وﺗﻌﻠ ﻤﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف 2
instructions of the supervising engineer.
7.2.7 Battery Gel Deep cycle 150Ah : :Deep cycle أﻣﺑﯾر150 ﺑطﺎرﯾﺔ ﺟل
Number: Supply and installation of a 150 amp deep cycle gel battery (original brand ﺿﻣﺎن ﺳﻧﺗﯾن-Gel )ﻣﺎرﻛﺔ ﺗﺟﺎرﯾﺔ أﺻﻠﯾﺔDeep cycle أﻣﺑﯾر150 ﺗورﯾد وﺗرﻛﯾب ﺑطﺎرﯾﺔ ﺟل:ﺑﺎﻟﻌدد
Gel - full two years warranty at least) and the price includes all necessary according to . ﻛﺎﻣﻠﺔ ﻋﻠﻰ اﻻﻗل( واﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرفpcs 2
ﻋدد
the attached specifications and instructions of the supervising engineer.
7.2.8 note :- Inverters Supply, installation, commissioning and testing of a String inverter. The word ﻛﻠﻣﺔ اﻟﻌﺎﻛس, (String inverter ) ﻟﻌواﻛس ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل وإﺧﺗﺑﺎر ﻣﺣول اﻟﻌﻛس: ﻣﻼﺣظﺔ
“Inverter” means reversing the current from DC to alternating current (AC). The direct current comes اﻟﺗﯾﺎر اﻟﻣﺳﺗﻣر ﻣﺻدره إﻣﺎ ﻣن اﻟﺑطﺎرﯾﺎت,(AC) ( إﻟﻰ ﻣﺗرددDC) ( ﺗﻌﻧﻲ ﻋﻛس اﻟﺗﯾﺎر ﻣن ﻣﺳﺗﻣرInverter)
from either batteries or solar panels or both according to the following specifications:-
-:أو اﻷﻟواح اﻟﺷﻣﺳﯾﺔ أو ﻛﻠﯾﮭﻣﺎ وﻓﻘﺄ ﻟﻠﻣواﺻﻔﺎت اﻟﺗﺎﻟﯾﺔ
7.2.9 Inverter works in two systems (24V-240V (Hybrid solar inverter) with a capacity of 2500VA: :2500VA ( وﺑﻘدرة24V-240V(Hybrid solar inverter) اﻧﻔرﺗر ﯾﻌﻣل ﺑﻧظﺎﻣﯾن
Quantity: Supply, installation, commissioning and testing of an inverter operating in two systems 24V-240V(Hybrid solar inverter ) ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل واﺧﺗﺑﺎر اﻧﻔرﺗر ﯾﻌﻣل ﺑﻧظﺎﻣﯾن:ﺑﺎﻟﻌدد
24V-240V (Hybrid solar inverter) with a capacity of 2500VA so that it can withstand at least twice ﺑﺣﯾث ﯾﺗﺣﻣل ﻣﺎ ﻻ ﯾﻘل ﻋن ﺿﻌف ﻗدرﺗﮫ ﻟﺑﺿﻊ ﺛواﻧﻲ وذو ﺣﻣﺎﯾﺔ اﺗوﻣﺎﺗﯾﻛﯾﺔ ﯾﻔﺻل ﻓﻲ ﺣﺎل2500VA وﺑﻘدرة
واﻟﻌﻣل ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻹﻧﺟﺎز اﻟﻌﻣل وﺑﺣﺳب%95 وﻛﻔﺎءه ﻻ ﺗﻘل ﻋن. زﯾﺎدة اﻟﺣﻣل او ارﺗﻔﺎع اﻟﺣرارةpcs
its capacity for a few seconds and has an automatic protection that disconnects in the event of an
increase in the load or an increase in temperature. And an efficiency of not less than 95%, and the 1
work includes everything needed to complete the work, according to the attached specifications
ﻋدد اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
and the instructions of the supervisin
7.2.10 Solar system installation accessories: ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل وإﺧﺗﺑﺎر ﺟﻣﯾﻊ: ﺑﺎﻟﻣﻘطوﻋﯾﺔ:ﻣﻠﺣﻘﺎت ﺗرﻛﯾب ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ وﺗﺷﻐﯾﻠﮭﺎ
In the cut: the supply, installation and processing of applications for the supply اﻟﻣﻠﺣﻘﺎت اﻟﻣطﻠوﺑﺔ ﻹﺗﻣﺎم ﺗرﻛﯾب وﺗﺟﮭﯾز ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ وﺗﺷﻐﯾﻠﮭﺎ وﻓﻘﺎ ً ﻟﻠﻧظم واﻟﻣﻌﺎﯾﯾر
and processing of energy - :اﻟﻌﺎﻟﻣﯾﺔ ﻛﻣﺎ ﯾﻠﻲ
1. Two 63 amp circuit breakers. . أﻣﺑﯾر63 ﻗواطﻊ2 ﻋدد.1
2. 1 MCCB breaker, 150 amps. . اﻣﺑﯾر150 ﻗوةMCCB ﻗﺎطﻊ1 ﻋدد.2
3. 3-line assembly box. . ﺧط3 ﺻﻧدوق ﺗﺟﻣﯾﻊ.3 Ls
4. 2-line arrester. .ﺧط2 ﻗﺎطﻊ ﺻواﻋﻖ.4 ﻣﻘطو 1
5. amps and amps amps amps. . أﻣﺑﯾر6 أﻣﺑﯾر و20 أﻣﺑﯾر و63 ﺑول2 ﻗواطﻊ ﺣﻣﺎﯾﺔ.5 ﻋﯾﺔ
6. A voltage monitor 100 amps 275 volts. . ﻓوﻟت275 أﻣﺑﯾر100 ﻣراﻗب ﻓوﻟﺗﯾﺔ.6
7... DC and AC insulated copper wires with sizes suitable for the amounts of . ﻣن اﻟﻧﺣﺎس ﺑﻣﻘﺎﺳﺎت ﻣﻧﺎﺳﺑﺔ ﻟﻛﻣﯾﺎت اﻟﺗﯾﺎر اﻟﻛﮭرﺑﺎﺋﻲ اﻟﻣﺎر ﻓﯾﮭﺎAC وDC اﺳﻼك ﻣﻌزوﻟﺔ. .7
electric current passing through them. واﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﻣﻠﺣﻘﺎت اﻟﻣطﻠوﺑﺔ ﻟﺗﺟﮭﯾز ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ ﺑﺎﻟﺷﻛل اﻟﻣطﻠوب
And the price includes all the services and accessories required to supply the وﻓﻘﺎ ﻟﻠﻣﻌﺎﯾﯾر اﻟﻌﺎﻟﻣﯾﺔ وان ﺗﻛون ﺟﻣﯾﻊ اﻟﻣﻠﺣﻘﺎت ذات ﺟودة ﻋﺎﻟﯾﺔ وﺧﺎﺿﻌﺔ ﻟﻣواﻓﻘﺔ اﻟﻣﮭﻧدس اﻟﻣﺷرف
solar energy as required. وﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
Total Amount of solar energy system work إﺟﻣﺎﻟﻲ اﻋﻣﺎل ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ
Total summation اﻹذاﻋﺔ اﻟﻣدرﺳﯾﺔ+ إﻻﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ
اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم