Vision Hope International

‫رؤﯾﺎ أﻣﻞ اﻟﺪوﻟﯿﺔ‬


Project Name: Enable gender-responsive and inclusive access to safe learning environments, and quality education services for school-aged children in four schools in Hays d
district, Hudaydah governorate. Funded by the Yemen Humanitarian Fund (YHF)
‫ ﺗﻤﻮﯾﻞ ﻣﻦ ﺻﻨﺪوق اﻟﺘﻤﻮﯾﻞ اﻹﻧﺴﺎﻧﻲ ﻓﻲ اﻟﯿﻤﻦ‬- ‫ ﺗﻤﻜﯿﻦ اﻟﻮﺻﻮل اﻟﺸﺎﻣﻞ واﻻﺳﺘﺠﺎﺑﺔ اﻟﺴﺮﯾﻌﺔ ﻟﻠﻨﻮع اﻻﺟﺘﻤﺎﻋﻲ إﻟﻰ ﺑﯿﺌﺎت ﺗﻌﻠﯿﻤﯿﺔ آﻣﻨﺔ وﺧﺪﻣﺎت ﺗﻌﻠﯿﻤﯿﺔ ﻋﺎﻟﯿﺔ اﻟﺠﻮدة ﻟﻸطﻔﺎل ﻓﻲ ﺳﻦ اﻟﻤﺪرﺳﺔ ﻓﻲ أرﺑﻊ ﻣﺪارس ﻓﻲ ﻣﺪﯾﺮﯾﺔ ﺣﯿﺲ – ﻣﺤﺎﻓﻈﺔ اﻟﺤﺪﯾﺪة‬:‫اﺳﻢ اﻟﻤﺸﺮوع‬

Project Code: YEM-23-S-INGO-25967 ‫رﻗﻢ اﻟﻤﺸﺮوع‬:


.‫ ﻣﺣﺎﻓظﺔ اﻟﺣدﯾدة‬- ‫ ﻣدﯾرﯾﺔ ﺣﯾس‬- ‫ﺟداول اﻟﻛﻣﯾﺎت ﻻﻋﻣﺎل اﻹﻧﺷﺎء و إﻋﺎدة اﻟﺗﺎھﯾل ﻓﻲ ﻣدرﺳﺔ اﻟﺻﺎﻟﺢ‬
BOQs of construction and rehabilitation work at Al-Saleh School - Hays district - AlHudaydah Governorate
‫م‬ Description ‫ﺑﯾــﺎن اﻻﻋﻣـــــــــــﺎل‬ ‫اﻟوﺣد‬ ‫ﺳﻌراﻟوح اﻟﻛﻣﯾﺔ‬ ‫اﻻﺟﻣﺎﻟﻲ‬
‫ة‬ ‫دة‬ ‫ﺑﺎﻟدوﻻر‬
‫ﺑﺎﻟدوﻻر‬
No. Unit Quanti Price Total price
ty
Notes : -:‫ﻣﻼﺣظﺎت‬
1. The contractor shall visit the site before elaboration of the tender and study all ‫ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻣﺗﻘدم ﻓﻲ اﻟﻌطﺎء زﯾﺎرة ﻣوﻗﻊ اﻟﻣﻧﺷﺄة ﻗﺑل اﻟﺑدء ﻓﻲ دراﺳﺔ اﻟﻌطﺎء ودراﺳﺔ ﺟﻣﯾﻊ اﻟظروف اﻟﻣﺣﯾطﺔ ﺑﺎﻟﻣﻧﺷﺄة‬
circumstances that surround the site, especially eventually existing slopes at the site. ‫واﻟﻣؤﺛرة ﻋﻠﻰ اﻷﻋﻣﺎل ﻣﺛل طرﯾﻖ إﯾﺻﺎل اﻟﻣواد اﻟﻼزﻣﺔ ﻟﻺﻧﺷﺎء و دراﺳﺔ طرﯾﻘﺔ ووﺳﯾﻠﺔ ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ اﻟﻌﺎم وﯾﺗﺣﻣل‬
2. During the excavation and in the case of being unable to reach the depth mentioned in the . ‫اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ‬
drawings and/or finding the soil bearing capacity (structural drawing) in this depth less than ‫ﻋﻧد اﻟﺣﻔر ﻓﻲ ﺣﺎﻟﺔ ﻋدم اﻟﻘدرة ﻟﻠوﺻول اﻟﻰ اﻟﻌﻣﻖ اﻟﺗﺻﻣﯾﻣﻲ ﺑﺎﻟرﺳوﻣﺎت ﻧﺗﯾﺟﺔ ﻟوﺟود أرض ﺻﺧرﯾﺔ أو ﻛﺎﻧت ﻣﻘﺎوﻣﺔ‬
the required, the contractor shall contact the project management. General Requirement: ‫اﻟﺗرﺑﺔ أﻗل ﻣن اﻟﻣﻘﺎوﻣﺔ اﻟﺗﺻﻣﯾﻣﯾﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول اﻷﺗﺻﺎل ﺑﺎدارة اﻟﻣﺷروع ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت ﻟﺗﺷﻛﯾل ﻟﺟﻧﺔ‬
The Environmental and Social Management Frame work is considered the controlling tool for ‫ﻟﻠدراﺳﺔ وﺗﺣدﯾد اﻟﺣﻠول اﻟﻣﻧﺎﺳﺑﺔ وإﻋﺗﻣﺎدھﺎ ﻣن ادارة اﻟﻣﺷروع وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ ﻓﻲ ﺣﺎﻟﺔ‬
mitigating environmental and social impacts .And mitigations listed in this are mandatory to be :‫اﻟﻣﺗطﻠﺑﺎت اﻟﻌﺎﻣﺔ‬.‫اﻟﻣﺧﺎﻟﻔﮫ‬
implemented along with the construction, the rehabilitation and maintenance of the schools. ‫ﯾﻌﺗﺑر ﻋﻣل إطﺎر اﻹدارة اﻟﺑﯾﺋﯾﺔ واﻻﺟﺗﻣﺎﻋﯾﺔ أداة اﻟﺗﺣﻛم ﻟﻠﺗﺧﻔﯾف ﻣن اﻵﺛﺎر اﻟﺑﯾﺋﯾﺔ واﻻﺟﺗﻣﺎﻋﯾﺔ واﻟﺗﺧﻔﯾﻔﺎت اﻟﻣدرﺟﺔ ﻓﻲ‬
The contractor is obliged to take the following measures to decrease impact of maintenance ‫ھذا اﻹطﺎر اﻟﺑﯾﺋﻲ واﻻﺟﺗﻣﺎﻋﻲ إﻟزاﻣﯾﺔ ﻟﯾﺗم ﺗﻧﻔﯾذھﺎ ﺟﻧﺑﺎ إﻟﻰ ﺟﻧب ﻣﻊ إﻧﺷﺎء وإﻋﺎدة ﺗﺄھﯾل وﺻﯾﺎﻧﺔ اﻟﻣدارس وﯾﻠﺗزم اﻟﻣﻘﺎول‬
work on the environment and beneficiaries: :‫ﺑﺎﺗﺧﺎذ اﻟﺗداﺑﯾر اﻟﺗﺎﻟﯾﺔ ﻟﺗﻘﻠﯾل أﺛر أﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ ﻋﻠﻰ اﻟﺑﯾﺋﺔ واﻟﻣﺳﺗﻔﯾدﯾن‬
1.Provide construction site with protection measures (Barriers, fence, portable scaffold ‫ ﻋﻼﻣﺎت اﻟﺗﺣذﯾر )ﯾﺳﻣﺢ ﻟﻸﺷﺧﺎص اﻟﻣﺳﻣوح ﻟﮭم‬،(‫ اﻟﺳﻘﺎﯾل‬،‫ اﻟﺳﯾﺎج‬،‫ ﺗوﻓﯾر ﺗداﺑﯾر اﻟﺣﻣﺎﯾﺔ ﻓﻲ ﻣوﻗﻊ اﻟﺑﻧﺎء )اﻟﺣواﺟز‬.1
sheets), warning signs (authorized persons are only allowed to access work area, Provide .‫ ﺗوﻓﯾر اﻹﺿﺎءة اﻟﻛﺎﻓﯾﺔ‬،( ‫ﻓﻘط ﻟﻠوﺻول إﻟﻰ ﻣﻧطﻘﺔ اﻟﻌﻣل ﻣﻊ‬
necessary light. .‫ ﻋﻣل اﻟدﻋم اﻟﻣﻧﺎﺳب ﻟﻠﺣﻔرﯾﺎت ﻟﻠﺣﻣﺎﯾﺔ ﺿد اﻻﻧﮭﯾﺎر‬.2
2.Provide proper support for excavations to protect against collapse. .‫ ﺧوذة( واﻟزاﻣﮭم ﺑﺎرﺗداﺋﮭﺎ اﺛﻧﺎء اﻟﻌﻣل‬،‫ أﺣذﯾﺔ اﻟﺳﻼﻣﺔ‬،‫ ﻗﻔﺎزات‬،‫ ﺗوﻓﯾر ادوات اﻟﺣﻣﺎﯾﺔ اﻟﺷﺧﺻﯾﺔ ﻟﻠﻌﻣﺎل )أﻗﻧﻌﺔ‬.3
3.Provide his workers with personal protective equipment (masks, gloves, safety shoes, ‫ ورش اﻟﻣوﻗﻊ ﺑﺎﻟﻣﺎء ﻟﻠﺗﻘﻠﯾل ﻣن اﻟﻐﺑﺎر‬،‫ ﺗﻘﻠﯾل اﻟﺿوﺿﺎء أﺛﻧﺎء ﺳﺎﻋﺎت اﻟﻌﻣل وﻋدم اﻟﻌﻣل ﻓﻲ اﻟﻠﯾل‬.4
helmet, overall) ‫اﻟﺦ‬،‫ اﻟﻌﻣل ﻓﻲ ﻣﻧطﻘﺔ ﻣﺣددة ﻓﻘط واﻻﻧﺗﻘﺎل اﻟﻰ اﻻﺧرى ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن اﻻوﻟﻰ وﻋزل ﻣوﻗﻊ اﻟﻌﻣل ﻣن اﻟزوار‬.5
4.Reduce noise during working hours and do not work at night, and spray site with water :‫ ﻧﻘل ﻓﺎﺋض اﻟﻣواد واﻟﻧﻔط واﻟﺷﺣوم ﺧﺎرج اﻟﻣﺑﺎﻧﻲ وﻧﻘﻠﮫ ﻓﻲ ﺷﺎﺣﻧﺎت ﻣﻐﻠﻘﺔ ﻟﺗﻔرﯾﻎ اﻟﻣواﻗﻊ ﺷﺗراطﺎت ﻋﺎﻣﺔ‬.6
during dust. ( ‫ ) اﻟﻛﻣﯾﺎت ﺗم ﺣﺳﺎﺑﮭﺎ ھﻧدﺳﯾﺎ ً ﻣﻊ ﺧﺻم اﻟﻔﺗﺣﺎت‬- : ‫ﻣﻼﺣظﺔ‬
5.Limit work in one area in series and isolate worksite from , visitors, etc...
6.Haul surplus material and oil and grease outside the premises and transport it in closed
trucks to dump sites.
1 .(‫ﺑﻧﺎء ﺛﻼﺛﺔ ﻓﺻول دراﺳﯾﺔ )ﻓﺻول ﺷﺑﮫ داﺋﻣﺔ‬

Building three classrooms (semi-permanent classrooms).


1.1 Site Works : : ‫اﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم‬
General Requirement: :‫اﻟﻣﺗطﻠﺑﺎت اﻟﻌﺎﻣﺔ‬
The Environmental and Social Management Frame work is considered the controlling tool for ‫ﯾﻌﺗﺑر ﻋﻣل إطﺎر اﻹدارة اﻟﺑﯾﺋﯾﺔ واﻻﺟﺗﻣﺎﻋﯾﺔ أداة اﻟﺗﺣﻛم ﻟﻠﺗﺧﻔﯾف ﻣن اﻵﺛﺎر اﻟﺑﯾﺋﯾﺔ واﻻﺟﺗﻣﺎﻋﯾﺔ واﻟﺗﺧﻔﯾﻔﺎت اﻟﻣدرﺟﺔ ﻓﻲ‬
mitigating environmental and social impacts .And mitigations listed in this are mandatory to be ‫ھذا اﻹطﺎر اﻟﺑﯾﺋﻲ واﻻﺟﺗﻣﺎﻋﻲ إﻟزاﻣﯾﺔ ﻟﯾﺗم ﺗﻧﻔﯾذھﺎ ﺟﻧﺑﺎ إﻟﻰ ﺟﻧب ﻣﻊ إﻧﺷﺎء وإﻋﺎدة ﺗﺄھﯾل وﺻﯾﺎﻧﺔ اﻟﻣدارس وﯾﻠﺗزم اﻟﻣﻘﺎول‬
implemented along with the construction, the rehabilitation and maintenance of the schools. :‫ﺑﺎﺗﺧﺎذ اﻟﺗداﺑﯾر اﻟﺗﺎﻟﯾﺔ ﻟﺗﻘﻠﯾل أﺛر أﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ ﻋﻠﻰ اﻟﺑﯾﺋﺔ واﻟﻣﺳﺗﻔﯾدﯾن‬
The contractor is obliged to take the following measures to decrease impact of maintenance ‫ ﻋﻼﻣﺎت اﻟﺗﺣذﯾر )ﯾﺳﻣﺢ ﻟﻸﺷﺧﺎص اﻟﻣﺳﻣوح ﻟﮭم‬،(‫ اﻟﺳﻘﺎﯾل‬،‫ اﻟﺳﯾﺎج‬،‫ ﺗوﻓﯾر ﺗداﺑﯾر اﻟﺣﻣﺎﯾﺔ ﻓﻲ ﻣوﻗﻊ اﻟﺑﻧﺎء )اﻟﺣواﺟز‬.1
work on the environment and beneficiaries: .‫ ﺗوﻓﯾر اﻹﺿﺎءة اﻟﻛﺎﻓﯾﺔ‬،( ‫ﻓﻘط ﻟﻠوﺻول إﻟﻰ ﻣﻧطﻘﺔ اﻟﻌﻣل ﻣﻊ‬
1.Provide construction site with protection measures (Barriers, fence, portable scaffold .‫ ﻋﻣل اﻟدﻋم اﻟﻣﻧﺎﺳب ﻟﻠﺣﻔرﯾﺎت ﻟﻠﺣﻣﺎﯾﺔ ﺿد اﻻﻧﮭﯾﺎر‬.2
sheets), warning signs (authorized persons are only allowed to access work area, Provide .‫ ﺧوذة( واﻟزاﻣﮭم ﺑﺎرﺗداﺋﮭﺎ اﺛﻧﺎء اﻟﻌﻣل‬،‫ أﺣذﯾﺔ اﻟﺳﻼﻣﺔ‬،‫ ﻗﻔﺎزات‬،‫ ﺗوﻓﯾر ادوات اﻟﺣﻣﺎﯾﺔ اﻟﺷﺧﺻﯾﺔ ﻟﻠﻌﻣﺎل )أﻗﻧﻌﺔ‬.3
necessary light. ‫ ورش اﻟﻣوﻗﻊ ﺑﺎﻟﻣﺎء ﻟﻠﺗﻘﻠﯾل ﻣن اﻟﻐﺑﺎر‬،‫ ﺗﻘﻠﯾل اﻟﺿوﺿﺎء أﺛﻧﺎء ﺳﺎﻋﺎت اﻟﻌﻣل وﻋدم اﻟﻌﻣل ﻓﻲ اﻟﻠﯾل‬.4
2.Provide proper support for excavations to protect against collapse. ‫اﻟﺦ‬،‫ اﻟﻌﻣل ﻓﻲ ﻣﻧطﻘﺔ ﻣﺣددة ﻓﻘط واﻻﻧﺗﻘﺎل اﻟﻰ اﻻﺧرى ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن اﻻوﻟﻰ وﻋزل ﻣوﻗﻊ اﻟﻌﻣل ﻣن اﻟزوار‬.5
3.Provide his workers with personal protective equipment (masks, gloves, safety shoes, :‫ ﻧﻘل ﻓﺎﺋض اﻟﻣواد واﻟﻧﻔط واﻟﺷﺣوم ﺧﺎرج اﻟﻣﺑﺎﻧﻲ وﻧﻘﻠﮫ ﻓﻲ ﺷﺎﺣﻧﺎت ﻣﻐﻠﻘﺔ ﻟﺗﻔرﯾﻎ اﻟﻣواﻗﻊ ﺷﺗراطﺎت ﻋﺎﻣﺔ‬.6
helmet, overall) ( ‫ ) اﻟﻛﻣﯾﺎت ﺗم ﺣﺳﺎﺑﮭﺎ ھﻧدﺳﯾﺎ ً ﻣﻊ ﺧﺻم اﻟﻔﺗﺣﺎت‬- : ‫ﻣﻼﺣظﺔ‬
4.Reduce noise during working hours and do not work at night, and spray site with water
during dust.
5.Limit work in one area in series and isolate worksite from , visitors, etc...
6.Haul surplus material and oil and grease outside the premises and transport it in closed
trucks to dump sites.

1.1.1 Site planning and levelling with excavation and Backfill : :‫أﻋﻣﺎل اﻟﺗﺳوﯾﺔ ﻟﻸرﺿﯾﺔ اﻟﻣﺷروع ﻣﻊ اﻟﺣﻔر واﻟردم‬
The Whole Project site have to be leveled according to the levels on the ground, ‫ﻛﺎﻣل وﻓﻘﺎ ً ﻟﻠﻣﻧﺎﺳﯾب ﻋﻠﻰ اﻟطﺑﯾﻌﺔ وذﻟك ﺑﺈزاﻟﺔ اﻟﻌواﺋﻖ اﻟﺳطﺣﯾﺔ وإزاﻟﺔ اﻟﻧﺑﺎﺗﺎت واﻟطﺑﻘﺎت اﻟﺳطﺣﯾﺔ‬
through removing the surface obstacles, trees, soil surface layers, cutting of the ‫ﻟﻠﺗرﺑﺔ ﺑﺎﻟﺣﻔر واﻟﻘطﻊ ﻟﻠﻣﻧﺎطﻖ اﻟﺗراﺑﯾﺔ أو اﻟﺻﺧرﯾﺔ اﻟﻣرﺗﻔﻌﺔ واﻟردم ﻟﻠﻣﻧﺎطﻖ اﻟﻣﻧﺧﻔﺿﺔ ﺑﺎﻟﺗرﺑﺔ اﻟزﻟطﯾﺔ‬
rising parts and backfilling the low parts with Gravel soil or that resulted from ‫ وﯾﺟب أن ﻻ ﺗزال اﻷﺷﺟﺎر إﻻ ﺑﻣواﻓﻘﺔ‬.‫أو اﻟﻧﺎﺗﺟﺔ ﻣن اﻟﺣﻔر ﻣﻊ ﻣراﻋﺔ اﻟﻣﯾول ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر‬
excavations. Slopes for rainwater drainage have to be considered. Trees will ‫وﻋﻧد إزاﻟﺔ اﻷﺷﺟﺎر وﻏﯾرھﺎ ﻣن اﻷﺷﯾﺎء اﻟﻧﺎﻣﯾﺔ واﻟﺟذور اﻟﺗﻲ ﯾزﯾد ﻗطر ﺟذوﻋﮭﺎ‬, ‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
not be removed only with supervisor approval. When removing trees and roots ‫ﻣﻠﯾﻣﺗر ﻋﻠﻰ اﻷﻗل ﺗﺣت ﺳطﺢ اﻷرض‬500 ‫ ﻓﯾﺟب اﺟﺗﺛﺎﺛﮭﺎ ﺣﺗﻰ ﻋﻣﻖ ﯾﺻل إﻟﻲ‬، ‫ ﻣﻠﯾﻣﺗر‬80 ‫ ﻋن‬Lum
with a diameter of more than 80 mm, they should be uprooted to a depth of at ‫ وإﻋﺎدة ردم اﻻﻧﺧﻔﺎﺿﺎت اﻟﻧﺎﺟﻣﺔ ﻋن اﺳﺗﺑﻌﺎد ﻛﺗل اﻟﺣﺟﺎرة أو اﻟﻌواﺋﻖ اﻷﺧرى ﺑﺗرﺑﺔ ﻣﻧﺎﺳﺑﺔ ودﻛﮭﺎ‬sum 1.00
least 500 mm below earth surface, Resulted excavations will be backfilled with ‫وﯾﺷﻣل اﻟﺳﻌر إزاﻟﺔ‬, ‫دون ﺗﻛﺎﻟﯾف إﺿﺎﻓﯾﺔ ورﻓﻊ اﻟﻣﺧﻠﻔﺎت اﻟﻰ اﻟﻣﻘﺎﻟب اﻟﻣﺧﺻﺻﺔ ﻣن اﻟﺳﻠطﺔ اﻟﻣﺣﻠﯾﺔ‬
Suitable and compacted soil without additional costs and transferring waste to ‫اﻟﻌواﺋﻖ اﻟﺳطﺣﯾﺔ وإزاﻟﺔ اﻟﻧﺑﺎﺗﺎت واﻟطﺑﻘﺎت اﻟﺳطﺣﯾﺔ ﻟﻠﺗرﺑﺔ وأﻋﻣﺎل اﻟدك واﻟرش ﻋﻠﻰ طﺑﻘﺎت ﻟﺗﺣﻘﯾﻖ‬
the designated landfills of local authority. The item includes the removal of ‫اﻟﻣﻧﺎﺳﯾب اﻟﻣﻼﺋﻣﺔ ﻟﻠوظﺎﺋف اﻟﻣﺣددة ﺑﻣﺧطط اﻟﻣوﻗﻊ اﻟﻌﺎم ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس واﻟرﺳوﻣﺎت‬
surface barriers, plants, surface layers of soil, compacting in layers and curing .‫اﻟﻣرﻓﻘﺔ ﻣﻊ ﺗﻌﻠﯾﻣﺎت ﻣﮭﻧدس اﻟﻣوﻗﻊ‬
with water to reach the appropriate levels of functions defined in the general site
plan according to specifications, drawings attched with the instruction of site
Soil excavation in meter cubic: :‫ﺣﻔر اﻟﺗرﺑﺔ ﺑﺎﻟﻣﺗر اﻟﻛﻌب‬
In cubic meters: digging in any type of soil for building foundations and corridors ‫ اﻟﺣﻔر ﻓﻲ أي ﻧوع ﻣن اﻧواع اﻟﺗرﺑﺔ ﻟﻸﺳﺎﺳﺎت اﻟﻣﺑﻧﻰ واﻟﻣﻣرات ﺑﻌﻣﻖ ﻻ ﯾﻘل ﻋن‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
with a depth of not less than 1 meter. Where necessary, even the level suitable ‫ وﺣﯾﺛﻣﺎ ﯾﻠزم ﺣﺗﻰ اﻟﻣﻧﺳوب اﻟﺻﺎﻟﺢ ﻟﻠﺗﺄﺳﯾس وﻧزع اﻟﻣﯾﺎه إن وﺟدت ﻣﻊ اﻟﺣﻔﺎظ ﻋﻠﻰ ﺟواﻧب‬.‫ﻣﺗر‬1
for establishment and dewatering, if any, while maintaining the aspects of drilling ‫ﻣﯾﺎه ( ﻣﻊ ﻧﻘل ﺟﻣﯾﻊ اﻟﻣﺧﻠﻔﺎت إﻟﻰ اﻟﻣواﻗﻊ اﻟﻣﻌﺗﻣدة ﻣن اﻟﺳﻠطﺔ‬- ‫ﺗﻠﻔون‬-‫ اﻟﺣﻔر واﻟﺗﻣدﯾدات )ﻛﮭرﺑﺎء‬m3
1.1.2 and extensions (electricity - telephone - water) with the transfer of all waste to ‫ وﯾﺗﺣﻣل اﻟﻣﻘﺎول أي‬.‫ اﻟﻣﺣﻠﯾﺔ واﻟﺣﻔرﯾﺗم طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬3‫م‬ 42.34
the sites approved by the local authority and drilling in accordance with the .‫أﺿرار ﻗد ﺗﺣدث ﺑﺎﻟﺧدﻣﺎت أو ﺑﺎﻟﻣﻧﺎزل ﺑﺳﺑب اﻟﺣﻔر وﺟﻣﯾﻊ ﻣﺎﯾﻠزم ﻻﻧﮭﺎء اﻟﺑﻧد‬
drawings, specifications and instructions of the supervising engineer. The
contractor shall bear any damages that may occur to the services or houses due
to excavation and all that is necessary to terminate the item.
Backfill around foundations, Sidewalk, water tank and areas that need to ‫اﻟردم ﺣول ﻛرﺳﻲ اﻟﺣﺟر واﻟﻌﻧﺎﺻر اﻹﻧﺷﺎﺋﯾﺔ أﺳﻔل ﻣﺳﺗوى ﺳطﺢ اﻷرض ﻟﻠﻣﺑﻧﻰ واﻟﺧزان واﻟﻣﻣرات‬
be in meter cubic: ‫واﻟﻣﻧﺎطﻖ اﻟﺗﻲ ﺗﺣﺗﺎج ﻟذﻟك ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
Backfill with valid and clean soil mixed with graded fractions stones resulted ‫ اﻟردم ﺑﺎﻟﺗرﺑﺔ اﻟﺻﺎﻟﺣﺔ واﻟﻧظﯾﻔﺔ ﻣﺧﻠوطﺔ ﺑﻛﺳر اﻷﺣﺟﺎر اﻟﻣﺗدرﺟﺔ ﺣول ﻛرﺳﻲ اﻟﺣﺟر‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
from site excavations or brought from outside to be filled around the foundations ‫واﻟﻌﻧﺎﺻر اﻹﻧﺷﺎﺋﯾﺔ أﺳﻔل ﻣﺳﺗوى ﺳطﺢ اﻷرض وداﺧل أرﺿﯾﺎت اﻟﻣﺑﻧﻰ ﻛﺎﻣﻠﺔ ﻣن ﻧﺎﺗﺞ اﻟﺣﻔر أو ﻣن‬
as well as inside the building on layers not more than 30 cm using mechanical ‫ ﺳم أوﻻ ً ﺑﺄول ﻣﻊ اﻟدك اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟرش ﺑﺎﻟﻣﺎء ﺣﺗﻰ‬30 ‫ﺧﺎرج اﻟﻣوﻗﻊ ﻋﻠﻰ طﺑﻘﺎ ًت ﻻ ﺗزﯾد ﻋﻠﻰ‬
compactor, curing with water to achieve the appropriate strength and get a ‫ﺗﺣﻘﯾﻖ اﻟﻘوة اﻟﻣﻧﺎﺳﺑﺔ و اﻟﺣﺻول ﻋﻠﻰ ﺗرﺑﺔ ﻣﺗﻣﺎﺳﻛﺔ وطﺑﻘﺎ ً ﻟﻠﻣﻧﺎﺳﯾب اﻟﻣﺣددة ﻣﻊ اﺳﺗﺧدام اﻟدك‬
cohesive soil according to the specified levels. Carry out compacting of narrow ‫ ﻣﻊ ﻋدم اﻹﺿرار ﺑﺎﻟﻌﻧﺎﺻر واﻷﻋﻣﺎل اﻟﻣﻧﻔذة ﻓﻲ‬,‫ﻟﻸﻣﺎﻛن اﻟﺿﯾﻘﺔ ﺣول اﻷﺳﺎﺳﺎت واﻟﻣﺑﺎﻧﻲ اﻟﺣﺟرﯾﺔ‬
1.1.3 areas around foundations and external stone walls, causing no damage to the ‫وﻧﻘل اﻟﺗرﺑﺔ اﻟزاﺋدة ﻋن اﻟردم إﻟﻰ ﺧﺎرج اﻟﻣوﻗﻊ ﻟﻠﻣﻘﺎﻟب اﻟﻌﺎﻣﺔ ﻣﻊ ﻋﻣل اﻟطرﻗﺎت واﻟﻣﺳﺎﻟك‬, ‫ اﻟﻣوﻗﻊ‬m3 36.00
works implemented in the site, and transfer of excess dump soil to public dumps ‫ اﻵﻣﻧﺔ واﻟﻼزﻣﺔ ﻟﻧﻘل اﻟﻣواد واﻟﻣﻌدات ﻟزوم اﻟﺗﻧﻔﯾذ ﻓﻲ ﻧطﺎق اﻟﻣوﻗﻊ وﺗﻧظﯾف اﻟﻣوﻗﻊ ﻣن اﻟﻣﺧﻠﻔﺎت‬3‫م‬
off site. Safe roads for trolleys to transfer materials and equipment used for ‫اﻟﻧﺎﺗﺟﺔ ﻋن اﻟﺗﻧﻔﯾذ وﺗﺳﻠﯾم اﻟﻣﺷروع وﻣوﻗﻌﮫ ﺧﺎﻟﯾﺎ ً ﻣن أي ﻣؤﺛرات ﻋﻠﻰ ﺳﻼﻣﺗﮫ ﻣﺳﺗﻘﺑﻼ ً ﻣن اﻧﮭﯾﺎرات‬
implementation within the site to be prepared. Before project handover, site has ‫اﻟﺗرﺑﺔ ﺑﺄﻧواﻋﮭﺎ وﺧﻼﻓﮫ ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن أﻋﻣﺎل اﻟﺗﻧﻔﯾذ ورﻋﺎة اﻟﻣﯾول اﻟﻼزم ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر‬
to be free of waste resulting from implementation as well as other factors which . ‫واﻟﻌﻣل ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻹﻧﺟﺎز اﻟﺑﻧد وطﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
may effect the project safety in future like landslides of various types and others,
taking in considerations preparation of slopes needed to drain rainwater. The
item includes all the necessary to complete the item in accordance with the
drawings
Remove and and reconstruction
specifications andof instructions
the school of the school
Yard supervisor..
wall for new :‫ھدم وإﻋﺎدة ﺑﻧﺎء ﺳور اﻟﻣدرﺳﺔ ﻟﻣوﻗﻊ اﻟﻔﺻول ﺑﺎﻟﻣﻘطوﻋﯾﺔ‬
classes in Lum sum: ‫ھدم ﺳور اﻟﻣدرﺳﺔ ﻓﻲ اﻟﻣوﻗﻊ اﻟﻣﺣدد ﻟﺑﻧﺎء اﻟﻔﺻول اﻟدارﺳﯾﺔ اﻟﺟدﯾدة و اﻟﻌﻣل ﯾﺷﻣل إﻋﺎدة ﺑﻧﺎء اﻟﺳور‬
Remove the school wall at the site specified for the construction of the new ‫ﻣن أطراف اﻟﻔﺻول اﻟدارﺳﯾﺔ ورﺑطﮫ ﻣﻊ اﻟﺑﻧﺎء اﻟﻣﺳﺗﺣدث ﻋﻠﻰ أن ﺗﻛون اﻟﻣواد اﻟﻣﺳﺗﺧدﻣﺔ ﺑﺣﺳب‬
classrooms and the work includes rebuilding the fence from the edges of the ‫اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس وﻣﺗﻧﺎﺳﻖ ﻣﻌﻣﺎرﯾﺎ ً ﻣﻊ اﻣﺗداد اﻟﺳور اﻟﻘدﯾم وﺑﻧﻔس طرﯾﻘﺔ اﻟﺑﻧﺎء اﻟﻣﺗﺑﻌﺔ ﻟذﻟك و ﻧﻘل‬
Lum
1.1.4 classrooms and linking it with the new construction, provided that the materials .‫اﻟﻣﺧﻠﻔﺎت و ﻛل ﻣﺎ ﯾﻠزم ﻻﻧﮭﺎء اﻟﺑﻧد ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 1
sum
used are according to specifications and standards and architecturally
consistent with the extension of the old wall and in the same way as the
construction used for that and the transfer of waste and everything necessary to
finish the item according to the instructions of the supervising engineer.
Rehabilitation of Yard school: :‫إﻋﺎدة ﺗﺄھﯾل ﺳور اﻟﻣدرﺳﺔ‬
Restoring and rehabilitating the entire school wall. The work includes removing ‫إﻋﺎدة ﺗرﻣﯾم و ﺗﺄھﯾل ﺳور اﻟﻣدرﺳﺔ ﺑﺎﻟﻛﺎﻣل و اﻟﻌﻣل ﯾﺷﻣل إزاﻟﺔ اﻟﺑﻠوك اﻟﺗﺎﻟف وإﻋﺎدة ﺑﻧﺎءه ﻛﺎﻟﺳﺎﺑﻖ و‬
1.1.5 the damaged block and rebuilding it as before, as well as the areas of damage ‫أﻣﺎﻛن اﻟﺿرر ﻓﻲ اﻟﺳور و اﻟﻛورﻧﯾش و طﻼء اﻟﻛورﻧﯾش و اﻻﻋﻣدة ﺑﺎﻟﻠون اﻟﻣطﻠوب ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت‬ lum. Sum1.00
in the wall and cornice according to the instructions of the supervising engineer. .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
Mitigation of environmental impact during the project implementation -: ‫ﺗﺧﻔﯾف اﻷﺛر اﻟﺑﯾﺋﻲ ﺧﻼل ﻓﺗرة ﺗﻧﻔﯾذ اﻟﻣﺷروع‬
period: ‫ﻋﻠﻰ اﻟﻣﻘﺎول ﺗورﯾد وﺗﻧﻔﯾذ اﻷﻋﻣﺎل اﻟﺿرورﯾﺔ ﺑﺎﻟﻣوﻗﻊ ﻟﺗﺧﻔﯾف اﻷﺛر اﻟﺑﯾﺋﻲ واﻟﻣﺗﻣﺛﻠﺔ‬:‫ﺑﺎﻟﻣﻘطوﻋﯾﺔ‬
The contractor shall supply and carry out the necessary works at the site to -:‫ﺑﺎﻟﺗﺎﻟﻲ‬
mitigate environmental impact through implementation the following : . ‫ اﻟﺦ ﻟﻣﻧﻊ دﺧول ﻏﯾر اﻟﻌﺎﻣﻠﯾن إﻟﯾﮫ‬... ‫ ﺗﺳوﯾر اﻟﻣوﻗﻊ ﻛﺎﻣﻼ ً ﺑﺎﻟزﻧك أو اﻷﺧﺷﺎب أو‬-1
1. Site shall be completely fenced with zinc or wood, etc. to prevent entry of non- ‫ ﺗورﯾد ﻣﺳﺗﻠزﻣﺎت وأدوات اﻟﺳﻼﻣﺔ اﻟﺷﺧﺻﯾﺔ ﻣن إﺻﺎﺑﺎت اﻟﻌﻣل وﺗﺷﻣل )اﻟﺟزﻣﺎت واﻟﻘﺑﻌﺎت‬-2
workers. ‫اﻟﺦ( ﺑﺎﻟﻌدد اﻟﻛﺎﻓﻲ ﻟﻠﻌﻣﺎل‬.. ‫واﻟﻛﻔوف واﻟﻧظﺎرات اﻟواﻗﯾﺔ اﻟﻛﻣﺎﻣﺎت وﺳدادات اﻷذان وأﺣزﻣﺔ اﻷﻣﺎن‬
2 – Supply of personal safety tools against work injuries (including caps, hats, .‫اﻟﻌﺎدﯾﯾن واﻟﻣﺎھرة ﻋﻠﻰ ﻧﻔﻘﺔ اﻟﻣﻘﺎول ﺑﺣﺳب ﺣﺟم اﻟﻌﻣﺎﻟﺔ اﻟﺗﻲ ﯾﺗطﻠﺑﮭﺎ اﻟﻣﺷروع وإﻟزاﻣﮭم ﺑﺎﺳﺗﺧداﻣﮭﺎ‬
gloves, protective glasses, gaskets, earplugs, safety belts, etc.) with adequate ‫اﻟﺦ‬..‫ﻣﺗر ﻣؤﻗت ﻣن اﻟزﻧك أو اﻟﺧﺷب أو اﻟﺑﻠك‬2.5 ‫ﻣﺗر وارﺗﻔﺎع‬1×1.5 ‫ ﺗﺷﯾﯾد ﺣﻣﺎم ﺑﺄﺑﻌﺎد‬-3
numbers for ordinary and skilled workers at the contractor's expense, depending ‫وﻣرﺣﺎض ﻋرﺑﻲ وﻣﻐﺳﻠﺔ اﻷﯾدي اﻟﻣؤﻗﺗﺔ وﺗوﻓﯾر اﻟﻣﯾﺎه ﻟﮭذا اﻟﺣﻣﺎم وﻋﻣل ﺣﻔرة )ﺑﯾﺎرة ﻣﺻﻐرة أو‬
on the size of the labor force required for the project. They will be oblige to use ‫ﺗرﻧش (ﻣﻊ اﻟﻐطﺎء وإﻟزام ﺟﻣﯾﻊ اﻟﻌﻣﺎل واﻟﻣﺷرﻓﯾن ﺑﺎﺳﺗﺧداﻣﮫ وﯾﺗم إزاﻟﺔ اﻟﺣﻣﺎم وردم اﻟﺑﯾﺎرة ﯾﻌد‬
them. . ‫اﺳﺗﻛﻣﺎل ﺗﻧﻔﯾذ اﻟﻣﺷروع‬
1.1.6 3 - Construction of a 1.5 x 1 x2.5 meter temporary bath of zinc, wood, bricks, etc ‫ اﻟﻘﯾﺎم ﺑﺗﺷوﯾن اﻟﻣواد ﺑطرﯾﻘﺔ ﻣﻧﻔﺻﻠﺔ وﺗوﻓﯾر ﻣﺳﺎﺣﺎت ﻛﺎﻓﯾﺔ ﻟﻠﺣرﻛﺔ واﻟﻣﻧﺎورة وﻛذﻟك إزاﻟﺔ‬-4 Lum 1
an eastern toilet, a temporary wash basin, supply of water for bathroom and .(‫ اﻷﺧﺷﺎب ورﻓﻊ ﻛﺎﻓﺔ اﻟﻣﺧﻠﻔﺎت ﺧﻼل ﻓﺗرة اﻟﺗﻧﻔﯾذ إﻟﻰ ﺧﺎرج ﻣﻧطﻘﺔ اﻟﻌﻣل )اﻟﻣﻘﺎﻟب اﻟﻣﺧﺻﺻﺔ‬sum
implement a covered cesspool . All workers and supervisors are obliged to use ‫اﻻﻟﺗزام ﺑوﺿﻊ اﻟﻣﻌدات اﻟﻣزﻋﺟﺔ ﺑﻌﯾدا ً ﻋن اﻷﻣﺎﻛن اﻟﻣﺄھوﻟﺔ وﺗﺷﻐﯾﻠﮭﺎ ﻓﻲ اﻷوﻗﺎت اﻟﻣﻧﺎﺳﺑﺔ وﻛذﻟك‬-5
it. At the completion of the project, the bathroom shall be removed and the ‫اﻻﻟﺗزام ﺑﺗﺧزﯾن اﻟﻣواد اﻟﺧطﯾرة ﺑﻌﯾدا ً ﻋن اﻟﻌﺎﻣﻠﯾن واﻟﻌﻣل ﻋﻠﻰ ﻋدم ﺗﻐﯾﯾر اﻟزﯾوت أو ﺗرك ﺑﻘﺎﯾﺎ اﻟﺷﺣوم‬
cesspool shall be backfilled. .‫ﻓﻲ ﻣﻧطﻘﺔ اﻟﻌﻣل‬
4 - Materials to be separately stored and provide sufficient areas for movement ‫ﻣﺟﺎري ( اﻟﺗﻲ ﺗﺗﻌرض ﻟﻠﻛﺳر إﺛﻧﺎء ﺗﻧﻔﯾذ‬-‫ﻣﯾﺎه‬- ‫ﺗﻠﻔون‬-‫اﻻﻟﺗزام ﺑﺈﺻﻼح اﻟﺧدﻣﺎت اﻟﻌﺎﻣﺔ )ﻛﮭرﺑﺎء‬-6
and handling, as well as removal of wood and all waste produced during the . ‫اﻟﻣﺷروع أوﻻ ً ﺑﺄول‬
implementation period outside the work area ( public dumps). . ‫ ﺣﻘﯾﺑﺔ اﺳﻌﺎﻓﺎت أوﻟﯾﺔ ﻟﻠﻌﻣﺎﻟﺔ‬-7
5 - Terrible equipments will be put away from populated places and to be
operated at the appropriate times as well as the obligation to store dangerous
materials away from workers and no change of oils or leaving the grease
residues in the work area.
6 - Commitment
"Helson's to yard
school reform public services (electricity - telephone - water -
mattress: :‫ﻓرﺷﺔ ھﻠﺳن ﻟﺣوش اﻟﻣدرﺳﺔ‬
Supplying and furnishing a graded helsen layer for the courtyard and the inner ‫ﺗورﯾد وﻓرش طﺑﻘﺔ ھﻠﺳن ﻣﺗدرج ﻟﻠﻔﻧﺎء واﻟﺳﺎﺣﺔ اﻟداﺧﻠﯾﺔ واﻟﻣوﺿﺣﺔ ﺑﺎﻟرﺳوﻣﺎت اﻟﻣوﺿﺣﺔ واﻟﻌﻣل‬
courtyard, as shown in the drawings, and the work includes the following: ‫ـ‬: ‫ﯾﺷﻣل اﻵﺗﻲ‬
1.1.7 - Leveling the site with tamping and spraying with water, and making slopes for ‫ ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ ﻣﻊ اﻟدك واﻟرش ﺑﺎﻟﻣﯾﺎه وﻋﻣل ﻣﯾول ﻟﻠﺳﺎﺣﺔ ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر ﻗﺑل ﻓرش اﻟﻛري‬- Lum 1
the yard to drain rainwater before laying the paver, according to the instructions ‫ ﺳم ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت‬5 ‫ ﺗورﯾد وﻓرش طﺑﻘﺔ ﻛري ﺑﺳﻣك‬-. ‫ وﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬sum
of the supervising engineer. - Supplying and spreading a layer of paver with a .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
thickness of 5 cm according to the instructions of the supervising engineer.”
Planting works:- In number: The supply and implementation of Plants with 2 -: ‫أﻋﻣﺎل اﻟﺗﺷﺟﯾر‬
meter length in pavement square that has dimention of ( 2M * 1.3 M). so every ‫ ﺳم ﺗﻧﻔﯾذ ﺑﻠوك ﺻم‬70 ‫ﻣﺗر ﺑﻌﻣﻖ‬1.3 ‫ﻣﺗر وﻋرض‬2 ‫ ﺗورﯾد وﺗﻧﻔﯾذ اﺣواض أﺷﺟﺎر طول‬: ‫ﺑﺎﻟﻌدد‬
two tree in one poll. The price includes planting seedlings, agricultural soil and ‫ وﻋﻣل اﻟردﻣﯾﺎت ﻣﻊ أﻋﻣﺎل‬.‫ ﺳم ﺑﺣﯾث ﯾﺗم ﻏرس ﺷﺟرﺗﯾن ﻓﻲ ﻛل ﺣوض‬40*20*20 ‫ﺗﻛون ﺑﻣﻘﯾﺎس‬
all that is needed according to the attached and according to drawings and ‫( ﻧﯾس إﻟﻰ اﺳﻣﻧت ﺑﺣﯾث ﯾﺗم‬1:3) ‫اﻟﺧرﺳﺎﻧﺔ ﻻﺻﻘﺔ ﻓﯾﻣﺎ ﺑﯾﻧﮭﺎ ﺑﻣوﻧﺔ ﺧرﺳﺎﻧﯾﺔ ذو ﻧﺳﺑﺔ ﺧﻠط ﺑﻣﻘدار‬
1.1.8 specifications and the instructions of the supervisor engineershall be in a scale ‫ أﯾﺎم ﻣﻊ ﺗﻠﺑﯾس اﻟﺑﻠوك ﻣن اﻟداﺧل واﻟﺧﺎرج إﺿﺎﻓﺔ اﻷﻟوان ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت‬5 ‫ رﺷﮭﺎ ﺑﺎﻟﻣﯾﺎه ﻛل ﯾوم ﺑﻣﻘدار‬pcs 8.00
of 25 * 10 * 50 cm. And the work of the backfill with concrete works adhesive ‫ﻋدد اﻟﻣﮭﻧدس اﻟﻣﺷرف ﺑﻣﺎ ﯾﺗﻧﺎﺳﻖ ﻣﻊ أﻟوان اﻟﻣدرﺳﺔ وﺷﻌﺎرات اﻟﻣﻧظﻣﺔ واﻟﺛﻣن ﯾﺷﻣل ﻏرس اﻟﺷﺗﻼت‬
between them with concrete mortar with a mixing ratio of (1:3) fine sand with ‫واﻟﺗرﺑﺔ اﻟزراﻋﯾﺔ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣﺧططﺎت اﻟﻣروﻓﻘﺔ وﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬
cement so that it is sprinkled with water every day by 5 days with the addition of .‫اﻟﻣﺷرف‬
colors according to the instructions of the supervising engineer in line with the
colors of the school and the logos of the organization.
Sidewalk around the building: Sidewalk around the building, height shall be at : ‫رﺻﯾف ﺣول اﻟﻣﺑﻧﻰ‬
least 30 cm and width 0.8 meter to be according to the detailed drawings ‫ ﻣﺗر ﺑﺣﺳب اﻟﻣﺧططﺎت‬0.8 ‫وﻋرض‬،‫ ﺳم‬30 ‫ رﺻﯾف ﺣول اﻟﻣﺑﻧﻰ ﺑﺎرﺗﻔﺎع ﻻ ﯾﻘل ﻋن‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
attached. Excavation, backfilling, compaction and curing with water to be ‫ﻣﻊ ﻋﻣل‬،‫ﺳم‬10 ‫اﻟﺗﻔﺻﯾﻠﯾﺔ اﻟﻣرﻓﻘﺔ ﻣﻊ اﻟﺣﻔر واﻟردم واﻟدك واﻟرش وطﺑﻘﺔ ﻣن اﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺳﻣك‬
1.1.9 executed. A layer of plain concrete thickness of 10 cm, casted on a layer of ‫ﻣﻊ ﻋﻣل ﺑﻼط أرﺻﻔﺔ ﻣﻠون ﻣﻊ ﻣراﻋﺎة اﻟﻣﯾول اﻟﻸزم ﻣﻊ‬, ‫ ﺳم‬10 ‫ طﺑﻘﺔ ﻣن اﻟﺻوﻟﻧﺞ ﺗﺣﺗﮭﺎ ﺑﺳﻣك‬m2 21.50
stone fractions 15 cm thickness. The layer of pavement cement tiles to be ‫ ﻣﺑﺎﻧﻲ ﺣﺟر ﻣرﺑوع ﻣﻊ اﻟﺗﻛﺣﯾل واﻟﺗدرﯾز وﯾﺷﻣل ﻣﻊ اﻟﺣﻔر واﻟﺗﺎﺳﯾس‬،‫ ﻣﺗر‬4 ‫ ﻋﻣل ﻓواﺻل اﻟﺗﻣدد ﻛل‬2‫م‬
installed taking into account slopes , expansion joints and concrete curbstones .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،
or squared stone as well as excavation and foundation according to the
drawings and specifications, and the instructions of the supervisor.
Moving the school’s main gate: Moving the school’s main gate from its main ‫ ﻧﻘل ﺑواﺑﺔ اﻟﻣدرﺳﺔ اﻟرﺋﯾﺳﯾﺔ ﻣن ﻣوﻗﻌﮭﺎ اﻟرﺋﯾﺳﻲ اﻟﻰ ﻣوﻗﻊ ﯾﺣددھﺎ‬:‫ﻧﻘل ﺑواﺑﺔ اﻟﻣدرﺳﺔ اﻟرﺋﯾﺳﯾﺔ‬
location to a location determined by the supervising engineer. The work includes ‫ﻣﮭﻧدس اﻟﻣﺷرف ﯾﺷﻣل اﻟﻌﻣل ﻓﺗﺢ ﻓﻲ اﻟﺳور ﻟﻠﺑواﺑﺔ و ﻋﻣل أﻋﻣدة ﺧرﺳﺎﻧﯾﺔ ﻣﻊ ﺻﯾﺎﻧﺔ وﻣﻔﺎﻗدة اﻟﺑواﺑﺔ‬
opening the Yard wall for the gate and making concrete columns, along with -: ‫م وذﻟك ﺑﻌﻣل اﻵﺗﻲ‬2.2 × ‫ م‬2.8 ‫اﻟﺣدﯾد ﻟﻠﻣدرﺳﺔ ﺑﺎﻷﺑﻌﺎد‬
maintaining and inspecting the school’s iron gate with dimensions of 2.8m x ‫ ﻗطﻊ اﻟﺣدﯾد اﻟﺗﺎﻟف واﺳﺗﺑدال اﻟﻘطﻊ اﻟﻣﺧﻠوﻋﺔ ﻣن ﻣراﺑﯾﻊ وﻏﯾرھﺎ ﻓﻲ ﺟﺳم اﻟﺑﺎب وﺳﻣﻛرة اﻷﺟزاء‬-
2.2m, by doing the following: - . ‫اﻻﺧرى ﺑﺈﺻﻼﺣﮭﺎ أو إﺳﺗﺑداﻟﮭﺎ‬
- Replacing rusted parts of the gates and others in the door body, and plumbing ‫ اﺳﺗﺑدال اﻟﻣﻐﺎﻟﻖ واﻟﻣﻔﺻﻼت اﻟﺗﺎﻟﻔﮫ ﺑﺄﺧري وﻋﻣل ﺛﻼث ﻣﻔﺻﻼت ﻓﻲ ﻛل ﺟﺎﻧب وﻣﺎ ﯾﻠزﻣﮭﻣﺎ وﺗورﯾد‬-
1.1.10 the other parts by repairing or replacing them. lum. Sum1.00
‫ﻗﻔﻠﯾن ﻛﺑﯾرﯾن أﺻﻠﻲ‬
- Replacing damaged shutters and hinges with others, making three hinges on ، ‫ﺿﺑط اﻟوزﻧﯾﺔ وﻏﯾر ذﻟك ﻣن اﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ اﻟﻼزﻣﮫ ﻟﺿﻣﺎن اﻋﺎدة ﺗﺷﻐﯾل اﻟﺑواﺑﺔ ﺑﺎﻟﺷﻛل اﻟﻣطﻠوب‬-
each side and what is needed, and supplying two large original locks. ‫وﻋﻠﻲ اﻟﻣﻘﺎول زﯾﺎرة اﻟﻣوﻗﻊ ﻗﺑل ﺗﻘدﯾم ﻋرض اﻟﺳﻌر‬
- Adjusting the weight and other necessary maintenance work to ensure that the ‫ﯾﺷﻣل اﻟﺑﻧد ﻛل ﻣﺎﯾﻠزم ﺑﺣﺳب اﺻول اﻟﻌﻣل اﻟﻣﺗﻌﺎرف ﻋﻠﯾﮭﺎ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
gate is restarted as required. The contractor must visit the site before submitting
the price offer.
The item includes everything necessary according to generally accepted work
Total Amount Of Excavation and Backfilling Works ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟردم و اﻟﺣﻔر‬
1.2 Concrete Works : ‫اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت‬
Notes : :‫ﻣﻠﺣوظﺔ‬
The prices for reinforced concrete include the following: -:‫أﺳﻌﺎر اﻟﺧرﺳﺎﻧﺎت ﺗﺷﻣل اﻷﺗﻲ‬
1- Form works and reinforcement .‫ أﻋﻣﺎل اﻟﺷدات اﻟﺧﺷﺑﯾﺔ واﻟﺣدﯾد‬-1
2- Mixing the concrete and the watering up to a period of 2 weeks and all related works .‫ اﺳﺑوﻋﯾن وﻛل اﻷﻋﻣﺎل ﺑﺣﺳب اﻟرﺳوﻣﺎت‬2 ‫ أﻋﻣﺎل اﻟﺧﻠطﺔ اﻟﺧرﺳﺎﻧﯾﺔﻣﻊ اﻟرش ﻟﻔﺗرة‬-2
mentioned in the drawings .‫ ﻋﻣل ﻣﻛﻌﺑﺎت اﺧﺗﺑﺎر واﺧﺗﺑﺎرھﺎ‬-3
3- Producing sample and their testing. .‫ﺳم أﺳﻔل اﻟﻣﯾدات اﻟداﺧﻠﯾﺔ واﻟﺧﺎرﺟﯾﺔ‬15 ‫ طﺑﻘﺔ ﻛري ﺳﻣك‬-4
4- A layer of aggregate of 15cm thickness under the internal and the external TB's. ‫ أى طﻠﺑﺎت إﺿﺎﻓﯾﺔ ﯾطﻠﺑﮭﺎ اﻟﻣﮭﻧدس‬-5
5- Any additional requests by the Engineer .‫ ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول أن ﯾورد اﻟﻣواد اﻟﺗﻲ ﺗﺗطﺎﺑﻖ ﻣﻊ اﻟﻣواﺻﻔﺎت اﻟﺧﺎﺻﺔ واﻟﻌﺎﻣﺔ‬6
6- The contractor shall only use materials corresponding with the general or special ‫ ﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻣﺳﺋوﻟﯾﺔ ﻧﻘل وﺗﺧزﯾن اﻟﻣواد ﺑﺎﻟطرﯾﻘﺔ اﻟﻣﻧﺎﺳﺑﺔ اﻟﺗﻰ ﻵﺗﻌرﺿﮭﺎ ﻟﻠﺗﻠف وﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻘﯾﺎم ﺑﺳرﻋﺔ ﻧﻘل‬-7
specifications. .‫اﻟﻣواد اﻟﺗﺎﻟﻔﺔ ﻣن اﻟﻣوﻗﻊ ﻣﺑﺎﺷرة ﺑﻌﺑﺎرة أﺧرى ﻣﻣﻧوع ﻣﻧﻌﺎ ﺑﺎﺗﺎ اﺳﺗﺧدام أي ﻣواد ﺗﺎﻟﻔﺔ‬
7- The contractor shall deliver the material to the site, store it in a proper way to prevent any ‫ ﯾﻠزم إﺳﺗﺧدام اﺳﻣﻧت ﻣﻘﺎوم ﻟﻠﻛﺑرﯾﺗﺎت ﻟﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت اﻟﻌﺎدﯾﺔ واﻟﻣﺳﻠﺣﺔ ﺑﺎﻷﺳﺎﺳﺎت واﻷرﺿﯾﺎت ﻓﻲ اﻟﻣﻧﺎطﻖ‬-8
damage and remove any surplus from the site after finishing. No spoiled material has to be .‫اﻟﺳﺎﺣﻠﯾﺔ‬
used. ‫ اﻟﻛري اﻟﻣﺳﺗﺧدم ﻟﻠﺻﺑﯾﺎت اﻟﻣﺳﻠﺣﺔ ﻛري ﻛﺳﺎرة وﯾﺳﺗﺧدم اﻟﮭزاز اﻟﻣﯾﻛﺎﻧﯾﻛﻲ أﺛﻧﺎء اﻟﺻب‬-9
8- Sulphate resistant cement shall be used for plain and reinforced concrete of the (3:2:1) ‫ ﺧرﺳﺎﻧﺔ‬3‫ م‬/ ‫ ﻛﺟم أﺳﻣﻧت‬350 ‫ ﻧﯾس و‬3‫م‬0.40 ‫ ﻛري و‬3‫م‬0.80 ‫ ﺧرﺳﺎﻧﺔ اﻟﺗﺳﻠﯾﺢ ﯾﺟب أن ﺗﺗﻛون ﻣن‬-10
foundations and floors in the coastal areas. .‫ ﻛري‬/ ‫ ﻧﯾس‬/ ‫اﺳﻣﻧت‬
9- Aggregate used for reinforced concrete shall be broken stones. A mechanical device shall ‫ ﺧرﺳﺎﻧﺔ‬3‫م‬1 ‫ﻛﺟم أﺳﻣﻧت ﻟﻛل‬250‫ ﻧﯾس و‬3‫م‬0.40‫ ﻛري و‬3‫م‬0.80 ‫ اﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﯾﺟب أن ﺗﺗﻛون ﻣن‬-11
be used during concreting for proper compaction. .‫ ﻛري‬/ ‫ ﻧﯾس‬/‫( أﺳﻣﻧت‬6:3:1)
10- Reinforced concrete shall generally, as long as no other specification is mentioned, . ‫ ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ ﻣن أﻋﻠﻰ ﺣدﯾد اﻟﺗﺳﻠﯾﺢ‬-12
consist of 0,80m3 aggregate, 0,40m3 sand and 350kg cement/m3 of concrete (1:2:3)
11- Plain concrete shall generally, as long as no other specification is mentioned, consist of
0,80m3 aggregate, 0,40m3 sand and 250kg cement/m3 of concrete (1:3:6).
12- The concealled pipes for electricity connection should be installed above the concrete
steel.
1.2.1 Plain concrete for floors 10 cm with stone fractions, Portland Cement: : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺳم ﻣﻊ ﺻوﻟﻧﺞ‬10 ‫ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻟﻸرﺿﯾﺎت‬
Plain concrete with a minimum thickness of 150 kg / cm 2, to be casted above a 150 ‫ وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن‬، ‫ﺳم إﺳﻣﻧت ﺑورﺗﻼﻧدي‬10 ‫ ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻟﻸرﺿﯾﺎت ﺳﻣك‬-: ‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
m2
stone fractions layer of not less than 10 cm thickness, according to the ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬،‫ﺳم‬10 ‫ ﻣﻊ وﺿﻊ ﻓرﺷﺔ ﻛﺳر اﺣﺟﺎر )ﺻوﻟﻧﺞ( ﺗﺣﺗﮭﺎ ﺑﺳﻣك ﻻ ﯾﻘل ﻋن‬،2‫ﺳم‬/‫ﻛﺟم‬ 104.00
2‫م‬
drawings, specifications and instructions of the supervising engineer. .‫واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

1.2.2 Reinforced concrete 250 kg / cm 2, for ground beam: : ‫ اﻟﻣﯾد إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ‫ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ‬
Reinforced concrete for cemells (ground beams) using Portland Cement, with ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ اﻟﻣﯾد اﻷرﺿﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
resistance of not less than 250 kg / cm 2. Item includes (shuttering, steel supply ‫ ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز‬،‫ اﻟﺻب‬،‫ ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250‫ ﻋن‬m3
and cutting, casting, vibrating concrete using a vibration machine and spattering . ‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،(‫ وﻛل ﻣﺎ ﯾﻠزم‬،‫ واﻟرش‬3‫م‬ 8.20
of water.( and all necessary) .All works to be done according to drawings,
specifications, and engineer supervisor instructions .
1.2.3 Reinforced concrete for columns and lintels of 250 kg / cm 2 Resistant : ‫إﺳﻣﻧت ﺑورﺗﻼﻧدي‬2 ‫ﺳم‬/‫ﻛﺟم‬250‫ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻸﻋﻣدة واﻷﻋﺗﺎب‬
Portland Cement: ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻸﻋﻣدة واﻷﻋﺗﺎب ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
Reinforced concrete for columns, lintels using Resistant Portland Cement, with ‫ ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز‬،‫ اﻟﺻب‬،‫ ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250‫ﻋن‬
resistance of not less than 250 kg / cm 2. Item includes wood formwork, steel ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬،(‫ وﻛل ﻣﺎ ﯾﻠزم‬،‫ واﻟرش ﻣﻊ إﺳﺗﺧدام اﻟﺗﻘﻣﯾص ﺑﺎﻟﺷواﻻت ﻟﻣدة ﻻ ﺗﻘل ﻋن إﺳﺑوع‬m3
6.20
supply and cutting, casting, vibrating concrete using a vibration machine, Curing .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ واﻟﻣواﺻﻔﺎت‬3‫م‬
with water in addition to cover columns with sackcloth for not less than a week.(
and all necessary) .All works to be done according to drawings, specifications,
and supervisor instructions.
1.2.4 Reinforced concrete for ceilings and beams, 250 kg / cm 2, Portland :‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ،‫ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور‬
Cement: ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور واﻟﻣﯾد اﻟﻌﻠوﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
Reinforced concrete for ceilings and beams using Portland Cement:with ‫ ھز‬،‫ اﻟﺻب‬،‫ ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ‫ وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن‬m3
resistance of not less than 250 kg / cm 2. Item includes (shuttering, steel supply ‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،(‫ واﻟرش ﺑﺎﻟﻣﺎء وﻛل ﻣﺎ ﯾﻠزم‬،‫ اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز‬3‫م‬ 22.60
and cutting, casting, vibrating concrete using a vibration machine and curing of .‫اﻟﻣﺷرف‬
water.( and all necessary) .All works to be done according to drawings,
specifications, and engineer supervisor instructions.
Total Amount of Concrete reinforcement Works. ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬
1.3 Stone and Brick Works: : ‫اﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ‬
Building works 3‫م‬/‫ﻛﺟم‬300 ‫أﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ ﺗﻧﻔذ درﺟﺔ أوﻟﻰ ﻣﺗراﺑطﺔ وﺑﺎﺳﺗﺧدام اﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم وﺑﻣﺣﺗوى أﺳﻣﻧت ﻻ ﯾﻘل ﻋن‬.1
1. Construction works shall be carried out first-class, interconnected, Resistant Portland cement, to be used with a cement
‫ وﯾﺟب ﺗرﻛﯾب وإﺣﻛﺎم اﻟﻠﺣﺎﻣﺎت اﻷﻓﻘﯾﺔ واﻟراﺳﯾﺔ‬،‫ رﻣل ﺑﺎﻟﺣﺟم ( أو ﺑﺣﺳب ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬3 :‫ أﺳﻣﻧت‬1 ) ‫أو‬, ‫رﻣل‬
content of not less than 300 kg / m3 of sand, or (1 cement: 3 Sand),Horizontal and vertical joints are properly implemented.
Leveling of wall faces and straightening of corners using the thread and balance. The item price include scaffolding, ‫واﻟﻌﻣل ﯾﺷﻣل اﻟﺳﻘﺎﯾل اﻟﻼزﻣﺔ واﻟﺗﻧﻌﯾم واﻟﺟﻠﻲ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم‬,‫ﺟﯾدا ً ﻣﻊ اﺳﺗواء اﻷوﺟﮫ واﺳﺗﻘﺎﻣﺔ اﻷرﻛﺎن ﺑﺎﺳﺗﺧدام اﻟﺧﯾط واﻟﻣﯾزان‬
smoothness, glossiness and all necessary to finish the work. . ‫ﻹﻧﮭﺎء اﻟﻌﻣل‬
2. The contractor shall submit samples of materials to be used (stones, bricks, sand, etc.) for written approval. ‫اﻟﺦ( ﻟﻠﻣواد اﻟﻣطﻠوﺑﺔ ﻟﺗﻧﻔﯾذ اﻟﻌﻣل ﻓﻲ اﻟﻣﺷروع ﻻﻋﺗﻣﺎدھﺎ وأﺧذ ﻣواﻓﻘﺔ‬...‫رﻣل‬-‫ﯾﺎﺟور‬-‫ﺑﻠك‬-‫ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﻘدﯾم ﻋﯾﻧﺎت)اﺣﺟﺎر‬.2
3. All stones have to be laid on their natural length as to be pressed vertically where they are in the building. spraying with .‫ﺧطﯾﺔ ﻋﻠﯾﮭﺎ‬
water twice a day for a week.
4. Stones have to be hard, solid, free of impurities, veins, sand holes, fractions and homogeneous in terms of origin and color
‫ﺗﺑﻧﻰ ﺟﻣﯾﻊ اﻷﺣﺟﺎر ﻋﻠﻰ ﻣراﻗدھﺎ اﻟطﺑﯾﻌﯾﺔ ﻟﯾﻛون اﻟﺿﻐط ﻋﻣودﯾﺎ ً ﻋﻠﻰ ھذه اﻟﻣراﻗد ﻣﮭﻣﺎ ﻛﺎن ﻣوﻗﻌﮭﺎ ﻓﻲ اﻟﺑﻧﺎء وﺗرش اﻟﻣﺑﺎﻧﻲ‬.3
(one quarry). .‫ﺟﯾدا ً ﻣرﺗﯾن ﻓﻲ اﻟﯾوم وﻟﻣدة أﺳﺑوع‬
5. Construction must be regular in terms of straightening of construction lines, joints and height of courses which shall not ‫ ﯾﺟب أن ﺗﻛون اﻷﺣﺟﺎر ﻗوﯾﮫ وﺻﻠﺑﮫ ﺧﺎﻟﯾﺔ ﻣن اﻟﺷواﺋب واﻟﻌروق واﻟﻔﺟوات اﻟرﻣﻠﯾﺔ واﻟﻛﺳور و ﻣﺗﺟﺎﻧﺳﺔ ﻣن ﺣﯾث اﻟﻧوع‬.4
exceed (20-25-30)cm .Spaces between fronting and lining stones (course stones) are well filled with cement mortar and stone .(‫واﻟﻠون)ﻣﺣﺟر واﺣد‬
fractions according to the drawings and specifications and the instructions of the supervisor
‫(ﺳم ﻟﺳرع‬30-25-20)‫ ﯾﺟب أن ﯾﻛون اﻟﺑﻧﺎء ﻣﻧﺗظﻣﺎ ً ﻣن ﺣﯾث اﺳﺗﻘﺎﻣﺔ ﺧطوط اﻟﺑﻧﺎء واﻟﻔواﺻل وارﺗﻔﺎﻋﺎت اﻟﺳروع ﻻ ﯾزﯾد ﻋن‬.5
6. The height of fronting stone construction without lining should not exceed 60 cm.
7. Granite stone constructions should be according to the sizes shown in the drawings. .‫اﻟواﺣد ﻣﻊ اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﺑﯾن اﻟﻣداﻣﯾك ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ واﻟﺷﻠف اﻟﺻﻐﯾر طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
8. The Engineer shall check and review the construction work properly (ensure that the balance and the thread is used .‫ﺳم ﺑدون ﺑطﺎﻧﺔ‬60‫ ﯾﺟب أن ﻻ ﯾزﯾد ارﺗﻔﺎع اﻟﺑﻧﺎء ﻟﻠواﺟﮭﺎت ﻋن‬.6
properly, thread is tighten and check the room diameters) .‫ ﯾﺟب أن ﺗﻛون ﻣﺑﺎﻧﻲ اﻟﺣﺟر اﻟﺟراﻧﯾت ﺣﺳب اﻟﻣﻘﺎﺳﺎت اﻟﻣوﺿﺣﺔ ﻓﻲ اﻟرﺳوﻣﺎت‬.7
9. The water balance and the plumb bob to be used in all courses of the constructions (in all work stages) . ‫ ﻋﻠﻰ اﻟﻣﮭﻧدس اﺳﺗﻼم أﻋﻣﺎل اﻟﺑﻧﺎء ﺑﺷﻛل ﺻﺣﯾﺢ واﻟﺗﺄﻛد ﻣن ﻣﯾزان اﻟﺧﯾط وﺷد اﻟﺧﯾط واﻟﺗرﺑﯾﻊ واﺳﺗﻼم أﻗطﺎر اﻟﻐرف واﻟﺗﺄﻛد ﻣن‬.8
10.Stones specially cut for edges will be used in all openings construction either fronting or lining stone. Edge stone height
(front height) not less than 15 cm minimum.
.‫ﺻﺣﺔ اﻟﺑﻧﺎء‬
11. The cladding stones should be applied from top and bottom for consistency, smooth back stones will not be used for .‫ ﯾﺟب اﺳﺗﺧدام ﻣﯾزان اﻟﻣﺎء ﻓﻲ ﻛل ﻣدﻣﺎك ﯾﺑﻧﻰ وﻋﻠﻰ اﻟﺑﻧﺎء اﺳﺗﺧدام اﻟﺑﻠﺑل ﻓﻲ ﻛﺎﻓﺔ ﻣراﺣل اﻟﻌﻣل‬.9
cladding . .‫ﺳم‬15‫ وﺑﺣﯾث ﻻ ﯾﻘل ﺑﻌد اﻟﺟﺑﮭﺔ اﻟﺻﻐﯾرة ﻟﻠرﻛن ﻋن‬.‫ ﯾﺟب اﺳﺗﺧدام أﺣﺟﺎر اﻷرﻛﺎن ﻓﻲ ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت ﻓﻲ اﻟﺑطﺎﻧﺔ واﻟظﮭﺎرة‬.10
12. Concrete beams and columns have to be spattered with cement mortar with mixing ratio of 1: 2 (cement: sand) and .‫ وﯾﻣﻧﻊ اﺳﺗﺧدام اﻷﺣﺟﺎر ذات اﻟظﮭر اﻷﻣﻠس‬،‫ ﯾراﻋﻰ ﺗﻧﻔﯾذ أﺣﺟﺎر اﻟﺗﻛﺳﯾﺔ ﻣن أﻋﻠﻰ وﻣن أﺳﻔل ﺑﺷﻛل ﻛﺎف ﻣن اﺟل اﻟﺗﻣﺎﺳك‬.11
curing with water before stone cladding .
.‫ رﻣل(ﻣﻊ اﻟرش ﻗﺑل اﻟﺗﻛﺳﯾﺔ ﺑﺎﻟﺣﺟر‬:‫)اﺳﻣﻧت‬1:2‫ ﯾﻠزم طرطﺷﺔ اﻟﺟﺳور واﻷﻋﻣدة ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط‬.12
13 - The lining part shall be constructed of stones. Gaps between fronting and lining stones have to be filled with plain
concrete of mixing (1: cement: 2.5 sand: 5 aggregate) , Aggregate shall be graded. ‫ ﯾﺟب أن ﺗﻛون اﻟﻣﺛﺎﻧﻲ)اﻟﺑطﺎﻧﺔ( ﻣن اﻟﺣﺟر وﯾﻌﺑﺄ اﻟﻔراغ اﻟذي ﺑﯾن ﺣﺟر اﻟﺗﻛﺳﯾﺔ )اﻟظﮭﺎرة( واﻟﺑطﺎﻧﺔ ﺑﺎﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺑﻧﺳﺑﺔ‬-13
14.Automatic concrete blocks will not be used before 28 days of fabrication. After supply to the project site, blocks should be .‫ﻛري( وﻋﻠﻰ إن ﯾﻛون اﻟﻛري ﻣﺗدرج‬5:‫ رﻣل‬2.5:‫اﺳﻣﻧت‬:1) ‫ﺧﻠط‬
cured with water before used for construction. ‫ ﯾوم ﻋﻠﻰ ﺗﺻﻧﯾﻌﮫ وﻋﻠﻰ اﻟﻣﻘﺎول ﺗورﯾد اﻟﺑﻠوك ﻟﻠﻣوﻗﻊ‬28 ‫ ﯾﻣﻧﻊ اﺳﺗﺧدام اﻟﺑﻠوك اﻻﺳﻣﻧﺗﻲ اﻟﻣﺻﻧﻊ أوﺗوﻣﺎﺗﯾﻛﯾﺎ ﻗﺑل ﻣرور‬.14
15. Mixing ratio of the cement mortar used for constructions with hollow cement blocks of 15 cm, 20 cm, 25 cm or more is .‫وﻣﻌﺎﻟﺟﺗﮫ ﺑﺎﻟﻣﺎء ﻗﺑل اﻟﺑﻧﺎء ﺑﮫ‬
(350 kg cement per cubic meter of sand.)
16. All the concrete block used is high pressure automatic. ‫ﻛﺟم‬350‫ﺳم أو اﻛﺛر ھﻲ‬25، ‫ﺳم‬20، ‫ﺳم‬15‫ ﻧﺳﺑﺔ اﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ اﻟﻣﺳﺗﺧدﻣﺔ ﻟﻠﻣﺑﺎﻧﻲ ﺑﺎﻟﺑﻠوﻛﺎت ااﻹﺳﻣﻧﺗﯾﺔ اﻟﻣﻔرﻏﺔ ﺳﻣك‬.15
- Solid block (Bardeen) for bearing walls: breaking resistance not less than 70 kg / cm 2 . ‫أﺳﻣﻧت ﻟﻛل ﻣﺗر ﻣﻛﻌب رﻣل‬
- Solid block (Bardeen) for non-bearing walls: breaking resistance not less than 35 kg / cm 2 .‫ ﺟﻣﯾﻊ اﻟﺑﻠك اﻟﻣﺳﺗﺧدم اﺗوﻣﺎﺗﯾﻛﻲ ﺿﻐط ﻋﺎﻟﻲ‬.16
17. All construction works shall be geometrically measured ,All openings and spaces to be deducted. 2‫ ﺳم‬/ ‫ ﻛﺟم‬70 ‫ ﻻ ﺗﻘل ﻣﻘﺎوﻣﺔ اﻟﻛﺳر ﻟﮫ ﻋن‬:‫ ﺑﻠك )ﺑردﯾن( ﺻم ﻟﻠﺟدران اﻟﺣﺎﻣﻠﺔ‬-
2‫ ﺳم‬/ ‫ ﻛﺟم‬35 ‫ ﻻ ﺗﻘل ﻣﻘﺎوﻣﺔ اﻟﻛﺳر ﻟﮫ ﻋن‬:‫ ﺑﻠك )ﺑردﯾن(ﺻم ﻟﻠﺟدران ﻏﯾر اﻟﺣﺎﻣﻠﺔ‬-
.‫ ﺗﻘﺎس ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ ھﻧدﺳﯾﺎ ً وﺗﺧﺻم ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت واﻟﻔراﻏﺎت‬.17
1.3.1 Black stone construction (basalt or granite): : ‫ﻣﺑﺎﻧﻲ ﺣﺟر ﻣرﺑوع أﺳود )ﺑﺎزﻟت او ﺟراﻧﯾت( ﻣﻧﺷﺎر ﺗﻛﺳﯾﺔ ﺣول اﻟﻣﯾدة‬
Squared black stone construction 15 cm thickness for the basalt stone base ‫ ﺑﻧﺎء ﺣﺟر ﻣرﺑوع ﻟﻠﻛرﺳﻲ اﻟﻣﺑﻧﻰ وﺣﯾث ﻣﺎ ﯾﻠزم اﺣﺟﺎر )ﺑﺎزﻟت او ﺟراﻧﯾت( ﻣﻧﺷﺎر‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
obtained from the project area(basalt or granite) or similar stones. Black stones ‫ ﺳم وأن ﺗﻛون اﺣﺟﺎراﻟﺑﻧﺎء ﻣﺳﺑﻠﺔ وﺧﺎﻟﯾﺔ ﻣن‬15 ‫ﻣﻘﺎوم ﻟﻠﻣﯾﺎة او اﺣﺟﺎر ﺗﻣﺎﺛﻠﺔ ﺳﻣك ﺟدار اﻟﺑﻧﺎء‬
have to be tailed, free of the veins and gaps, Rows height not more than 30 cm. ‫ﺳم وان ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي ﻣﻘﺎوم‬30 ‫اﻟﻌروق واﻟﻔﺟوات وارﺗﻔﺎع اﻟﺻف ﻻﯾزﯾد ﻋن‬
Cement mortar solty soil resistance used to be made of 3: 1 (cement: sand) . ‫رﻣل( ﻣﻊ اﻟﺗدرﯾز واﻟﺗﻛﺣﯾل ﻟﻠﻣﺑﺎﻧﻲ ﻣن ﻣﻧﺳوب اﻻرض واﻟﺗدرﯾز‬:‫)اﺳﻣﻧت‬3:1 ‫ﻟﻸﻣﻼح ﺑﻧﺳﺑﺔ‬
Starting from the ground level, Wall joints have to be smoothed, recessed ‫ واﻟﺗﻠﻌﯾص اﻟﺟﯾد ﻟﻠﻣﺑﺎﻧﻲ ﻣن اﺳﻔل ﻣﻧﺳوب اﻻرض ﻣﻊ اﻟرش واﻟﺗﻌﺑﺋﮫ اﻟﺟﯾده ﺑﯾن اﻟﻔراغ اﻟذي ﺑﯾن ﺣﺟر‬m3
pointing and then be well cured with water. Fronting and lining stones have to be ‫ﻛري( وﻋﻠﻰ ان‬5:‫ رﻣل‬2.5:‫اﺳﻣﻧت‬:1) ‫ اﻟﺗﻛﺳﯾﺔ )اﻟظﮭﺎرة( واﻟﺑطﺎﻧﺔ ﺑﺎﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط‬3‫م‬ 5.00
well interconnected using longitudinal stone connecting the entire thickness of ‫ وﯾﺟب اﻟرﺑط ﺑﯾن اﻟظﮭﺎره واﻟﺑطﺎﻧﮫ ﺑﺎﺣﺟﺎر طوﻟﯾﮫ ﻣﺗداﺧﻠﮫ ﻋﻠﻰ ﻛﺎﻣل ﺳﻣك‬.‫ﯾﻛون اﻟﻛري ﻣﺗدرج‬
the wall every 2 linear meter, spaces have to be well filled with concrete of(1: ‫اﻟﺣﺎﺋط ﻛل اﺛﻧﯾن ﻣﺗر طوﻟﻲ ﻓﻲ ﻛل ﺻﻔﺔ ﻣﺑﺎﻧﻲ ﻣﻊ ﻣراﻋﺎة ﺗداﺧل اﻻﺣﺟﺎر ﻋﻧد اﺗﺻﺎل ﺟدارﯾﯾن واﻟﺛﻣن‬
cement: 2.5 sand: 5 graded aggregate), taking into account the interconnection ‫ﯾﺷﻣل رﻓﻊ اﻟﻛرﺳﻲ ﺣﺗﻰ اﻟﻣﻧﺎﺳﯾب اﻟﺗﺻﻣﯾﻣﯾﺔ طﺑﻘﺎ ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬
of stones when connecting two walls .All stone works have to be well and . ‫اﻟﻣﺷرف‬
enough spattered with water. Item Price includes building to the design levels
according to the drawings and specifications and instructions of the supervisor.
1.3.2 The buildings of a stone chair under the Ground beam, in cubic meter:- -:‫ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
In cubic metres: stone chair buildings under the masonry, thickness of 60 cm, ‫ ﺳم وﯾﺟب ان ﺗﻛون ﻣن اﻷﺣﺟﺎر اﻟﺻﻠﺑﺔ‬60 ‫ ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺳﻣك‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
must be made of solid stones free of veins and gaps, and the construction must :‫ )أﺳﻣﻧت‬1 :3 ‫ ﺑﻧﺳﺑﺔ‬,‫واﻟﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق واﻟﻔﺟوات و أن ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم‬
be made with resistant Portland cement, in a ratio of 3:1 (cement: sand), and it ‫رﻣل( وﯾﻛون ﺑﺷﻛل ﻣﻧﺗظم وﻣﺗراﺑط ﻣﻊ اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﻟﻠﻔراﻏﺎت ﻣﻊ اﻟﺗدرﯾز واﻟﺗزﻏﯾن وﻣلء اﻟﻔراﻏﺎت‬
must be in a regular and cohesive manner, with good filling of the voids with ‫ اﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ ﻣﻊ ﻋﻣل ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ‬7 ‫ ﺑﯾن اﻟوﺟﮫ واﻟﺑطﺎﻧﺔ ﺑﺎﻟﻣوﻧﺔ اﻻﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟرش ﻟﻣدة‬m3
seaming, cementing and filling. The spaces between the face and the lining are ‫ ﺳم ﻣن أﺳﻔل اﻟﻠﺣﺟر ﺑﻌد رش اﻷرض ﺑﺎﻟﻣﺎء واﻟﺳﻌر ﯾﺷﻣل ﻛل‬10 ‫ ﻣﻊ أﺣﺟﺎر ﻣﺗوﺳطﺔ اﻟﺣﺟم ﺑﻣﻘدار‬3‫م‬ 33.60
filled with cement mortar and sprayed for a period of 7 days. The work is carried .‫ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
out professionally, with ordinary concrete made with medium-sized stones 10
cm from the bottom of the stone, after spraying the ground with water. The price
includes everything necessary to implement the item, and the work is done
according to the specifications, drawings, and directions of the supervising
1.3.3 Hollow concrete Block constructions 20 cm, Automatic in meter square: : ‫ أﺗوﻣﺎﺗﯾﻛﻲ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك ﻣﻔرغ‬
Hollow concrete Block 20 cm thickness, used for external walls and internal ‫ﻟﻠﻘواطﻊ اﻟداﺧﻠﯾﺔ و اﻟدراوي و‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك )ﺑردﯾن( إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﻣﻔرغ ﺳﻣك‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
partitions and where necessary, using cement mortar: 1: 3 (cement: sieved ، (‫ رﻣل ﻣﻐرﺑل‬:‫)اﺳﻣﻧت‬3 : 1 ‫ وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬,‫ اﻟﻣﻣر اﻻﻣﺎﻣﻲ و اﻟراﻣب وﺣﯾﺛﻣﺎ ﯾﻠزم‬m2 32.00
sand),and according to drawings and specifications, and instructions of the .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬2‫م‬
supervisor
1.3.4 Solid concrete Block constructions 20 cm, Automatic: : ‫ أﺗوﻣﺎﺗﯾﻛﻲ‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك ﺻم‬
Solid concrete Block 20 cm thickness, used for external walls and where ‫ وﯾ ُﺑﻧﻰ‬,‫ﻟﻠﺟدران اﻟﺧﺎرﺟﯾﺔ وﺣﯾﺛﻣﺎ ﯾﻠزم‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﺻم ﺳﻣك‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
necessary, using cement mortar: 1: 3 (cement: sieved sand),and according to ‫ وﺗﻌﻠﯾﻣﺎت‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬، (‫ رﻣل ﻣﻐرﺑل‬:‫)اﺳﻣﻧت‬3 : 1 ‫ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬m2 105.00
drawings and specifications, and instructions of the supervisor. .‫ اﻟﻣﮭﻧدس اﻟﻣﺷرف‬2‫م‬

Total Amount of Masonary and Block Works ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟﺣﺟر و اﻟﺑﻠوك‬
1.4 Plastering and Painting Works: : ‫اﻟﺗﻠﺑﯾس واﻟدھﺎن‬
Notes: -: ‫ﻣﻼﺣظﺎت‬
1-Plastering using Ordinary Resistant Portland cement to wet. Plastering shall consists of ، ‫ ﺗﻠﺑﯾس أﺳﻧﻣﺗﻲ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم ﻟﻸﻣﻼح واﻟرطﺑﺔ ﻣﻛون ﻣن ﺛﻼث طﺑﻘﺎت‬-1
three layers: - Cement spattering layer 0.5 cm thick for all ceilings and walls with a mortar
‫( ﻛﯾس‬1:2:1)‫ ﺳم ﻋﻠﻰ ﺟﻣﯾﻊ اﻷﺳﻘف واﻟﺣواﺋط ﺑﻣوﻧﺔ ﻣﻛوﻧﺔ ﻣن اﻟﺗﺎﻟﻲ‬0.5 ‫طﺑﻘﺔ طرطﺷﺔ ﺑﺳﻣك‬
consisting of (1: 2: 1) A Cement bag: 2 trolley of fine aggregate : 1 trolley of sand. It includes
the daily curing with water for five days . ‫ و‬. ‫ﻛﻣﺎ ﯾراﻋﻰ اﻟرش اﻟﻐزﯾز ﺑﺎﻟﻣﺎء ﯾوﻣﯾﺎ ً وﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم‬. ‫ ﻋرﺑﯾﺔ ﻧﯾس‬:‫ ﻋرﺑﯾﺗﯾن ھﻠﺳن‬:‫اﺳﻣﻧت‬
- Two layers ( base coat and finish coat) with a thickness of 1.5-2cm by 3: 1 (Cement: sand) , ‫ ﻧﯾس( وﯾﺷﻣل اﻟطرطﺷﺔ واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ‬:‫ )أﺳﻣﻧت‬3:1‫ ﺳم ﺑﻧﺳﺑﺔ‬2-1.5 ‫طﺑﻘﺗﻲ ظﮭﺎرة وﺑطﺎﻧﺔ ﺑﺳﻣك‬
It includes the spatter dash, the base layer and the finish layer, and curing with water three ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬، ‫واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬
times a day, according to the drawings and specifications and instructions of the supervisor. 1- .‫اﻟﻣﺷرف‬
All the work of plastering Is a cement roughening for all walls, internal ceilings, external ‫ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺑﯾﺎض ﺗﺧﺷﯾن إﺳﻣﻧﺗﻲ ﻟﺟﻣﯾﻊ اﻟﺟدران واﻟﺣواﺋط واﻷﺳﻘف اﻟداﺧﻠﯾﺔ واﻟﻣظﻼت‬.2
umbrellas, parapets and staircases of 3: 1 ratio using dots, Bands , leveling spots and
‫ ﻣﻊ اﻟﺑؤج واﻷوﺗﺎر واﻟطوارف واﻟﺧدﻣﺔ ﺑﺎﻟﻣﺣﺎرة ﺑﻌد‬3:1 ‫اﻟﺧﺎرﺟﯾﺔ واﻟدراوي واﻟﺳﻼﻟم ﺑﻣوﻧﺔ ﺑﻧﺳﺑﺔ‬
finishing with Plastering trowel after roughing.
2-Roofs and walls must be cleaned of wood , suspended impurities and be cured with water
.‫اﻟﺗﺧﺷﯾن‬
before plastering. ‫ﯾﺟب ﺗﻧظﯾف اﻷﺳﻘف واﻟﺟدران ﻣن ﻗطﻊ اﻷﺧﺷﺎب واﻟﺷواﺋب اﻟﻌﺎﻟﻘﺔ ورﺷﮭﺎ ﺑﺎﻟﻣﺎء ﻗﺑل أﻋﻣﺎل‬.3
3-Contractor shall implement a rough cement spattering layer (450 kg cement / m3 rough .‫اﻟﺗﻠﺑﯾس‬
sand or fine aggregate) and curing with water for three days for all internal walls, ceilings, ‫ رﻣل ﺧﺷن أو ھﻠﺳن ( ﻣﻊ‬3‫م‬/‫ﻛﺟم إﺳﻣﻧت‬450)‫ ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﻧﻔﯾذ طﺑﻘﺔ طرطﺷﺔ إﺳﻣﻧﺗﯾﺔ ﺧﺷﻧﺔ‬.4
parapets and front walls. .‫اﻟرش ﻟﻣدة ﺛﻼﺛﺔ أﯾﺎم ﻟﺟﻣﯾﻊ اﻟﺟدران واﻷﺳﻘف اﻟداﺧﻠﯾﺔ واﻟدراوي واﻟواﺟﮭﺎت‬
4. Steel mesh, width 20 cm and thickness of not less than 1 mm should be used at the
‫ ﻣﻠم ﻋﻧد اﻟﺗﻘﺎء اﻟﺟدران اﻟﺑﻠك ﺑﺎﻟﺟدران‬1‫ﺳم وﺳﻣك ﻻ ﯾﻘل ﻋن‬20 ‫ﯾﺟب ﻋﻣل ﺷﺑك ﺣدﯾد ﻋرض‬.5
meeting of block walls with stone walls, ceilings, columns and covering all electrical and water
pipes.
. ‫اﻟﺣﺟر وﺑﺎﻷﺳﻘف واﻷﻋﻣدة وﻓوق ﻣواﺳﯾر اﻟﻛﮭرﺑﺎء وﯾﺛﺑت ﺑﺎﻟﻣﺳﺎﻣﯾر ﻣن اﻟﺟﮭﺗﯾن ﻗﺑل ﺗﻧﻔﯾذ اﻟطرطﺷﺔ‬
5. Bands, rulers, the Aluminum panel and water Balance should be used in the vertically and ‫ﯾﺟب اﺳﺗﺧدام اﻷوﺗﺎر ﻓﻲ ﻋﻣﻠﯾﺔ اﻟوزن رأﺳﯾﺎ ً وأﻓﻘﯾﺎ ً وﻋﻣل ﻣﺳﺎطر وﻧﻘﺎط ﺗﺛﺑﯾت واﺳﺗﺧدام اﻟﻘدة‬.6
horizontally plastering leveling process and In accordance with established technical .‫واﻟﻣﯾزان وﻓﻘﺎ ً ﻟﻸﺻول اﻟﻔﻧﯾﺔ اﻟﻣﺗﺑﻌﺔ‬
principles. .‫ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﺳﻠﯾم أﻋﻣﺎل اﻟﺑؤج واﻷوﺗﺎر ﻟﻠﻣﮭﻧدس اﻟﻣﺷرف ﻗﺑل اﻟﺑدء ﻓﻲ اﻋﻣﺎل اﻟﺗﺄﺳﯾس‬.7
6. Dots & Bands works shall be approved by the supervisor engineer before base works ‫ﯾﻌﻣل اﻟﺗﺷطﯾب واﻟﻧﮭو ﻟﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺗﻠﺑﯾس ﺑﺎﻟﺷﻛل اﻟﺻﺣﯾﺢ ﻣﻊ ﺿرورة إﻧﮭﺎء اﻟزواﯾﺎ اﻟداﺧﻠﯾﺔ‬.8
plastering is started. ‫واﻟﺧﺎرﺟﯾﺔ اﻟﻧﺎﺗﺟﺔ ﻣن ﺗﻘﺎﺑل اﻟﺟدران ﻣﻊ ﺑﻌﺿﮭﺎ أو ﻣﻊ ﻋﻧﺎﺻر اﺧري ﺑﺷﻛل ﺟﯾد واﻻﻋﺗﻧﺎء ﺑﮭﺎ اﻋﺗﻧﺎء‬
7. All plastering works have to be properly finished, like finishing the internal and external
angles resulting from meeting the walls with each other or with other elements like ceilings
‫ﺧﺎص ﯾﻧﮭو ﺗﻠك اﻟﺗﻘﺎﺑﻼت ﻣﻊ اﻷﺧذ ﻓﻲ اﻻﻋﺗﺑﺎر إن ﺗﻘﺎﺑل اﻷﺳﻘف ﻣﻊ اﻟﺟدران ﯾﻌﻣل ﺑﺷﻛل‬
which shall be made a round(a quarter of circle 5 cm radius), Edges of columns and walls are .(‫ﺳم‬1 ‫ وﻋﻧد اﻟﺣروف ﻟﻸﻋﻣدة واﻟﺟدران ﯾﺗم ﺷطﻔﮭﺎ‬,‫ﺳم‬5‫ﻣﺳﺗدﯾر)رﺑﻊ داﺋرة ﻧﺻف ﻗطرھﺎ‬
beveled 1 cm). .(‫ﻟﺦ‬...‫ﺷﺑﺎﺑﯾك‬- ‫اﻟﻛﻣﯾﺎت اﻟﻣدرﺟﺔ ﺑﺎﻟﺟدول ﻣﺧﺻوﻣﺔ اﻟﻔﺗﺣﺎت)اﺑواب‬.9
1.4.1 Plastering of ceilings, columns and stairs Portland cement : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس اﻟﺳﻘوف‬
Ceilings, columns and bottom surface of stairs to be plastered with Resistant ‫ ﺗﻠﺑﯾس اﻟﺳﻘوف واﻷﻋﻣدة وﺑطن اﻟﺳﻼﻟم ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﯾﺷﻣل‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Portland cement. The item includes: Cement spattering, the base layer and the ‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ‬3 : 1 ‫اﻟطرطﺷﺔ واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬
finish layer are made of cement mortar of 1: 3 ratio .plastering wire mesh will be ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ‬،‫ اﻟﯾوم‬m2 130.00
used at meeting points of constructions and concrete. All works will be cured .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬2‫م‬
with water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
1.4.2 Internal Wall Plastering, Portland cement: : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس اﻟﺟدران اﻟداﺧﻠﯾﺔ‬
Internal Wall plastering to be done using Portland cement, The item includes: ‫ ﺗﻠﺑﯾس اﻟﺟدران واﻟﺣواﺋط اﻟداﺧﻠﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﯾﺷﻣل اﻟطرطﺷﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Cement Spattering, the base layer and the finish layer are made of cement ‫ وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن‬،3 : 1 ‫واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬
m2
mortar of 1: 3 ratio, plastering wire mesh will be used at meeting points of ،‫ واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ‬،‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬،‫اﻟﺗﻠﺑﯾس‬ 220.00
2‫م‬
constructions and concrete. .‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
Dots &bands are used for leveling of plastering. Plastering will be cured with
water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
1.4.3 External plastering: External plastering to be done using Portland cement The : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬
Item includes Cement spattering using cement mortar of 300kg cement/m3 fine ‫ وﯾﺷﻣل اﻟطرطﺷﺔ ﺑﻣوﻧﺔ ﻣﻛوﻧﺔ ﻣن‬،‫ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي‬،‫ ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
aggregate, base layer and the final layer are made of cement mortar of 1: 3 ‫ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ‬،‫ ﻛﺟم إﺳﻣﻧت ﻟﻛل ﻣﺗر ﻣﻛﻌب ﻣن اﻟﮭﻠﺳن واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ‬300 m2
ratio. Dots &bands are used for leveling of plastering.spraying with water three ، ‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم ﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم‬،‫ وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن اﻟﺗﻠﺑﯾس‬3 : 1 ‫ ﺑﻧﺳﺑﺔ‬2‫ م‬227.00
times a day for 5 days. Plastering wire mesh will be used at meeting points of .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬,‫واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس‬
constructions and concrete. Plastering works have to be done according to
1.4.4 drawings, specifications and instructions of the supervisor.
Colored cement spattering in square meter: 4 ‫ﺗورﯾد وﺗﻧﻔﯾذ رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ ﻟﻠواﺟﮭﺎت اﻟﺧﺎرﺟﯾﺔ واﻟﻣظﻼت‬: ‫رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Supply and implementation of a colored cement workshop for external facades ‫ اوﺟﮫ ﺑدون ﻟون و وﺟﮭﯾن ﻣﻊ اﻟﻠون اﻟﻣطﻠوب ﺑﺣﯾث ﯾﺗم ﺗﻌﺑﺋﺔ اﻟﻔراﻏﺎت و‬2 ‫أوﺟﮫ ﺑﺣﯾث ﯾﻛون‬
and umbrellas 4 sides so that it is 2 faces without color and two sides with the ‫ وﺣﯾﺛﻣﺎ ﯾﻠزم ﺑﺣﺳب‬, ‫اﻟﺧطوط ﺑﺎﻻﺳﻣﻧت و اﻟﻔواﺻل ﺑﺎﺳﺗﺧدام اداة اﻟرش ﻣﻊ اﻟﻣﺳﺢ و اﻟﺗﻌدﯾل‬
required color so that the spaces and lines are filled with cement and separators . ‫ اﻟﻣﺧططﺎت اﻟﺗﻔﺻﯾﻠﯾﺔ اﻟﻣرﻓﻘﺔ وﻋﻠﻰ ان ﺗﻛون ﻣواد اﻟرﺷﺔ واﻷﻟون ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬m2 227.00
using the spraying tool with wiping and modification, and where necessary 2‫م‬
according to the attached detailed plans and that the spray materials and colors
are according to the instructions of the supervising engineer.
1.4.5 External plastering with painting by dark color : External plastering to be : ‫ﺣول اﻟﺷﺑﺎﺑﯾك ﻣﻊ اﻟدھﺎن ﺑﻠون ﻏﺎﻣﻖ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬
done using Portland cement with color thikness 4cm. and 12 cm width The Item ‫ﺳم ﺣول اﻟﺷﺑﺎﺑﯾك‬4 ‫ ﻣﻊ اﻟﻠون ﺑﺳﻣﺎﻛﺔ‬،‫ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي‬،‫ ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
includes Cement spattering using cement mortar of 300kg cement/m3 fine ‫ ﻛﺟم إﺳﻣﻧت ﻟﻛل ﻣﺗر ﻣﻛﻌب ﻣن اﻟﮭﻠﺳن‬300 ‫ وﯾﺷﻣل اﻟطرطﺷﺔ ﺑﻣوﻧﺔ ﻣﻛوﻧﺔ ﻣن‬. ‫ ﺳم‬12 ‫وﺑﻌرض‬
aggregate, base layer and the final layer are made of cement mortar of 1: 3 ‫ وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن‬3 : 1 ‫ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬،‫واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ‬
ml
ratio. Dots &bands are used for leveling of plastering.spraying with water three ‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬,‫ واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس‬، ‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم ﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم‬،‫اﻟﺗﻠﺑﯾس‬ 116.70
‫مط‬
times a day for 5 days. Plastering wire mesh will be used at meeting points of .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬
constructions and concrete. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
1.5 Painting Works (‫أﻋﻣﺎل اﻟدھﺎﻧﺎت )اﻟرﻧﺞ‬

1- Surfaces must be completely dry before painting, moisture less than 15%. ,%15 ‫( ﯾﺟب أن ﺗﻛون ھذه اﻷﺳطﺢ ﺟﺎﻓﺔ ﺗﻣﺎﻣﺎ ً ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل اﻟدھﺎن و ﻧﺳﺑﺔ اﻟرطوﺑﺔ اﻗل ﻣن‬1
2- Walls, ceilings and other parts which need to be painted have to be well cleaned and free from ‫(ﯾﺗم ﺗﻧظﯾف اﻟﺣواﺋط واﻷﺳﻘف واﻷﺟزاء اﻟﻣطﻠوب دھﺎﻧﮭﺎ ﺟﯾدا ً ﻣن اﻷﺗرﺑﺔ واﻟﻐﺑﺎر واﻟﺷواﺋب وﻣﺧﻠﻔﺎت اﻟﺑﯾﺎض‬2
Dust, impurities and wastes using sandstone for rubbing. Ceilings are treated by mechanical rubbing
‫)ﺛم ﻋﻣﻠﯾﺔ‬.‫ﺑواﺳطﺔ اﻟﺣف ﺑﺣﺟر اﻟﻣﺳن وﺗﺗم ﻣﻌﺎﻟﺟﺔ ﺑﻼطﺎت اﻷﺳﻘف ﺑواﺳطﺔ اﻟﺣف اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ‬
and cement mortar then, sandpaper is used for smoothening.
3- Base layer of primer is used for to all surfaces need to be painted. ( ‫اﻟﺗﻧﻌﯾم ﺟﻣﯾﻊ اﻟﻣﺳﺎﺣﺎت ﺑورق اﻟﺻﻧﻔرة‬
4- After base layer is dried, putty layer is done to the entire surfaces and left to dry, sanding and .‫ ( ﯾﺗم ﻋﻣل طﺑﻘﺔ اﻷﺳﺎس ﻟﻸﺳطﺢ اﻟﻣراد دھﺎﻧﮭﺎ ﺣﺗﻰ ﺗﺗﺷﺑﻊ‬3
cleaning by carton paper for the putty layer to be done. Dust on surface resulted from sanding and ‫( ﺑﻌد ﺟﻔﺎف طﺑﻘﺔ اﻷﺳﺎس ﯾﺗم ﻋﻠم طﺑﻘﺔ اﻟﻣﻌﺟون ﻟﻛﺎﻣل اﻟﺳطﺢ ﺣﺳب ﻧوع اﻟدھﺎن وﺗﺗرك ﻟﺗﺟف ﺛم ﺗﺗم‬4
softening to be cleaned, then another layer of putty with the same way is done. ‫ ﻣﻊ ﻧظﺎﻓﺔ اﻟﻐﺑﺎر ﻣن اﻟﺳطﺢ اﻟﻧﺎﺟم ﻋن أﻋﻣﺎل‬،‫اﻟﺻﻧﻔرة اﻟﺗﻧﻌﯾم ﺑواﺳطﺔ اﻟورق اﻟﻛرﺗوﻧﻲ اﻟﻣﺧﺻص ﻟﮭذا اﻟﻐرض‬
5- Surfaces are painted with white primer paint and left to dry, followed by two faces of the desired .‫اﻟﺻﻧﻔرة واﻟﺗﻧﻌﯾم وﺗﻌﺎد طﺑﻘﺔ ﺛﺎﻧﯾﺔ ﻣن اﻟﻣﻌﺟون ﺑﻧﻔس اﻟطرﯾﻘﺔ اﻷوﻟﻰ‬
color paint with sufficient time for each layer to dry. The final coat must be done after all other works ‫( ﯾﺗم دھﺎن اﻟﺳطﺢ ﺑوﺟﮫ دھﺎن ﺗﺣﺿﯾري أﺑﯾض ﺛم ﯾﺗرك ﻟﯾﺟف ﺗﻣﺎﻣﺎ ً وﯾﻠﯾﮫ وﺟﮭﯾن ﻣن اﻟدھﺎن ﺑﺎﻟﻠون اﻟﻣطﻠوب‬5
on the surfaces is completed.
6- The paint works shall be carried out according to the instructions of the paint manufacturer, All paint
‫ﻣﻊ اﻟوﻗت اﻟﻛﺎﻓﻲ ﻟﺟﻔﺎف ﻛل طﺑﻘﺔ ﻋﻠﻣﺎ ً ﺑﺄن اﻟوﺟﮫ اﻷﺧﯾر ﯾﺟب أن ﯾﺗم ﺑﻌد اﻛﺗﻣﺎل ﻛﺎﻓﺔ اﻷﻋﻣﺎل اﻷﺧرى‬
materials are from the same factory. .‫ﺑﺎﻷﺳطﺢ اﻟﻣراد دھﻧﮭﺎ‬
7- Interior paints consist of (6) stages. ‫ ( ﯾﺗم ﺗﻧﻔﯾذ أﻋﻣﺎل اﻟدھﺎﻧﺎت ﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﺷرﻛﺔ اﻟﻣﺻﻧﻌﺔ ﻟﻠدھﺎﻧﺎت ﻋﻠﻰ أن ﺗﻛون ﻛﺎﻓﺔ ﻣواد اﻟدھﺎن ﻣن ﻧﻔس‬6
8- External paints consists of (3) stages. .‫اﻟﻣﺻﻧﻊ‬
9- The appropriate putty for oil paints should be used. .‫ ( ﻣراﺣل‬6 ) ‫( ﺗﺗﻛون اﻟطﺑﻘﺎت ﻟﻠدھﺎﻧﺎت اﻟداﺧﻠﯾﺔ ﻣن‬7
10- Moisture-proof plastic paint is used for exterior facades and umbrellas . .‫ ( ﻣراﺣل‬3 ) ‫( ﺗﺗﻛون اﻟطﺑﻘﺎت ﻟﻠدھﺎﻧﺎت اﻟﺧﺎرﺟﯾﺔ ﻣن‬8
11- All samples of required paints must be approved before supply and implementation. Contractor
.‫ ( ﯾﺟب اﺳﺗﻌﻣﺎل اﻟﻣﻌﺟون اﻟﻣﻧﺎﺳب واﻟﺧﺎص ﺑﺎﻟدھﺎﻧﺎت اﻟزﯾﺗﯾﺔ‬9
shall be responsible of violation.
12- Materials used in paints must be of the highest quality and certified by the Specifications and .‫(اﻟواﺟﮭﺎت اﻟﺧﺎرﺟﯾﺔ واﻟﻣظﻼت ﻟﻠطرﻗﺎت دھﺎن ﺑﻼﺳﺗﯾك ﻣﻘﺎوم ﻟﻠرطوﺑﺔ‬10
Metrology Authority. ‫(ﯾﺟب ﺿرورة اﻋﺗﻣﺎد ﺟﻣﯾﻊ ﻋﯾﻧﺎت اﻟدھﺎﻧﺎت اﻟﻣطﻠوﺑﺔ اﻟﻣﺧﺗﻠﻔﺔ ﻗﺑل اﻟﺗورﯾد واﻟﺗﻧﻔﯾذ وﯾﺗﺣﻣل اﻟﻣﻘﺎول‬11
13- The paint shall be supplied inside its sealed original packaging, indicating the name of the .‫ﻣﺳؤوﻟﯾﺔ اﻟﻣﺧﺎﻟﻔﺔ‬
manufacturer, the type of paint, the date of production, the expiry date, the usage manual and the like. .‫( اﻟﻣواد اﻟﻣﺳﺗﺧدﻣﺔ ﻓﻲ اﻟدھﺎﻧﺎت ﯾﺟب أن ﺗﻛون ﻣن أﺟود اﻻﻧواع وﻣﻌﺗﻣدة ﻣن ھﯾﺋﺔ اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس‬12
Paints will be stored in a suitable place and in an appropriate manner. ‫(ﯾورد اﻟدھﺎن اﻟﻰ اﻟﻣوﻗﻊ داﺧل ﻋﺑواﺗﮫ اﻷﺻﻠﯾﺔ اﻟﻣﺧﺗوﻣﺔ واﻟﻣﺑﯾن ﻋﻠﯾﮭﺎ اﺳم اﻟﺷرﻛﺔ اﻟﺻﺎﻧﻌﺔ وﻧوع اﻟدھﺎن‬13
14- The contractor must remove the paint stains first by first before drying and cohesion on ground or
‫ وإرﺷﺎد اﻻﺳﺗﻌﻣﺎل وﻣﺎ ﺷﺎﺑﮭﮭﺎ ﻋﻠﻰ أن ﯾﺟري ﺗﺧزﯾﻧﮭﺎ ﻓﻲ ﻣﻛﺎن‬،‫وﺗﺎرﯾﺦ اﻹﻧﺗﺎج وﺗﺎرﯾﺦ اﻧﺗﮭﺎء اﻟﺻﻼﺣﯾﺔ‬
glass and have to use nylon paper or any similar on floors during the process of painting according to
the instructions of the engineer and after the completion of the paint to clean the stains on tiles and .‫ﻣﻧﺎﺳب وﺑطرﯾﻘﺔ ﻣﻧﺎﺳﺑﺔ‬
glass. ‫( ﻋﻠﻰ اﻟﻣﻘﺎول أن ﯾزﯾل ﺑﻘﻊ اﻟدھﺎن أوﻻ ﺑﺄول ﻗﺑل ﺟﻔﺎﻓﮭﺎ وﺗﻣﺎﺳﻛﮭﺎ ﻋﻠﻰ اﻷرض أو اﻟزﺟﺎج وﻋﻠﯾﮫ أن ﯾﻘوم‬14
‫ﺑﻔرش ﻧﺎﯾﻠون اوﺣﻼﻓﮫ ﻋﻠﻰ اﻻرﺿﯾﺎت أﺛﻧﺎء ﻋﻣﻠﯾﺔ اﻟدھﺎن ﺗﺑﻌﺎ ﻟﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس وﺑﻌد اﻧﺟﺎز اﻋﻣﺎل اﻟدھﺎن ﻋﻠﯾﮫ‬
1.5.1 Emulsion painting for ceilings: : ‫دھﺎن أﻣﻠﺷن ﻟﻠﺳﻘوف‬
Water emulsion paint for ceilings consists of base layer and three coats of the ‫ دھﺎن أﻣﻠﺷن )ﻣﺎﺋﻲ( ﻟﻠﺳﻘوف ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
required color , three layers of putty and sanding to be done before painting and .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت‬m2 130.00
according to the drawings and specifications, and the instructions of the 2‫م‬
supervisor.
1.5.2 Oil matte paint: : ‫دھﺎن زﯾﺗﻲ ﻣطﻔﻲ‬
Oil matte paint for walls consists of a primer coat and three coats of the required ‫ دھﺎن زﯾﺗﻲ ﻣطﻔﻲ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻟﻠﺣواﺋط واﻟﺟدران ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
color painted above 3 coats of putty and sanding and according to the drawings ‫ وﺗﻌﻠﯾﻣﺎت‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت‬m2 214.20
and specifications, and the instructions of the supervisor .‫ اﻟﻣﮭﻧدس اﻟﻣﺷرف‬2‫م‬
1.6 Flooring & Tiling Works: :‫اﻋﻣﺎل اﻻرﺿﯾﺎت واﻟﺗﻛﺳﯾﺎت‬
Notes : : ‫ﻣﻼﺣظﺎت‬
1.Cement mortar to be used for Installation of tiles with a mixing ratio of 3: 1. Tiles to be laid ‫ ﻣﻊ اﻟﻔرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟﻧﯾس ﺗﺣﺗﮫ وﺑﺣﯾث ﺗﻛون‬3:1 ‫ﯾﺗم ﺗﻧﻔﯾذ اﻟﺑﻼط ﺑﻣوﻧﺔ أﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط‬.1
on a bedding of fine aggregate or sand . Joins between tiles are straight and regular
.‫اﻟﻔواﺻل ﻣﺳﺗﻘﯾﻣﺔ وﻣﻧﺗظﻣﺔ‬
2. Tiles must be automatically fabricated and regularly cut.
3. Mosaic tiles with marble fractions is automatic made, size (25 x 25) cm , Half of the . ‫ﯾﺟب أن ﯾﻛون اﻟﺑﻼط أوﺗوﻣﺎﺗﯾﻛﻲ اﻟﺻﻧﻊ وﺑﻘص ﻣﻧﺗظم‬.2
thickness of this type made with white cement and is uniformed color. ‫(ﺳم وﯾﻛون ﻧﺻف اﻟﺳﻣﺎﻛﺔ‬25×25)‫ اﻟﺑﻼط اﻟﻣوزﯾﻛو ﺑﻛﺳر رﺧﺎم أوﺗوﻣﺎﺗﯾﻛﻲ اﻟﺻﻧﻊ ﻣﻘﺎس‬.3
4. An aluminum panel & water balance is used to ensure that the surface of tiles is leveled . ‫ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض وﻣوﺣد اﻟﻠون‬
taking into account the slopes needed. ‫اﻟﺗﺄﻛد ﻣن اﺳﺗواء ﺳطﺢ اﻟﺑﻼط أﺛﻧﺎء اﻟﺗﻧﻔﯾذﺑﺎﺳﺗﺧدام اﻟﻘدة وﻣﯾزان اﻟﻣﺎء ﻣﻊ ﻣراﻋﺎة اﻟﻣﯾول‬.4
5. Joints should be cleaned thoroughly from cement residues and dust, grouted with white ‫ﯾﺟب ﺗﻧظﯾف اﻟﻔواﺻل ﺟﯾدا ً ﻣن ﺑﻘﺎﯾﺎ اﻷﺳﻣﻧت واﻷﺗرﺑﮫ وﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻷﺳﻣﻧت اﻷﺑﯾض واﻟﺟﻠﻰ‬.5
cement, mechanically glazed and polished, curing with water must be done for at least 4 days
. ً‫ أﯾﺎم ﺻﺑﺎﺣﺎ ً وﻣﺳﺎء‬4 ‫واﻟﺻﻘل اﻟﻣﯾﻛﺎﻧﯾﻛﻲ ﻣﻊ ﺿرورة اﻟرش ﻟﻸﻋﻣﺎل اﻟﻣﻧﻔذة ﻣدة ﻻ ﺗﻘل ﻋن‬
(morning & evening).
6. Floor tiling work of bathrooms, kitchens and buffets, to be installed on a damp-proof layer
‫ﺑﺎﻟﻧﺳﺑﺔ ﻟﺑﻼط ارﺿﯾﺔ اﻟﺣﻣﺎﻣﺎت واﻟﻣطﺎﺑﺦ واﻟﺑوﻓﯾﺎت ﯾﻠزم ﺗورﯾدوﺗﻧﻔﯾذ طﺑﻘﺔ ﻋزل )وﺟﮭﯾن ﻣن‬- .6
consists of a sackcloth layer between two faces of asphalt. A fine aggregate layer to be made .ً ‫ﺛم ﺗﻧﻔﯾذ ﺑﻧد اﻟﻌﻣل وﻓﻘﺎ ً ﻟﻣﺎ ذﻛر ﻟﺣﻘﺎ‬, ‫اﻟزﻓﻠت ﺑﯾﻧﮭﻣﺎ طﺑﻘﺔ ﺧﯾش( ﺗﺣت طﺑﻘﺔ اﻟﮭﻠﺳن‬
above the damp-proof layer. ‫ وﻣﻘﺎوﻣﺗﮫ اﻟﺷدﯾدة‬2‫ ﺳم‬/ ‫ ﻛﺟم‬300 : 250 ‫ ﺑﻼط اﻹﻧﺗرﻟوك ﯾﺗﺣﻣل اﻟﺿﻐوط واﻷﺣﻣﺎل اﻟﻌﺎﻟﯾﺔ‬-7
7 - Interlock tiles bear high pressures and loads 250: 300 kg / cm2 and its strong resistance to . ‫ ﻣم‬0.5 ‫ﻟﻠﺗﺂﻛل أﻗل ﻣن‬
corrosion, less than 0.5 mm. ‫ ﺗﻘﺎس ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺑﻼط ھﻧدﺳﯾﺎ ً وﺗﺧﺻم ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت واﻟﻔراﻏﺎت‬-8
8- All tiling works shall be measured geometrically and all openings and spaces will be
deducted.
1.6.1 Mosaic tiles 25 x 25 cm, with marble fractions, automatic in sqare meter: ‫ أﺗوﻣﺎﺗﯾﻛﻲ)ﻟﻠﻔﺻول و اﻟﻣﻣر ﯾﺗﺿﻣن اﻟراﻣب( ﺑﺎﻟﻣﺗر‬،‫ ﺑﻛﺳر اﻟرﺧﺎم‬،‫ ﺳم‬25×25 ‫ﺑﻼط ﻣوزاﯾﻛو‬
Supply and installation of Mosaic tile 25 x 25 cm, 2.5 cm thickness, mixed with : ‫اﻟﻣرﺑﻊ‬
marble fractions. Half thickness to be made of white and uniform color. The ‫ وﯾﻛون ﻧﺻف اﻟﺳﻣﺎﻛﺔ‬،‫ ﺑﻛﺳر اﻟرﺧﺎم أﺗوﻣﺎﺗﯾﻛﻲ‬،‫ ﺳم‬2.5 ‫ وﺳﻣك‬،‫ ﺳم‬25×25 ‫ﺑﻼط ﻣوزاﯾﻛو‬
item includes a bedding of sand or fine aggregate. Mosaic tiles are installed on ‫ وﯾوﺿﻊ ﻋﻠﻰ ﻣوﻧﺔ‬،‫وﯾﺷﻣل ﻓرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟرﻣل )اﻟﻧﯾس( ﺗﺣﺗﮫ‬, ‫ وﻣوﺣد اﻟﻠون‬،‫ ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬m2 108.75
a concrete mortar of 1: 3. , Joints between tiles to be grouted using White ‫ واﻟﺟﻠﻲ واﻟﺗﻧﻌﯾم واﻟﺗﻠﻣﯾﻊ اﻟﻣﯾﻛﺎﻧﯾﻛﻲ ﻓﻲ‬،‫ ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬3 : 1 ‫ إﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬2‫م‬
cement and tile surface is mechanically polished and smoothed according to .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬.‫اﻟﻣوﻗﻊ ﺑﻌد اﻟﺗرﻛﯾب‬
drawings and specifications, instructions of the supervisor engineer.
1.6.2 Skirting Tiles : :‫أﻋﻣﺎل اﻟوزرات اﻟﺳﯾراﻣﯾك‬
Supply and apply Ceramic skirts (10cm*40cm*2cm), beveled from one of the ‫(ﺳم ﻣﺷطوﻓﺔ ﻣن اﺣد اﻟﺣروف‬2*40*10) ‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ ﺗورﯾد وﺗرﻛﯾب وزرات ﺳﯾراﻣﯾك ﻣﻘﺎس‬
edges (industrial rinse) for the classess, and where necessary according to the ‫ وذﻟك ﻟﻠﻔﺻول وﺣﯾﺛﻣﺎ ﯾﻠزم ﺑﺣﺳب ﻣﺎ ﺗﺑﯾﻧﮫ اﻟرﺳوﻣﺎت ﻣﻊ إﻋﺗﻣﺎد اﻟﻌﯾﻧﺎت ﻗﺑل اﻟﺗورﯾد‬،(‫)ﺷطﻔﺔ ﺻﻧﺎﻋﯾﺔ‬
drawings shown and with the approval of the provided samples before delivery :‫واﻟﺛﻣن ﯾﺷﻣل‬
and the price includes: .‫ اﻟﺗﺧﺷﯾن اﻟﻸزم ﺧﻠف اﻟﻧﻌﻼت ﻓﻲ اﻟﺟدران أو اﻟﺧرﺳﺎﻧﺔ واﻟﺗﻧظﯾف‬-
ml
- Scrapping behind the insoles in walls or concrete and cleaning. .‫وذﻟك ﻟﺗرﻛﯾب وﻟﺻﻖ اﻟﻧﻌﻼت‬، (3:1) ‫ ﻋﻣل ﻣوﻧﺔ أﺳﻣﻧﺗﯾﺔ ﺑﻧﺳب ﺧﻠط‬- 77.00
‫ط‬.‫م‬
- Cement mortar with mixing ratios (1:3), in order to install and paste the insole. .ً ‫ اﻟﺗروﯾب ﺑﻣوﻧﺔ اﻷﺳﻣﻧت اﻷﺑﯾض وﺗﻌﺑﺋﺔ اﻟﻔواﺻل ﺟﯾدا‬-
- Wet with white cement mortar and fill joints well. ‫ اﻟرش ﺑﺎﻟﻣﺎء ﻛﻣﺎ ﯾﺷﻣل اﻟﺛﻣن ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺗﻧظﯾف واﻟﺗﺷطﯾب وﺗﺳﻠﯾم اﻟﻌﻣل ﻋﻠﻰ اﻛﻣل وﺟﮫ ﺑﺣﺳب‬-
- The final treatment of the final surface and heavy spraying with water and the .‫اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
price includes all the work of cleaning and finishing and delivery of work to the
fullest according to specifications and drawings and the instructions of the
1.6.3 Staircase and ramp of mosaic tiles for entrances (precast). : ‫ﻣﺻﺑوب ﻟﻠﻣداﺧل‬,‫درج وﻣﻧﺣدر ﻣوزاﯾﻛواﻟﻠﻣداﺧل‬
Supply and tiling of staircase and ramp of mosaic tiles for entrance stairs, mixed ‫ﺳم)ﻗﺎﺋم وﻧﺎﺋم ﻋﻠﻰ‬30‫ﺳم و‬15 ‫ درج وﻣﻧﺣدر ﻣوزاﯾﻛوا ﻟﻠﻣداﺧل اﻟﻣطﻌم ﺑﻛﺳر اﻟرﺧﺎم‬:‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
with marble fractions,15 cm for riser and 30 cm for tread, precast molded. well ،‫ وﯾﺟب اﻟﻌﻧﺎﯾﺔ ﺑﻧﺳب اﻟﺧﻠط‬،‫ﻣﺻﺑوب ﻟﻠﻣداﺧل‬، ‫ اﻟﺗواﻟﻲ( وﻣﻧﺣدر ﺧﺎص ﺑذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬ml
mixing, curing, glazing and polishing. The item includes excavation, backfill, ‫ و ﯾﺷﻣل اﻟﻌﻣل اﻟﺣﻔر و اﻟردم و اﻟﺑﻧﺎء و وﺿﻊ اﻟﺷﻠف و ﺻب اﻟﺧرﺳﺎﻧﺔ و‬،‫ واﻟﺟﻠﻲ واﻟﺗﻠﻣﯾﻊ‬،‫ط واﻟرش‬.‫م‬ 10.00
construction, stone fractions layer, concrete casting and mosaic tiling according .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ﻋﻣل اﻟﻣوزاﯾﻛو طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬
to the drawings. Specifications, and supervisor's instructions

Total Amount of Finishing Works. ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟﺗﺷطﯾﺑﺎت‬


1.7 Carpentry works (wood, aluminum, iron) : (‫ ﺣدﯾد‬،‫ أﻟﻣوﻧﯾوم‬،‫أﻋﻣﺎل اﻟﻧﺟﺎرة )ﺧﺷب‬
Notes: :‫اﻟﻤﻼﺣﻈﺎت‬
1- Item prices include sanding, kneading, smoothing and painting work for all wooden .‫ ﺸﻤﻞ أﺳﻌﺎر اﻟﺒﻨﻮد أﻋﻤﺎل اﻟﺼﻨﻔﺮة واﻟﻤﻌﺠﻨﺔ واﻟﺘﻨﻌ ﻢ واﻟﺪﻫﺎن ﻟ ﻞ اﻟﻌﻨﺎ اﻟﺨﺸ ﺔ‬-1
elements. ‫ ﻣﻬﺎزر‬.‫اﻟﻤﻮﻗﻊ‬ ‫ﺸﻤﻞ أﺳﻌﺎر اﻟﺒﻨﻮد ﺗﻮر ﺪ ﺟﻤﻴﻊ اﻟﺨﺮدوات اﻟﻼزﻣﺔ ﻣﻦ ﻫﻨﺪرا ﺎت وﻣﻐﺎﻟﻖ وﻣﻔﺼﻼت وﻛﺬا اﻟ ﻛ ﺐ‬-2
2- Item prices include the supply of all necessary hardware, including hinges, bolts, and . ‫اﻷﺑﻮاب ﺠﺐ أن ﺗﻜﻮن ﻣﻦ ﻧ ع" اﻳﺰو" ﺻﻨﻊ ا ﻄﺎ أو ﻣﺎ ﻌﺎدﻟﻪ‬
hinges, as well as on-site installation. Door handles must be of the “ISO” type, made in Italy, ‫ذﻟﻚ اﻟﺼﻨﻔﺮة اﻟﺠ ﺪة وﻃ ﻘﺔ دﻫﺎن ﻣﻘﺎوم ﻟﻠﺼﺪأ أو‬ ‫اﻟﻌﻤ اﻷﺑﻮاب اﻟﺤﺪ ﺪة ﺠﺐ أن ﻳﺘﻢ ﻃ ﻘﺎ ﻟﻠﺘﺼﺎﻣ ﻢ ﻤﺎ‬ ‫ ﻞ‬-3
or its equivalent. .‫وﻃ ﻘﺘ دﻫﺎن أ ﻠ و ﺎﻟﻠﻮن اﻟﻤﺤﺪد‬
3- Work on iron doors must be done according to the designs, including good sanding, a first ‫ ﻠﻮن‬1mm ‫ أﻟﻤﻨﻴﻮم اﻟﻨﻮاﻓﺬ ﺠﺐ أن ﻜﻮن أر ﻧﻮﻋ ﺔ )ﻣﻤﺘﺎز(ﻋ أن ﺗﻜﻮن اﻟﻤﻘﺎﻃﻊ ﺳﻌﻮد ﺔ ﻻ ﺗﻘﻞ ﺳﻤﺎ ﺘﻬﺎ ﻋﻦ‬-4
layer of rust-resistant paint, and two layers of acrylic paint in the specified color. ، ‫ ﻣﻢ‬6 ‫ﻣ ﻜﺮو( )زوا ﺎ ﻣﺼﻨﻊ( و ﻜﻮن ﺳﻤﻚ اﻟﺰﺟﺎج‬20) ‫ﺑﺮوﻧﺰي أو أﺑ ﺾ‬
4- The aluminum windows must be of the highest quality (excellent), provided that the
‫ﺗﺠﻤﻴﻊ ور ﻂ ﺻﻔﺎﺋﺢ وﻗﻮاﺋﻢ اﻷﻟﻤﻨﻴﻮم وﺗ ﺒ ﺖ اﻟﻬﻨﺪرا ﺎت واﻟﻤﻬﺎزر واﻟﻤﻐﺎﻟﻖ‬ ‫ﺬا ﺗﻜﻮن اﻟﻤﺴﺎﻣ اﻟﻤﺴﺘﺨﺪﻣﺔ‬ ‫وﻛ‬
sections are Saudi and their thickness is not less than 1mm, in a bronze or white color (20
.‫ﻣﺴﺎﻣ ﺣﺪ ﺪ ﺿﺪ اﻟﺼﺪأ واﻟﺨﺪش أو ﻣﺴﺎﻣ ﻣﻐﻠﻔﺔ ﻤﺎدة اﻟﻨ ﻞ ﻛﺮوم‬
microns) (factory corners), and the thickness of the glass is 6mm.
‫ﺟﻤﻴﻊ اﻟﺤﻮاف اﻟﺤﺎدة ﺠﺐ أن ﻳﺘﻢ ﺗﻨﻌ ﻤﻪ ﻟﺘﻔﺎدي اﻻﺻﺎ ﺎت ﻋﻨﺪ اﻻﺳﺘﺨﺪام أو اﻟﺘﻨﻈ ﻒ أ ﻀﺎ‬
Likewise, the nails used in assembling and connecting aluminum sheets and columns and
installing the handles, shakers, and shutters are iron nails that are resistant to rust and ‫ ﻣﻢ‬7 (‫ ﻣﻢ واﻟﺨﻮاﺑ ) وﺗﺪ أو ﻣﺎﺷﺎ ﻪ‬5 ‫ ﻣﺮات ﻣﻦ ﻞ ﺟﺎﻧﺐ ﺎﺳﺘﺨﺪام اﻟﻤﺴﺎﻣ اﻟﻤﻐﻠﻔﺔ‬3 ‫ ﺠﺐ أن ﺗ ﺖ اﻟﻨﺎﻓﺬة‬-5
scratching, or nails coated with nickel-chrome. .‫ وﻛﺬﻟﻚ ﺠﺐ ﻣ ء اﻟﻔﻮاﺻﻞ ﺎﻟﻤﻌﺠﻮن‬.‫ﻋ اﻷﻗﻞ‬
All sharp edges must be smoothed to avoid injury during use or cleaning as well ‫ ﯾﺟب إﺣﺿﺎر ﻋﯾﻧﺎت ﻟﻛل ﻣن اﻷﺑواب و اﻟﺷﺑﺎﺑﯾك وﺷﺑك اﻟﺣﻣﺎﯾﺔ إﻟﻰ إدارة اﻟﻣﻧظﻣﺔ‬- 6
5-The window must be fixed 3 times on each side using 5 mm coated nails and at least 7 mm .‫ﻻﻋﺗﻣﺎدھﺎ ﻗﺑل اﻟﺑدء ﻓﻲ اﻟﺗﻧﻔﯾذ‬
anchors (dowels or similar). The joints must also be filled with putty. .‫ ﯾﺟب إﺣﺿﺎر ﻋﯾﻧﺎت ﻟﻛل ﻣن اﻷﺑواب و اﻟﺷﺑﺎﺑﯾك وﺷﺑك اﻟﺣﻣﺎﯾﺔ إﻟﻰ إدارة اﻟﺷرﻛﺔ ﻻﻋﺗﻣﺎدھﺎ ﻗﺑل اﻟﺑدء ﻓﻲ اﻟﺗﻧﻔﯾذ‬-7
6 - Samples of doors, windows, and safety nets must be brought to the organization’s
administration
To be approved before starting implementation.
1.7.1 Wooden strips sec.(1”*4”)-Meranti wood : : ‫ ﺧﺷب ﻣﯾراﻧﺗﻲ‬،‫(ھﻧش‬4×1) ‫ﺷراﺋر ﺧﺷﺑﯾﺔ ﻗطﺎع‬
Supply and installation of wooden strips for walls, red meranti wood, width not less than 10 ‫ ﺳم وﺑﺳﻣك ﻻ ﯾﻘل ﻋن‬10‫ ﻋرض ﻻﯾﻘل ﻋن‬،‫ ﻣﯾراﻧﺗﻲ أﺣﻣر‬،‫ ﺗورﯾد وﺗرﻛﯾب ﺷراﺋر ﺧﺷﺑﯾﺔ ﻟﻠﺟدران‬:‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
cm and a thickness of not less than 2.5 cm, finely polished and painted 3 facets and fixed with ‫ ﺳم ﻓﻲ اﻟﺟدران‬3 ‫م وﺑﻌﻣﻖ ﻻ ﯾﻘل ﻋن‬0.50 ‫ أوﺟﮭﮫ وﺗﺛﺑت ﺑﺎﻟﺑراﻏﻲ ﻛل‬3 ‫ ﺳم ﻣﻧﻌﻣﺔ وﻣﺻﻧﻔرة وﻣدھﻧﺔ ﺑﺎﻟورﻧﯾش‬2.5
screws every 0.50 m and a depth of not less than 3 cm on walls and be free of defects and ‫ وﻋﻧدﻣﺳﺗوى اﻷﻋﺗﺎب ﻟﺟﻣﯾﻊ اﻟﻔﺻول‬،‫ ﺳم ﻣن أﻷرﺿﯾﺎت‬70 ‫ وﺗﻛون ﺧﺎﻟﯾﺔ ﻣن اﻟﻌﯾوب واﻟﺷروخ و ﺗﺛﺑت ﺑﺎرﺗﻔﺎع‬ml
63.00
cracks. They shall be fixed at 70cm from floor level, the other strips are fixed at lintels level of . ‫ وﺷراﺋر ﻋﻠوﯾﺔ ﻟﻠﻣﻌﻣل ﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬,‫ط واﻻدارة واﻟﻣﺧزن واﻟﻣﻛﺗﺑﺔ‬.‫م‬
classrooms, administration, store, library and laboratory and according to the drawings,
specifications and instructions of supervisor engineer.

1.7.2 Aluminum windows: : ‫ﻧواﻓذ اﻟوﻣﻧﯾوم‬


Square meters: aluminum windows bronze excellent quality and have throat aluminum strip ‫ ﺳم وﺳﻣك‬8×4‫ ﻧواﻓذ اﻟوﻣﻧﯾوم ﺑروﻧزي ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة وﯾﻛون اﻟﺣﻠﻖ ﻗطﺎع اﻟﻣوﻧﯾوم ﻻ ﯾﻘل ﻋن‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
not less than 4×8 cm and aluminum thickness not less than 1.2 mm and uses a special rubber ‫ﻣم وﯾﺳﺗﺧدم ﻣطﺎط ﺧﺎص ﻹﺣﻛﺎم اﻟﻐﻠﻖ وﻣﻧﻊ ﺗﺳرب اﻟﮭواء او اﻟﻣﺎء وﺟﻣﯾﻊ اﻟﺧردوات‬1.2 ‫اﻷﻟﻣﻧﯾوم ﻻ ﯾﻘل ﻋن‬
to seal and prevent the leakage of air or water and all haberdashery of hinges and shutters be ‫ ﻣم ﻣﻊ وزﺟﺎج ﻣﺛﻠﺞ او ﻣﺷﺟر‬6 ‫ﻣن ﻣﻔﺻﻼت وﻣﻐﺎﻟﻖ ﺗﻛون اﺻﻠﯾﺔ اﻟﻧوع وﻣﻘﺎﺑض ﻻﻛﺳﯾس وزﺟﺎج أﺑﯾض ﺑﺳﻣك‬
original type and handles Laxis and white glass thickness of 6 mm with and iced glass or ‫ﻣﺎﻧﻊ ﻟﻠرؤﯾﺔ )ﻓﻲ اﻟﻣواﺿﻊ اﻟﻣﺣددة ﻓﻲ اﻟرﺳوﻣﺎت( وﻋﻣل ﺷﺑك اﻟﻧﺎﻣس اﻟﻣﺎﻧﻊ ﻟﻠﺣﺷرات ﻟﻠدرﻓﺎت اﻟﻘﺎﺑﻠﺔ ﻟﻠﻔﺗﺢ وﺗﺛﺑﯾت‬
wooded invisible (in the positions specified in the drawings) and the work of netting mosquito ‫)اﻟﻘﯾﺎس ﻣن‬،‫ ﻣﻊ ﺟﻣﯾﻊ اﻟﺧردوات‬،‫ وﺗﺛﺑﯾت اﻟزﺟﺎج ﺑﺎﻟرﺑﻼت اﻟﺧﺎﺻﺔ‬،‫ اﻟﺣﻠوق ﻣن ﺟﻣﯾﻊ اﻟﺟواﻧب اﺛﻧﯾن ﺗﺛﺑﯾﺗﺎت ﻋﻠﻰ اﻷﻗل‬m2
insect insect for openable shutters and install the throats from all sides Two fixations on The .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬.‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ اﻷﺑﻌﺎد اﻟداﺧﻠﯾﺔ( طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬2‫م‬
21.00
least, fixing the glass with special calves, with all the haberdashery, (measurement of internal
dimensions) according to the drawings, specifications, and instructions of the supervising
engineer. (A sample must be submitted for approval.)

1.7.3 Windows protection steel mesh : ‫ﺷﺑك ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ ﻣﺻﺑﻌﺎت‬


Supply and installation of protective grid steel mesh for windows 12 mm / 15 mm and no ‫ﺳم ﺑﯾن اﻟﻘواﺋم اﻟرﺋﯾﺳﯾﺔ‬12 ‫ﻣم وﺑﻌرض ﻻ ﯾزﯾد ﻋن‬15/‫ﻣم‬12‫ ﺗورﯾد وﺗﻧﻔﯾذ ﺷﺑك ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ ﻣﺻﺑﻌﺎت‬-:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
more than 12 cm width between main vertical rods and 15 cm between horizontal rods and ‫ وﺷﺑك دﯾﻣن‬, ‫"ھﻧش واﻟﺗﺛﺑﯾت ﺑواﺳطﺔ اﻟﻠﺣﺎم ﻣن ﺟﻣﯾﻊ اﻟﺟواﻧب‬2 ‫ ﺳم ﺑﯾن اﻟﻌوارض اﻷﻓﻘﯾﺔ وﺷﻠﻣﺎﻧﺎت داﺋرﯾﺔ‬15 ‫وﻋن‬
circular planks 2 " . It will be fixed by welding from all sides. Deman mesh (2.50 x 2.50) cm is ‫ (ﺳم ﻟﺣﻣﺎﯾﺔ اﻟزﺟﺎج ﻣن اﻟﻛﺳر واﻟﻘﻣرﯾﺎت وﯾﺷﻣل اﻟرﻧﺞ وﺟﮭﯾن ﺑراﯾﻣر أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون‬2.50×2.50) m2
installed to protect window glass and yemeni decoration glass ( Gamaria) . The item includes .‫ اﻟﻣطﻠوب ﻣﻊ اﻟﺻﻧﻔرة وﺟﻠﺦ اﻟزواﺋد واﻟﺗﻧﻌﯾم وﻛل ﻣﺎ ﯾﻠزم وﺑﺣﺳب ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬2‫م‬ 28.20
two coats of primer base and three coats of the desired color with sanding, abrasion,
smoothing, and all necessary, according to the instructions of the supervisor.
1.7.4 Gypsum Qamrya: :‫اﻟﻘﻣرﯾﺎت‬
supply and install Gypsum Qamrya studded with colored glass size (1*0.70m) thickness 5cm ‫ﺳم ﻧوﻋﯾﺔ‬5 ‫ﻣﺗر( وﺳﻣﺎﻛﺔ اﻟﻘﻣرﯾﺔ ﻻ ﺗﻘل ﻋن‬0.70*1) ‫ﺗورﯾد وﺗرﻛﯾب ﻗﻣرﯾﺎت ﻣن اﻟﺟص ﻣﻊ اﻟزﺟﺎج اﻟﻣﻠون ﻣﻘﺎس‬
approved type, support by appropriate nails, the work must be carried out professionally and ‫ ﻣﻌﺗﻣدة ﻣﻊ اﻟﺗﺛﺑﯾت اﻟﺟﯾد وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت‬pcs
the price includes everything necessary to implement the item, and the work must be done .‫ﻋدد واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 12.00
according to the specifications, drawings, and the directives of the supervising engineer.

1.7.5 Steel Doors (Provide sample to check): .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬: ‫أﺑواب ﺣدﯾد رص‬
Galvanized iron doors, shutter is made of steel tubes - rectangular section (1” × 2”) , ‫ھﻧش ( ﺳﻣك‬2 × ‫ھﻧش‬1) ‫ ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد اﻟﻣراﺑﯾﻊ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Thickness 1.3 mm, Steel panels are placed together in excellent technical form . Steel angle ‫واﻟﺣﻠﻖ ﻋرﯾض رص‬, ‫"ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل‬2 ‫ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن دﺋري‬1.3
beam 2” to be welded along the perimeter of the entire door . Door frame (rectangular section ‫ ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل‬2 ‫ﺳم وﺳﻣك‬20 ‫ﻻﯾﻘل ﻋن‬
panels )width is not less than 20 cm and thickness 2 mm with three hinges. The item price ‫ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ‬
m2
Includes the anti-rust paint after sanding and well abrasion, two coats of oil paint for door and ‫وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل‬ 6.60
locks. Frames are installed before plastering, they have to be fixed to walls by three points of .‫ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬20 ‫ ﻣﻠم وطول‬16 ‫ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر‬
2‫م‬
each side at least using steel dowels 16 mm diameter and 20 cm long, planted in wall and
welded In accordance with the instructions of the supervisor engineer.

1.7.6 Classroom blackboards: :‫ﺳﺑورات ﺳوداء ﻟﻠﻔﺻول اﻟدراﺳﯾﺔ‬


Supply and implement cement blackboards by paste and paint size (2.4*1.2m) chalky black ‫ﻣﺗر( ﻟون اﺳود طﺑﺎﺷﯾرﯾﺔ ﻣﻊ اﻟﺑرواز اﻟﺧﺷﺑﻲ‬1.2*2.4) ‫ﺗورﯾد وﺗﻧﻔﯾذ ﺳﺑورات اﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟﻣﻌﺟون واﻟطﻼء ﻣﻘﺎس‬
color, with a wooden frame and chalk shelf, the work must be carried out professionally and ‫ وﺟﻠﺳﺎت اﻟطﺑﺎﺷﯾر وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت‬pcs
the price includes everything necessary to implement the item, and the work must be done .‫ﻋدد وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 3.00
according to the specifications, drawings, and the directives of the supervising engineer.
1.7.7 Rainwater drainage pipes: : ‫ﻣواﺳﯾر ﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر‬
By linear metre, supply and installation of medium pressure plastic pipes to ‫ ھﻧش‬3 ‫ ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ ﺗورﯾد وﺗرﻛﯾب ﻣواﺳﯾر ﺑﻼﺳﺗﯾك ﺿﻐط ﻣﺗوﺳط ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر ﻗطر‬pcs
3.00
drain rainwater, 3 inches in diameter, and securely fixed, with the length of the . .‫ ﻣﺗر‬1 ‫ﻋدد واﻟﺗﺛﺑﯾت ﺑﺈﺣﻛﺎن ﻋﻠﻰ أن ﯾﻛون طول اﻟﻣﯾزاب‬
gutter being 1 meter. "
Total Amount of Doors and Windows Works ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻷﺑواب و اﻟﻧواﻓذ‬

1.8 Electrical Works : : ‫اﻻﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ‬


Notes : ‫ـ‬:‫ﻣﻼﺣظﺎت‬
- All materials and accessories must be of the highest quality and conform to international standards. .‫ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد واﻷدوات ﻣن أﺟود اﻷﻧواع وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﻘﯾﺎﺳﯾﺔ اﻟﻌﺎﻟﻣﯾﺔ‬-
- All electrical work items will include supply of materials, installation, testing and commission. Internal wiring for all
‫ ﺟﻣﯾﻊ ﺑﻧود اﻷﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ ﺷﺎﻣﻠﺔ ﺗورﯾد اﻟﻣواد واﻟﺗرﻛﯾب واﻟﺗﺟرﺑﺔ واﻟﺗﺷﻐﯾل وان ﺗﻛون اﻟﺗﻣدﯾدات داﺧﻠﯾﺔ ﻣﺧﻔﯾﺔ ﻟﺟﻣﯾﻊ‬-
networks shall be concealed inside plastic conduits of PVC type, conforming to British specifications BS-4607 and
shall have electrical insulation resistance of more than 100 Mega ohm.
‫ وأن ﺗﻛون ﻣﻘﺎوﻣﺔ اﻟﻌزل‬BS-4607 ‫ وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ‬PVC ‫اﻟﺷﺑﻛﺎت داﺧل ﻣواﺳﯾر ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣن ﻧوع‬
Independent conduits for each electric circuit shall be used with a diameter not less than 20 cm. Flexible metal ‫ﺳم وﺗﺳﺗﻌﻣل‬20 ‫ ﯾﺟب اﺳﺗﻌﻣﺎل ﻣواﺳﯾر ﻣﺳﺗﻘﻠﺔ ﻟﻛل داﺋرة ﻛﮭرﺑﺎﺋﯾﺔ ﺑﻘطر ﻻ ﯾﻘل ﻋن‬. ‫ ﻣﯾﺟﺎ أوم‬100 ‫اﻟﻛﮭرﺑﻲ ﺑﮭﺎ أﻛﺛر ﻣن‬
conduits shall be used to protect wires and movable cables, such as connections of devices and motors and at ‫اﻟﻣواﺳﯾر اﻟﻣﻌدﻧﯾﺔ اﻟﻣرﻧﺔ ﻟﺣﻣﺎﯾﺔ اﻷﺳﻼك واﻟﻛواﺑل اﻟﻣﺗﺣرﻛﺔ او اﻟﻣﻌرﺿﺔ ﻟﻠﺗﺣرﯾك ﻣﺛل ﺗوﺻﯾﻼت اﻷﺟﮭزة واﻟﻣوﺗورات وﻋﻧد‬
the expansion joints of the building, if any. No visible wiring is accepted , The contractor will bear responsibly of ‫ وﻻ ﯾﺳﻣﺢ ﺑﺎﻟﺗﻣدﯾدات اﻟظﺎھرة وأي ﺧطﺎء ﻓﻲ اﻟﺗﻣدﯾدات ﯾﺗﺣﻣل اﻟﻣﻘﺎول إﻋﺎدة اﻟﻌﻣل ﺑﺎﻟﺷﻛل‬,.‫ﻓواﺻل اﻟﺗﻣدد ﻟﻠﻣﺑﻧﻰ إن وﺟدت‬
any mistakes in the installation and shall re-install them properly . The wiring for each network must be - ‫ ﺷﺑﻛﺔ اﻟﻣﺄﺧذ اﻟﻛﮭرﺑﺎﺋﯾﺔ‬- ‫ ﻛﻣﺎ ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات ﻟﻛل ﺷﺑﻛﺔ ﻣﺳﺗﻘﻠﺔ ﻋن اﻷﺧرى ) ﺷﺑﻛﺔ اﻹﻧﺎرة اﻟﻛﮭرﺑﺎﺋﯾﺔ‬. ‫اﻟﺳﻠﯾم‬
independent of each other (Electrical lighting network, electrical sockets network, telephone network, computer ‫ﺗﻠﻔزﯾون وﻏﯾرھﺎ ( وﻻ ﯾﺳﻣﺢ اﻟﺧﻠط ﺑﯾﻧﮭﺎ ﻓﻲ اﻟﻣواﺳﯾر أو اﻟﻘﺳﺎﻣﺎت‬، ‫ ﺣرﯾﻖ‬،‫ﻛﻣﺑﯾوﺗر‬، _ ‫ ﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر‬- ‫ﺷﺑﻛﺔ اﻟﺗﻠﻔون‬
network, fire, television, etc.). They are not allowed to be mixed in conduits , partitions or boxes. A minimum
. ‫ﺳم ﺑﯾن ﺷﺑﻛﺔ اﻟﻛﮭرﺑﺎء وﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر واﻟﺗﻠﻔون‬40 ‫ ﻛﻣﺎ ﯾﺟب ﻣراﻋﺎة وﺟود ﻣﺳﺎﻓﺔ ﻻ ﺗﻘل ﻋن‬, ‫واﻟﻌﻠب‬
distance of 40 cm should be considered between the power network and the computer and telephone networks. -
The circular and squared assembly boxes used for the switches shall be made of good plastic, Fire resistant and
‫ ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ اﻟداﺋرﯾﺔ واﻟﻣرﺑﻌﺔ واﻟﻣﺳﺗﺧدﻣﺔ ﻟﻠﻣﻔﺎﺗﯾﺢ ﻣﺻﻧوﻋﺔ ﻣن اﻟﺑﻼﺳﺗﯾك اﻟﺟﯾد واﻟﻣﻘﺎوم ﻟﻠﺣرﯾﻖ وﻣطﺎﺑﻘﺔ‬-
comply with the British specifications BS4662, VDE-3676 and shall have special covers to prevent penetration of ‫ ﻋﻠﻰ أن ﯾﻛون ﻟﮭﺎ أﻏطﯾﺔ ﺧﺎﺻﺔ ﺗﻣﻧﻊ ﺗﺳرب اﻟرطوﺑﺔ واﻟﺣﺷرات ﻟﮭﺎ و‬BS-4662 ، VDE-3676 ‫ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ‬
moisture and insects. Those boxes will be made by the same factory which manufactured the electrical pipes, All ‫ﯾﺟب أن ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ ﻣﺻﻧﻌﺔ ﻣن ﻧﻔس اﻟﻣﺻﻧﻊ اﻟﻣﺻﻧﻊ ﻟﻣواﺳﯾر اﻟﻛﮭرﺑﺎء ﻛﻣﺎ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣﺂﺧذ ﻣطﺎﺑﻘﺔ‬
sockets shall comply with (IEC 60889, 60309) specifications. (IEC 60889, 60309) ‫ﻟﻠﻣواﺻﻔﺎت اﻟﺗﺎﻟﯾﺔ‬
- The contractor must submit the drawings which illustrate all electrical installations , path of pipes , places of the ‫ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﺳﻠﯾم رﺳوﻣﺎت ﺗوﺿﯾﺣﯾﺔ ﺗﺑﯾن ﺟﻣﯾﻊ اﻟﺗرﻛﯾﺑﺎت اﻟﻛﮭرﺑﺎﺋﯾﺔ وﻣﺳﺎر اﻟﻣواﺳﯾر وأﻣﺎﻛن اﻟﻘﺳﺎﻣﺎت وﻟوﺣﺎت اﻟﻛﮭرﺑﺎء‬-
circuit breakers and electrical boards before starting any work for approval by the Engineer ‫ﻗﺑل اﻟﺑدء ﺑﺄي أﻋﻣﺎل ﻟﻼﻋﺗﻣﺎد ﻣن ﻗﺑل اﻟﻣﮭﻧدس‬
Submitting the As built drawings and bear the cost to the item prices.
. ‫( وﺗﺣﻣﯾل ﺗﻛﻠﻔﺗﮭﺎ ﻋﻠﻰ أﺳﻌﺎر اﻟﺑﻧود‬As Builte Drawing) ‫وﻋﻣل رﺳوﻣﺎت ﻟﻣﺎ ھو ﻣﻧﻔذ ﺑﺣﺳب ﻣراﺣل ﺗﻧﻔﯾذ اﻷﻋﻣﺎل‬
- The electrical circuits of 13A socket are the same of lighting, but that number of sockets does not exceed 6
sockets in the circuit and its wiring is (2.50) mm square. - Each socket of 20A or heater shall have an independent
.‫ ( ﻣﻠم ﻣرﺑﻊ‬2.50 ) ‫ ﺑﻧﻔس طرﯾﻘﺔ اﻹﻧﺎرة ﺑﺣﯾث ﻻ ﺗزﯾد ﻋدد اﻟﻣﺂﺧذ ﻋن ﺳﺗﺔ ﻣﺂﺧذ ﻓﻲ اﻟداﺋرة وأﺳﻼﻛﮭﺎ‬13A ‫دواﺋر اﻟﻣﺂﺧذ‬-
circuit, wire (4 mm square), pipe, and circuit breakers. - When connecting wires to each other regular connections ‫ﻣﺎﺳورة وﻗﺎطﻊ‬،(‫ ﻣﻠم ﻣرﺑﻊ‬4 )‫ أو ﺳﺧﺎن داﺋرة ﻣﺳﺗﻘﻠﺔ ﺳﻠك‬20A ‫ﻛل ﻣﺄﺧذ‬-
are used like connecters. connecters ‫ﻋﻧد اﻻﺣﺗﯾﺎج إﻟﻰ ﺗوﺻﯾل اﻷﺳﻼك ﻣﻊ ﺑﻌﺿﮭﺎ ﺗﺳﺗﺧدم ﺗوﺻﯾﻼت ﻧظﺎﻣﯾﺔ ﻛﻧﻛﺗرات‬-
- The executive plan of each area shall be attached to the boards of this area in a way that does not corrode or .‫ﯾﺗم إﻟﺻﺎق اﻟﻣﺧطط اﻟﺗﻧﻔﯾذي ﻟﻛل ﻣﻧطﻘﺔ داﺧل اﻟﻠوﺣﺎت اﻟﺧﺎﺻﺔ ﺑﮭذه اﻟﻣﻧطﻘﺔ ﺑطرﯾﻘﺔ ﻻ ﺗﺗﺂﻛل وﻻ ﺗﺗﺄﺛر ﺑﺎﻟﻣﺎء‬-
affected by water. ‫ ﯾﺟب ﺗﻘدﯾم ﻋﯾﻧﺎت ﻟﺟﻣﯾﻊ اﻟﻣواد ﻗﺑل اﻟﺗﻧﻔﯾذ واﻟﺗرﻛﯾب وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳؤوﻟﯾﺔ وﺗﻛﻠﻔﺔ اﻟﺗورﯾد ﻗﺑل اﻋﺗﻣﺎد اﻟﻌﯾﻧﺔ ﻣن‬-
- Samples must be submitted for all materials prior to installation. The Contractor shall bear all responsibility and .‫ﻗﺑل اﻹﺳت ﺷﺎري وﯾﺣﻖ ﻟﻼﺳﺗﺷﺎري رﻓض أي ﻛﻣﯾﺎت ﯾﺗم ﺗﻧﻔﯾذھﺎ أو ﺗورﯾدھﺎ ﻗﺑل اﻋﺗﻣﺎدھﺎ‬
cost of supply before the sample is approved by the Consultant. The
‫ﯾﺗم ﺗرﻗﯾم ﺟﻣﯾﻊ اﻷﺳﻼك ﻓﻲ ﻟوﺣﺎت اﻟﺗوزﯾﻊ اﻟﻔرﻋﯾﺔ وﻓﻘﺎ ﻷرﻗﺎم اﻟدواﺋر ﺑﺄرﻗﺎم ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﺧﺻﺻﺔ ﻟﮭذا اﻟﻐرض وﯾﺗم ﻋﻣل‬-
Consultant shall be entitled to reject any quantities installed or supplied before approval.
- All wires in the distribution boards shall be numbered according to the circuits numbers with plastic numbers .‫ھذه اﻷرﻗﺎم داﺧل اﻟﻣﻔﺎﺗﯾﺢ و اﻟﻣﺂﺧذ‬
designated for this purpose. These numbers will be pasted inside the switches and sockets. ‫ ( ﻋن‬Conductivity) ‫ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ ﻣوﺻﻼت اﻷﺳﻼك واﻟﻛواﺑل ﻣﺻﻧوﻋﺔ ﻣن اﻟﻧﺣﺎس اﻟذي ﻻ ﺗﻘل ﻣوﺻﻠﯾﺗﮫ‬-
-All wires and cables to be made of copper with a conductivity of at least ‫( وﺗﻛون ﻣوﺻﻼت وﻛﺎﺑﻼت اﻟﻣﺣرﻛﺎت وﻣﺎ ﺷﺎﺑﮫ ﻣن اﻟﻧوع‬IEC-28) ‫ وﻣﺻﻧﻊ طﺑﻘﺎ ﻟﻣواﺻﻔﺎت ھﯾﺋﺔ اﻟﻛﮭرﺑﺎء اﻟدوﻟﯾﺔ‬99%
99%and manufactured according to the specifications of the International ‫ ﻓوﻟت وﺑﻣﻘﺎطﻊ‬1000/600 ‫ و ﯾﺟب أن ﺗﻛون ھذه اﻟﻛﺎﺑﻼت واﻷﺳﻼك ﻣن ﻓﺋﺔ‬. ‫اﻟﻣﺷﻌر اﻟﻣرن ﻟﺗﺣﻣل اﻻھﺗزازات‬
Electricity Authority (IEC-28). Connectors and cables of motor and the like shall be flexible type to resist vibrations. ‫واﺳﺗطﺎﻋﺎت ﺗﯾﺎرﯾﮫ ﻣﻧﺎﺳﺑﺔ‬
These cables and wires must be 1000/600 volts, with suitable sections and capacity. The standard colors of wires ‫ أﺧﺿر‬،‫ أزرق (ﻟﻠﻔﺎزات أﺳود ﻟﻠﺣﯾﺎدي )أﺧﺿر‬،‫ أﺻﻔر‬،‫وﯾﺟب اﻻﻟﺗزام ﺑﺎﻷﻟوان اﻟﻘﯾﺎﺳﯾﺔ ﻟﻸﺳﻼك واﻟﻛﺎﺑﻼت )أﺣﻣر‬
and cables must be adhered. (red, yellow, blue) for power, black for neutral ,(green, green and yellow) for ground,
‫وأﺻﻔر(ﻟﻸرﺿﻲ ﺑﺣﯾث ﻻ ﯾﻧﺷﺄ اﻟﺗﺑﺎس ﺑﯾن اﻷﺳﻼك اﻟﻣﺗﻌددة‬
so that, there is no confusion between multiple wires. -Testing: Operation of all electric equipment, fittings,
insulated circuits, insulated cables, all main and subsidiary circuit breakers, earthing. ‫ اﻟﺗﺄرﯾض‬, ‫ﺟﻣﯾﻊ اﻟﻘواطﻊ اﻟرﺋﯾﺳﯾﺔ واﻟﻔرﻋﯾﺔ‬, ‫ﻋﺎزﻟﯾﮫ اﻟﻛﺎﺑﻼت‬, ‫ﻋﺎزﻟﯾﮫ اﻟدواﺋر‬, ‫ﺗﺷﻐﯾل ﺟﻣﯾﻊ اﻷﺟﮭزة واﻟﺗرﻛﯾﺑﺎت‬: ‫اﺧﺗﺑﺎر‬-
- Wiring through wall should be made vertically. It is strictly forbidden to break walls horizontally. .‫ وﯾﻣﻧﻊ ﻣﻧﻌﺎ ﺑﺎﺗﺎ اﻟﺗﻛﺳﯾر ﻓﻲ اﻟﺟدران ﺑﺷﻛل أﻓﻘﻲ‬.. ‫ ﯾراﻋﻰ أن ﺗﻛون ھذه اﻟﺗﻣدﯾدات رأﺳﯾﮫ‬--
-Testing: All electric equipment , fittings, insulated circuits, insulated cables, all main and sub circuit breakers, and ‫ ﯾﺟب ﺗﺷﻐﯾل ﺟﻣﯾﻊ اﻟﻣﻌدات اﻟﻛﮭرﺑﺎﺋﯾﺔ واﻟﺗﺟﮭﯾزات واﻟدواﺋر اﻟﻣﻌزوﻟﺔ واﻟﻛﺎﺑﻼت اﻟﻣﻌزوﻟﺔ وﺟﻣﯾﻊ ﻗواطﻊ اﻟداﺋرة‬:‫ اﻻﺧﺗﺑﺎر‬-
earthing have to be operationalized - Work includes the installation of plastic pipes (PVC) of orange color for ‫( ﺑﺎﻟﻠون اﻟﺑرﺗﻘﺎﻟﻲ ﻟﻸﺳﻘف واﻷﺳود ﻟﻠﺟدران‬PVC) ‫ ﯾﺷﻣل اﻟﻌﻣل ﺗرﻛﯾب اﻷﻧﺎﺑﯾب اﻟﺑﻼﺳﺗﯾﻛﯾﺔ‬- ‫اﻟرﺋﯾﺳﯾﺔ واﻟﻔرﻋﯾﺔ واﻟﺗﺄرﯾض‬
ceilings and black for walls with diameters ¾” & 1”, which to be placed before wiring. Wiring to be manufactured ‫ ﻣم ﺑﺟودة ﻋﺎﻟﯾﺔ وﻣﻌزوﻟﺔ ﺑﻣﺎدة‬2.5 ‫ ﯾﺻﻧﻊ اﻻﺳﻼك ﻣن ﻧﺣﺎس‬.‫ واﻟﺗﻲ ﯾﺟب وﺿﻌﮭﺎ ﻗﺑل ﺗوﺻﯾل اﻷﺳﻼك‬، "1 &" ¾ ‫ﺑﺄﻗطﺎر‬
of copper 2.5 mm high quality, insulated by plastic material with the boxes size (7 cm × 7 cm) and junction points. .‫ ﺳم( وﻧﻘﺎط اﻟوﺻل‬7 × ‫ ﺳم‬7) ‫ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﻊ ﺣﺟم اﻟﺻﻧﺎدﯾﻖ‬
- Work includes all installations from the distribution board to the distribution boxes with wires 2.5 mm and 4 mm
‫ ﻣم‬4 ‫ ﻣم و‬2.5 ‫ ﯾﺷﻣل اﻟﻌﻣل ﺟﻣﯾﻊ اﻟﺗرﻛﯾﺑﺎت ﻣن ﻟوﺣﺔ اﻟﺗوزﯾﻊ إﻟﻰ ﺻﻧﺎدﯾﻖ اﻟﺗوزﯾﻊ ﺑﺄﺳﻼك‬-
- At the intersection of a water line or a sewage line with the path of an electrical cable, the power cable should be
above and not below the installation ‫ ﯾﺟب أن ﯾﻛون ﻛﺎﺑل اﻟطﺎﻗﺔ أﻋﻠﻰ وﻟﯾس أﺳﻔل‬، ‫ ﻋﻧد ﺗﻘﺎطﻊ ﺧط اﻟﻣﯾﺎه أو ﺧط اﻟﺻرف اﻟﺻﺣﻲ ﻣﻊ ﻣﺳﺎر ﻛﺎﺑل ﻛﮭرﺑﺎﺋﻲ‬-
- The item includes everything necessary ‫اﻟﺗرﻛﯾب‬
to carry out the work to the fullest according to the attached technical specifications and engineering drawings and ‫ ﯾﺗﺿﻣن اﻟﻌﻧﺻر ﻛل ﻣﺎ ھو ﺿروري ﻟﺗﻧﻔﯾذ اﻟﻌﻣل ﻋﻠﻰ أﻛﻣل وﺟﮫ ﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻔﻧﯾﺔ اﻟﻣرﻓﻘﺔ واﻟرﺳوﻣﺎت اﻟﮭﻧدﺳﯾﺔ‬-
the instructions of the supervisor ‫ ﯾﺟب أن ﯾﻛون ﻛﺎﺑل اﻟطﺎﻗﺔ أﻋﻠﻰ و‬، ‫ ﻋﻧد ﺗﻘﺎطﻊ ﺧط ﻣﯾﺎه أو ﺧط ﺻرف ﺻﺣﻲ ﻣﻊ ﻣﺳﺎر ﻛﺎﺑل ﻛﮭرﺑﺎﺋﻲ‬- ‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﺷرف‬
.‫ﻟﯾس ﺗﺣت اﻟﺗﺛﺑﯾت‬
1.8.1 Socket 13 A: : A 13 ‫ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬
Supply and installation of a socket 13A with a switch, It shall be concealed ‫ ﯾرﻛب داﺧل اﻟﺣﺎﺋط ﻣﻊ ﺟﻣﯾﻊ‬،(‫ ﻣﻊ اﻟﻣﻔﺗﺎح )ﺳوﯾﺗش‬A 13 ‫ ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬:‫ﺑﺎﻟﻌدد‬
inside the wall with all requirements of black PVC conduits which will be bent in ،‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬PVC) ‫ اﻟﻣﺳﺗﻠزﻣﺎت ﻣن ﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾك اﻟﺳوداء‬pcs
the bending points using spiral spring, wires and boxes. Screws are used for ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬،‫ واﻟﺗوﺻﯾل ﺣﺗﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬،‫ﻋدد وأﺳﻼك وﻋﻠب ﻣﻊ اﻟﺗﺛﺑﯾت ﺑﺎﻟﻣﺳﺎﻣﺑر اﻟﻘﻼووظ‬ 6.00
fixation. Item includes all connection to the distribution board according to .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬
drawings and specifications , And the supervisor's instructions.

1.8.2 Ceiling fans: : ‫ﻣراوح ﺳﻘف‬


In number: Supply and installation of fans fixed to the ceilings, excellent type, ‫ ﺗورﯾد وﺗرﻛﯾب ﻣراوح ﺗﺛﺑت ﺑﺎﻟﺳﻘوف ﻧوع ﻣﻣﺗﺎز اﺗوﻣﺎﺗﯾﻛﻲ ﻧظﺎﻣﯾن طﺎﻗﺔ ﺷﻣﺳﯾﺔ وﻛﮭرﺑﺎء ﻣﻊ‬: ‫ﺑﺎﻟﻌدد‬
automatic, two systems solar energy and electricity systems, with the switch and ‫اﻟﻣﻔﺗﺎح وﺟﻣٌﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﺗوﺻٌﯾل ﺣﺗﻰ ﻣﺄﺧذ اﻟﻛﮭرﺑﺎء وﺗﺷﻣل اﻟﻣواﺳﯾر واﻟﺑﻼﺳﺗﯾﻛﯾﺔ واﻟﺗﻲ ﺗوﺿﻊ‬
all supplies, and connection to the electrical outlet, including plastic pipes, which ‫ﻗﺑل اﻟﺻب واﻟﻌﻠب واﻏطٌﯾﺗﮭﺎ وﺗﺛﺑٌﯾﺗﮭﺎ واﻟﻣﺳﺎﻣﯾر اﻟﻘﺎﻟووظ واﻟﺗﺳﻠﯾك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ وﯾﺗم‬ pcs
are placed before pouring, cans and their covers, and fixed with screws and ‫اﻋﺗﻣﺎد اﻟﻌﯾﻧﮫ ﻣن ﻗﺑل ادارة اﻟﻣﺷروع واﻟﺛﻣن ٌﯾﺷﻣل ﻛل ﻣﺎ ٌﯾﻠزم ﻻﻧﮭﺎء اﻟﻌﻣل ﺣﺳب اﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾٌﻣﺎت‬ 6.00
‫ﻋدد‬
wires from the point to the distribution panel. The sample is approved by the .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
project management, and the price includes everything. What is necessary to
complete the work according to the specifications and instructions of the
supervising engineer..
1.8.3 Supply and installation of standard lighting : Supply and installation of a : ‫ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ‬
standard lighting unit, include the switch and PVC pipes which can be bent ( at (PVC) ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﻋﺎدﯾﺔ وﺗﺷﻣل اﻟﻣﻔﺗﺎح واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء‬:‫ﺑﺎﻟﻌدد‬
bending points) using spiral spring, pipes are placed before casting .The item ‫ واﻟﺗﻰ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ‬،‫وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬ pcs
15.00
shall include boxes and their covers which they shall be fixed with screws as ‫ وﺗﻌﻠﯾﻣﺎت‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬ ‫ﻋدد‬
well as wires from the point to the distribution board according to drawings and .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
specifications.
1.8.4 Supply and installation of a regular lighting unit with a hemispherical : ‫ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي‬
cover: ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي وﺗﺷﻣل اﻟﻣﻔﺗﺎح واﻟﻣواﺳﯾر‬:‫ﺑﺎﻟﻌدد‬
In numbers: Supply and installation of a regular lighting unit with a hemispherical ‫ واﻟﺗﻰ ﺗوﺿﻊ ﻗﺑل اﻟﺻب‬،‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬PVC) ‫اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء‬ pcs
cover, including the switch and black plastic pipes (PVC). It is bent - in the ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬،‫واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬ 4.00
‫ﻋدد‬
bending areas - using spring, which is placed before casting, the cans and their .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬
covers, and fixed with screws and wires from the point to the distribution panel,
according to the drawings and specifications, and the instructions of the
Total Amount of Electricity Works ‫إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ‬

Total summation .(‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل ﺑﻧﺎء اﻟﻔﺻول )ﺷﺑﮫ اﻟداﺋﻣﺔ‬

2 ‫ﺗرﻣﯾم و إﻋﺎدة ﺗﺄھﯾل ﻟﻣدرﺳﺔ اﻟﺻﺎﻟﺢ‬


Restoration and rehabilitation of Alsaalih School.
2.1 Oil matte paint: : ‫دھﺎن زﯾﺗﻲ‬
Oil matte paint for walls consists of a primer coat and three coats of the required ‫ دھﺎن زﯾﺗﻲ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻟﻠﺣواﺋط واﻟﺟدران ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
color painted above 3 coats of putty and sanding and according to the drawings ‫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت و اﻟﻌﻣل ﯾﺷﻣل ﻣﻌﺎﻟﺟﺔ اﻟﺗﻠﺑﯾس ﻓﻲ ﺣواف اﻟﻧواﻓد و‬m2
650.00
and specifications, and the instructions of the supervisor .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ ﻏﯾرھﺎ ﻣن اﻟﻔﺗﺣﺎت ﻓﻲ اﻟﺟدران‬2‫م‬

2.2 Emulsion painting for ceilings: : ‫دھﺎن أﻣﻠﺷن ﻟﻠﺳﻘوف‬


Water emulsion paint for ceilings consists of base layer and three coats of the ‫ دھﺎن أﻣﻠﺷن )ﻣﺎﺋﻲ( ﻟﻠﺳﻘوف ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
m2
required color , three layers of putty and sanding to be done before painting and ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬،‫اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت ﺑﻌد اﻟﺗﻧﺿﯾف واﻟﻘﺷط وﺗرﻣﯾم اﻟﺗﻠﯾﯾس اﻟﺳﺎﺑﻖ‬ 410.00
2‫م‬
according to the drawings and specifications, and the instructions of the .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬
supervisor.
2.3 Water- Resistant Plastic Paint: : ‫دھﺎن ﻣﺎﺋﻲ ﺑﻼﺳﺗﯾك ﻣﻘﺎوم ﻟﻠﻣﺎء‬
Water emulsion paint for exterior walls consists of base layer and three coats of ،‫دھﺎن ﻣﺳﺗﺣﻠب ﻣﺎﺋﻲ ﻟﻠﺟدران اﻟﺧﺎرﺟﯾﺔ ﯾﺗﻛون ﻣن طﺑﻘﺔ أﺳﺎﺳﯾﺔ وﺛﻼث طﺑﻘﺎت ﻣن اﻟﻠون اﻟﻣطﻠوب‬
the required color , the price includes all the work necessary to prepare the ‫ اﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ اﻷﻋﻣﺎل اﻟﻼزﻣﺔ ﻟﺗﺟﮭﯾز اﻷﺳطﺢ ﻣن اﻟﺻﻧﻔرة واﻟﻣﻌﺟﻧﺔ و ﻣﻌﺎﻟﺟﺔ اﻟﻔﺗﺣﺎت ﻓﻲ‬m2
180.00
surfaces of sanding and kneading and all that is necessary. according to the ‫ ﺣﺳب اﻟﻣﺧططﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت‬.‫ اﻟﺗﻠﯾﯾس ﺑﺎﻻﺳﻣﻧت ﻗﺑل اﻟدھﺎن و اﻟﻣﻌﺟﻧﺔ وﻛل ﻣﺎ ﯾﻠزم‬2‫م‬
drawings and specifications, and the instructions of the supervisor. . ‫اﻟﻣﺷرف‬

2.4 Aluminum windows: : ‫ﻧواﻓذ اﻟوﻣﻧﯾوم‬


Bronze aluminum windows , excellent quality are installed. Frame section be at ‫ ﺗورﯾد و ﺗرﻛﯾب ﻧواﻓذ اﻟوﻣﻧﯾوم و درﻓﺎت ﻟﻠﻧواﻓذ اﻟﻣﻔﻘودة ﺑروﻧزي ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
least 4 x 8 cm , thickness shall not be less than 1.2 mm. Special rubber shall be ‫ﻣم وﯾﺳﺗﺧدم‬1.2 ‫ ﺳم وﺳﻣك اﻷﻟﻣﻧﯾوم ﻻ ﯾﻘل ﻋن‬8×4‫وﯾﻛون اﻟﺣﻠﻖ ﻗطﺎع اﻟﻣوﻧﯾوم ﻻ ﯾﻘل ﻋن‬
used for sealing and preventing leakage of air or water. All fittings like hinges ‫ﻣطﺎط ﺧﺎص ﻹﺣﻛﺎم اﻟﻐﻠﻖ وﻣﻧﻊ ﺗﺳرب اﻟﮭواء او اﻟﻣﺎء وﺟﻣﯾﻊ اﻟﺧردوات ﻣن ﻣﻔﺻﻼت وﻣﻐﺎﻟﻖ‬
m2
and locks be original types. Knobs are laxis, glass 6mm white or opaque ‫ ﻣم ﻣﻊ وزﺟﺎج ﻣﺛﻠﺞ او ﻣﺷﺟر ﻣﺎﻧﻊ‬6 ‫ﺗﻛون اﺻﻠﯾﺔ اﻟﻧوع وﻣﻘﺎﺑض ﻻﻛﺳﯾس وزﺟﺎج أﺑﯾض ﺑﺳﻣك‬ 47.00
2‫م‬
(according to locations specified in drawings) openable-shutters are provided ‫ﻟﻠرؤﯾﺔ )ﻓﻲ اﻟﻣواﺿﻊ اﻟﻣﺣددة ﻓﻲ اﻟرﺳوﻣﺎت( وﻋﻣل ﺷﺑك اﻟﻧﺎﻣس اﻟﻣﺎﻧﻊ ﻟﻠﺣﺷرات ﻟﻠدرﻓﺎت اﻟﻘﺎﺑﻠﺔ‬
with insect-resistant nets. All sides of frames are fixed with at least two rivets, ،‫ وﺗﺛﺑﯾت اﻟزﺟﺎج ﺑﺎﻟرﺑﻼت اﻟﺧﺎﺻﺔ‬،‫ﻟﻠﻔﺗﺢ وﺗﺛﺑﯾت اﻟﺣﻠوق ﻣن ﺟﻣﯾﻊ اﻟﺟواﻧب اﺛﻧﯾن ﺗﺛﺑﯾﺗﺎت ﻋﻠﻰ اﻷﻗل‬
with all fittings, according Specifications, and instructions of the supervisor ‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬،‫)اﻟﻘﯾﺎس ﻣن اﻷﺑﻌﺎد اﻟداﺧﻠﯾﺔ( طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ﻣﻊ ﺟﻣﯾﻊ اﻟﺧردوات‬
engineer (Samples needed to be provided). .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬.‫اﻟﻣﺷرف‬
2.5 Maintenance of aluminum windows: Maintenance of aluminum windows. The ‫ ﺻﯾﺎﻧﺔ ﺷﺑﺎﺑﯾك اﻟﻣﻧﯾوم و اﻟﻌﻣل ﯾﺷﻣل ﺗﺛﺑﯾت اﻟﻧواﻓذ وﻋﻣل رﺑﻼت و ﺿﻣﺎن‬: ‫ﺻﯾﺎﻧﺔ ﺷﺑﺎﺑﯾك اﻟﻣﻧﯾوم‬
work includes installing the windows, making shutters, ensuring that the ‫و ﻛل ﻣﺎ ﯾﻠزم ﻻﻧﮭﺎء اﻟﺑﻧد‬. ‫ﻏﻠﻖ و ﻓﺗﺢ اﻟﻧواﻓذ ﺑﺳﮭوﻟﺔ و ﺗورﯾد و ﺗرﻛﯾب ﺷﺑك اﻟﻧﺎﻣس وﺗﻧظﯾف اﻟﻧواﻓذ‬
m2
windows close and open easily, supplying and installing awnings, and cleaning ‫ ﯾﺗﺿﻣن‬.‫ﺑﺣﺳب ﺗوﺟﯾﮭﺎت ﻣﮭﻧدس اﻟﻣﺷرف‬ 6.00
2‫م‬
the windows. And everything necessary to complete the item according to the
directives of the supervising engineer.
2.6 Aluminum glass windows: :‫زﺟﺎج ﻧواﻓذ اﻟﻣﻧﯾوم‬
Supply and installation of 6 mm thick glass instead of broken aluminum ‫ ﻣم ﺑدﻻ ﻣن اﻟﻣﻛﺳر ﻟﻠﻧواﻓذ اﻷﻟﻣﻧﯾوم ﻣﻊ اﻟرﺑﻼت واﻟﺗﺛﺑﯾت وﻋﻣل ﻛل‬6 ‫ ﺗورﯾد وﺗرﻛﯾب زﺟﺎج ﺳﻣك‬m2
windows, along with bolts, fixing, and doing everything necessary according to .‫ ﻣﺎﯾﻠزم ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬2‫م‬ 5.00
the instructions of the supervising engineer.

2.7 Sanding and re-painting of the protective grille. :‫ﺻﻧﻔرة و إﻋﺎدة دھﺎن ﺷﺑك ﺣﻣﺎﯾﺔ‬
Per square meter: - Sanding and repainting the protective nets using abrasives ‫ ﺻﻧﻔرة و إﻋﺎدة دھﺎن ﻟﺷﺑﺎك اﻟﺣﻣﺎﯾﺔ ﺑﺎﻟﺟﻠﺦ و اﻟﺑرﺷﺎت و اﻟﻌﻣل ﯾﺷﻣل طﻼء وﺟﮭﯾن‬-:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
and sprays. The work includes painting two sides with a base primer and three ‫ ﺑراﯾﻣر أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﺻﻧﻔرة وﺟﻠﺦ اﻟزواﺋد واﻟﺗﻧﻌﯾم وﻛل ﻣﺎ ﯾﻠزم وﺑﺣﺳب‬m2 63.00
sides in the required color, sanding, grinding the excess, smoothing, and .‫ ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬2‫م‬
everything necessary, according to the directives of the supervising engineer.

2.8 Wooden strips sec.(1”*4”)-Meranti wood : : ‫ ﺧﺷب ﻣﯾراﻧﺗﻲ‬،‫(ھﻧش‬4×1) ‫ﺷراﺋر ﺧﺷﺑﯾﺔ ﻗطﺎع‬
Supply and installation of wooden strips for walls, red meranti wood, width not ‫ ﺳم‬10‫ ﻋرض ﻻﯾﻘل ﻋن‬،‫ ﻣﯾراﻧﺗﻲ أﺣﻣر‬،‫ ﺗورﯾد وﺗرﻛﯾب ﺷراﺋر ﺧﺷﺑﯾﺔ ﻟﻠﺟدران‬:‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
less than 10 cm and a thickness of not less than 2.5 cm, finely polished and ‫م‬0.50 ‫ أوﺟﮭﮫ وﺗﺛﺑت ﺑﺎﻟﺑراﻏﻲ ﻛل‬3 ‫ ﺳم ﻣﻧﻌﻣﺔ وﻣﺻﻧﻔرة وﻣدھﻧﺔ ﺑﺎﻟورﻧﯾش‬2.5 ‫وﺑﺳﻣك ﻻ ﯾﻘل ﻋن‬
painted 3 facets and fixed with screws every 0.50 m and a depth of not less than ‫ ﺳم ﻣن‬70 ‫ ﺳم ﻓﻲ اﻟﺟدران وﺗﻛون ﺧﺎﻟﯾﺔ ﻣن اﻟﻌﯾوب واﻟﺷروخ و ﺗﺛﺑت ﺑﺎرﺗﻔﺎع‬3 ‫ وﺑﻌﻣﻖ ﻻ ﯾﻘل ﻋن‬ml 50.00
3 cm on walls and be free of defects and cracks. They shall be fixed at 70cm ‫ وﺷراﺋر ﻋﻠوﯾﺔ ﻟﻠﻣﻌﻣل‬,‫ وﻋﻧدﻣﺳﺗوى اﻷﻋﺗﺎب ﻟﺟﻣﯾﻊ اﻟﻔﺻول واﻻدارة واﻟﻣﺧزن واﻟﻣﻛﺗﺑﺔ‬،‫م ط أﻷرﺿﯾﺎت‬
from floor level, the other strips are fixed at lintels level of classrooms, . ‫ﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
administration, store, library and laboratory and according to the drawings,
specifications and instructions of supervisor engineer.
2.9 Maintenance and repainting of wooden shutters: :‫ﺻﯾﺎﻧﺔ و إﻋﺎدة دھﺎن اﻟﺷراﯾر اﻟﺧﺷﺑﯾﺔ‬
Per linear meter: Maintenance and repainting of wooden wall panels, so that ‫ ﺑﺣﯾث ﯾﺗم ﺗﻧﻌﯾﻣﮭﺎ وﺻﻧﻔرﺗﮭﺎ و دھﺎﻧﮭﺎ‬،‫ ﺻﯾﺎﻧﺔ و اﻋﺎدة دھﺎن ﻟﺷراﺋر ﺧﺷﺑﯾﺔ ﻟﻠﺟدران‬:‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
they are smoothed, sanded, and painted with 3-sided varnish. The item includes ‫ أوﺟﮭﮫ و اﻟﺑﻧد ﯾﺷﻣل ﺻﯾﺎﻧﺔ اﻟﻣﻧﺎطﻖ اﻟﻣﮭﺗرﺋﺔ و ﺗﻐﯾﯾرھﺎ ﺑﺷراﺋر ﻣﺷﺎﺑﮭﺔ او ﻧوﻋﯾﺔ‬3 ‫ﺑﺎﻟورﻧﯾش‬
maintenance of worn out areas and replacing them with similar or red Meranti ‫ ﺳم ﻓﻲ اﻟﺟدران وﺗﻛون ﺧﺎﻟﯾﺔ ﻣن‬3 ‫م وﺑﻌﻣﻖ ﻻ ﯾﻘل ﻋن‬0.50 ‫ﻣﯾراﻧﺗﻲ أﺣﻣروﺗﺛﺑت ﺑﺎﻟﺑراﻏﻲ ﻛل‬ ml
210.00
type panels, which are fixed with screws every 0.50 m and at a depth of not less ‫اﻟﻌﯾوب واﻟﺷروخ و ﺗﺛﺑت ﺑﺎرﺗﻔﺎع ﻣﻧﺎﺳب ﻣن أﻷرﺿﯾﺔ ﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت‬ ‫مط‬
than 3 cm in the walls and are free of defects. The cracks are fixed at an . ‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
appropriate height from the floor according to the drawings, specifications, and
instructions of the supervising engineer.
2.10 Maintenance of iron doors: : ‫ﺻﯾﺎﻧﺔ اﻻﺑواب اﻟﺣدﯾدﯾﺔ ﻟﻠﻔﺻول و اﻟﺑواﺑﺔ اﻟرﺋﯾﺳﯾﺔ ﻟﻠﻣدرﺳﺔ‬
In square meters: Maintaining and inspecting the school’s iron doors according -: ‫ ﺻﯾﺎﻧﺔ وﻣﻔﺎﻗدة اﻻﺑواب اﻟﺣدﯾدﯾﺔ ﻟﻠﻣدرﺳﺔ ﺑﺎﻷﺑﻌﺎد ﺑﺣﺳب اﻟﻛﻣﯾﺎت م وذﻟك ﺑﻌﻣل اﻵﺗﻲ‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
to the dimensions according to the quantities, by doing the following: -
- Cutting the damaged iron, replacing the removed parts of the gates and others ‫ ﻗطﻊ اﻟﺣدﯾد اﻟﺗﺎﻟف واﺳﺗﺑدال اﻟﻘطﻊ اﻟﻣﺧﻠوﻋﺔ ﻣن ﻣراﺑﯾﻊ وﻏﯾرھﺎ ﻓﻲ ﺟﺳم اﻟﺑﺎب وﺳﻣﻛرة اﻷﺟزاء‬-
in the door body, and plumbing the other parts by repairing or replacing them. . . ‫اﻻﺧرى ﺑﺈﺻﻼﺣﮭﺎ أو إﺳﺗﺑداﻟﮭﺎ و طﻼء اﻻﺑواب ﺑﻣﺎدة اﺳﺎس و ووﺟﮭﯾن زﯾﺗﻲ ﺑﻌد اﻟﺟﻠﺦ و اﻟﺳﻧﻔرة‬
- Replacing damaged bolts and hinges with others, making three hinges on ‫ اﺳﺗﺑدال اﻟﻣﻐﺎﻟﻖ واﻟﻣﻔﺻﻼت اﻟﺗﺎﻟﻔﮫ ﺑﺄﺧري وﻋﻣل ﺛﻼث ﻣﻔﺻﻼت ﻓﻲ ﻛل ﺟﺎﻧب وﻣﺎ ﯾﻠزﻣﮭﻣﺎ وﺗورﯾد‬- m2
25.50
each side and what is needed for them, and supplying an excellent quality lock. .‫ﻗﻔل ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة‬ 2‫م‬
- Adjusting the weight and other necessary maintenance work to ensure that the ، ‫ﺿﺑط اﻟوزﻧﯾﺔ وﻏﯾر ذﻟك ﻣن اﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ اﻟﻼزﻣﮫ ﻟﺿﻣﺎن اﻋﺎدة ﺗﺷﻐﯾل اﻟﺑواﺑﺔ ﺑﺎﻟﺷﻛل اﻟﻣطﻠوب‬-
gate is restarted as required. The contractor must visit the site before submitting ‫وﻋﻠﻲ اﻟﻣﻘﺎول زﯾﺎرة اﻟﻣوﻗﻊ ﻗﺑل ﺗﻘدﯾم ﻋرض اﻟﺳﻌر‬
the price offer. .‫ﯾﺷﻣل اﻟﺑﻧد ﻛل ﻣﺎﯾﻠزم ﺑﺣﺳب اﺻول اﻟﻌﻣل اﻟﻣﺗﻌﺎرف ﻋﻠﯾﮭﺎ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
The item includes everything necessary according to generally accepted work
2.11 principles and the instructions of the supervising engineer
Supply and installation of a single fluorescent lighting unit, 120 cm, 40 : ‫ وات‬40 ‫ﺳم‬120 ‫ﺗورﯾد وﺗرﻛﯾب وﺣدة اﻧﺎرة ﻓﻠورﺳﻧت ﻣﻔرد‬
watts: 40 ‫ﺳم‬120 ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة اﻧﺎرة ﻓﻠورﺳﻧت ﻣﻔرد‬: ‫ﺑﺎﻟﻌدد‬
In number: Supply and installation of a single fluorescent lighting unit, 120 cm 40 ‫ ( واﻟﺗﻲ ﺗوﺿﻊ‬PVC) ‫وات ﻣﻊ اﻟﻣﻔﺗﺎح وﺗﺷﻣل اﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ‬ pcs
24.00
It comes with the key and includes plastic pipes (PVC) which are placed ‫ﻗﺑل اﻟﺻب واﻟﻌﻠب واﻏطﯾﺗﮭﺎ وﻣﺳﺎﻣﯾر اﻟﻘﻠووظ واﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ‬ ‫ﻋدد‬
Before molding, cans and their lids are secured with screws and wires .‫ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
From the point to the distribution board according to the specification and
2.12 standards
Supply and and with the instructions
installation of the
of a regular site engineer.
outdoor lighting unit with a semi-oval : ‫"ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي‬
cover: ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي وﺗﺷﻣل اﻟﻣﻔﺗﺎح‬:‫ﺑﺎﻟﻌدد‬
In numbers: Supply and installation of a regular external lighting unit with a semi- ‫ واﻟﺗﻰ ﺗوﺿﻊ‬،‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬PVC) ‫واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء‬
oval cover, including the switch and black plastic pipes (PVC). It is bent - in the ً ‫ طﺑﻘﺎ‬،‫ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬ pcs
12.00
bending areas - using spring, which is placed before pouring. The cans and their .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬ ‫ﻋدد‬
covers are fixed with screws and wires from the point to the distribution panel,
according to the drawings, specifications, and the engineer’s instructions. Admin.
2.13 Ceiling fans: : ‫ﻣراوح ﺳﻘف‬
In number: Supply and installation of fans fixed to the ceilings, excellent type, ‫ ﺗورﯾد وﺗرﻛﯾب ﻣراوح ﺗﺛﺑت ﺑﺎﻟﺳﻘوف ﻧوع ﻣﻣﺗﺎز اﺗوﻣﺎﺗﯾﻛﻲ ﻧظﺎﻣﯾن طﺎﻗﺔ ﺷﻣﺳﯾﺔ وﻛﮭرﺑﺎء ﻣﻊ‬: ‫ﺑﺎﻟﻌدد‬
automatic, two systems solar energy and electricity systems, with the switch and ‫اﻟﻣﻔﺗﺎح وﺟﻣٌﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﺗوﺻٌﯾل ﺣﺗﻰ ﻣﺄﺧذ اﻟﻛﮭرﺑﺎء وﺗﺷﻣل اﻟﻣواﺳﯾر واﻟﺑﻼﺳﺗﯾﻛﯾﺔ واﻟﺗﻲ ﺗوﺿﻊ‬
all supplies, and connection to the electrical outlet, including plastic pipes, which ‫ ﻗﺑل اﻟﺻب واﻟﻌﻠب واﻏطٌﯾﺗﮭﺎ وﺗﺛﺑٌﯾﺗﮭﺎ واﻟﻣﺳﺎﻣﯾر اﻟﻘﺎﻟووظ واﻟﺗﺳﻠﯾك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ وﯾﺗم‬pcs
are placed before pouring, cans and their covers, and fixed with screws and ‫ﻋدد اﻋﺗﻣﺎد اﻟﻌﯾﻧﮫ ﻣن ﻗﺑل ادارة اﻟﻣﺷروع واﻟﺛﻣن ٌﯾﺷﻣل ﻛل ﻣﺎ ٌﯾﻠزم ﻻﻧﮭﺎء اﻟﻌﻣل ﺣﺳب اﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾٌﻣﺎت‬ 12.00
wires from the point to the distribution panel. The sample is approved by the .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
project management, and the price includes everything. What is necessary to
complete the work according to the specifications and instructions of the
supervising engineer..
2.14 12 line electrical distribution board: :‫ ﺧط‬12 ‫ﻟوﺣﺔ ﺗوزﯾﻊ ﻛﮭرﺑﺎﺋﯾﺔ‬
In number: Sub-distribution panel (single phase) Crabtree or its equivalent with ‫ ﺗورﯾد وﺗرﻛﯾب ﻟوﺣﺔ ﺗوزﯾﻊ ﻓرﻋﯾﺔ )طور اﺣﺎدي( ﻛراﺑﺗري أو ﻣﺎ ﯾﻌﺎدﻟﮭﺎ ﺑدوﻻب ﺗرﻛب داﺧل‬:‫ ﺑﺎﻟﻌدد‬pcs
a cupboard installed inside the wall with 12 lines, according to the drawings, ‫ طﺑﻘﺎ ً ﻣﻊ ﻋﻣل اﻟﺗﻣدﯾدات اﻟﻼزﻣﺔ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ ﺧط‬12 ‫ﻋدد اﻟﺣﺎﺋط‬ 1.00
specifications, and instructions of the supervising engineer. .‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
2.15 Socket 13 A: : A 13 ‫ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬
Supply and installation of a socket 13A with a switch, It shall be concealed ‫ ﯾرﻛب داﺧل اﻟﺣﺎﺋط ﻣﻊ ﺟﻣﯾﻊ‬،(‫ ﻣﻊ اﻟﻣﻔﺗﺎح )ﺳوﯾﺗش‬A 13 ‫ ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬:‫ﺑﺎﻟﻌدد‬
inside the wall with all requirements of black PVC conduits which will be bent in ،‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬PVC) ‫اﻟﻣﺳﺗﻠزﻣﺎت ﻣن ﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾك اﻟﺳوداء‬
pcs
the bending points using spiral spring, wires and boxes. Screws are used for ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬،‫ واﻟﺗوﺻﯾل ﺣﺗﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬،‫وأﺳﻼك وﻋﻠب ﻣﻊ اﻟﺗﺛﺑﯾت ﺑﺎﻟﻣﺳﺎﻣﺑر اﻟﻘﻼووظ‬ 9.00
‫ﻋدد‬
fixation. Item includes all connection to the distribution board according to .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬
drawings and specifications , And the supervisor's instructions.

The total of rehabilitation work in Al-Saleh School ‫اﻹﺟﻣﺎﻟﻲ ﻻﻋﻣﺎل إﻋﺎدة اﻟﺗﺄھﯾل ﻓﻲ ﻣدرﺳﺔ اﻟﺻﺎﻟﺢ‬
3 ‫ ﺣﻣﺎﻣﺎت‬3 ‫ﺑﻧﺎء‬
Building of Three bathroom
3.1 Site Works ‫اﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم‬

Notes : -:‫ﻣﻼﺣظﺎت‬
1. The contractor shall visit the site before elaboration of the tender and study all ‫ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻣﺗﻘدم ﻓﻲ اﻟﻌطﺎء زﯾﺎرة ﻣوﻗﻊ اﻟﻣﻧﺷﺄة ﻗﺑل اﻟﺑدء ﻓﻲ دراﺳﺔ اﻟﻌطﺎء ودراﺳﺔ ﺟﻣﯾﻊ اﻟظروف اﻟﻣﺣﯾطﺔ ﺑﺎﻟﻣﻧﺷﺄة‬
circumstances that surround the site, especially eventually existing slopes at the site. ‫واﻟﻣؤﺛرة ﻋﻠﻰ اﻷﻋﻣﺎل ﻣﺛل طرﯾﻖ إﯾﺻﺎل اﻟﻣواد اﻟﻼزﻣﺔ ﻟﻺﻧﺷﺎء و دراﺳﺔ طرﯾﻘﺔ ووﺳﯾﻠﺔ ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ اﻟﻌﺎم وﯾﺗﺣﻣل‬
2. During the excavation and in the case of being unable to reach the depth mentioned in the . ‫اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ‬
drawings and/or finding the soil bearing capacity (structural drawing) in this depth less than ‫ﻋﻧد اﻟﺣﻔر ﻓﻲ ﺣﺎﻟﺔ ﻋدم اﻟﻘدرة ﻟﻠوﺻول اﻟﻰ اﻟﻌﻣﻖ اﻟﺗﺻﻣﯾﻣﻲ ﺑﺎﻟرﺳوﻣﺎت ﻧﺗﯾﺟﺔ ﻟوﺟود أرض ﺻﺧرﯾﺔ أو ﻛﺎﻧت ﻣﻘﺎوﻣﺔ‬
the required, the contractor shall contact the project management. ‫اﻟﺗرﺑﺔ أﻗل ﻣن اﻟﻣﻘﺎوﻣﺔ اﻟﺗﺻﻣﯾﻣﯾﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول اﻷﺗﺻﺎل ﺑﺎدارة اﻟﻣﺷروع ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت ﻟﺗﺷﻛﯾل ﻟﺟﻧﺔ‬
.‫ﻟﻠدراﺳﺔ وﺗﺣدﯾد اﻟﺣﻠول اﻟﻣﻧﺎﺳﺑﺔ وإﻋﺗﻣﺎدھﺎ ﻣن ادارة اﻟﻣﺷروع وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﻣﺧﺎﻟﻔﮫ‬

3.1.1 Soil excavations: :‫ﺣﻔر اﻟﺗرﺑﺔ ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬


implement soil excavation width 0.5m till the rock (the rock near ground surface) ‫ﻣﺗر ﺣﺗﻰ اﻟوﺻول اﻟﺻﺧر )اﻟﺻﺧر ﻗرﯾب ﻣن ﺳطﺢ اﻻرض( ﻟزوم‬0.5 ‫ﺗﻧﻔﯾذ ﺣﻔر ﺗراﺑﻲ ﺑﻌرض‬
for foundation works The price includes everything necessary to implement the ‫اﻟﺗﺄﺳﯾس واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ اﻟﺗﺧﻠص ﻣن اﻟﻣواد اﻟﻧﺎﺗﺟﺔ اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ‬
item with the disposal of the resulting materials to a suitable place with no harm ‫ ﺗوﺛر ﻋﻠﻰ اﻷراﺿﻲ اﻟزراﻋﯾﺔ وﻣﺟﺎري اﻟﺳﯾول واﻻﻣﻼك اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل‬m3 13.33
or affect agricultural lands, water streams and private property, the work must .‫ ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬3‫م‬
be carried out professionally and the price includes everything necessary to
implement the item, and the work must be done according to the specifications,
drawings, and the directives of the supervising engineer.
3.1.2 Backfill around foundations, Bathrooms and areas that need to be: : ‫اﻟردم ﺣول أﺳﺎﺳﺎت اﻟﺣﻣﺎﻣﺎت واﻟﻣﻧﺎطﻖ اﻟﺗﻲ ﺗﺣﺗﺎج ﻟذﻟك‬
Backfill with valid and clean soil mixed with graded fractions stones resulted ‫ اﻟردم ﺑﺎﻟﺗرﺑﺔ اﻟﺻﺎﻟﺣﺔ واﻟﻧظﯾﻔﺔ ﻣﺧﻠوطﺔ ﺑﻛﺳر اﻷﺣﺟﺎر اﻟﻣﺗدرﺟﺔ ﺣول اﻷﺳﺎﺳﺎت‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
from site excavations or brought from outside to be filled around the foundations ‫ ﺳم‬30 ‫وداﺧل أرﺿﯾﺎت اﻟﻣﺑﻧﻰ ﻛﺎﻣﻠﺔ ﻣن ﻧﺎﺗﺞ اﻟﺣﻔر أو ﻣن ﺧﺎرج اﻟﻣوﻗﻊ ﻋﻠﻰ طﺑﻘﺎ ًت ﻻ ﺗزﯾد ﻋﻠﻰ‬
as well as inside the building on layers not more than 30 cm using mechanical ‫أوﻻ ً ﺑﺄول ﻣﻊ اﻟدك اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟرش ﺑﺎﻟﻣﺎء ﺣﺗﻰ ﺗﺣﻘﯾﻖ اﻟﻘوة اﻟﻣﻧﺎﺳﺑﺔ و اﻟﺣﺻول ﻋﻠﻰ ﺗرﺑﺔ ﻣﺗﻣﺎﺳﻛﺔ‬
compactor, curing with water to achieve the appropriate strength and get a ‫ ﻣﻊ ﻋدم‬,‫وطﺑﻘﺎ ً ﻟﻠﻣﻧﺎﺳﯾب اﻟﻣﺣددة ﻣﻊ اﺳﺗﺧدام اﻟدك ﻟﻸﻣﺎﻛن اﻟﺿﯾﻘﺔ ﺣول اﻷﺳﺎﺳﺎت واﻟﻣﺑﺎﻧﻲ اﻟﺣﺟرﯾﺔ‬
cohesive soil according to the specified levels. Carry out compacting of narrow ‫وﻧﻘل اﻟﺗرﺑﺔ اﻟزاﺋدة ﻋن اﻟردم إﻟﻰ ﺧﺎرج اﻟﻣوﻗﻊ‬, ‫اﻹﺿرار ﺑﺎﻟﻌﻧﺎﺻر واﻷﻋﻣﺎل اﻟﻣﻧﻔذة ﻓﻲ اﻟﻣوﻗﻊ‬
areas around foundations and external stone walls, causing no damage to the ‫ﻟﻠﻣﻘﺎﻟب اﻟﻌﺎﻣﺔ ﻣﻊ ﻋﻣل اﻟطرﻗﺎت واﻟﻣﺳﺎﻟك اﻵﻣﻧﺔ واﻟﻼزﻣﺔ ﻟﻧﻘل اﻟﻣواد واﻟﻣﻌدات ﻟزوم اﻟﺗﻧﻔﯾذ ﻓﻲ ﻧطﺎق‬
m3
works implemented in the site, and transfer of excess dump soil to public dumps ‫اﻟﻣوﻗﻊ وﺗﻧظﯾف اﻟﻣوﻗﻊ ﻣن اﻟﻣﺧﻠﻔﺎت اﻟﻧﺎﺗﺟﺔ ﻋن اﻟﺗﻧﻔﯾذ وﺗﺳﻠﯾم اﻟﻣﺷروع وﻣوﻗﻌﮫ ﺧﺎﻟﯾﺎ ً ﻣن أي ﻣؤﺛرات‬ 9.70
3‫م‬
off site. Safe roads for trolleys to transfer materials and equipment used for ‫ﻋﻠﻰ ﺳﻼﻣﺗﮫ ﻣﺳﺗﻘﺑﻼ ً ﻣن اﻧﮭﯾﺎرات اﻟﺗرﺑﺔ ﺑﺄﻧواﻋﮭﺎ وﺧﻼﻓﮫ ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن أﻋﻣﺎل اﻟﺗﻧﻔﯾذ ورﻋﺎة اﻟﻣﯾول‬
implementation within the site to be prepared. Before project handover, site has ‫اﻟﻼزم ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر واﻟﻌﻣل ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻹﻧﺟﺎز اﻟﺑﻧد وطﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬
to be free of waste resulting from implementation as well as other factors which . ‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
may effect the project safety in future like landslides of various types and others,
taking in considerations preparation of slopes needed to drain rainwater. The
item includes all the necessary to complete the item in accordance with the
drawings and specifications and instructions of the supervisor..
3.1.3 Pavement bathroom surrounding in square meter: :‫أرﺻﻔﺔ ﺧﺎرﺟﯾﺔ ﺣول اﻟﺣﻣﺎﻣﺎت ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Supply and construct external side pavement around the building according to ‫ اﻟﺛﻣن ﯾﺗﺿﻣن‬.‫ﺗورﯾد وإﻧﺷﺎء أرﺻﻔﺔ ﺧﺎرﺟﯾﺔ ﺣول اﻟﻣﺑﻧﻰ طﺑﻘﺎ ﻟﻠﻣرﺳوﻣﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬
drawings and/or instructions by the Engineer. The price includes the following ‫ــ طﺑﻘﺔ ﻛﺳر ﺣﺟر ﺑﺳﻣك‬.‫ﺳم‬20 ‫ ــ طﺑﻘﺔ ﻛﺳر ﺣﺟر ﺑﺳﻣك‬. ‫ﺳم‬30 ‫ــ ﺑﻧﺎء ﺣﺟر ﻣرﺑوع ﻋرض‬:‫اﻟﺗﺎﻟﻲ‬
m2
:Regulated stone walls 30cm thickness, hardcore (crushed stone) layer 20cm ‫ﺳم ﻋﻠﻰ ﻣوﻧﺔ‬3×30×30 ‫ ــ ﺑﻼط ﺧرﺳﺎﻧﻲ ﻣﻠون‬.‫ﺳم‬10 ‫ ــ طﺑﻘﺔ ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﺑﺳﻣك‬.‫ﺳم‬20 11.00
2‫م‬
thickness, plain concrete layer 10cm thickness, Colored concrete tiles .‫أﺳﻣﻧﺗﯾﺔ ﻻﺻﻘﺔ ﺑﺣﺳب اﻟرﺳوﻣﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
30x30x3cm on cement mortar as in the drawings with the instruction of site
engineer.
3.1.4 Stairs and ramps for Bathrooms entrance: :‫إﻧﺷﺎء درج وﻣﯾول ﺧرﺳﺎﻧﻲ ﻣﻊ ﺑﻼط ﻣوزاﯾﻛو ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
Provide and construct entrance stairs & RAMP for the disabled The price ‫ﺳم‬30 ‫ﺳم وﺑﻌرض اﻟﻧﺎﺋﻣﺔ‬5 ‫ﺗورﯾد وإﻧﺷﺎء درج ﻟﻠﻣداﺧل ﻣﻊ رﻣب ﻟﻠﻣﻌﺎﻗﯾن ﻣن اﻟﺑﻼط اﻟﻣوزاﯾﻛو ﺑﺳﻣك‬
includes the following :hardcore (crushed stone) layer 20cm thickness, ‫طﺑﻘﺔ ﻛﺳر ﺣﺟر ﺑﺳﻣك‬- -:‫ ( و اﻟﻌﻣل ﯾﺷﻣل اﻷﺗﻲ‬3.0‫ ﻋرض و طول‬1.2) ‫ﺳم‬15 ‫ وإرﺗﻔﺎع اﻟﻘﺎﺋﻣﺔ‬ml
foundations of plain concrete , compacted stone, and squared stones, Terrazzo ‫ ﺗﻠﺑﯾس ﺑﻼط ﻣوزاﯾﻛو )ﻣطﻌم‬.‫اﺳﺎﺳﺎت ﻣن اﻟﺟﻌم واﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ واﻟﻣﺑﺎﻧﻲ اﻟﺣﺟر اﻟﻣرﺑوع‬- ,‫ﺳم‬20 ‫ط‬.‫م‬ 9.00
tiles (concrete with marble fragments) for stair treads and risers on cement ‫ﺑﻛﺳر اﻟرﺧﺎم( ﻟﻠﻘواﺋم و اﻟﻧواﺋم ﻋﻠﻰ ﻣوﻧﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟﺟﻠﻲ اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟﺗﻧﻌﯾم اﻟﺗﺎم و ﻛل ﻣﺎﯾﻠزم‬
mortar, inclusive all related works according to drawings and/or instructions of .‫ﻷﻧﮭﺎء اﻟﺑﻧد طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وأﺻول اﻟﻌﻣل وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
the Engineer.
Total Amount of site work ‫إﺟﻣﺎﻟﻲ اﻋﻣﺎل اﻟﻣوﻗﻊ‬
3.2 Concrete Works ‫اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ‬

Notes : :‫ﻣﻠﺣوظﺔ‬
The prices for reinforced concrete include the following: -:‫أﺳﻌﺎر اﻟﺧرﺳﺎﻧﺎت ﺗﺷﻣل اﻷﺗﻲ‬
1- Form works and reinforcement .‫ أﻋﻣﺎل اﻟﺷدات اﻟﺧﺷﺑﯾﺔ واﻟﺣدﯾد‬-1
2- Mixing the concrete and the watering up to a period of 2 weeks and all related works mentioned in .‫ اﺳﺑوﻋﯾن وﻛل اﻷﻋﻣﺎل ﺑﺣﺳب اﻟرﺳوﻣﺎت‬2 ‫ أﻋﻣﺎل اﻟﺧﻠطﺔ اﻟﺧرﺳﺎﻧﯾﺔﻣﻊ اﻟرش ﻟﻔﺗرة‬-2
the drawings .‫ ﻋﻣل ﻣﻛﻌﺑﺎت اﺧﺗﺑﺎر واﺧﺗﺑﺎرھﺎ‬-3
3- Producing sample and their testing. .‫ﺳم أﺳﻔل اﻟﻣﯾدات اﻟداﺧﻠﯾﺔ واﻟﺧﺎرﺟﯾﺔ‬15 ‫ طﺑﻘﺔ ﻛري ﺳﻣك‬-4
4- A layer of aggregate of 15cm thickness under the internal and the external TB's. ‫ أى طﻠﺑﺎت إﺿﺎﻓﯾﺔ ﯾطﻠﺑﮭﺎ اﻟﻣﮭﻧدس‬-5
5- Any additional requests by the Engineer .‫ ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول أن ﯾورد اﻟﻣواد اﻟﺗﻲ ﺗﺗطﺎﺑﻖ ﻣﻊ اﻟﻣواﺻﻔﺎت اﻟﺧﺎﺻﺔ واﻟﻌﺎﻣﺔ‬6
6- The contractor shall only use materials corresponding with the general or special specifications. ‫ ﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻣﺳﺋوﻟﯾﺔ ﻧﻘل وﺗﺧزﯾن اﻟﻣواد ﺑﺎﻟطرﯾﻘﺔ اﻟﻣﻧﺎﺳﺑﺔ اﻟﺗﻰ ﻵﺗﻌرﺿﮭﺎ ﻟﻠﺗﻠف وﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻘﯾﺎم ﺑﺳرﻋﺔ ﻧﻘل اﻟﻣواد‬-7
7- The contractor shall deliver the material to the site, store it in a proper way to prevent any damage .‫اﻟﺗﺎﻟﻔﺔ ﻣن اﻟﻣوﻗﻊ ﻣﺑﺎﺷرة ﺑﻌﺑﺎرة أﺧرى ﻣﻣﻧوع ﻣﻧﻌﺎ ﺑﺎﺗﺎ اﺳﺗﺧدام أي ﻣواد ﺗﺎﻟﻔﺔ‬
and remove any surplus from the site after finishing. No spoiled material has to be used. .‫ ﯾﻠزم إﺳﺗﺧدام اﺳﻣﻧت ﻣﻘﺎوم ﻟﻠﻛﺑرﯾﺗﺎت ﻟﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت اﻟﻌﺎدﯾﺔ واﻟﻣﺳﻠﺣﺔ ﺑﺎﻷﺳﺎﺳﺎت واﻷرﺿﯾﺎت ﻓﻲ اﻟﻣﻧﺎطﻖ اﻟﺳﺎﺣﻠﯾﺔ‬-8
8- Sulphate resistant cement shall be used for plain and reinforced concrete of the foundations and ‫ اﻟﻛري اﻟﻣﺳﺗﺧدم ﻟﻠﺻﺑﯾﺎت اﻟﻣﺳﻠﺣﺔ ﻛري ﻛﺳﺎرة وﯾﺳﺗﺧدم اﻟﮭزاز اﻟﻣﯾﻛﺎﻧﯾﻛﻲ أﺛﻧﺎء اﻟﺻب‬-9
floors in the coastal areas. / ‫( اﺳﻣﻧت‬3:2:1) ‫ ﺧرﺳﺎﻧﺔ‬3‫ م‬/ ‫ ﻛﺟم أﺳﻣﻧت‬350 ‫ ﻧﯾس و‬3‫م‬0.40 ‫ ﻛري و‬3‫م‬0.80 ‫ ﺧرﺳﺎﻧﺔ اﻟﺗﺳﻠﯾﺢ ﯾﺟب أن ﺗﺗﻛون ﻣن‬-10
9- Aggregate used for reinforced concrete shall be broken stones. A mechanical device shall be used .‫ ﻛري‬/ ‫ﻧﯾس‬
during concreting for proper compaction. (6:3:1) ‫ ﺧرﺳﺎﻧﺔ‬3‫م‬1 ‫ﻛﺟم أﺳﻣﻧت ﻟﻛل‬250‫ ﻧﯾس و‬3‫م‬0.40‫ ﻛري و‬3‫م‬0.80 ‫ اﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﯾﺟب أن ﺗﺗﻛون ﻣن‬-11
10- Reinforced concrete shall generally, as long as no other specification is mentioned, consist of .‫ ﻛري‬/ ‫ ﻧﯾس‬/‫أﺳﻣﻧت‬
0,80m3 aggregate, 0,40m3 sand and 350kg cement/m3 of concrete (1:2:3) . ‫ ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ ﻣن أﻋﻠﻰ ﺣدﯾد اﻟﺗﺳﻠﯾﺢ‬-12
11- Plain concrete shall generally, as long as no other specification is mentioned, consist of 0,80m3 . ‫ ﺳم‬5 ‫ ﺳم واﻟﻘواﻋد‬2.5 ‫ ﯾﺟب ﻣراﻋﺎة رﻓﻊ اﻟﺣدﯾد ﻋن اﻟﺧﺷب ﻟﻠﻣﺣﺎﻓظﺔ ﻋﻠﻰ ﻣﺳﺎﻓﺔ اﻟﺗﻐطﯾﺔ ﻓﻰ اﻟﺟﺳور واﻟﺑﻼط‬-13
aggregate, 0,40m3 sand and 250kg cement/m3 of concrete (1:3:6).
12- The concealled pipes for electricity connection should be installed above the concrete steel.

3.2.1 Reinforced concrete 250 kg / cm 2, for cemells (ground beams): : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﻟﻠﻣﯾد اﻷرﺿﯾﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ‫ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ‬
Reinforced concrete for footings, foundations, column necks and cemells ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ اﻟﻣﯾد اﻷرﺿﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
(ground beams) using Portland Cement, with resistance of not less than 250 kg ‫ ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز‬،‫ اﻟﺻب‬،‫ ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250‫ﻋن‬ m3
/ cm 2. Item includes (shuttering, steel supply and cutting, casting, vibrating . ‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،(‫ وﻛل ﻣﺎ ﯾﻠزم‬،‫واﻟرش‬ 2.12
3‫م‬
concrete using a vibration machine and spattering of water.( and all necessary)
.All works to be done according to drawings, specifications, and engineer
supervisor instructions .
3.2.2 Reinforced concrete for ceilings and beams, 250 kg / cm 2, Portland :‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ،‫ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور‬
Cement: ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور واﻟﻣﯾد اﻟﻌﻠوﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
Reinforced concrete for ceilings and beams using Portland Cement:with ‫ ھز‬،‫ اﻟﺻب‬،‫ ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ‫وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن‬
m3
resistance of not less than 250 kg / cm 2. Item includes (shuttering, steel supply ‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،(‫ واﻟرش ﺑﺎﻟﻣﺎء وﻛل ﻣﺎ ﯾﻠزم‬،‫اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز‬ 4.38
3‫م‬
and cutting, casting, vibrating concrete using a vibration machine and curing of .‫اﻟﻣﺷرف‬
water.( and all necessary) .All works to be done according to drawings,
specifications, and engineer supervisor instructions.
3.2.3 Light reinforcement concrete for Bathrooms, Portland cement: : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺧرﺳﺎﻧﺔ ﺧﻔﯾﻔﺔ اﻟﺗﺳﻠﯾﺢ ﻟزوم اﻟﺣﻣﺎﻣﺎت‬
Light reinforcement concrete with Portland cement, with not less than 200 ،2‫ﺳم‬/‫ ﻛﺟم‬200 ‫ ﺧرﺳﺎﻧﺔ ﺧﻔﯾﻔﺔ اﻟﺗﺳﻠﯾﺢ إﺳﻣﻧت ﺑورﺗﻼﻧدي ﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
kg/cm2 resistance, using Portland cement, Number of steel bars used not less ) ‫م ﻓﻲ اﻹﺗﺟﺎھﯾن‬/12 ‫ ق‬5 ‫ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑروﺗﻼﻧدي اﻟﻣﻘﺎوم ﻋﻠﻰ أﻻ ّ ﯾﻘل ﻋدد اﻷﺳﯾﺎخ ﻋن‬
than (5 bars12mm Dia/m) in both directions (top and bottom). Mechanical ‫ ﺗورﯾد‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،‫ ﺳم‬20 ‫ﻓرش وﻏطﺎء( ﻣﻊ وﺿﻊ ﻓرﺷﺔ ﻛﺳر أﺣﺟﺎر )ﺻوﻟﻧﺞ( ﺗﺣﺗﮭﺎ ﺳﻣك‬ m3
Casting shall be used on a rock fractions layer of 20 cm thickness, Item ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت اﻟﺗﻔﺻﯾﻠﯾﺔ‬،(‫ وﻛل ﻣﺎ ﯾﻠزم‬،‫ اﻟرش‬،‫ ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز‬،‫ اﻟﺻب‬،‫وﻗص ووﺿﻊ اﻟﺣدﯾد‬ 1.21
3‫م‬
includes (shuttering, steel supply and cutting, casting, vibrating concrete using a .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫اﻟﻣرﻓﻘﺔ‬
vibration machine and spraying of water.( and all necessary) .All works to be
done according to drawings, specifications, and engineer supervisor instructions.
Total Amount of concrete work ‫إﺟﻣﺎﻟﻲ اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ‬
3.3 Stone and Brick Works ‫اﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ‬
Notes : :‫اﻟﻣﻼﺣظﺎت‬
1- All stones and bricks shall be of the same type and thickness as mentioned in the drawings. .‫ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺣﺟر واﻟﻣﺑﺎﻧﻲ ﺑﻧﻔس اﻟﻧوﻋﯾﺔ واﻟﺳﻣك اﻟﻣوﺿﺢ ﺑﺎﻟرﺳوﻣﺎت‬-1
2- Sample for all types of stones and blocks shall be approved before using, the contractor ‫ ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول ﺗورﯾد ﻋﯾﻧﺔ ﻣن اﻷﺣﺟﺎر واﻟﺑﻠك اﻟﻰ ادارة اﻟﻣﺷروع ﻻﻋﺗﻣﺎدھﺎ ﻗﺑل اﻟﺑدء ﺑﺎﻟﺗﻧﻔﯾذ‬-2
shall get a written acceptance from the project management before using. .‫ ﻟﻛل ﻣﺗر ﻣﻛﻌب ﻛﺣد أدﻧﻰ‬3:1 ‫ ﯾﺟب أن ﺗﺣﺗوي اﻟﻣوﻧﺔ اﻷﺳﻣﻧﺗﯾﺔ ﻋﻠﻰ ﻧﺳﺑﺔ‬-3
3- The mortar shall contain min. 1:3 /m3 .‫ اﻟﻛﻣﯾﺎت اﻟﻣوﺟودة ﺑﺎﻟﺟدول )ﺻﺎﻓﯾﺔ( ﻣﺧﺻوم ﻓﯾﮭﺎ اﻟﻔﺗﺣﺎت اﻷﺑواب‬-4
4- The quantities mentioned in the BoQ are net measurements. .‫ ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول أن ﯾورد ﻛل اﻟﻣواد اﻟﻣطﻠوﺑﺔ ﻟﻸﻋﻣﺎل وأن ﯾﻣﺗﺛل ﻟﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬-5
5- The Contractor shall supply all required materials for the works and comply with Engineers ‫ ﻣم ﻓﻰ اﻟواﺟﮭﺎت وأن ﺗﻛون اﻟﻣﯾﺎﺳم ﻣﻧﺗظﻣﺔ‬6‫ ﻣم ﻓﻰ اﻟﻛراﺳﻲ و‬8 ‫ ﯾﺟب ﺗوﺣﯾد اﻟﻣﯾﺎﺳم وﻻ ﯾزﯾد ﻋرض اﻟﻣﯾﺳم ﻋن‬-6
instructions. .‫رأﺳﯾﺎ وأﻓﻘﯾﺎ‬
6- All joints must be of the same size max. 8mm for footings and 6mm for facades. . ‫ ﻋﻣل اﻟرﺑط اﻟﻼزم ﺑﯾن اﻷﺣﺟﺎر ﻓﻰ اﻟﺑطﺎﻧﺔ واﻟظﮭﺎرة وﺗﻛون اﺣﺟﺎر اﻟﺑطﺎﻧﺔ ﻣﺳﺎوﯾﺔ ﻻﺣﺟﺎر اﻟظﮭﺎرة ﻓﻰ اﻟﺣﺟم‬-7
7- All stones must be of the same size and ligated well. . ‫ ﯾﺟب أن ﯾﻛون طول اﻟﺣﺟر أﻛﺑر او ﻣﺳﺎوى ﻻرﺗﻔﺎﻋﮫ‬-8
8- The stone length shuold be more or the same as its height. . ‫ اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﻟﻠﻣداﻣﯾك ﺑﺎﻟﻣوﻧﺔ‬-9
9- Adequate gap filling with mortar. ‫ ﯾﺗم اﺳﺗﺧدام اﻻﺳﻣﻧت اﻟﻣﻘﺎوم ﻟﺟﻣﯾﻊ اﻋﻣﺎل اﻟﻣﺑﺎﻧﻰ ﺗﺣت ﻣﻧﺳوب رﺿﯾﺎت اﻟدور اﻻرﺿﻰ ﻓﻰ اﻟﻣﻧﺎطﻖ اﻟﺳﺎﺣﻠﯾﺔ‬-10
10- Sulphate resistant cement shall be used for All stones underground works in the coastal .‫واﻟرطﺑﺔ‬
areas.

3.3.1 The buildings of a stone chair under the Ground beam, in cubic meter:- -:‫ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
In cubic metres: stone chair buildings under the masonry, thickness of 60 cm, must be made ‫ ﺳم وﯾﺟب ان ﺗﻛون ﻣن اﻷﺣﺟﺎر اﻟﺻﻠﺑﺔ واﻟﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق‬60 ‫ ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺳﻣك‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
of solid stones free of veins and gaps, and the construction must be made with resistant ‫ رﻣل( وﯾﻛون ﺑﺷﻛل ﻣﻧﺗظم وﻣﺗراﺑط ﻣﻊ‬:‫ )أﺳﻣﻧت‬1 :3 ‫ ﺑﻧﺳﺑﺔ‬,‫واﻟﻔﺟوات و أن ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم‬
Portland cement, in a ratio of 3:1 (cement: sand), and it must be in a regular and cohesive ‫ اﯾﺎم‬7 ‫اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﻟﻠﻔراﻏﺎت ﻣﻊ اﻟﺗدرﯾز واﻟﺗزﻏﯾن وﻣلء اﻟﻔراﻏﺎت ﺑﯾن اﻟوﺟﮫ واﻟﺑطﺎﻧﺔ ﺑﺎﻟﻣوﻧﺔ اﻻﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟرش ﻟﻣدة‬
manner, with good filling of the voids with seaming, cementing and filling. The spaces ‫ ﺳم ﻣن أﺳﻔل اﻟﻠﺣﺟر ﺑﻌد رش اﻷرض‬10 ‫وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ ﻣﻊ ﻋﻣل ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻣﻊ أﺣﺟﺎر ﻣﺗوﺳطﺔ اﻟﺣﺟم ﺑﻣﻘدار‬
between the face and the lining are filled with cement mortar and sprayed for a period of 7 .‫ ﺑﺎﻟﻣﺎء واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬m3
8.82
days. The work is carried out professionally, with ordinary concrete made with medium-sized 3‫م‬
stones 10 cm from the bottom of the stone, after spraying the ground with water. The price
includes everything necessary to implement the item, and the work is done according to the
specifications, drawings, and directions of the supervising engineer.

3.3.2 Black stone construction (basalt or granite) in meter cubic: :‫ﻣﺑﺎﻧﻲ ﺣﺟر ﻣﻧﺷﺎر أﺳود )ﺑﺎزﻟت او ﺟراﻧﯾت( ﻣﻧﺷﺎر ﺗﻛﺳﯾﺔ ﺣول اﻟﻣﯾدة ﺑﺎﻟﻣﺗر اﻟﻛﻌب‬
Squared black stone construction 15 cm thickness for the basalt stone base obtained from ‫ ﺑﻧﺎء ﺣﺟر ﻣﻧﺷﺎر ﻟﻠﻛرﺳﻲ اﻟﻣﺑﻧﻰ وﺣﯾث ﻣﺎ ﯾﻠزم اﺣﺟﺎر )ﺑﺎزﻟت او ﺟراﻧﯾت( ﻣﻧﺷﺎر ﻣﻘﺎوم ﻟﻠﻣﯾﺎة او‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
the project area(basalt or granite) or similar stones. Black stones have to be tailed, free of the ‫ ﺳم وأن ﺗﻛون اﺣﺟﺎراﻟﺑﻧﺎء ﻣﺳﺑﻠﺔ وﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق واﻟﻔﺟوات وارﺗﻔﺎع اﻟﺻف‬15 ‫اﺣﺟﺎر ﺗﻣﺎﺛﻠﺔ ﺳﻣك ﺟدار اﻟﺑﻧﺎء‬
veins and gaps, Rows height not more than 30 cm. Cement mortar solty soil resistance used ‫رﻣل( ﻣﻊ اﻟﺗدرﯾز واﻟﺗﻛﺣﯾل‬:‫)اﺳﻣﻧت‬3:1 ‫ﺳم وان ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي ﻣﻘﺎوم ﻟﻸﻣﻼح ﺑﻧﺳﺑﺔ‬30 ‫ﻻﯾزﯾد ﻋن‬
to be made of 3: 1 (cement: sand) . Starting from the ground level, Wall joints have to be ‫ﻟﻠﻣﺑﺎﻧﻲ ﻣن ﻣﻧﺳوب اﻻرض واﻟﺗدرﯾز واﻟﺗﻠﻌﯾص اﻟﺟﯾد ﻟﻠﻣﺑﺎﻧﻲ ﻣن اﺳﻔل ﻣﻧﺳوب اﻻرض ﻣﻊ اﻟرش واﻟﺗﻌﺑﺋﮫ اﻟﺟﯾده ﺑﯾن‬
smoothed, recessed pointing and then be well cured with water. Fronting and lining stones ‫ﻛري( وﻋﻠﻰ ان‬5:‫ رﻣل‬2.5:‫اﺳﻣﻧت‬:1) ‫اﻟﻔراغ اﻟذي ﺑﯾن ﺣﺟر اﻟﺗﻛﺳﯾﺔ )اﻟظﮭﺎرة( واﻟﺑطﺎﻧﺔ ﺑﺎﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط‬
have to be well interconnected using longitudinal stone connecting the entire thickness of the ‫ وﯾﺟب اﻟرﺑط ﺑﯾن اﻟظﮭﺎره واﻟﺑطﺎﻧﮫ ﺑﺎﺣﺟﺎر طوﻟﯾﮫ ﻣﺗداﺧﻠﮫ ﻋﻠﻰ ﻛﺎﻣل ﺳﻣك اﻟﺣﺎﺋط ﻛل اﺛﻧﯾن ﻣﺗر‬.‫ ﯾﻛون اﻟﻛري ﻣﺗدرج‬m3 2.11
wall every 2 linear meter, spaces have to be well filled with concrete of(1: cement: 2.5 sand: 5 ‫ طوﻟﻲ ﻓﻲ ﻛل ﺻﻔﺔ ﻣﺑﺎﻧﻲ ﻣﻊ ﻣراﻋﺎة ﺗداﺧل اﻻﺣﺟﺎر ﻋﻧد اﺗﺻﺎل ﺟدارﯾﯾن واﻟﺛﻣن ﯾﺷﻣل رﻓﻊ اﻟﻛرﺳﻲ ﺣﺗﻰ اﻟﻣﻧﺎﺳﯾب‬3‫م‬
graded aggregate), taking into account the interconnection of stones when connecting two . ‫اﻟﺗﺻﻣﯾﻣﯾﺔ طﺑﻘﺎ ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
walls .All stone works have to be well and enough spattered with water. Item Price includes
building to the design levels according to the drawings and specifications and instructions of
the supervisor.

3.3.3 Hollow concrete Block constructions 20 cm, Automatic in meter square: : ‫ أﺗوﻣﺎﺗﯾﻛﻲ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك ﻣﻔرغ‬
Hollow concrete Block 20 cm thickness, used for external walls and internal partitions and ‫ﻟﻠﻘواطﻊ اﻟداﺧﻠﯾﺔ و اﻟدراوي و اﻟﻣﻣر اﻻﻣﺎﻣﻲ و‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك )ﺑردﯾن( إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﻣﻔرغ ﺳﻣك‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
where necessary, using cement mortar: 1: 3 (cement: sieved sand),and spraying by water for ‫ اﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل‬7 ‫ ﻣﻊ اﻟرش ﻟﻣدة‬، (‫ رﻣل ﻣﻐرﺑل‬:‫)اﺳﻣﻧت‬3 : 1 ‫ وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬,‫ اﻟراﻣب وﺣﯾﺛﻣﺎ ﯾﻠزم‬m2
7days, the work must be carried out professionally and the price includes everything .‫ ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬2‫م‬ 20.00
necessary to implement the item, and the work must be done according to the specifications,
drawings, and the directives of the supervising engineer.

3.3.4 Solid concrete Block constructions 20 cm, Automatic: : ‫ أﺗوﻣﺎﺗﯾﻛﻲ‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك ﺻم‬
Solid concrete Block 20 cm thickness, used for external walls and where necessary, using ‫ وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ‬,‫ﻟﻠﺟدران اﻟﺧﺎرﺟﯾﺔ وﺣﯾﺛﻣﺎ ﯾﻠزم‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﺻم ﺳﻣك‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
cement mortar: 1: 3 (cement: sieved sand),and spraying by water for 7days, the work must be ‫ اﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم‬7 ‫ ﻣﻊ اﻟرش ﻟﻣدة‬، (‫ رﻣل ﻣﻐرﺑل‬:‫)اﺳﻣﻧت‬3 : 1 ‫ ﺑﻧﺳﺑﺔ‬m2
carried out professionally and the price includes everything necessary to implement the item, .‫اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 40.00
2‫م‬
and the work must be done according to the specifications, drawings, and the directives of the
supervising engineer.

Total Amount of stone and brick works ‫إﺟﻣﺎﻟﻲ اﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ‬


3.4 Plastering and Painting Works: : ‫اﻟﺗﻠﺑﯾس واﻟدھﺎن‬

Notes: :‫ﻣﻼﺣظﺎت‬
1- All external and internal walls shall receive a rough coat of cement mortar, ‫ ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺗﻼﺑﯾس اﻹﺳﻣﻧﺗﯾﺔ ﻟﺟﻣﯾﻊ اﻟﺣواﺋط اﻟداﺧﻠﯾﺔ واﻟﺧﺎرﺟﯾﺔ واﻻﺳﻘف ﺑﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ‬-1
300 kg cement / m3 sand. . ‫ﻧﯾس ﻣﻊ ﻋﻣل اﻟﺑؤج واﻷوﺗﺎر واﻟطوارف واﻟﺧدﻣﺔ ﺑﺎﻟﻣﺣﺎراه ﺑﻌد اﻟﺗﺧﺷﯾن‬/‫ أﺳﻣﻧت‬3:1 ‫ﻣﻛوﻧﺔ ﻣن‬
2- Apply steel mesh to cover joints between different building materials and ‫ ﻋﻣل ﺷﺑك ﺗﻼﺑﯾس ﻋﻧد اﻟﻔواﺻل وﻋﻧد اﺧﺗﻼف ﻣواد اﻟﺑﻧﺎء وﻛذﻟك ﻋﻣل زواﯾﺎ ﺷﺑك ﻣﻌدﻧﯾﺔ ﻋﻧد‬-2
install metal angles at the edges of windows, doors and columns ....etc . . ‫اﻟﺦ‬....‫واﻟﺳﻼﻟم واﻟﻣراﯾﺎ‬.. ‫ﺣروف اﻟﻧواﻓذ واﻻﺑواب واﻻﻋﻣدة‬
3- Sulphate resistant cement shall be used for All Plastering Works in the ‫ ﯾﺟب أن ﯾﺗم ﺟﻣﯾﻊ اﻋﻣﺎل اﻟﺗﻠﺑﯾس )أﺳﻣﻧت ﻣﻘﺎوم( ﻛﺑرﯾﺗﺎت ﻓﻰ اﻟﻣﻧﺎطﻘﺔ اﻟﺳﺎﺣﻠﯾﺔ‬-3
coastal areas.. ‫ ﯾﺟب إﻋﺗﻣﺎد ﺟﻣﯾﻊ ﻋﯾﻧﺎت اﻟدھﺎﻧﺎت اﻟﻣطﻠوﺑﺔ ﻗﺑل اﻻﺳﺗﺧدام‬-4
4- Paints shall be approved before using. ‫ ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﺣﺻول ﻋﻠﻰ ﻣواﻓﻘﺔ اﻟﻣﮭﻧدس ﻋﻠﻰ أﻋﻣﺎل اﻟﺻﻧﻔرة واﻟﺗﻧﻌﯾم واﻟﻣﻌﺟﻧﺔ ﻗﺑل ﺗﻧﻔﯾذ‬-5
5- The contractor shall get approval of pasting, sanding and smoothing works by . ‫أﻋﻣﺎل اﻟدھﺎﻧﺎت‬
the Engineer before the painting works are started. . ‫ رﻣل‬/ ‫ أﺳﻣﻧت‬2:1 ‫ ﻣوﻧﺔ اﻟطرطﺷﺔ اﻷﺳﻣﻧﺗﯾﺔ ﺗﻛون ﺑﻧﺳﺑﺔ‬-6
6- The cement spray should be 1:2 cement:sand . . ‫ اﻟرش ارﺑﻊ ﻣرات ﻓﻰ اﻟﯾوم ﻷﻋﻣﺎل اﻟﺗﻼﺑﯾس‬-7
7- Plaster must be splashed with water daily.

3.4.1 Wall Plastering, Portland cement: : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس اﻟﺟدران اﻟداﺧﻠﯾﺔ‬


Wall plastering to be done using Portland cement, The item includes: Cement ‫ ﺗﻠﺑﯾس اﻟﺟدران واﻟﺣواﺋط ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﯾﺷﻣل اﻟطرطﺷﺔ واﻟطﺑﻘﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Spattering, the base layer and the finish layer are made of cement mortar of 1: 3 ‫ ﻣﻊ‬،‫ وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن اﻟﺗﻠﺑﯾس‬،3 : 1 ‫اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬
ratio, plastering wire mesh will be used at meeting points of constructions and ً ‫ طﺑﻘﺎ‬،‫ واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ‬،‫ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬m2
49.10
concrete. .‫ ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬2‫م‬
Dots &bands are used for leveling of plastering. Plastering will be cured with
water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
1.4.3 External plastering: External plastering to be done using Portland cement The : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬
Item includes Cement spattering using cement mortar of 300kg cement/m3 fine ‫ وﯾﺷﻣل اﻟطرطﺷﺔ ﺑﻣوﻧﺔ ﻣﻛوﻧﺔ ﻣن‬،‫ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي‬،‫ ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
aggregate, base layer and the final layer are made of cement mortar of 1: 3 ‫ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ‬،‫ ﻛﺟم إﺳﻣﻧت ﻟﻛل ﻣﺗر ﻣﻛﻌب ﻣن اﻟﮭﻠﺳن واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ‬300 m2
ratio. Dots &bands are used for leveling of plastering.spraying with water three ، ‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم ﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم‬،‫ وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن اﻟﺗﻠﺑﯾس‬3 : 1 ‫ ﺑﻧﺳﺑﺔ‬2‫م‬ 57.00
times a day for 5 days. Plastering wire mesh will be used at meeting points of .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬,‫واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس‬
constructions and concrete. Plastering works have to be done according to
3.4.2 drawings, specifications and instructions of the supervisor.
Plastering of ceilings, columns and stairs Portland cement : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس اﻟﺳﻘوف‬
Ceilings, columns and bottom surface of stairs to be plastered with Resistant ‫ ﺗﻠﺑﯾس اﻟﺳﻘوف ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﯾﺷﻣل اﻟطرطﺷﺔ واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Portland cement. The item includes: Cement spattering, the base layer and the ‫ واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس‬،‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬3 : 1 ‫واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬
finish layer are made of cement mortar of 1: 3 ratio .plastering wire mesh will be .‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ ﻓﻲ ﻣﻧﺎطﻖ اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ‬m2
used at meeting points of constructions and concrete. All works will be cured 13.53
2‫م‬
with water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
3.4.3 Plastering of Drawi Portland cement : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس اﻟدراوي‬
Ceilings, columns and bottom surface of stairs to be plastered with Resistant ‫ ﺗﻠﺑﯾس اﻟدراوي ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﯾﺷﻣل اﻟطرطﺷﺔ واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Portland cement. The item includes: Cement spattering, the base layer and the ‫ واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس‬،‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬3 : 1 ‫واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬
finish layer are made of cement mortar of 1: 3 ratio .plastering wire mesh will be .‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ ﻓﻲ ﻣﻧﺎطﻖ اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ‬m2 6.75
used at meeting points of constructions and concrete. All works will be cured 2‫م‬
with water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
3.4.4 Colored cement spattering: : ‫رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ‬
Supply and implementing colored cement spattering for external facades, ‫ أوﺟﮫ‬4 ‫ﺗورﯾد وﺗﻧﻔﯾذ رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ ﻟﻠواﺟﮭﺎت اﻟﺧﺎرﺟﯾﺔ واﻟﻣظﻼت وﺣﯾﺛﻣﺎ ﯾﻠزم‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
umbrellas and where necessary according to the attached detailed drawings. ‫ وﺟﮭﯾن ﺑدون ﻟون و ووﺟﮭﯾن ﻣﻊ اﻟﻠون ﻣﻊ ﺿﻣﺎن ﺗﻐطﯾﺔ ﻓواﺻل اﻟﺑﻧﺎء ﻓﻲ اﻟﺑﻠوك ﻗﺑل اﻟرش ﺑﺣﺳب‬m2 70.00
The spattering materials and colors shall be made according to the instructions 2‫م‬
. ‫اﻟﻣﺧططﺎت اﻟﺗﻔﺻﯾﻠﯾﺔ اﻟﻣرﻓﻘﺔ وﻋﻠﻰ ان ﺗﻛون ﻣواد اﻟرﺷﺔ واﻷﻟون ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
of the supervising engineer.
3.4.5 Oil matte paint in square meter: :‫دھﺎن زﯾﺗﻲ ﻣطﻔﻲ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Oil matte paint for walls consists of a primer coat and three coats of the required ‫ دھﺎن زﯾﺗﻲ ﻣطﻔﻲ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻟﻠﺣواﺋط واﻟﺟدران ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون‬m2
color painted above 3 coats of putty and sanding and according to the drawings ‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬، ‫ اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت‬2‫م‬ 49.00
and specifications, and the instructions of the supervisor .‫اﻟﻣﺷرف‬
3.4.6 Emulsion painting for ceilings: : ‫دھﺎن أﻣﻠﺷن ﻟﻠﺳﻘوف‬
Water emulsion paint for ceilings consists of base layer and three coats of the ‫ دھﺎن أﻣﻠﺷن )ﻣﺎﺋﻲ( ﻟﻠﺳﻘوف ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ‬:‫ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬m2
required color , three layers of putty and sanding to be done before painting and ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬،‫ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت ﺑﻌد ﺗﻧﺿﯾف و ﻗﺷط اﻻﺳﻘف و ﻣﻌﺎﻟﺟﺔ اﻟﺗﻠﺑﯾس اﻟﺗﺎﻟف‬2‫م‬ 13.53
according to the drawings and specifications, and the instructions of the .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬
supervisor.
Total Amount of Plastering and Painting Work ‫إﺟﻣﺎﻟﻲ اﻋﻣﺎل اﻟﺗﻠﺑﯾس و اﻟدھﺎن‬

3.5 Flooring & Tiling Works: :‫اﻋﻣﺎل اﻻرﺿﯾﺎت واﻟﺗﻛﺳﯾﺎت‬


Notes : : ‫ﻣﻼﺣظﺎت‬
1.Cement mortar to be used for Installation of tiles with a mixing ratio of 3: 1. Tiles to be laid on a ‫ ﻣﻊ اﻟﻔرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟﻧﯾس ﺗﺣﺗﮫ وﺑﺣﯾث ﺗﻛون اﻟﻔواﺻل ﻣﺳﺗﻘﯾﻣﺔ‬3:1 ‫ﯾﺗم ﺗﻧﻔﯾذ اﻟﺑﻼط ﺑﻣوﻧﺔ أﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط‬.1
bedding of fine aggregate or sand . Joins between tiles are straight and regular .‫وﻣﻧﺗظﻣﺔ‬
2. Tiles must be automatically fabricated and regularly cut. . ‫ﯾﺟب أن ﯾﻛون اﻟﺑﻼط أوﺗوﻣﺎﺗﯾﻛﻲ اﻟﺻﻧﻊ وﺑﻘص ﻣﻧﺗظم‬.2
3. Mosaic tiles with marble fractions is automatic made, size (25 x 25) cm , Half of the thickness of ‫(ﺳم وﯾﻛون ﻧﺻف اﻟﺳﻣﺎﻛﺔ ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض وﻣوﺣد‬25×25)‫ اﻟﺑﻼط اﻟﻣوزﯾﻛو ﺑﻛﺳر رﺧﺎم أوﺗوﻣﺎﺗﯾﻛﻲ اﻟﺻﻧﻊ ﻣﻘﺎس‬.3
this type made with white cement and is uniformed color.
. ‫اﻟﻠون‬
4. An aluminum panel & water balance is used to ensure that the surface of tiles is leveled taking into
‫اﻟﺗﺄﻛد ﻣن اﺳﺗواء ﺳطﺢ اﻟﺑﻼط أﺛﻧﺎء اﻟﺗﻧﻔﯾذﺑﺎﺳﺗﺧدام اﻟﻘدة وﻣﯾزان اﻟﻣﺎء ﻣﻊ ﻣراﻋﺎة اﻟﻣﯾول‬.4
account the slopes needed.
5. Joints should be cleaned thoroughly from cement residues and dust, grouted with white cement, ‫ﯾﺟب ﺗﻧظﯾف اﻟﻔواﺻل ﺟﯾدا ً ﻣن ﺑﻘﺎﯾﺎ اﻷﺳﻣﻧت واﻷﺗرﺑﮫ وﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻷﺳﻣﻧت اﻷﺑﯾض واﻟﺟﻠﻰ واﻟﺻﻘل‬.5
mechanically glazed and polished, curing with water must be done for at least 4 days (morning & . ً‫ أﯾﺎم ﺻﺑﺎﺣﺎ ً وﻣﺳﺎء‬4 ‫اﻟﻣﯾﻛﺎﻧﯾﻛﻲ ﻣﻊ ﺿرورة اﻟرش ﻟﻸﻋﻣﺎل اﻟﻣﻧﻔذة ﻣدة ﻻ ﺗﻘل ﻋن‬
evening). ‫ﺑﺎﻟﻧﺳﺑﺔ ﻟﺑﻼط ارﺿﯾﺔ اﻟﺣﻣﺎﻣﺎت واﻟﻣطﺎﺑﺦ واﻟﺑوﻓﯾﺎت ﯾﻠزم ﺗورﯾدوﺗﻧﻔﯾذ طﺑﻘﺔ ﻋزل )وﺟﮭﯾن ﻣن اﻟزﻓﻠت ﺑﯾﻧﮭﻣﺎ طﺑﻘﺔ‬- .6
6. Floor tiling work of bathrooms, kitchens and buffets, to be installed on a damp-proof layer consists .ً ‫ﺛم ﺗﻧﻔﯾذ ﺑﻧد اﻟﻌﻣل وﻓﻘﺎ ً ﻟﻣﺎ ذﻛر ﻟﺣﻘﺎ‬, ‫ﺧﯾش( ﺗﺣت طﺑﻘﺔ اﻟﮭﻠﺳن‬
of a sackcloth layer between two faces of asphalt. A fine aggregate layer to be made above the damp- . ‫ ﻣم‬0.5 ‫ وﻣﻘﺎوﻣﺗﮫ اﻟﺷدﯾدة ﻟﻠﺗﺂﻛل أﻗل ﻣن‬2‫ ﺳم‬/ ‫ ﻛﺟم‬300 : 250 ‫ ﺑﻼط اﻹﻧﺗرﻟوك ﯾﺗﺣﻣل اﻟﺿﻐوط واﻷﺣﻣﺎل اﻟﻌﺎﻟﯾﺔ‬-7
proof layer. ‫ ﺗﻘﺎس ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺑﻼط ھﻧدﺳﯾﺎ ً وﺗﺧﺻم ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت واﻟﻔراﻏﺎت‬-8
7 - Interlock tiles bear high pressures and loads 250: 300 kg / cm2 and its strong resistance to
corrosion, less than 0.5 mm.
8- All tiling works shall be measured geometrically and all openings and spaces will be deducted.
Granulated Ceramic Tiles : ‫ﺑﻼط ﺳﯾراﻣﯾك ﻣﺣﺑب‬
Supply and installation of Granulated Ceramic tiles for floors similar to the quality of the Spanish ‫ وﯾﺷﻣل‬,(‫ﻣﺎﻧﻊ ﻟﻠﺗزﺣﻠﻖ )ﻣﺧﺷن‬،‫ ﺑﻼط ﺳﯾراﻣﯾك ﻣﺣﺑب ﻟﻸرﺿﯾﺎت ﻣﺎﯾﻣﺎﺛل ﺟودة اﻟﺑﻼط اﻷﺳﺑﺎﻧﻲ‬:‫ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬m2
3.5.1 tile and is anti skidding. Tiles to be installed using cement mortar 1:3 on a layer of fine aggregate ‫ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻹﺳﻣﻧت‬3 : 1 ‫ﻓرﺷﺔ ﻣن اﻟﮭﻠﺳن او اﻟرﻣل اﻟﺧﺷن ﺗﺣﺗﮫ وﯾوﺿﻊ ﻋﻠﻰ ﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬ 12.41
and sand . Joints between tiles to be grouted with White cement according to drawings and 2‫م‬
.‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻷﺑﯾض‬
specifications, instructions of the supervisor engineer.
Ceramic Qaishani tiles: : ‫ﺑﻼط ﺳﯾراﻣﯾك ﻗﯾﺷﺎﻧﻲ‬
Supply and installation of Ceramic tiles for walls, similar to the Spanish tiles size 15 × 15 cm or 10 ‫ ﺳم ﻟﻠﺟدران وﯾﺛﺑت‬10×10 ‫ ﺳم أو‬15×15 ‫ ﺑﻼط ﻗﯾﺷﺎﻧﻲ ﻣﺎﯾﻣﺎﺛل ﺟودة اﻟﺑﻼط اﻷﺳﺑﺎﻧﻲ ﻣﻘﺎس‬:‫ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬m2
3.5.2 × 10 cm , It shall be installed on cement mortar of 1: 3, Joints are grouted with white cement 38.70
،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬3 : 1 ‫ ﻋﻠﻰ ﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬2‫م‬
according to the drawings and specifications, and the instructions of the supervisor.
.‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
Total Amount of Flooring & Tiling Work ‫إﺟﻣﺎﻟﻲ اﻋﻣﺎل اﻻرﺿﯾﺎت واﻟﺗﻛﺳﯾﺎت‬
3.6
Carpentry works (wood, aluminum, iron) : (‫ ﺣدﯾد‬،‫ أﻟﻣوﻧﯾوم‬،‫أﻋﻣﺎل اﻟﻧﺟﺎرة )ﺧﺷب‬
Notes : :‫ أﻋﻣــﺎل اﻻﻟﻣﻧﯾوم‬-1
1 - Aluminum works ‫ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ ﻗطﺎﻋﺎت اﻷﻟوﻣﻧﯾوم واﻟﺧردوات اﻟداﺧﻠﺔ ﻓﻲ أﻋﻣﺎل اﻷﻟوﻣﻧﯾوم ﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﻘﯾﺎﺳﯾﺔ‬-
- Aluminum profiles as well as the other accessories shall comply with American Standard ASTM B 209 or ) ‫ ( و أﻻ ّ ﯾﻘل طﻼء اﻷﻟوﻣﻧﯾوم ﻋن‬BS 1728 ) ‫ ( أو اﻟﻣواﺻﻔﺎت اﻟﻘﯾﺎﺳﯾﺔ اﻟﺑرﯾطﺎﻧﯾﺔ‬ASTM B 209 ) ‫اﻷﻣرﯾﻛﯾﺔ‬
British
. ‫ ( ﻣﯾﻛرون‬16
Standard BS 1728. Aluminum cover paint shall not be less than 16 microns. - The visible surface of
sections are free of stains and apparent defects. Sections have to be resistant against scratching, Different
‫ ﯾﻛون اﻟﺳطﺢ اﻟظﺎھر ﻟﻠﻘطﺎﻋﺎت ﺑﻌد ﻋﻣﻠﯾﺔ اﻟﻣﻌﺎﻟﺟﺔ ﺑﺎﻷﻛﺳدة ﺧﺎﻟﯾﺎ ً ﻣن اﻟﺑﻘﻊ واﻟﻌﯾوب اﻟظﺎھرة وھذه اﻟﻘطﺎﻋﺎت ﻟﮭﺎ‬-
sections of each model are assembled by riveting, taking into account the strengthening of the contact ‫ﻣﻘﺎوﻣﺔ ﺿد اﻟﺧدش وﯾﺗم ﺗﺟﻣﯾﻊ اﻟﻘطﺎﻋﺎت اﻟﻣﺧﺗﻠﻔﺔ اﻟﻣﻛوﻧﺔ ﻟﻛل ﻧﻣوذج ﺑطرﯾﻘﺔ ﻣﺳﻣﺎر اﻟﺑرﺷﺎم ﻣﻊ ﻣراﻋﺎة ﺗﻘوﯾﺔ ﻧﻘطﺔ‬
points. .‫اﻻﺗﺻﺎل‬
- UAE aluminum windows or equivalent, white color or other color approved by the consultant. ‫ ﻧواﻓذ ﻣن اﻷﻟوﻣﻧﯾوم اﻹﻣﺎراﺗﻲ أو ﻣﺎ ﯾﻌﺎدﻟﮫ اﺑﯾض اﻟﻠون اوﻟون اﺧر ﻣﻌﺗﻣد ﻣن اﻻﺳﺗﺷﺎري ﻣﻊ اﻟزﺟﺎج اﻟﺧﺎﻟﻲ ﻣن‬-
Glass is free of ripples, bubbles or defects, Color as approved either opaque or transparent and according ‫ واﻟﻧواﻓذ ﺗﻛون‬.ً ‫اﻟﺗﻣوﺟﺎت أو اﻟﻔﻘﺎﻋﺎت أو اﻟﻌﯾوب ﻣن اﻟﻧوع اﻟﻣﺧﺗﺎر )اﻟﺷﻔﺎف أو اﻟﻣﺷﺟر(وﻓﻘﺎ ً ﻟﻠﺳﻣﺎﻛﺎت اﻟﻣﺣددة ﻻﺣﻘﺎ‬
to the thicknesses specified later. Windows shall be one or two shutters with or without fixed parts. Samples ‫درﻓﺔ واﺣدة أو درﻓﺗﯾن ﻣﻊ أو ﺑدون أﺟزاء ﺛﺎﺑﺗﺔ وﺗﻌﺗﻣد اﻟﻌﯾﻧﺎت ﻗﺑل اﻟﺗورﯾد ﻋﻠﻰ أن ﯾﻛون ﻣﻘطﻊ ﺑرواز اﻟدرﻓﺔ اﻟزﺟﺎج ﻻ‬
shall be approved prior to supply, Glass shutter section shall be at least 4 x 6 cm and frame width shall be ‫ ﯾﻛون زﺟﺎج ﺟﻣﯾﻊ اﻟﺷﺑﺎﺑﯾك ﻟﻠﺣﻣﺎﻣﺎت ﻣن‬- . ‫ ( ﺳم واﻟﺣﻠﻖ ﺑﻌرض ﯾﻧﺎﺳب اﻟدرﻓﺔ وأﺟزاء اﻟﺷﺑﺎﺑﯾك‬6×4 ) ‫ﯾﻘل ﻋن‬
suitable for the shutter width as well as other window parts. ‫اﻟﻧوع اﻟﻣﺷﺟر واﻟﻣﻌﺗم‬
- Window glass of bathrooms is opaque. - Wooden frame (5 x 3) cm for all openings to be installed and well
.‫( ﺳم ﻟﻔﺗﺣﺎت ﻗﺑل اﻋﻣﺎل اﻟﺗﻠﺑس ﯾﺛﺑت ﺟﯾدا ُ ﻓﻲ اﻟﺟدران‬3×5)‫ﺗﻧﻔﯾذ اطﺎر ﺧﺷﺑﻲ‬-
fixed at walls before the plastering works started.
- Frames are fixed in the building openings by screws with their wall plugs and according to the technical .‫ ﯾﺛﺑت اﻟﺣﻠﻖ ﻓﻲ ﻓﺗﺣﺔ اﻟﻣﺑﺎﻧﻲ ﺑواﺳطﺔ ﻣﺳﺎﻣﯾر اﻟﺗﺛﺑﯾت داﺧل ﺧواﺑﯾر ﺑﻼﺳﺗﯾك وﺣﺳب اﻷﺻول اﻟﻔﻧﯾﺔ اﻟﻣﺗﺑﻌﺔ ﻓﻲ ذﻟك‬-
fundamentals followed. ‫اﻟﻣﻌﺟﻧﺔ ﺣول اﻟﺣﻠﻖ ﻣن اﻟداﺧل واﻟﺧﺎرج ﺑﻣﻌﺟون ﺑﻼﺳﺗﯾﻛﻲ ﺷﻔﺎف‬-
- Putty is made around frames from inside and outside using transparent plastic putty. Glass is fixed with .‫ﺟﻣﯾﻊ اﻟﻘطﻊ اﻟﻣﻌدﻧﯾﺔ واﻟﺑراﻏﻲ واﻟزواﯾﺎ اﻟﻼزﻣﺔ ﻟﻠﺗﺛﺑﯾت ﻣن اﻷﻟﻣوﻧﯾوم‬-
rubber parts needed for solid installation. - All metal pieces, screws and angles required for installation are .‫ﻋﻣل اﻟﺛﻘوب اﻟﻼزﻣﺔ ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر واﻟﺗﻲ ﺗﺗﺟﻣﻊ داﺧل اﻟﺣﻠﻖ‬-
made of aluminum. .‫اﻷﻗﻔﺎل واﻟﻣﻘﺎﺑض واﻟﻣﻔﺻﻼت وزواﯾﺎ اﻟﺗﺛﺑﯾت إﯾطﺎﻟﻲ درﺟﺔ أوﻟﻰ او ﻣﺎ ﯾﻣﺎﺛﻠﮭﺎ‬-
- Holes in frames are made for dewatering of rainwater that collects inside the frame. ‫ اﻟﺑﻌوض ( ﻣﺗﺣرك وﯾﺛﺑت ﺑﺷﻛل ﺟﯾد وﯾﻛون ﻣن اﻟﻧوع ﻏﯾر ﻗﺎﺑل‬، ‫ اﻟﻧﺎﻣس‬، ‫ﺟﻣﯾﻊ اﻟﻧواﻓذ ﯾرﻛب ﻋﻠﯾﮭﺎ ﺷﺑك ) اﻟذﺑﺎب‬-
- Locks, knobs, hinges and fixing angles are Italian, first class or the like. . ‫اﻟﺻدأ وﻣﻘﺎوم ﻟﻠﻌواﻣل اﻟﺟوﯾﺔ واﻟرطوﺑﺔ‬
- Nets (flies, mosquitoes) movable, wellestablished, rustproof and resistant to weather and humidity.
.‫ﺗﺧﺿﻊ ﻣﻘﺎطﻊ اﻻﻟﻣﻧﯾوم اﻟﻣراد اﺳﺗﻌﻣﺎﻟﮭﺎ ﻟﻠﻔﺣوﺻﺎت اﻟﻣﺧﺑرﯾﺔ دون اﻻﻋﺗراض ﻋﻠﻰ ذﻟك وﻋﻠﻰ ﻧﻔﻘـﺔ اﻟﻣﻘﺎول‬-
- Sections of aluminum to be used are subjected to laboratory tests without objection and at the expense of
the contractor.
‫ ﺗﺧﺿﻊ ﻣﻘﺎطﻊ اﻷﻟﻣﻧﯾوم اﻟﻣراد اﺳﺗﻌﻣﺎﻟﮭﺎ ﻟﻠﻔﺣوﺻﺎت اﻟﻣﺧﺑرﯾﺔ دون اﻻﻋﺗراض ﻋﻠﻰ ذﻟك وﻋﻠﻰ ﻧﻔﻘﺔ اﻟﻣﺗﻌﮭد‬-
- The contractor must verify all dimensions and openings after installation. ‫ ﻋﻠﻲ اﻟﻣﻘﺎول اﻟﺗﺣﻘﻖ ﻣن ﺟﻣﯾﻊ اﻟﻣﻘﺎﺳﺎت واﻟﻔﺗﺣﺎت ﻋﻠﻲ اﻟطﺑﯾﻌﺔ وﺗﺻﻧﻊ أﻋﻣﺎل اﻟﻧﺟﺎرة ﺑﺎﻟﻣواﺻﻔﺎت اﻟﻣطﻠوﺑﺔ وﺗﺣت‬-
Aluminum works have to be made according to the required specifications and under full responsibility of .‫ﻣﺳﺋوﻟﯾﺗﮫ اﻟﺗﺎﻣﺔ وﻋﻠﻲ اﻟﻣﻘﺎول ﺗﻘدﯾم ﻋﯾﻧﺎت ﻟﻼﻋﺗﻣﺎد ﻗﺑل اﻟﺗرﻛﯾب‬
contractor who should provide samples of works for approval before installation. ‫ وﻓﻲ ﺣﺎﻟﺔ ﻋدم ﺗوﻓر ﺑﯾﺎﻧﺎت ﻛﺎﻓﯾﺔ‬،‫ ﯾﺗم ﺗﺛﺑﯾت اﻟدراﺑزﯾﻧﺎت ﻣﻊ اﻷﻋﻣﺎل اﻷﺧرى واﻟﻌﻧﺎﺻر اﻟﺣﺎﻣﻠﺔ ﻛﻣﺎ ھو ﻣﺣدد وﻣﺑﯾن‬.
Railing to be installed as specified and indicated in drawings. In the absence of sufficient data, the .‫ﯾﺗم اﻟﺗﺛﺑﯾت ﺑﺄﻓﺿل اﻟطرق اﻟﻣﻧﺎﺳﺑﺔ ﻟﻧوع وﻣﻛﺎن اﻟﻌﻣل اﻟﻣﻧﻔذ‬
installation shall be carried out in the best manner appropriate to the type and place of work performed. .‫ ﯾﺗم ﺗﺛﺑﯾت اﻟﺳﻼﻟم اﻟﺑﺣﺎري ﺑﺎﺳﺗﺧدام أﻧظﻣﺔ ﻣن اﻟﺧواﺑﯾر واﻟﻣﺳﺎﻣﯾر اﻟﻣﻠوﻟﺑﺔ اﻟﻣﻌﺗﻣدة ﻋﻠﻰ أﺳﺎس ﻗدرﺗﮭﺎ اﻟﺗﺻﻣﯾﻣﯾﺔ‬-
The movable ladder to be installed using a system of screws and wall plugs based on their design capacity. .‫ﯾﺟب اﻟﺗﺣﻘﻖ ﻣن أن اﻟﻘدرة اﻟﺗﺻﻣﯾﻣﯾﺔ ﻷﻧظﻣﺔ اﻟﺗﺛﺑﯾت واﻟرﺑط أﻛﺑر ﻣن اﻷﺣﻣﺎل اﻟﺳﺎﻛﻧﺔ واﻟﺣﯾﺔ اﻟﻣﺳﻣوح ﺑﮭﺎ‬
It should be verified that the design capacity of the mounting and fastening systems is greater than the
static and live loads allowed.
3.6.1 Aluminum windows for bathrooms (special type): :(‫ﻧواﻓذ اﻟﻣﻧﯾوم ﻟﻠﺣﻣﺎﻣﺎت )ﻧوﻋﯾﺔ ﻗطﺎع ﺧﺎص‬
supply and install Aluminum windows size (0.6*0.6m) for bathrooms special and ‫ ﻗطﺎع ﺧﺎص ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة ﻣﻊ اﻟﺗﺛﺑﯾت‬،‫ﻣﺗر( ﻟﻠﺣﻣﺎﻧﺎت‬0.6*0.6) ‫ﺗورﯾد وﺗرﻛﯾب ﻧواﻓذ اﻟﻣﻧﯾوم ﻣﻘﺎس‬
approved type, support by appropriate nails, closing, install all belongings ‫ﺑﺧواﺑﯾر ﻣﻧﺎﺳﺑﺔ واﻟﺗﻛﺗﯾم وﺗرﻛﯾب ﻣﻠﺣﻘﺎت اﺻﻠﯾﺔ ﻣﻌﺗﻣدة )ﻣﻔﺻﻼت ورﺑﻼت وﻣﺳﻛﺎت وﻣﺳﺎﻣﯾر وﻛل ﻣﺎ‬
excellent quality (hands, rapper, nails, ..etc.), the work must be carried out ‫ ﯾﻠزم( وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت‬pcs 3.00
professionally and the price includes everything necessary to implement the .‫ﻋدد واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
item, and the work must be done according to the specifications, drawings, and
the directives of the supervising engineer.
3.6.2 “Harden iron doors: (a sample must be submitted for approval): :(‫ )وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬: ‫أﺑواب ﺣدﯾد رص‬
Per square meter: Supply and installation of galvanized iron doors (1.0 * 2.2) ‫( ﻣﺗر ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن‬2.2 * 1.0) ‫ ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
meters, with the shutter made of square iron (1 inch It is not less than 20 cm ‫ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن دﺋري‬1.3 ‫ھﻧش ( ﺳﻣك‬2 × ‫ھﻧش‬1) ‫اﻟﺣدﯾد اﻟﻣراﺑﯾﻊ‬
and 2 mm thick, with three hinges, including anti-rust paint after sanding and ‫ ﻣم ﻣﻊ ﻋﻣل‬2 ‫ ﺳم وﺳﻣك‬20 ‫واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن‬, ‫"ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل‬2
good grinding of the welding traces, with two other sides of oil paint for the door ‫ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل‬
pcs
and shutters, provided that the shavings are executed before the paneling work ‫اﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن اﻟدھﺎن‬ 2.00
‫ﻋدد‬
and the shavings are fixed to the walls at least three points on each side with ‫اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث اﻟﺣﻠوق ﺑﺎﻟﺟدران‬
iron staples, 16 mm in diameter and 20 cm long, placed inside the stone and ‫ﺳم ﺗوﺿﻊ داﺧل‬20 ‫ ﻣﻠم وطول‬16 ‫ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر‬
welded accordingly. Directions and instructions of the supervising engineer. .‫اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
"

3.6.3 Steel Doors (Sample needed to approve): .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬: ‫أﺑواب ﺣدﯾد رص‬
Galvanized iron doors, shutter is made of steel tubes - rectangular section (0.8” ‫( ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد‬2.0 * 0.8) ‫ ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
× 2”) , Thickness 1.3 mm, Steel panels are placed together in excellent ‫"ﻋﻠﻰ‬2 ‫ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن دﺋري‬1.3 ‫ھﻧش ( ﺳﻣك‬2 × ‫ھﻧش‬1) ‫اﻟﻣراﺑﯾﻊ‬
technical form . Steel angle beam 2” to be welded along the perimeter of the ‫ ﻣم ﻣﻊ ﻋﻣل ﺛﻼت‬2 ‫ﺳم وﺳﻣك‬20 ‫واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن‬, ‫ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل‬
entire door . Door frame (rectangular section panels )width is not less than 20 ‫ ﻣﻔﺻﻼت وﯾﺷﻣل‬pcs
cm and thickness 2 mm with three hinges. The item price Includes the anti-rust ‫ﻋدد ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن اﻟدھﺎن‬ 3.00
paint after sanding and well abrasion, two coats of oil paint for door and locks. ‫اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث اﻟﺣﻠوق ﺑﺎﻟﺟدران‬
Frames are installed before plastering, they have to be fixed to walls by three ‫ﺳم ﺗوﺿﻊ داﺧل‬20 ‫ ﻣﻠم وطول‬16 ‫ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر‬
points of each side at least using steel dowels 16 mm diameter and 20 cm long, .‫اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
planted in wall and welded In accordance with the instructions of the supervisor
engineer.
3.6.4 Metal steel mesh for windows: :‫ﺷﺑك ﺣدﯾد ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ‬
supply and install Security steel grills for windows size (0.6*0.6m)approved type, ‫ﻣﺗر( ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة ﺷﻠﻣﺎﻧﺎت وﻣﺻﺑﻌﺎت ﻣن اﻟﺣدﯾد‬0.6*0.6) ‫ﺗورﯾد وﺗرﻛﯾب ﺷﺑك ﺣدﯾد ﺣﻣﺎﯾﺔ ﻣﻘﺎس‬
heavy steel frames and bars, include paint and support by appropriate nails,, the ‫ اﻟﺟﺎﻓﻲ ﻣﻊ اﻟطﻼء واﻟﺗﺛﺑﯾت ﺑﺧواﺑﯾر ﻣﻧﺎﺳﺑﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد‬pcs
work must be carried out professionally and the price includes everything .‫ﻋدد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 3.00
necessary to implement the item, and the work must be done according to the
specifications, drawings, and the directives of the supervising engineer.

Total Amount of Metal, Aluminum & Wood Works ‫إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﻧﺟﺎره‬
3.7 Sanitary Works ‫اﻻﻋﻣﺎل اﻟﺻﺣﯾﺔ‬
Notes: All pipe installations are original Indian type (zenith) or equivalent and are accepted by the supervising .‫ ﺟﻣﯾﻊ اﻟﺗﻣدﯾد ﺑﺎﻷﻧﺎﺑﯾب ﻧوع زﻧت ھﻧدي أﺻﻠﻲ أو ﻣﺎ ﯾﻌﺎدﻟﮫ وﯾﻘﺑﻠﮫ اﻟﻣﮭﻧدس اﻟﻣﺷرف‬.1 -:‫ﻣﻼﺣظﺎت‬
engineer. .‫ﺟﻣﯾﻊ ﻣﺣﺎﺑس اﻟﺗﺣﻛم ﻛروم أﺻﻠﻲ أو ﻣﺎ ﯾﻌﺎدﻟﮫ وﯾﻘﺑﻠﮫ اﻟﻣﮭﻧد س اﻟﻣﺷرف‬.2
2. All control valves are Original Chrome or equivalent and are accepted by the Engineer Supervisor. ‫ﺟﻣﯾﻊ اﻷﺣواض واﻟﻛراﺳﻲ واﻟﻘطﻊ اﻟﺻﺣﯾﺔ واﻷدوات ﻣﺻﻧوﻋﺔ ﻣن اﻟﺧزف اﻟﻣزﺟﺞ ) اﻟﺻﯾﻧﻲ ( ﻣﺎرﻛﺔ ﻣﻌﺗﻣدة وﯾﻘﺑﻠﮫ‬.3
3. All sinks, toilets, sanitary accessories and tools made of glazed porcelain are approved and accepted by .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
the supervising engineer.
(‫ﺗﻌﺎﻟﺞ اﻟﻣواﺳﯾر ﺿد اﻟﺻدأ ﺑﺎﻟرﻧﺞ )اﻟدھﺎن اﻟﻣﻘﺎوم ﻟﻠﺻداء‬.4
4. Pipes are cured against rust by (antirust paint)
5 - All drainage pipes for bathrooms are high pressure plastic (UPVC) for internal and external installations ‫ ﺣﺳب اﻷﻗطﺎر اﻟﻣﺣددة‬.‫( ﺗﻣدﯾدات داﺧﻠﯾﺔ وﺧﺎرﺟﯾﺔ‬UPVC) ‫ﺟﻣﯾﻊ ﻣواﺳﯾر اﻟﺻرف ﻟﻠﺣﻣﺎﻣﺎت ﺑﻼﺳﺗﯾك ﺿﻐط ﻋﺎﻟﻲ‬--5
and according to the specified diameters. ‫ﻻ ﯾﺟوز ﻟﻠﻣﻘﺎول ﺗﻐطﯾﺔ أي ﺟزء ﻣن اﻟﻌﻣل ﺣﺗﻰ ﯾﺗم اﺧﺗﺑﺎره‬-6
6 - Contractor should not cover any part of the work until it is tested. As) ‫ﯾﺟب ﻋﻣل رﺳوﻣﺎت ﺗﻧﻔﯾذﯾﮫ ﻟﻺﻋﻣﺎل وﺗﻌﻣﯾدھﺎ ﻗﺑل اﻟﺗﻧﻔﯾذ وﻋﻣل رﺳوﻣﺎت ﻟﻣﺎ ھو ﻣﻧﻔذ ﺑﺣﺳب ﻣراﺣل ﺗﻧﻔﯾذ اﻷﻋﻣﺎل‬-7
7 – Shop drawings have to be done and endorsed before implementation as well as the drawings of works ‫( وﺗﺣﻣﯾل ﺗﻛﻠﻔﺗﮭﺎ ﻋﻠﻰ أﺳﻌﺎر اﻟﺑﻧود‬Built Drawing
have been implemented (As Built Drawing) to be prepared and bear their cost on the item price. ‫ﯾﺟب أن ﺗﻛون ﺻﻧﺎﻋﺔ ﻛل اﻟﻘطﻊ اﻟﺻﺣﯾﺔ ﺳﻠﯾﻣﺔ ﺧﺎﻟﯾﺔ ﻣن ﻋﯾوب اﻟﺻﻧﺎﻋﺔ واﻟﻔﺟوات واﻟﻧﺗوءات وذات ﺳطوح ﻣﻠﺳﺎء‬-8
8. All sanitary pieces shall be free from industrial defects, gaps, protrusions and have smooth surfaces. ‫ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻷﺟﮭزة اﻟﺻﺣﯾﺔ اﻟﻣﺳﺗﺧدﻣﺔ ﻣﺻﻧوﻋﺔ ﻣن اﻟزھر اﻟﻧﻘﻲ اﻟﺧﺎﻟﻲ ﻣن اﻟﻣواد اﻟﻐرﯾﺑﺔ أو ﻣن اﻟﻔﺧﺎر اﻟﻣﺻﻧﻊ‬-9
9. All Sanitary appliances used shall be made of pure Iron cast, free of foreign substances, Or of glazed fire ‫ﻣن اﻟطﯾن اﻟﻧﺎري ﻛل ﻣﻧﮭﺎ ﺑﺎﻟﺳﻣك اﻟﻣﻧﺎﺳب وأن ﺗﻛون ﻓﻲ اﻟﺣﺎﻟﺗﯾن ﻣطﻠﯾﺔ ﺑﺎﻟﺻﯾﻧﻲ وأن ﯾﻛون اﻟطﻼء ﻣﻧﺗظم اﻟﻠون ﺧﺎﻟﻲ ﻣن‬
clay, each shall be of appropriate thickness, glazing shall be regular, free of stains and crusts. Regular ‫ ﻣم وﯾﻘﺎس اﻟﺳﻣك ﺑﺎﻟﺟﮭﺎز‬1 ‫اﻟﺑﻘﻊ واﻟﻘﺷور ﻣﻧﺗظم اﻟﺳطﺢ ﺧﺎﻟﻲ ﻣن اﻟﺗﻣوﺟﺎت واﻟﺗﻧﻣﯾﻼت اﻟﺷﻌرﯾﺔ وﻻ ﯾﻘل ﺳﻣك اﻟطﻼء ﻋن‬
surface, free of ripples, The thickness of coating is not less than1mm and be measured by special magnetic
.‫اﻟﻣﻐﻧﺎطﯾﺳﻲ اﻟﺧﺎص ﺑذﻟك‬
device.
‫ﯾﺟب ﺿرورة اﻋﺗﻣﺎد ﺟﻣﯾﻊ ﻋﯾﻧﺎت اﻷدوات اﻟﺻﺣﯾﺔ ﻣن ﻗﺑل اﻟﻣﮭﻧدس اﻻﺳﺗﺷﺎري ﻗﺑل اﻟﺗورﯾد واﻟﺗﺷوﯾن وﯾﺗﺣﻣل اﻟﻣﻘﺎول‬-10
10 - All samples of sanitary equipment should be approved by the consultant engineer prior to supply and
storing, The contractor shall be responsible for any violation. ‫ﻣﺳؤوﻟﯾﺔ اﻟﻣﺧﺎﻟﻔﺔ‬
11- The Item price includes internal installations of cold and hot feeding pipes, ablution water taps, chromium ‫ﯾﺷﻣل اﻟﺛﻣن اﻟﺗﻣدﯾدات اﻟداﺧﻠﯾﺔ ﻟﻣواﺳﯾر اﻟﺗﻐذﯾﺔ ﺑﺎرد وﺣﺎر وﺣﻧﻔﯾﺎت اﻟوﺿوء واﻟﻣﺣﺎﺑس ﻣن اﻟﻧﺣﺎس وﻣﺣﺎﺑس زاوﯾﺔ ﻣن‬-11
angular valves at each water feeding point, vertical drainage pipes, internal drainage pipes , internal and ‫اﻟﻛروم ﻋﻧد ﻛل ﻧﻘطﺔ ﺗﻐذﯾﺔ ﺑﺎﻟﻣﺎء ﻣﻊ اﻟﻌزل اﻟﻛﺎﻣل ﻟﻠﻣواﺳﯾر ﺑﻣواد ﻣﻌﺗﻣدة وﻛذﻟك اﻟﺗﺻرﯾف اﻟرأﺳﻲ اﻟﻧﮭﺎﺋﻲ وﻣواﺳﯾر‬
external ventilation pipes , elbows and joints up to the nearest inspection room. All pipes have to be ‫اﻟﺻرف اﻟﺻﺣﻲ اﻟداﺧﻠﯾﺔ وﻣواﺳﯾر اﻟﺗﮭوﯾﺔ اﻟداﺧﻠﯾﺔ واﻟﺧﺎرﺟﯾﺔ )أﻓﻘﯾﺎ ً ورأﺳﯾﺎ ً ﺗوﺻﯾل إﻟﻰ اﻟﺳطﺢ( واﻷﻛواع واﻟوﺻﻼت ﺣﺗﻰ‬
completely insulated with approved materials. . ‫أﻗرب ﻏرﻓﺔ ﺗﻔﺗﯾش‬
12- Rainfall drainage pipes (For roof rainfall drainage) to be high pressure plastic (UPVC) according to .‫( طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬UPVC) ‫ﻣواﺳﯾر ﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر اﻟﻧﺎزﻟﺔ ﻣن اﻟﺳطوح ﺑﻼﺳﺗﯾك ﺿﻐط ﻋﺎﻟﻲ‬-12
drawings and specifications. ‫ ﻛﻣﺎ ﯾﺷﻣل اﻟﺛﻣن ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﻟﺗﺷطﯾب اﻟﻌﻣل وﺗﺳﻠﯾﻣﮫ ﻋﻠﻰ‬،‫أﻋﻣﺎل اﻟﺗﻛﺳﯾر واﻟﺗﺛﺑﯾت واﻟﺗﺣﺑﯾش ﺑﻣوﻧﺔ اﻷﺳﻣﻧت واﻟرﻣل‬-13
13-The item price also includes breaking, fixing and covering works with cement sand mortar and all .‫أﻛﻣل وﺟﮫ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
necessary to finish the work and deliver it to the fullest satisfaction according to specifications, drawings and
. ‫أﻋﻣﺎل اﻟﺗﺷطﯾب واﻟﻣﻌﺟﻧﺔ ﺣول اﻟﺣوض ﺑﺎﻟﺳﻠﯾﻛون‬-14
instructions of the supervisor engineer.
14 – Finishing and putty around the basin with Silicon.
. ‫ﺟﻣﯾﻊ اﻟﺗوﺻﯾﻼت اﻟﺧﺎﺻﺔ ﺑﺎﻷدوات اﻟﺻﺣﯾﺔ ﻣن اﻟﻧوع اﻟﻣطﻠﻲ ﺑﺎﻟﻛروم‬-15
15. All sanitary fittings are chromium-type. . ‫ﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﻠﻔﺔ اﺟور اﻟﻔﺣص ﺑﻛﺎﻓﺔ اﻧواﻋﮫ‬-16
16. Contractor shall bear the cost of inspection fees of all kinds. .‫ اﻟﺣد اﻷﻗﺻﻰ ﺣﺳب ﻣواﺻﻔﺎت اﻟﻣﺻﻧﻊ‬% 50 ‫ ﻻ ﯾﺳﻣﺢ ﺑﺎﻧﺣﻧﺎء اﻟوﺻﻼت أﻛﺑر ﻣن‬-17
17. Bending of joints shall not exceed . ‫ ﻋﻧد ﺗوﻗف اﻟﺗﻣدﯾد ﯾﺗم ﺳد ﻓﺗﺣﺎت اﻷﻧﺎﺑﯾب ﺑﺳدادة ﻣؤﻗﺗﺔ‬-18
max. 50% according to the manufacturer's specifications.
18. Pipe openings will be blocked with a temporary seal during suspension of work.

3.7.1 Completed Arabic toilet: :‫ﻣرﺣﺎض ﻋرﺑﻲ ﻣﺗﻛﺎﻣل‬


Supply, install, and operate completed Arabic toilet include elbow, Arabic siphon, floor drains, ‫ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل ﻣرﺣﺎض ﻋرﺑﻲ ﻣﺗﻛﺎﻣل ﻣﻊ اﻟﻛوع وﺳﯾﻔون ﻋرﺑﻲ وﻣﺷن ارﺿﻲ ﻣﻊ ﺗﻣدﯾدات اﻟﺻرف اﻟﺻﺣﻲ‬
include sewage connection by plastic pipes dim=6" (0.5 of total pressure) with ventlation ‫ ھﻧش )ﻧﺻف ﺿﻐط(ﻣﻊ اﻧﺑوب ﺗﮭوﯾﺔ ﻟﻛل ﺣﻣﺎم وﻛذﻟك اﻟﻌﻣل ﯾﺷﻣل ﺗﻣدﯾدات اﻟﺗﻐذﯾﺔ‬6 ‫اﻟداﺧﻠﯾﺔ ﺑﻣواﺳﯾر ﺑﻼﺳﺗﯾك ﻗطر‬
pipe/bathroom , and the work include water feeds by plastic pipes diameter 0.5" with heavy ‫ھﻧش وﻣﻊ ﺗرﻛﯾب ﺣﻧﻔﻲ اﻟﻧﯾﻛل ﻛروم ﺛﻘﯾل وﻣﺣﺎﺑس ﻣﻊ ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﻣن ﻗطﻊ‬0.5 ‫اﻟداﺧﻠﯾﺔ ﺑﻣواﺳﯾر ﺑﻼﺳﺗﯾك ﻗطر‬
steel faucet, valves, ... etc. and all fittings, all items must be excellent quality and approved, ‫ ووﺻﻼت وﻣﺣﺎﺑس وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد اﺻﻠﯾﺔ ﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم‬pcs
3.00
the work must be carried out professionally and the price includes everything necessary to .‫ﻋدد اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
implement the item, and the work must be done according to the specifications, drawings, and
the directives of the supervising engineer.

3.7.2 Completed flush toilet: :‫ﻣرﺣﺎض اﻓرﻧﺟﻲ ﻣﺗﻛﺎﻣل‬


Supply, install, and operate completed Arabic toilet include elbow, Arabic siphon, floor drains, ‫ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل ﻣرﺣﺎض اﻓرﻧﺟﻲ ﻣﺗﻛﺎﻣل وﺳﯾﻔون اﻟﺧﺎص ﺑﮫ ﻣﻊ ﺗﻣدﯾدات اﻟﺻرف اﻟﺻﺣﻲ اﻟداﺧﻠﯾﺔ ﺑﻣواﺳﯾر‬
include sewage connection by plastic pipes dim=6" (0.5 of total pressure) with ventlation ‫ ھﻧش )ﻧﺻف ﺿﻐط(ﻣﻊ اﻧﺑوب ﺗﮭوﯾﺔ ﻟﻛل ﺣﻣﺎم وﻛذﻟك اﻟﻌﻣل ﯾﺷﻣل ﺗﻣدﯾدات اﻟﺗﻐذﯾﺔ اﻟداﺧﻠﯾﺔ ﺑﻣواﺳﯾر‬6 ‫ﺑﻼﺳﺗﯾك ﻗطر‬
pipe/bathroom , and the work include water feeds by plastic pipes diameter 0.5" with heavy ‫ھﻧش وﻣﻊ ﺗرﻛﯾب ﺣﻧﻔﻲ اﻟﻧﯾﻛل ﻛروم ﺛﻘﯾل وﻣﺣﺎﺑس ﻣﻊ ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﻣن ﻗطﻊ ووﺻﻼت وﻣﺣﺎﺑس‬0.5 ‫ﺑﻼﺳﺗﯾك ﻗطر‬
steel faucet, valves, ... etc. and all fittings, all items must be excellent quality and approved, ‫وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد اﺻﻠﯾﺔ ﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت‬
pcs
1.00
the work must be carried out professionally and the price includes everything necessary to .‫ﻋدد واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
implement the item, and the work must be done according to the specifications, drawings, and
the directives of the supervising engineer.

3.7.3 Wash Basin: -: ‫ﻣﻐﺳﻠﺔ وﺟﮫ‬


In number: Supply and installation of a countertop sink with dimensions of 40 * 60 cm, with ‫ ھﻧش‬0.5 ‫ ﺳم ﺑﺎﻟون اﻟﻣطﻠوب ﻣﻊ اﻟﻌﻣود ﻣﻊ اﻟﺣﻧﻔﯾﺎت ذو ﻣﻘﺎس‬60 * 40 ‫ ﺗورﯾد وﺗرﻛﯾب ﻣﻐﺳﻠﺔ وﺟﮫ ذو أﺑﻌﺎد‬: ‫ﺑﺎﻟﻌدد‬
the required balloon, column and faucets measuring 0.5 inches, installed and fixed on pipes ‫ واﻟﺗﺻرﯾف ﺣﺗﻰ اﻟﻣﺷن اﻷرﺿﻲ ﺑﺣﺳب‬، ‫ ﯾرﻛب وﯾﺛﺑت ﻋﻠﻰ ﻣواﺳﯾر ﻣﻊ ﺟﻣﯾﻊ ﺗوﺻﯾﻼت اﻟﻣﺎء ﻣن اﻟﺟدار اﻟﺧﺎرﺟﻲ‬pcs
with all water connections from the external wall, and draining to the ground basin according ‫اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 3.00
to the specifications, standards and instructions of the supervising engineer.
‫ﻋدد‬
3.7.4 External sewage extensions include excavation and backfill: :‫ﺗﻣدﯾدات اﻟﺻرف اﻟﺻﺣﻲ اﻟﺧﺎرﺟﯾﺔ ﻣﻊ اﻟﺣﻔر واﻟردم‬
Supply, install, and operate external sewage extensions include excavation and 6 ‫ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل ﺗﻣدﯾدات اﻟﺻرف اﻟﺻﺣﻲ اﻟﺧﺎرﺟﯾﺔ ﻣﻊ اﻟﺣﻔر واﻟردم ﺑﻣواﺳﯾر ﺑﻼﺳﺗﯾك ﻗطر‬
backfill by plastic pipes dim= 6" (0.5 of total pressure) between sewage ‫ھﻧش )ﻧﺻف ﺿﻐط( ﺑﯾن ﻏرف اﻟﺗﻔﺗﯾش ﺣﺗﻰ اﻟﺑﯾﺎرة واﻟﻌﻣل ﯾﺷﻣل ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﻣن ﻗطﻊ وﻣﺳﺗﻠزﻣﺎت‬
inspection rooms, including ventilation pipes (ventilation pipe for each ‫ﺳم ﻣﻊ ﺿﺑط اﻟﻣﯾول وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد اﺻﻠﯾﺔ ﻣﻌﺗﻣدة‬60 ‫اﻟﺳﺑﺎﻛﺔ وﯾﺗم اﻟﺣﻔر ﺑﻌﻣﻖ ﻣﻧﺎﺳب ﻻ ﯾﻘل ﻋن‬
bathroom), the work include everything necessary such as fittings, and support ‫ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت‬ml 25.00
on walls by steel clips, excavation must be at less 60cm and accurate the slope, .‫ط وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬.‫م‬
all items must be excellent quality and approved, the work must be carried out
professionally and the price includes everything necessary to implement the
item, and the work must be done according to the specifications, drawings, and
the directives of the supervising engineer.
3.7.5 sewage inspection rooms: : ‫ﻏﺮف ﺗﻔﺘ ﺶ ﻟﻠ ف اﻟﺼ‬
supply and implement sewage inspection rooms size net 0.6*0.6*0.6m by automatic ‫ﻣ وذﻟﻚ ﺑﻮاﺳﻄﺔ ﻠﻚ ﺻﻢ‬0.6*0.6*0.6 ‫ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﻏﺮف ﺗﻔﺘ ﺶ ﻟﻠ ف اﻟﺼ ﻣﻘﺎس ﺻﺎ‬
solid bricks size 40*20*20cm, work include excavation and implement crushed stones ‫ﺳﻢ واﻟﻌﻤﻞ ﺸﻤﻞ اﻟﺤﻔﺮ وﻋﻤﻞ ﻃ ﻘﻪ ﻛ ﺣﺠﺮ ﻣﻊ ﺧﺮﺳﺎﻧﺔ ﻋﺎد ﺔ ﺗﺤﺖ‬20*20*40 ‫ﺗﻤﺎﺗ ﻚ ﻣﻘﺎس‬
with concrete under the inspection room and exterior and interior plaster by cement ‫ﻏﺮﻓﺔ اﻟﺘﻔﺘ ﺶ ﺛﻢ ﻳﺘﻢ ﺑﻨﺎء اﻟﺠﺪران وﺗﻠﺒ ﺲ اﻟﻐﺮﻓﺔ ﻣﻦ اﻟﺪاﺧﻞ واﻟﺨﺎرج ﺎﻟﻤﻮﻧﺔ اﻻﺳﻤﻨ ﺔ ﻣﻊ ﻣﺎدة‬
mortar with Sika include supply and implement concrete lid thickness 10cm by cement ‫ﺳﻢ و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ ﻌﺪ ان ﻳﺘﻢ‬10 ‫ واﻟﻌﻤﻞ ﺸﻤﻞ ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﻏﻄﺎء ﺧﺮﺳﺎ ﺳﻤﺎ ﺔ‬،‫ اﻟﺴ ﺎ‬pcs 4.00
mortar mixture of Portland cement and Sana'a crushed sand or equivalent sand from ‫ﻋدد ﺿ ﻂ ﻣﻴﻮل ﻣﻮاﺳ اﻟ ف اﻟﺼ وذﻟﻚ ﺎﺳﺘﺨﺪام أﺳﻤﻨﺖ ﺑﻮرﺗﻼﻧﺪي ورﻣﻞ ﻛﺴﺎرە ﺻﻨﻌﺎ او ﻣﺎ‬
nearest area mixing (1:3) and spraying by water for 7days, the work must be carried out ‫( ﻣﻊ اﻟﺮش و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ‬3:1) ‫ﺎﻓﺌﻪ ﻣﻦ اﻗﺮب ﻣﻨﻄﻘﺔ و ﺴﺘﺨﺪم ﺑ ﺴ ﺔ ﺧﻠﻂ‬
professionally and the price includes everything necessary to implement the item, and .‫ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬
the work must be done according to the specifications, drawings, and the directives of
the supervising engineer.
3.7.6 Water plastic tank with exterior feeding extensions: :‫ﺧزاﻧﺎت ﻣﯾﺎه ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﻊ ﺗﻣدﯾدات اﻟﺗﻐذﯾﺔ اﻟﺧﺎرﺟﯾﺔ‬
Supply and install water plastic tank 3 layers (approved type) on roof capacity ‫ ﻟﺗر ﻣﻊ ﻋﻣل ﻗﺎﻋدة‬2000 ‫ﺗورﯾد وﺗرﻛﯾب ﺧزان ﺑﻼﺳﺗﯾك ﺛﻼث طﺑﻘﺎت )ﻋﯾﻧﺔ ﻣﻌﺗﻣدة( ﻓﻲ اﻟﺳطﺢ ﺳﻌﺔ‬
2000 Liters, include cement foundation under the tank thickness 15cm and ‫ﺳم( و ﻓﺗﺣﺎت ﻓﻲ اﻟذروة ﻟﻣرور اﻟﺗﻣدﯾدات واﻟﻌﻣل ﯾﺷﻣل ﺗورﯾد‬15) ‫اﺳﻣﻧﺗﯾﺔ ﺗﺣت اﻟﺧزان ﺑﺳﻣﺎﻛﺔ‬
vents in the walls of peak for water extensions, work include float ball, valves, ‫ھﻧش ﻣن اﻟﺧزان اﻟﻰ اﻟﺣﻣﺎﻣﺎت واﻟﻣﻐﺎﺳل ﻣﻊ‬0.5 ‫ﺗرﻛﯾب ﻋواﻣﺔ وﻣﺣﺑس وﻣواﺳﯾر ﺗﻐذﯾﺔ ﺑﻼﺳﺗﯾك ﻗطر‬
pcs
plastic pipes dim=0.5" from the tank to bathrooms and hand washing basins ‫ﺗﺛﺑﯾﺗﮭﺎ ﺑﻛﻠﯾﺑﺎت اﺻﻠﯾﺔ ﻓﻲ اﻟﺟدران وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد اﺻﻠﯾﺔ ﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر‬ 1.00
‫ﻋدد‬
with support in walls by steel clips, all items must be excellent quality and .‫ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
approved, the work must be carried out professionally and the price includes
everything necessary to implement the item, and the work must be done
according to the specifications, drawings, and the directives of the supervising
engineer.
Total Amount of Sanitary Works ‫إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﺻﺣﯾﺔ‬
3.8 Electricity Works ‫اﻻﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ‬
Notes : ‫ـ‬:‫ﻣﻼﺣظﺎت‬
- All materials and accessories must be of the highest quality and conform to international standards. .‫ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد واﻷدوات ﻣن أﺟود اﻷﻧواع وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﻘﯾﺎﺳﯾﺔ اﻟﻌﺎﻟﻣﯾﺔ‬-
- All electrical work items will include supply of materials, installation, testing and commission. Internal ‫ ﺟﻣﯾﻊ ﺑﻧود اﻷﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ ﺷﺎﻣﻠﺔ ﺗورﯾد اﻟﻣواد واﻟﺗرﻛﯾب واﻟﺗﺟرﺑﺔ واﻟﺗﺷﻐﯾل وان ﺗﻛون اﻟﺗﻣدﯾدات داﺧﻠﯾﺔ ﻣﺧﻔﯾﺔ ﻟﺟﻣﯾﻊ اﻟﺷﺑﻛﺎت‬-
wiring for all networks shall be concealed inside plastic conduits of PVC type, conforming to British ‫ وأن ﺗﻛون ﻣﻘﺎوﻣﺔ اﻟﻌزل اﻟﻛﮭرﺑﻲ ﺑﮭﺎ أﻛﺛر‬BS-4607 ‫ وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ‬PVC ‫داﺧل ﻣواﺳﯾر ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣن ﻧوع‬
specifications BS-4607 and shall have electrical insulation resistance of more than 100 Mega ohm. ‫ﺳم وﺗﺳﺗﻌﻣل اﻟﻣواﺳﯾر اﻟﻣﻌدﻧﯾﺔ اﻟﻣرﻧﺔ‬20 ‫ ﯾﺟب اﺳﺗﻌﻣﺎل ﻣواﺳﯾر ﻣﺳﺗﻘﻠﺔ ﻟﻛل داﺋرة ﻛﮭرﺑﺎﺋﯾﺔ ﺑﻘطر ﻻ ﯾﻘل ﻋن‬. ‫ ﻣﯾﺟﺎ أوم‬100 ‫ﻣن‬
Independent conduits for each electric circuit shall be used with a diameter not less than 20 cm. ‫ﻟﺣﻣﺎﯾﺔ اﻷﺳﻼك واﻟﻛواﺑل اﻟﻣﺗﺣرﻛﺔ او اﻟﻣﻌرﺿﺔ ﻟﻠﺗﺣرﯾك ﻣﺛل ﺗوﺻﯾﻼت اﻷﺟﮭزة واﻟﻣوﺗورات وﻋﻧد ﻓواﺻل اﻟﺗﻣدد ﻟﻠﻣﺑﻧﻰ إن‬
Flexible metal conduits shall be used to protect wires and movable cables, such as connections of ‫ ﻛﻣﺎ ﯾﺟب أن ﺗﻛون‬. ‫ وﻻ ﯾﺳﻣﺢ ﺑﺎﻟﺗﻣدﯾدات اﻟظﺎھرة وأي ﺧطﺎء ﻓﻲ اﻟﺗﻣدﯾدات ﯾﺗﺣﻣل اﻟﻣﻘﺎول إﻋﺎدة اﻟﻌﻣل ﺑﺎﻟﺷﻛل اﻟﺳﻠﯾم‬,.‫وﺟدت‬
devices and motors and at the expansion joints of the building, if any. No visible wiring is accepted , _ ‫ ﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر‬- ‫ ﺷﺑﻛﺔ اﻟﺗﻠﻔون‬- ‫ ﺷﺑﻛﺔ اﻟﻣﺄﺧذ اﻟﻛﮭرﺑﺎﺋﯾﺔ‬- ‫اﻟﺗﻣدﯾدات ﻟﻛل ﺷﺑﻛﺔ ﻣﺳﺗﻘﻠﺔ ﻋن اﻷﺧرى ) ﺷﺑﻛﺔ اﻹﻧﺎرة اﻟﻛﮭرﺑﺎﺋﯾﺔ‬
The contractor will bear responsibly of any mistakes in the installation and shall re-install them properly ‫ ﻛﻣﺎ ﯾﺟب ﻣراﻋﺎة وﺟود ﻣﺳﺎﻓﺔ ﻻ‬, ‫ﺗﻠﻔزﯾون وﻏﯾرھﺎ ( وﻻ ﯾﺳﻣﺢ اﻟﺧﻠط ﺑﯾﻧﮭﺎ ﻓﻲ اﻟﻣواﺳﯾر أو اﻟﻘﺳﺎﻣﺎت واﻟﻌﻠب‬، ‫ ﺣرﯾﻖ‬،‫ﻛﻣﺑﯾوﺗر‬،
. The wiring for each network must be independent of each other (Electrical lighting network, electrical . ‫ﺳم ﺑﯾن ﺷﺑﻛﺔ اﻟﻛﮭرﺑﺎء وﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر واﻟﺗﻠﻔون‬40 ‫ﺗﻘل ﻋن‬
sockets network, telephone network, computer network, fire, television, etc.). They are not allowed to ‫ ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ اﻟداﺋرﯾﺔ واﻟﻣرﺑﻌﺔ واﻟﻣﺳﺗﺧدﻣﺔ ﻟﻠﻣﻔﺎﺗﯾﺢ ﻣﺻﻧوﻋﺔ ﻣن اﻟﺑﻼﺳﺗﯾك اﻟﺟﯾد واﻟﻣﻘﺎوم ﻟﻠﺣرﯾﻖ وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت‬-
be mixed in conduits , partitions or boxes. A minimum distance of 40 cm should be considered ‫ ﻋﻠﻰ أن ﯾﻛون ﻟﮭﺎ أﻏطﯾﺔ ﺧﺎﺻﺔ ﺗﻣﻧﻊ ﺗﺳرب اﻟرطوﺑﺔ واﻟﺣﺷرات ﻟﮭﺎ و ﯾﺟب أن ﺗﻛون‬BS-4662 ، VDE-3676 ‫اﻟﺑرﯾطﺎﻧﯾﺔ‬
between the power network and the computer and telephone networks. - The circular and squared ‫ﻋﻠب اﻟﺗﺟﻣﯾﻊ ﻣﺻﻧﻌﺔ ﻣن ﻧﻔس اﻟﻣﺻﻧﻊ اﻟﻣﺻﻧﻊ ﻟﻣواﺳﯾر اﻟﻛﮭرﺑﺎء ﻛﻣﺎ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣﺂﺧذ ﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺗﺎﻟﯾﺔ‬
assembly boxes used for the switches shall be made of good plastic, Fire resistant and comply with (IEC 60889, 60309)
the British specifications BS4662, VDE-3676 and shall have special covers to prevent penetration of ‫ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﺳﻠﯾم رﺳوﻣﺎت ﺗوﺿﯾﺣﯾﺔ ﺗﺑﯾن ﺟﻣﯾﻊ اﻟﺗرﻛﯾﺑﺎت اﻟﻛﮭرﺑﺎﺋﯾﺔ وﻣﺳﺎر اﻟﻣواﺳﯾر وأﻣﺎﻛن اﻟﻘﺳﺎﻣﺎت وﻟوﺣﺎت اﻟﻛﮭرﺑﺎء ﻗﺑل‬-
moisture and insects. Those boxes will be made by the same factory which manufactured the electrical ‫اﻟﺑدء ﺑﺄي أﻋﻣﺎل ﻟﻼﻋﺗﻣﺎد ﻣن ﻗﺑل اﻟﻣﮭﻧدس‬
pipes, All sockets shall comply with (IEC 60889, 60309) specifications. . ‫( وﺗﺣﻣﯾل ﺗﻛﻠﻔﺗﮭﺎ ﻋﻠﻰ أﺳﻌﺎر اﻟﺑﻧود‬As Builte Drawing) ‫وﻋﻣل رﺳوﻣﺎت ﻟﻣﺎ ھو ﻣﻧﻔذ ﺑﺣﺳب ﻣراﺣل ﺗﻧﻔﯾذ اﻷﻋﻣﺎل‬
- The contractor must submit the drawings which illustrate all electrical installations , path of pipes , .‫ ( ﻣﻠم ﻣرﺑﻊ‬2.50 ) ‫ ﺑﻧﻔس طرﯾﻘﺔ اﻹﻧﺎرة ﺑﺣﯾث ﻻ ﺗزﯾد ﻋدد اﻟﻣﺂﺧذ ﻋن ﺳﺗﺔ ﻣﺂﺧذ ﻓﻲ اﻟداﺋرة وأﺳﻼﻛﮭﺎ‬13A ‫دواﺋر اﻟﻣﺂﺧذ‬-
places of the circuit breakers and electrical boards before starting any work for approval by the ‫ﻣﺎﺳورة وﻗﺎطﻊ‬،(‫ ﻣﻠم ﻣرﺑﻊ‬4 )‫ أو ﺳﺧﺎن داﺋرة ﻣﺳﺗﻘﻠﺔ ﺳﻠك‬20A ‫ﻛل ﻣﺄﺧذ‬-
Engineer connecters ‫ﻋﻧد اﻻﺣﺗﯾﺎج إﻟﻰ ﺗوﺻﯾل اﻷﺳﻼك ﻣﻊ ﺑﻌﺿﮭﺎ ﺗﺳﺗﺧدم ﺗوﺻﯾﻼت ﻧظﺎﻣﯾﺔ ﻛﻧﻛﺗرات‬-
Submitting the As built drawings and bear the cost to the item prices. .‫ﯾﺗم إﻟﺻﺎق اﻟﻣﺧطط اﻟﺗﻧﻔﯾذي ﻟﻛل ﻣﻧطﻘﺔ داﺧل اﻟﻠوﺣﺎت اﻟﺧﺎﺻﺔ ﺑﮭذه اﻟﻣﻧطﻘﺔ ﺑطرﯾﻘﺔ ﻻ ﺗﺗﺂﻛل وﻻ ﺗﺗﺄﺛر ﺑﺎﻟﻣﺎء‬-
- The electrical circuits of 13A socket are the same of lighting, but that number of sockets does not ‫ ﯾﺟب ﺗﻘدﯾم ﻋﯾﻧﺎت ﻟﺟﻣﯾﻊ اﻟﻣواد ﻗﺑل اﻟﺗﻧﻔﯾذ واﻟﺗرﻛﯾب وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳؤوﻟﯾﺔ وﺗﻛﻠﻔﺔ اﻟﺗورﯾد ﻗﺑل اﻋﺗﻣﺎد اﻟﻌﯾﻧﺔ ﻣن ﻗﺑل‬-
exceed 6 sockets in the circuit and its wiring is (2.50) mm square. - Each socket of 20A or heater shall .‫اﻹﺳت ﺷﺎري وﯾﺣﻖ ﻟﻼﺳﺗﺷﺎري رﻓض أي ﻛﻣﯾﺎت ﯾﺗم ﺗﻧﻔﯾذھﺎ أو ﺗورﯾدھﺎ ﻗﺑل اﻋﺗﻣﺎدھﺎ‬
have an independent circuit, wire (4 mm square), pipe, and circuit breakers. - When connecting wires ‫ﯾﺗم ﺗرﻗﯾم ﺟﻣﯾﻊ اﻷﺳﻼك ﻓﻲ ﻟوﺣﺎت اﻟﺗوزﯾﻊ اﻟﻔرﻋﯾﺔ وﻓﻘﺎ ﻷرﻗﺎم اﻟدواﺋر ﺑﺄرﻗﺎم ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﺧﺻﺻﺔ ﻟﮭذا اﻟﻐرض وﯾﺗم ﻋﻣل ھذه‬-
to each other regular connections are used like connecters. .‫اﻷرﻗﺎم داﺧل اﻟﻣﻔﺎﺗﯾﺢ و اﻟﻣﺂﺧذ‬
- The executive plan of each area shall be attached to the boards of this area in a way that does not %99 ‫ ( ﻋن‬Conductivity) ‫ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ ﻣوﺻﻼت اﻷﺳﻼك واﻟﻛواﺑل ﻣﺻﻧوﻋﺔ ﻣن اﻟﻧﺣﺎس اﻟذي ﻻ ﺗﻘل ﻣوﺻﻠﯾﺗﮫ‬-
corrode or affected by water. ‫( وﺗﻛون ﻣوﺻﻼت وﻛﺎﺑﻼت اﻟﻣﺣرﻛﺎت وﻣﺎ ﺷﺎﺑﮫ ﻣن اﻟﻧوع اﻟﻣﺷﻌر‬IEC-28) ‫وﻣﺻﻧﻊ طﺑﻘﺎ ﻟﻣواﺻﻔﺎت ھﯾﺋﺔ اﻟﻛﮭرﺑﺎء اﻟدوﻟﯾﺔ‬
- Samples must be submitted for all materials prior to installation. The Contractor shall bear all ‫ ﻓوﻟت وﺑﻣﻘﺎطﻊ واﺳﺗطﺎﻋﺎت ﺗﯾﺎرﯾﮫ‬1000/600 ‫ و ﯾﺟب أن ﺗﻛون ھذه اﻟﻛﺎﺑﻼت واﻷﺳﻼك ﻣن ﻓﺋﺔ‬. ‫اﻟﻣرن ﻟﺗﺣﻣل اﻻھﺗزازات‬
responsibility and cost of supply before the sample is approved by the Consultant. The ‫ﻣﻧﺎﺳﺑﺔ‬
Consultant shall be entitled to reject any quantities installed or supplied before approval. ‫ أﺧﺿر‬،‫ أزرق (ﻟﻠﻔﺎزات أﺳود ﻟﻠﺣﯾﺎدي )أﺧﺿر‬،‫ أﺻﻔر‬،‫وﯾﺟب اﻻﻟﺗزام ﺑﺎﻷﻟوان اﻟﻘﯾﺎﺳﯾﺔ ﻟﻸﺳﻼك واﻟﻛﺎﺑﻼت )أﺣﻣر‬
- All wires in the distribution boards shall be numbered according to the circuits numbers with plastic ‫وأﺻﻔر(ﻟﻸرﺿﻲ ﺑﺣﯾث ﻻ ﯾﻧﺷﺄ اﻟﺗﺑﺎس ﺑﯾن اﻷﺳﻼك اﻟﻣﺗﻌددة‬
numbers designated for this purpose. These numbers will be pasted inside the switches and sockets. ‫ اﻟﺗﺄرﯾض‬, ‫ﺟﻣﯾﻊ اﻟﻘواطﻊ اﻟرﺋﯾﺳﯾﺔ واﻟﻔرﻋﯾﺔ‬, ‫ﻋﺎزﻟﯾﮫ اﻟﻛﺎﺑﻼت‬, ‫ﻋﺎزﻟﯾﮫ اﻟدواﺋر‬, ‫ﺗﺷﻐﯾل ﺟﻣﯾﻊ اﻷﺟﮭزة واﻟﺗرﻛﯾﺑﺎت‬: ‫اﺧﺗﺑﺎر‬-
-All wires and cables to be made of copper with a conductivity of at least .‫ وﯾﻣﻧﻊ ﻣﻧﻌﺎ ﺑﺎﺗﺎ اﻟﺗﻛﺳﯾر ﻓﻲ اﻟﺟدران ﺑﺷﻛل أﻓﻘﻲ‬.. ‫ ﯾراﻋﻰ أن ﺗﻛون ھذه اﻟﺗﻣدﯾدات رأﺳﯾﮫ‬--
99%and manufactured according to the specifications of the International ‫ ﯾﺟب ﺗﺷﻐﯾل ﺟﻣﯾﻊ اﻟﻣﻌدات اﻟﻛﮭرﺑﺎﺋﯾﺔ واﻟﺗﺟﮭﯾزات واﻟدواﺋر اﻟﻣﻌزوﻟﺔ واﻟﻛﺎﺑﻼت اﻟﻣﻌزوﻟﺔ وﺟﻣﯾﻊ ﻗواطﻊ اﻟداﺋرة‬:‫ اﻻﺧﺗﺑﺎر‬-
Electricity Authority (IEC-28). Connectors and cables of motor and the like shall be flexible type to ‫( ﺑﺎﻟﻠون اﻟﺑرﺗﻘﺎﻟﻲ ﻟﻸﺳﻘف واﻷﺳود ﻟﻠﺟدران ﺑﺄﻗطﺎر‬PVC) ‫ ﯾﺷﻣل اﻟﻌﻣل ﺗرﻛﯾب اﻷﻧﺎﺑﯾب اﻟﺑﻼﺳﺗﯾﻛﯾﺔ‬- ‫اﻟرﺋﯾﺳﯾﺔ واﻟﻔرﻋﯾﺔ واﻟﺗﺄرﯾض‬
resist vibrations. These cables and wires must be 1000/600 volts, with suitable sections and capacity. ‫ ﻣم ﺑﺟودة ﻋﺎﻟﯾﺔ وﻣﻌزوﻟﺔ ﺑﻣﺎدة ﺑﻼﺳﺗﯾﻛﯾﺔ‬2.5 ‫ ﯾﺻﻧﻊ اﻻﺳﻼك ﻣن ﻧﺣﺎس‬.‫ واﻟﺗﻲ ﯾﺟب وﺿﻌﮭﺎ ﻗﺑل ﺗوﺻﯾل اﻷﺳﻼك‬، "1 &" ¾
The standard colors of wires and cables must be adhered. (red, yellow, blue) for power, black for .‫ ﺳم( وﻧﻘﺎط اﻟوﺻل‬7 × ‫ ﺳم‬7) ‫ﻣﻊ ﺣﺟم اﻟﺻﻧﺎدﯾﻖ‬
neutral ,(green, green and yellow) for ground, so that, there is no confusion between multiple wires. - ‫ ﻣم‬4 ‫ ﻣم و‬2.5 ‫ ﯾﺷﻣل اﻟﻌﻣل ﺟﻣﯾﻊ اﻟﺗرﻛﯾﺑﺎت ﻣن ﻟوﺣﺔ اﻟﺗوزﯾﻊ إﻟﻰ ﺻﻧﺎدﯾﻖ اﻟﺗوزﯾﻊ ﺑﺄﺳﻼك‬-
Testing: Operation of all electric equipment, fittings, insulated circuits, insulated cables, all main and ‫ ﯾﺟب أن ﯾﻛون ﻛﺎﺑل اﻟطﺎﻗﺔ أﻋﻠﻰ وﻟﯾس أﺳﻔل اﻟﺗرﻛﯾب‬، ‫ ﻋﻧد ﺗﻘﺎطﻊ ﺧط اﻟﻣﯾﺎه أو ﺧط اﻟﺻرف اﻟﺻﺣﻲ ﻣﻊ ﻣﺳﺎر ﻛﺎﺑل ﻛﮭرﺑﺎﺋﻲ‬-
subsidiary circuit breakers, earthing. ‫ ﯾﺗﺿﻣن اﻟﻌﻧﺻر ﻛل ﻣﺎ ھو ﺿروري ﻟﺗﻧﻔﯾذ اﻟﻌﻣل ﻋﻠﻰ أﻛﻣل وﺟﮫ ﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻔﻧﯾﺔ اﻟﻣرﻓﻘﺔ واﻟرﺳوﻣﺎت اﻟﮭﻧدﺳﯾﺔ وﺗﻌﻠﯾﻣﺎت‬-
- Wiring through wall should be made vertically. It is strictly forbidden to break walls horizontally. ‫ ﯾﺟب أن ﯾﻛون ﻛﺎﺑل اﻟطﺎﻗﺔ أﻋﻠﻰ و ﻟﯾس ﺗﺣت‬، ‫ ﻋﻧد ﺗﻘﺎطﻊ ﺧط ﻣﯾﺎه أو ﺧط ﺻرف ﺻﺣﻲ ﻣﻊ ﻣﺳﺎر ﻛﺎﺑل ﻛﮭرﺑﺎﺋﻲ‬- ‫اﻟﻣﺷرف‬
-Testing: All electric equipment , fittings, insulated circuits, insulated cables, all main and sub circuit .‫اﻟﺗﺛﺑﯾت‬
breakers, and earthing have to be operationalized - Work includes the installation of plastic pipes
(PVC) of orange color for ceilings and black for walls with diameters ¾” & 1”, which to be placed
before wiring. Wiring to be manufactured of copper 2.5 mm high quality, insulated by plastic material
3.8.1 with
Supplythe boxes size (7 cm ×of7 standard
and installation cm) and junction
lightingpoints.
unit: : ‫ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ‬
Supply and installation of a normal lighting units, with switches including black plastic conduits ‫( وﺗﺛﻧﻰ‬PVC) ‫ ﻣﻊ اﻟﻣﻔﺗﺎح وﺗﺷﻣل اﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء‬،‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ‬:‫ﺑﺎﻟﻌدد‬
(PVC) which can be bent ( at bending points) using spiral spring ,these pipes have to be installed ‫ واﻟﺗﻲ ﺗوﺿﻊ ﻗﺑل اﻟﺻب؛ واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر‬،‫ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬pcs
before casting. The item includes boxes and their covers, screws, and wires from the point to the 5.00
.‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ واﻷﺳﻼك ﻣن اﻟﻧﻘطﺔ إﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬،‫ﻋدد اﻟﻘﻼووظ‬
distribution board, according to the drawings and specifications, and the instructions of the
supervisor.
3.8.2 Supply and installation of standard lighting unit with hemispherical cover: Supply and : ‫ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي‬
installation of a standard lighting unit with a hemispherical cover, include the switch and PVC pipes ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي وﺗﺷﻣل اﻟﻣﻔﺗﺎح واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ‬:‫ﺑﺎﻟﻌدد‬
which can be bent ( at bending points) using spiral spring, pipes are placed before casting .The pcs
‫ واﻟﺗﻰ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ‬،‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬PVC) ‫اﻟﺳوداء‬ 2.00
item shall include boxes and their covers which they shall be fixed with screws as well as wires
‫ وﺗﻌﻠﯾﻣﺎت‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬
‫ﻋدد‬
from the point to the distribution board according to drawings and specifications.
.‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
Total Amount of Electricity Works ‫إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ‬
Total summation ‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل ﺑﻧﺎء ﺣﻣﺎﻣﺎت‬
4 ‫ﺗرﻣﯾم و إﻋﺎدة ﺗﺄھﯾل ﻟﺣﻣﺎﻣﺎت ﻣدرﺳﺔ اﻟﺻﺎﻟﺢ‬
Restoration and rehabilitation of Bathrooms Alsaalih School.
Notes : -:‫ﻣﻼﺣظﺎت‬
1. The contractor shall visit the site before elaboration of the tender and study all circumstances that ‫ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻣﺗﻘدم ﻓﻲ اﻟﻌطﺎء زﯾﺎرة ﻣوﻗﻊ اﻟﻣﻧﺷﺄة ﻗﺑل اﻟﺑدء ﻓﻲ دراﺳﺔ اﻟﻌطﺎء ودراﺳﺔ ﺟﻣﯾﻊ اﻟظروف اﻟﻣﺣﯾطﺔ ﺑﺎﻟﻣﻧﺷﺄة واﻟﻣؤﺛرة‬
surround the site, especially eventually existing slopes at the site. ‫ﻋﻠﻰ اﻷﻋﻣﺎل ﻣﺛل طرﯾﻖ إﯾﺻﺎل اﻟﻣواد اﻟﻼزﻣﺔ ﻟﻺﻧﺷﺎء و دراﺳﺔ طرﯾﻘﺔ ووﺳﯾﻠﺔ ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ اﻟﻌﺎم وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل‬
2. During the excavation and in the case of being unable to reach the depth mentioned in the drawings . ‫اﻟﻣﺳﺋوﻟﯾﺔ‬
and/or finding the soil bearing capacity (structural drawing) in this depth less than the required, the ‫ﻋﻧد اﻟﺣﻔر ﻓﻲ ﺣﺎﻟﺔ ﻋدم اﻟﻘدرة ﻟﻠوﺻول اﻟﻰ اﻟﻌﻣﻖ اﻟﺗﺻﻣﯾﻣﻲ ﺑﺎﻟرﺳوﻣﺎت ﻧﺗﯾﺟﺔ ﻟوﺟود أرض ﺻﺧرﯾﺔ أو ﻛﺎﻧت ﻣﻘﺎوﻣﺔ اﻟﺗرﺑﺔ أﻗل‬
contractor shall contact the project management. ‫ﻣن اﻟﻣﻘﺎوﻣﺔ اﻟﺗﺻﻣﯾﻣﯾﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول اﻷﺗﺻﺎل ﺑﺎدارة اﻟﻣﺷروع ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت ﻟﺗﺷﻛﯾل ﻟﺟﻧﺔ ﻟﻠدراﺳﺔ وﺗﺣدﯾد‬
.‫اﻟﺣﻠول اﻟﻣﻧﺎﺳﺑﺔ وإﻋﺗﻣﺎدھﺎ ﻣن ادارة اﻟﻣﺷروع وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﻣﺧﺎﻟﻔﮫ‬

4.1 Renew Oily paint with emery and paste for interior walls: :‫ﻣﻊ اﻟﺼﻨﻔﺮة واﻟﻤﻌﺠﻮن ﻟﻠﺠﺪران اﻟﺪاﺧﻠ ﺔ‬ ‫ﺗﺠﺪ ﺪ ﻃﻼء ز‬
supply and implement renew oily paint with emery and paste for interior walls (‫ ﻃ ﻘﺎت‬3‫ﻣﻊ اﻟﻤﻌﺠﻮن واﻟﺼﻨﻔﺮة ﻟﻠﺠﺪران اﻟﺪاﺧﻠ ﺔ )ﻃ ﻘﺔ أﺳﺎس و‬ ‫ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﺗﺠﺪ ﺪ ﻃﻼء ز‬
(foundation layer and 3 layers) and use paint and paste approved excellent quality ‫و ﺴﺘﺨﺪم ﻣﻌﺠﻮن وﻃﻼء ﻧﻮﻋ ﺔ ﻣﻌﺘﻤﺪة ﺣﺴﺐ اﻟﻠﻮن اﻟﻤﻄﻠﻮب ﻌﺪ ﻣﻮاﻓﻘﺔ ﻣﻬﻨﺪس اﻟﻤ وع و ﻨﻔﺬ‬
according to the required color with approval from project engineer, the work must be ‫ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت‬m2 20.00
carried out professionally and the price includes everything necessary to implement the .‫ وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬2‫م‬
item, and the work must be done according to the specifications, drawings, and the
directives of the supervising engineer.
4.2 Renew Emulsion paint with emery and paste for ceilings: :‫ﺗﺠﺪ ﺪ ﻃﻼء اﻣﻠﺸﻦ ﻣﻊ اﻟﺼﻨﻔﺮة ﻟﻠﺴﻘﻒ‬
supply and implement renew emulsion paint with emery for ceilings (foundation layer ‫ ﻃ ﻘﺎت( و ﺴﺘﺨﺪم ﻃﻼء‬3‫ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﺗﺠﺪ ﺪ ﻃﻼء اﻣﻠﺸﻦ ﻣﻊ اﻟﺼﻨﻔﺮة ﻟﻠﺴﻘﻒ )ﻃ ﻘﺔ أﺳﺎس و‬
and 3 layers) and use paint approved excellent quality according to the required color ‫ ﻧﻮﻋ ﺔ ﻣﻌﺘﻤﺪة ﺣﺴﺐ اﻟﻠﻮن اﻟﻤﻄﻠﻮب ﻌﺪ ﻣﻮاﻓﻘﺔ ﻣﻬﻨﺪس اﻟﻤ وع و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ‬m2
with approval from project engineer, the work must be carried out professionally and ‫ ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس‬2‫م‬ 10.00
the price includes everything necessary to implement the item, and the work must be .‫اﻟﻤ ف‬
done according to the specifications, drawings, and the directives of the supervising
engineer.
4.3 Renew Emulsion paint with emery and paste for exterior walls: :‫ﺗﺠﺪ ﺪ ﻃﻼء اﻣﻠﺸﻦ ﻣﻘﺎوم ﻟﻠﺮﻃ ﺔ ﻟﻠﺠﺪران اﻟﺨﺎرﺟ ﺔ‬
supply and implement renew emulsion paint with emery for exterior walls (foundation (‫ ﻃ ﻘﺎت وﺟﻪ‬3‫)ﻃ ﻘﺔ أﺳﺎس و‬3 ‫ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﻃﻼء اﻣﻠﺸﻦ ﻣﻘﺎوم ﻟﻠﺮﻃ ﺔ ﻟﻠﺠﺪران اﻟﺨﺎرﺟ ﺔ‬
layer and 3 layers) and use paint approved excellent quality according to the required ‫ و ﺴﺘﺨﺪم ﻃﻼء ﻧﻮﻋ ﺔ ﻣﻌﺘﻤﺪة ﻌﺪ ﻣﻮاﻓﻘﺔ ﻣﻬﻨﺪس اﻟﻤ وع و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ‬m2
color with approval from project engineer, the work must be carried out professionally .‫ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬2‫م‬ 10.00
and the price includes everything necessary to implement the item, and the work must
be done according to the specifications, drawings, and the directives of the supervising
engineer.
4.4 Maintenance of iron doors ‫ﺻﯾﺎﻧﺔ اﻻﺑواب اﻟﺣدﯾدﯾﺔ‬
In square meters: Maintaining and inspecting the school’s iron doors according ‫ ﺻﯾﺎﻧﺔ وﻣﻔﺎﻗدة اﻻﺑواب اﻟﺣدﯾدﯾﺔ ﻟﻠﺣﻣﺎﻣﺎت ﺑﺎﻷﺑﻌﺎد ﺑﺣﺳب اﻟﻛﻣﯾﺎت م وذﻟك ﺑﻌﻣل اﻵﺗﻲ‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
to the dimensions according to the quantities, by doing the following: - -:
- Cutting the damaged iron, replacing the removed parts of the gates and others ‫ ﻗطﻊ اﻟﺣدﯾد اﻟﺗﺎﻟف واﺳﺗﺑدال اﻟﻘطﻊ اﻟﻣﺧﻠوﻋﺔ ﻣن ﻣراﺑﯾﻊ وﻏﯾرھﺎ ﻓﻲ ﺟﺳم اﻟﺑﺎب وﺳﻣﻛرة اﻷﺟزاء‬-
in the door body, and plumbing the other parts by repairing or replacing them. . . ‫اﻻﺧرى ﺑﺈﺻﻼﺣﮭﺎ أو إﺳﺗﺑداﻟﮭﺎ و طﻼء اﻻﺑواب ﺑﻣﺎدة اﺳﺎس و ووﺟﮭﯾن زﯾﺗﻲ ﺑﻌد اﻟﺟﻠﺦ و اﻟﺳﻧﻔرة‬
- Replacing damaged bolts and hinges with others, making three hinges on ‫ اﺳﺗﺑدال اﻟﻣﻐﺎﻟﻖ واﻟﻣﻔﺻﻼت اﻟﺗﺎﻟﻔﮫ ﺑﺄﺧري وﻋﻣل ﺛﻼث ﻣﻔﺻﻼت ﻓﻲ ﻛل ﺟﺎﻧب وﻣﺎ ﯾﻠزﻣﮭﻣﺎ وﺗورﯾد‬-
m2
each side and what is needed for them, and supplying an excellent quality lock. .‫ﻗﻔل ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة‬ 2.20
2‫م‬
- Adjusting the weight and other necessary maintenance work to ensure that the ، ‫ﺿﺑط اﻟوزﻧﯾﺔ وﻏﯾر ذﻟك ﻣن اﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ اﻟﻼزﻣﮫ ﻟﺿﻣﺎن اﻋﺎدة ﺗﺷﻐﯾل اﻟﺑواﺑﺔ ﺑﺎﻟﺷﻛل اﻟﻣطﻠوب‬-
gate is restarted as required. The contractor must visit the site before submitting ‫وﻋﻠﻲ اﻟﻣﻘﺎول زﯾﺎرة اﻟﻣوﻗﻊ ﻗﺑل ﺗﻘدﯾم ﻋرض اﻟﺳﻌر‬
the price offer. .‫ﯾﺷﻣل اﻟﺑﻧد ﻛل ﻣﺎﯾﻠزم ﺑﺣﺳب اﺻول اﻟﻌﻣل اﻟﻣﺗﻌﺎرف ﻋﻠﯾﮭﺎ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
The item includes everything necessary according to generally accepted work
principles and the instructions of the supervising engineer

4.5 Steel Doors (Sample need to check): .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬: ‫أﺑواب ﺣدﯾد‬
Galvanized iron doors, shutter is made of steel tubes - rectangular section (1” × ( ‫ھﻧش‬2 × ‫ھﻧش‬1) ‫ ﺗورﯾدو ﺗرﻛﯾب أﺑواب ﺣدﯾد ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد اﻟﻣراﺑﯾﻊ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
2”) , Thickness 1.3 mm, Steel panels are placed together in excellent technical ‫"ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل‬2 ‫ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن دﺋري‬1.3 ‫ﺳﻣك‬
form . Steel angle beam 2” to be welded along the perimeter of the entire door . ‫ ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل‬2 ‫ﺳم وﺳﻣك‬20 ‫واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن‬,
Door frame (rectangular section panels )width is not less than 20 cm and ‫ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن اﻟدھﺎن‬
thickness 2 mm with three hinges. The item price Includes the anti-rust paint ‫ اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث اﻟﺣﻠوق ﺑﺎﻟﺟدران‬m2 4.70
after sanding and well abrasion, two coats of oil paint for door and locks. ‫ﺳم ﺗوﺿﻊ داﺧل‬20 ‫ ﻣﻠم وطول‬16 ‫ ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر‬2‫م‬
Frames are installed before plastering, they have to be fixed to walls by three .‫اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
points of each side at least using steel dowels 16 mm diameter and 20 cm long,
planted in wall and welded In accordance with the instructions of the supervisor
engineer.
4.6 Hand Wash basin: :‫ﻣﻔﺎﻗدة ﻣﻐﺳﻠﺔ اﻟﯾد‬
In number: Supply and installation of an excellent quality porcelain hand sink, ‫ ﻣﻔﺎﻗدة و ﺗﺷﻐﯾل ﻣﻐﺳﻠﺔ ﯾد واﻟﻌﻣل ﯾﺷﻣل ﺗورﯾد ﻣﺣﺎﺑس ﻟﻠﻣﻐﺳﻠﺔ و ﺗﻧﻔﯾذ ﺗﺻرﯾف اﻟﻣﯾﺎه‬:‫ﺑﺎﻟﻌدد‬
along with the handles and related accessories of excellent quality. The work ‫ ھﻧش ﻣﺛﺑﺗﺔ ﺑﺎﻟﺟدران اﻟﺧﺎرﺟﯾﺔ ﻣن‬2.5 ‫ ﻣوﺻل ﺑﻣواﺳﯾر‬،‫ ﺑﺎﺳﺗﺧدام ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﻣن ھراب وﻏﯾره‬pcs
includes implementing water drainage using all the necessary supplies, such as ..‫ﻋدد اﻟﻣﻐﺳﻠﺔ إﻟﻰ ﻏرﻓﺔ اﻟﺗﻔﺗﯾش اﻟﺧﺎرﺟﯾﺔ و اﻟﻌﻣل ﯾﺷﻣل ﺗورﯾد اﻟﻣﻐﺳﻠﺔ ﺑﺎﻟﻣﺎء و ﻛل ﻣﺎ ﯾﻠزم ﻻﻧﮭﺎء اﻟﺑﻧد‬ 1.00
escapes and others, connected to 2.5-inch pipes fixed to the external walls from
the sink to the external inspection room..”

4.7 Chamber size 60cm x 60cm: : ‫ﺳم‬60 ×‫ﺳم‬60 ‫" ﻏرﻓﺔ ﺗﻔﺗﯾش ﻣﻘﺎس‬
- Supply and implementation of an chamber with clear internal dimensions of 60 ‫ ﺳم اﻟﻰ ﻗﺎع‬60 ‫ وﻋﻣﻖ ﻻﯾﻘل‬,‫ﺳم‬60 × ‫ﺳم‬60 ‫ ﺗورﯾد وﺗﻧﻔﯾذ ﻏرﻓﺔ ﺗﻔﺗﯾش ﺑﺎﺑﻌﺎد ﺻﺎﻓﯾﺔ ﻣن اﻟداﺧل‬-
cm x 60 cm, and a depth of no less than 60 cm to the bottom of the pipe, built of ‫ ﻣﻊ‬,‫ﺳم( ﺑﺎﺳﺗﺧدام اﻻﺳﻣﻧت اﻟﻣﻘﺎوم ﻣﻊ ﻣﺎدة اﻟﺳﯾﻛﺎ‬40×20×20) ‫ ﺗﺑﻧﻰ ﻣن اﻟﺑﻠك اﻟﺻم ﻣﻘﺎس‬,‫اﻻﻧﺑوب‬
solid blocks, size (20 x 20 x 40 cm) using resistant cement with Cica, with a ‫ وﺗﻠﺑس ﻣن اﻟداﺧل واﻟﺧﺎرج ﺑﺎﺳﻣﻧت ﻣﻘﺎوم‬,‫ﺳم ﺑﺎﺳﻣﻧت ﻣﻘﺎوم ﻣﻊ ﻣﺎدة اﻟﺳﯾﻛﺎ‬15 ‫ﻗﺎﻋدة ﺧرﺳﺎﻧﯾﺔ ﺳﻣك‬
concrete base 15 cm thick with resistant cement with Cica. It is covered from the ‫ ﻣﻊ ﻣﺎدة اﻟﺳﯾﻛﺎ وﻋﻣل اﻟﺳواﻗﻲ ﻣﻊ ﺗﺛﺑﯾت ﻣﻘطﻊ ﻣﺎﺳورة ﺑﻼﺳﺗﯾك ﻟﻠﺳﺎﻗﯾﺔ وﻋﻣل ﻏطﺎء ﻣن اﻟﺧرﺳﺎﻧﺔ‬pcs 3.00
inside and outside with resistant cement with sika material. The waterwheels are ‫ﻋدد اﻟﻣﺳﻠﺣﺔ ﻣﻊ ﻋﻣل ﻣﻘﺑض ﻣن اﻟﺣدﯾد واﻟﺑﻧد ﯾﺷﻣل اﻟﺣﻔر واﻟردم طﺑﻘﺎ ﻟﻠﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬
made, a plastic pipe section is installed for the waterwheel, a reinforced ".‫اﻟﻣﺷرف‬
concrete cover is made, and an iron handle is made. The item includes
excavation and backfilling in accordance with the specifications and instructions
of the supervising engineer.”.”
4.8 External & internal sewage extensions include excavation and backfill: :‫ﺗﻤﺪ ﺪات اﻟ ف اﻟﺼ اﻟﺨﺎرﺟ ﺔ و اﻟﺪاﺧﻠ ﺔ ﻣﻊ اﻟﺤﻔﺮ واﻟﺮدم‬
Supply, install, and operate external sewage extensions include excavation and backfill 6 ‫ﺗﻮر ﺪ وﺗﺮﻛ ﺐ و ﺸﻐ ﻞ ﺗﻤﺪ ﺪات اﻟ ف اﻟﺼ اﻟﺨﺎرﺟ ﺔ ﻣﻊ اﻟﺤﻔﺮ واﻟﺮدم ﻤﻮاﺳ ﻼﺳ ﻚ ﻗﻄﺮ‬
by plastic pipes dim= 6" (0.5 of total pressure) between sewage inspection rooms, ‫ﻫ ﺶ )ﻧﺼﻒ ﺿﻐﻂ(ﺑ ﻏﺮف اﻟﺘﻔﺘ ﺶ ﺣ اﻟﺒ ﺎرة واﻟﻌﻤﻞ ﺸﻤﻞ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﻣﻦ ﻗﻄﻊ‬
including ventilation pipes (ventilation pipe for each bathroom), the work include ‫ﺳﻢ ﻣﻊ ﺿ ﻂ اﻟﻤﻴﻮل وﺗﻜﻮن ﺟﻤﻴﻊ‬60 ‫ وﻣﺴﺘﻠﺰﻣﺎت اﻟﺴ ﺎ ﺔ و ﺘﻢ اﻟﺤﻔﺮ ﻌﻤﻖ ﻣﻨﺎﺳﺐ ﻻ ﻘﻞ ﻋﻦ‬Lum
everything necessary such as fittings, and support on walls by steel clips, excavation ‫اﻟﻤﻮاد اﺻﻠ ﺔ ﻣﻌﺘﻤﺪة و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ‬ 1.00
must be at less 60cm and accurate the slope, all items must be excellent quality and .‫ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬Sum
approved, the work must be carried out professionally and the price includes everything
necessary to implement the item, and the work must be done according to the
specifications, drawings, and the directives of the supervising engineer.
4.9 Water plastic tank with exterior feeding extensions: :‫ﺧزاﻧﺎت ﻣﯾﺎه ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﻊ ﺗﻣدﯾدات اﻟﺗﻐذﯾﺔ اﻟﺧﺎرﺟﯾﺔ‬
Supply and install water plastic tank 3 layers (approved type) on roof capacity ‫ ﻟﺗر ﻣﻊ ﻋﻣل ﻗﺎﻋدة‬2000 ‫ﺗورﯾد وﺗرﻛﯾب ﺧزان ﺑﻼﺳﺗﯾك ﺛﻼث طﺑﻘﺎت )ﻋﯾﻧﺔ ﻣﻌﺗﻣدة( ﻓﻲ اﻟﺳطﺢ ﺳﻌﺔ‬
2000 Liters, include cement foundation under the tank thickness 15cm and ‫ﺳم( و ﻓﺗﺣﺎت ﻓﻲ اﻟذروة ﻟﻣرور اﻟﺗﻣدﯾدات واﻟﻌﻣل ﯾﺷﻣل ﺗورﯾد‬15) ‫اﺳﻣﻧﺗﯾﺔ ﺗﺣت اﻟﺧزان ﺑﺳﻣﺎﻛﺔ‬
vents in the walls of peak for water extensions, work include float ball, valves, ‫ھﻧش ﻣن اﻟﺧزان اﻟﻰ اﻟﺣﻣﺎﻣﺎت واﻟﻣﻐﺎﺳل ﻣﻊ‬0.5 ‫ﺗرﻛﯾب ﻋواﻣﺔ وﻣﺣﺑس وﻣواﺳﯾر ﺗﻐذﯾﺔ ﺑﻼﺳﺗﯾك ﻗطر‬
plastic pipes dim=0.5" from the tank to bathrooms and hand washing basins ‫ﺗﺛﺑﯾﺗﮭﺎ ﺑﻛﻠﯾﺑﺎت اﺻﻠﯾﺔ ﻓﻲ اﻟﺟدران وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد اﺻﻠﯾﺔ ﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر‬ pcs
1.00
with support in walls by steel clips, all items must be excellent quality and .‫ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ ‫ﻋدد‬
approved, the work must be carried out professionally and the price includes
everything necessary to implement the item, and the work must be done
according to the specifications, drawings, and the directives of the supervising
engineer.
4.10 Rehabilitation of the septic tank: ‫ إﻋﺎدة ﺗﺄھﯾل اﻟﺑﯾﺎرة و ﺗﺷﻐﯾﻠﮭﺎ و اﻟﺗﻲ ﺗﺗﺿﻣن ﺗﻧظﯾف اﻟﻣﺧﻠﻔﺎت و اﻻﺗرﺑﺔ ﻓوق و‬: ‫إﻋﺎدة ﺗﺄھﯾل اﻟﺑﯾﺎرة‬
Rehabilitation of the cesspool, which includes cleaning out the waste and dust ‫ ﻋﻣل ﺻﻔﺗﯾن ﻣن اﻟﺑﻠوك و اﻟﺗﻠﺑﯾس ﺣول اﻟﺑﯾﺎرة ﻟﻠﺣﻣﺎﯾﺔ و ﻋﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺿﻣﺎن ﻋدم‬,‫داﺧل اﻟﺑﯾﺎرة‬
above and inside the cesspool, making two layers of blocks and plastering ‫دﺧول ﻣﯾﺎة اﻻﻣطﺎر اﻟﻰ اﻟﺑﯾﺎرة و اﻟﻌﻣل ﯾﺷﻣل ﺗﻐطﯾﺔ ﻓﺗﺣﺎت اﻟﺑﯾﺎرة ﻣن اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ و ﻋﻣل‬ Lum
around the cesspool for protection, and doing everything necessary to ensure . ‫اﻏطﯾﺔ ﺧرﺳﺎﻧﯾﺔ و ﻋﻣل ھواﯾﺔ ﻟﻠﺑﯾﺎرة‬ 1.00
that rainwater does not enter the cesspool. The work includes covering the Sum
cesspool openings with reinforced concrete and Making concrete covers and
making a hobby for the yard.
4.11 Supply and installation of a regular outdoor lighting unit with a semi-oval : ‫"ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي‬
cover: ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي وﺗﺷﻣل اﻟﻣﻔﺗﺎح‬:‫ﺑﺎﻟﻌدد‬
In numbers: Supply and installation of a regular external lighting unit with a semi- ‫ واﻟﺗﻰ ﺗوﺿﻊ‬،‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬PVC) ‫واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء‬
pcs
oval cover, including the switch and black plastic pipes (PVC). It is bent - in the ً ‫ طﺑﻘﺎ‬،‫ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬ 5.00
‫ﻋدد‬
bending areas - using spring, which is placed before pouring. The cans and their .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬
covers are fixed with screws and wires from the point to the distribution panel,
according to the drawings, specifications, and the engineer’s instructions. Admin.
4.12 Socket 13 A: : A 13 ‫ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬
Supply and installation of a socket 13A with a switch, It shall be concealed ‫ ﯾرﻛب داﺧل اﻟﺣﺎﺋط ﻣﻊ ﺟﻣﯾﻊ‬،(‫ ﻣﻊ اﻟﻣﻔﺗﺎح )ﺳوﯾﺗش‬A 13 ‫ ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬:‫ﺑﺎﻟﻌدد‬
inside the wall with all requirements of black PVC conduits which will be bent in ،‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬PVC) ‫اﻟﻣﺳﺗﻠزﻣﺎت ﻣن ﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾك اﻟﺳوداء‬
pcs
the bending points using spiral spring, wires and boxes. Screws are used for ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬،‫ واﻟﺗوﺻﯾل ﺣﺗﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬،‫وأﺳﻼك وﻋﻠب ﻣﻊ اﻟﺗﺛﺑﯾت ﺑﺎﻟﻣﺳﺎﻣﺑر اﻟﻘﻼووظ‬ 2.00
‫ﻋدد‬
fixation. Item includes all connection to the distribution board according to .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬
drawings and specifications , And the supervisor's instructions.

Total summation ‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل إﻋﺎدة ﺗﺄھﯾل و إﻋﺎدة ﺗرﻣﯾم اﻟﺣﻣﺎﻣﺎت ﻓﻲ ﻣدرﺳﺔ اﻟﺻﺎﻟﺢ‬
5 ‫أﻋﻣﺎل ﺑﻧﺎء ﺧزان ﻣﯾﺎه ارﺿﻲ ﻣدرﺳﺔ اﻟﺻﺎﻟﺢ‬

Construction work on a Underground water tank at Alsaalih School

5.1 Site Work : ‫اﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم‬


Notes : -:‫ﻣﻼﺣظﺎت‬
1. The contractor shall visit the site before elaboration of the tender and study all ‫ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻣﺗﻘدم ﻓﻲ اﻟﻌطﺎء زﯾﺎرة ﻣوﻗﻊ اﻟﻣﻧﺷﺄة ﻗﺑل اﻟﺑدء ﻓﻲ دراﺳﺔ اﻟﻌطﺎء ودراﺳﺔ ﺟﻣﯾﻊ اﻟظروف‬
circumstances that surround the site, especially eventually existing slopes at the ‫اﻟﻣﺣﯾطﺔ ﺑﺎﻟﻣﻧﺷﺄة واﻟﻣؤﺛرة ﻋﻠﻰ اﻷﻋﻣﺎل ﻣﺛل طرﯾﻖ إﯾﺻﺎل اﻟﻣواد اﻟﻼزﻣﺔ ﻟﻺﻧﺷﺎء و دراﺳﺔ طرﯾﻘﺔ‬
site. . ‫ووﺳﯾﻠﺔ ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ اﻟﻌﺎم وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ‬
2. During the excavation and in the case of being unable to reach the depth ‫ﻋﻧد اﻟﺣﻔر ﻓﻲ ﺣﺎﻟﺔ ﻋدم اﻟﻘدرة ﻟﻠوﺻول اﻟﻰ اﻟﻌﻣﻖ اﻟﺗﺻﻣﯾﻣﻲ ﺑﺎﻟرﺳوﻣﺎت ﻧﺗﯾﺟﺔ ﻟوﺟود أرض ﺻﺧرﯾﺔ‬
mentioned in the drawings and/or finding the soil bearing capacity (structural ‫أو ﻛﺎﻧت ﻣﻘﺎوﻣﺔ اﻟﺗرﺑﺔ أﻗل ﻣن اﻟﻣﻘﺎوﻣﺔ اﻟﺗﺻﻣﯾﻣﯾﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول اﻷﺗﺻﺎل ﺑﺎدارة اﻟﻣﺷروع ﻗﺑل اﻟﺑدء‬
drawing) in this depth less than the required, the contractor shall contact the ‫ﻓﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت ﻟﺗﺷﻛﯾل ﻟﺟﻧﺔ ﻟﻠدراﺳﺔ وﺗﺣدﯾد اﻟﺣﻠول اﻟﻣﻧﺎﺳﺑﺔ وإﻋﺗﻣﺎدھﺎ ﻣن ادارة اﻟﻣﺷروع‬
project management. .‫وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﻣﺧﺎﻟﻔﮫ‬
5.1.1 Site leveling: :‫ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ‬
implement leveling for site dim=(3*3*depth 2.8m) in site this include remove for ‫ ﻣﺗر( ﻓﻲ اﻟﻣوﻗﻊ ﻣﻊ ازاﻟﺔ‬2.8 ‫*ﻋﻣﻖ‬3*3) ‫ﺗﻧﻔﯾذ ﺗﺳوﯾﺔ ﺳطﺣﯾﺔ ﻟﻣوﻗﻊ اﻟﺧزان ﺑﺎﻻﺑﻌﺎد اﻟﺻﺎﻓﻲ‬
trees, soil, stones, ..etc. from the site giving well level, the price includes ‫ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم‬،‫اﻟﺦ ﻣن اﻟﻣوﻗﻊ ﺑﺣﯾث ﯾﺻﺑﺢ اﻟﻣوﻗﻊ ﻣﺳﺗوي‬...‫اﻟﺣﺷﺎﺋش واﻟﺗرﺑﺔ واﻻﺣﺟﺎر و‬
everything necessary to implement the item with the disposal of the resulting ‫ ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ اﻟﺗﺧﻠص ﻣن اﻟﻣواد اﻟﻧﺎﺗﺟﺔ اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ اﻷراﺿﻲ اﻟزراﻋﯾﺔ‬m2
materials to a suitable place with no harm or affect agricultural lands, water ‫ وﻣﺟﺎري اﻟﺳﯾول واﻻﻣﻼك اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم‬2‫م‬ 20.00
streams and private property, the work must be carried out professionally and .‫اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
the price includes everything necessary to implement the item, and the work
must be done according to the specifications, drawings, and the directives of the
5.1.2 supervising engineer.
Soil excavations: :‫اﻟﺣﻔر اﻟﺗراﺑﻲ‬
Implement soil excavation dim=(4*4*depth 3.2 m) in ground this include stones ‫ﻣﺗر( ﻓﻲ اﻻرض وﯾﺷﻣل اي اﺣﺟﺎر ﻣﺧﺗﻠطﺔ ﺿﻣن‬3.2 ‫*ﻋﻣﻖ‬4*4) ‫ﺗﻧﻔﯾذ ﺣﻔر ﺗراﺑﻲ ﻟﻠﺧزان ﺑﺎﻻﺑﻌﺎد‬
mixed with soil reaching valid rock for foundation (rock layer near ground ‫اﻟﺗرﺑﺔ ﺣﺗﻰ اﻟوﺻول اﻟﻰ اﻟﺻﺧر اﻟﺻﺎﻟﺢ ﻟﻠﺗﺄﺳﯾس )اﻟﺻﺧر ﻗرﯾب ﻣن ﺳطﺢ اﻻرض( وﯾﺗم اﻟﻌﻣل‬
surface) using appropriate tools and appropriate support for excavation sides so ‫ﺑواﺳطﺔ أدوات ﻣﻧﺎﺳﺑﺔ ﻣﻊ اﻟﺣﻔﺎظ ﻋﻠﻰ اﺳﻧﺎد ﺟواﻧب اﻟﺣﻔر ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ اﻟﻣﺑﺎﻧﻲ اﻟﻣﺟﺎورة‬
as to not cause harm the nearly buildings, the price includes everything ‫ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ اﻟﺗﺧﻠص ﻣن اﻟﻣواد اﻟﻧﺎﺗﺟﺔ اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ ﺗوﺛر‬m3 10.00
necessary to implement the item with the disposal of the resulting materials to a ‫ ﻋﻠﻰ اﻷراﺿﻲ اﻟزراﻋﯾﺔ وﻣﺟﺎري اﻟﺳﯾول واﻻﻣﻼك اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ‬3‫م‬
suitable place with no harm or affect agricultural lands, water streams and .‫ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
private property, the work must be carried out professionally and the price
includes everything necessary to implement the item, and the work must be
done according to the specifications, drawings, and the directives of the
5.1.3 Rock excavations: :‫اﻟﺣﻔر اﻟﺻﺧري‬
Implement excavations in the rock dim=(4*4*depth 3.2 m) reaching foundation ‫ﻣﺗر( ﺣﺗﻰ اﻟوﺻول اﻟﻰ ﻣﻧﺳوب اﻟﺗﺄﺳﯾس وﯾﺗم اﻟﻌﻣل‬3.2 ‫*ﻋﻣﻖ‬4*4) ‫ﺗﻧﻔﯾذ ﺣﻔر ﻓﻲ اﻟﺻﺧر ﺑﺎﻻﺑﻌﺎد‬
level using appropriate tools which will not harm the nearly buildings, the price ‫ﺑواﺳطﺔ أدوات ﻣﻧﺎﺳﺑﺔ ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ اﻟﻣﺑﺎﻧﻲ اﻟﻣﺟﺎورة واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ‬
includes everything necessary to implement the item with the disposal of the ‫ اﻟﺗﺧﻠص ﻣن اﻟﻣواد اﻟﻧﺎﺗﺟﺔ اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ اﻷراﺿﻲ اﻟزراﻋﯾﺔ وﻣﺟﺎري اﻟﺳﯾول‬m3
resulting materials to a suitable place with no harm or affect agricultural lands, ‫ واﻻﻣﻼك اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب‬3‫م‬ 10.00
water streams and private property, the work must be carried out professionally .‫اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
and the price includes everything necessary to implement the item, and the work
must be done according to the specifications, drawings, and the directives of the
supervising engineer.
Total Amount of site work ‫إﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم‬
5.2 Concrete Works : ‫اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت‬
5.2.1 Normal concrete (sub-base concrete) under the body of tank: :‫ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ )ﺧرﺳﺎﻧﺔ ﻧظﺎﻓﺔ( ﺗﺣت ﺟﺳم اﻟﺧزان‬
supply and implement Normal concrete thickness 10cm under the body of tank ‫ ﺳم ﺗﺣت ﺟﺳم اﻟﺧزان ﺑﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ذات ﻣﺣﺗوى اﺳﻣﻧﺗﻲ‬10 ‫ﺗورﯾد وﺗﻧﻔﯾذ ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﺑﺳﻣﺎﻛﺔ‬
with concrete of 300kg/m3 cement quantity, by Portland cement and sand and ‫ﻣﺗر ﻣﻛﻌب وذﻟك ﺑﺎﺳﺗﺧدام أﺳﻣﻧت ﺑورﺗﻼﻧدي ورﻣل وﻛري ﻣن اﻗرب ﻣﻧطﻘﺔ وﯾﻧﻔذ اﻟﻌﻣل‬/‫ﻛﺟم‬300
m2
gravel from nearest area, the work must be carried out professionally and the ‫ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت‬ 16.00
2‫م‬
price includes everything necessary to implement the item, and the work must .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
be done according to the specifications, drawings, and the directives of the
supervising engineer.
5.2.2 Reinforced concrete for bottom slab, beams, top slab: :‫اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ ﻟﻼرﺿﯾﺔ واﻟﺟﺳور واﻟﺳﻘف‬
supply and implement reinforced concrete forbottom slab, beams, top slab with ‫ﺗورﯾد وﺗﻧﻔﯾذ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻼرﺿﯾﺔ واﻟﺟﺳور واﻟﺳﻘف وذﻟك ﺑﺧرﺳﺎﻧﺔ ذات ﻣﺣﺗوى اﺳﻣﻧﺗﻲ‬
concrete of 350kg/m3 cement quantity, using mechanical mixer for concrete, ‫ﻣﺗر ﻣﻛﻌب وﯾﺗم اﻟﺻب ﺑﺎﺳﺗﺧدام ﺧﻼطﺔ ﻣﯾﻛﺎﻧﯾﻛﯾﺔ ﻟﺧﻠط اﻟﺧرﺳﺎﻧﺔ وﯾﺳﺗﺧدم اﻟﮭزاز ﻣﻊ‬/‫ﻛﺟم‬350
vibrator, polishing the surface after casting, and adhere to spray and immerse ‫ وﯾﺗم اﻟﺗﻧﻔﯾذ‬،‫ ﯾوم‬21 ‫ﻣراﻋﺎة اﻟﺗﺧﺷﯾن ﺑﻌد اﻟﺻب واﻻﻟﺗزام ﺑﺎﻟرش واﻟﻐﻣر ﺑﺎﻟﻣﺎء ﻟﻣدة ﻻ ﺗﻘل ﻋن‬
the concrete by water for not less than 21day, implement approved materials as ‫ وﻣﻌﺗﻣد ﻣن ﻣﮭﻧدس‬Grade40 ‫ ﺣدﯾد ﺗﺳﻠﯾﺢ ﺟودة ﻋﺎﻟﯾﺔ‬-1 :‫ﺑﺎﺳﺗﺧدام ﻣواد ﻣﻌﺗﻣدة ﻋﻠﻰ اﻟﻧﺣو اﻟﺗﺎﻟﻲ‬
following: 1- reinforcing steel high quality Grade 40 approved by project ‫اﻟﻣﺷروع )ﺣدﯾد ﺗرﻛﻲ ﺟودة ﻋﺎﻟﯾﺔ ﻣن وﻛﯾل ﻣﻌﺗﻣد ﻓﻲ اﻟﺟﻣﮭورﯾﺔ اﻟﯾﻣﻧﯾﺔ( ﺑﺣﯾث ﯾﻛون ﺟدﯾد وﺧﺎﻟﻲ‬
engineer (Turkish steel high quality from authorized agent in Yemen) have to be ‫ﻣن اﻟﺻدأ وان ﻻ ﯾﻛون ﻗد ﺗﻌرض ﻟﻠرطوﺑﺔ ﻋﻧد اﻟوﻛﯾل وﯾﺗم ﻧﻘﻠﮫ ﻟﻠﻣوﻗﻊ ﺑﺻوره ﺳﻠﯾﻣﺔ وﯾﺣﻔظ ﻓﻲ‬
new and rust free and have not been exposed to moisture in warehouse of ‫ اﺳﻣﻧت ﺑورﺗﻼﻧدي‬-2 .‫اﻟﻣوﻗﻊ ﺑطرﯾﻘﺔ ﺳﻠﯾﻣﺔ ﻓﻲ ﻣﺧزن ﻣﻐﻠﻖ ﺑﺣﯾث ﻻ ﯾﺗﻌرض ﻟﻠﻣطر او رطوﺑﺔ اﻟﺟو‬
agent, transport it to site in proper way and store it in site properly in closed ‫ﻧوﻋﯾﺔ ﻣﻣﺗﺎز وﻣﻌﺗﻣد ﻣن ﻣﮭﻧدس اﻟﻣﺷروع )اﺳﻣﻧت ﻋﻣران او اﻟوطﻧﯾﺔ( وان ﯾﻛون اﻻﺳﻣﻧت طري ﻟم‬
store away of rain and moisture. 2-Portland cement excellent quality approved ‫ﻟﻠﻛﯾس وان ﻻ ﯾﻛون‬/‫ﻛﺟم‬50 ‫ ﯾﻣر ﻋﻠﻰ إﻧﺗﺎﺟﮫ اﻛﺛر ﻣن ﺷﮭرﯾن وان ﯾﻛون ﻣﺷون ﺑﺄﻛﯾﺎس ﺳﻠﯾﻣﺔ ﺳﻌﺔ‬m3
by project engineer (Amran or Alwatanya cement) fresh cement manufactured ‫ ﻣﺗﺣﺟر ﻗد ﺗﻌرض ﻟﻠرطوﺑﺔ وﯾﺗم ﻧﻘﻠﮫ ﻟﻠﻣوﻗﻊ ﺑﺻوره ﺳﻠﯾﻣﺔ وﯾﺣﻔظ ﻓﻲ اﻟﻣوﻗﻊ ﺑطرﯾﻘﺔ ﺳﻠﯾﻣﺔ ﻓﻲ ﻣﺧزن‬3‫م‬ 6.10
date less than 2months, in proper bags capacity 50kg/bag, not stiffened, and ‫ رﻣل ﻧوﻋﯾﺔ ﻣﺗدرج ﻣن اﻟﻛﺳﺎرة وﯾﻛون ﺧﺎﻟﻲ ﻣن‬-3 .‫ﻣﻐﻠﻖ ﺑﺣﯾث ﻻ ﯾﺗﻌرض ﻟﻠﻣطر او رطوﺑﺔ اﻟﺟو‬
have not been exposed to moisture, transport it to site in proper way and store it ‫اﻻﺗرﺑﺔ واﻟﺷواﺋب ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة وﻣﻌﺗﻣد ﻣن ﻣﮭﻧدس اﻟﻣﺷروع )رﻣل ﻛﺳﺎره ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة او ﻣﺎ ﯾﻛﺎﻓﺋﮫ‬
in site properly in closed store away of rain and moisture. 3- Gradient Sand from ‫ ﻛري ﻧوﻋﯾﺔ ﺑﺎزﻟﺗﻲ ﻣﺗدرج ﻣن اﻟﻛﺳﺎرة وﯾﻛون ﺧﺎﻟﻲ ﻣن اﻻﺗرﺑﺔ واﻟﺷواﺋب‬-4 .(‫ﻣن اﻗرب ﻣﻧطﻘﺔ‬
crusher, soil and impurities free, excellent quality approved by project engineer -5 .(‫ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة وﻣﻌﺗﻣد ﻣن ﻣﮭﻧدس اﻟﻣﺷروع )ﻛري ﻛﺳﺎره ﺻﻧﻌﺎﻧﻲ او ﻣﺎ ﯾﻛﺎﻓﺋﮫ ﻣن اﻗرب ﻣﻧطﻘﺔ‬
(Sana'a crushed sand or equivalent sand from nearest area). 4- Basalt gradient ‫ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ‬،.‫ﻣﯾﺎه ﻧظﯾﻔﺔ ﻧﻔس ﻧوﻋﯾﺔ اﻟﻣﯾﺎه اﻟﺻﺎﻟﺣﺔ ﻟﻠﺷرب‬
gravel from crusher, soil and impurities free, excellent quality approved by .‫اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
project engineer (High quality of crushed gravel or equivalent sand from nearest ‫ ﯾراﻋﻲ ﻗﺑل اﻟﺻب ﺗرﻛﯾب ﻣﺎﺳورة ﻣﻔﯾض ﻟﻠﺧزان وﻋﻣل ﻓﺗﺣﺎت ﻓﻲ اﻟﺳﻘف ﻟﻣﺎﺳورة اﻟﺷﻔط‬:‫ﻣﻼﺣظﺔ‬
area). 5- Clean water same type of drinking water, the work must be carried out .‫وﻓﺗﺣﺔ اﺧرى ﻟﺗﺟﻣﯾﻊ اﻟﻣﺎء اﻟﻰ اﻟﺧزان وﻓﺗﺣﺔ ﻻﻧﺑوب اﻟﺗﮭوﯾﺔ‬
professionally and the price includes everything necessary to implement the
item,
Total and the work
amount must be done
of Concrete Worksaccording to the specifications, drawings, and ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ‬

5.3 Stone and Brick Works: : ‫اﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ‬


5.3.1 Basalt stone walls thickness 50cm (trimmed square basalt stone approved :(‫ﺣﺠﺮ ﺎزﻟ اﺳﻮد ﻣ ع وﻗ ﺺ ﻧﻮﻋ ﺔ ﻣﻌﺘﻤﺪة‬ ) ‫ﺳﻢ‬50 ‫اﻟﺠﺪاران اﻟﺤﺠﺮ اﻟ ﺎزﻟ ﺳﻤﺎ ﺔ‬
type): ‫ﺳﻢ ﻣﻦ اﻟﺤﺠﺮ ﺎزﻟ اﺳﻮد ﻣ ع وﻗ ﺺ ﻧﻮﻋ ﺔ ﻣﻌﺘﻤﺪة ﻣﻊ‬50 ‫ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﻣ ﺎ ﺟﺪران ﺳﻤﺎ ﺔ‬
supply and implement stone walls thickness 50cm by trimmed square basalt ‫ﻣ ﻣﻜﻌﺐ وذﻟﻚ ﺎﺳﺘﺨﺪام أﺳﻤﻨﺖ ﺑﻮرﺗﻼﻧﺪي ورﻣﻞ‬/‫ﻛﺠﻢ‬300 ‫ﺧﺮﺳﺎﻧﺔ ﻋﺎد ﺔ ذات ﻣﺤﺘﻮى اﺳﻤﻨ‬
stone approved type with normal concrete of of 300kg/m3 cement quantity by ‫ ا ﺎم‬7 ‫ وﻛﺮي ﻣﻦ اﻗﺮب ﻣﻨﻄﻘﺔ ﻣﻊ اﻟﺘﺪر ﺰ واﻟ ﻏ وﻣﻞء اﻟﻔﺮاﻏﺎت ﺑ اﻟﻮﺟﻪ واﻟ ﻄﺎﻧﺔ ﻣﻊ اﻟﺮش ﻟﻤﺪة‬m3
Portland cement and sand and gravel from nearest area with good stuffing and 16.00
‫ و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت‬3‫م‬
filling the blanks between face and lining of walls with cement mortar and .‫واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬
spraying by water for 7days, the work must be carried out professionally and the
price includes everything necessary to implement the item, and the work must
be done according to the specifications, drawings, and the directives of the
Total amount of Stone and Brick Works : ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ‬
5.4 Plastering and Painting Works: : ‫اﻟﺗﻠﺑﯾس واﻟدھﺎن‬
5.4.1 Interior plaster for walls with Sicka: :‫اﻟﺗﻠﺑﯾس اﻟداﺧﻠﻲ ﻟﻠﺟدران ﻣﻊ اﻟﺳﯾﻛﺎ‬
supply and implement interior plaster thickness (1-2cm) for walls before the ‫ﺳم( ﻟﻠﺟدران ﻣن اﻟداﺧل ﻗﺑل ﺻﺑﺔ اﻟﺳﻘف ﻣﻊ اﻟطرطﺷﺔ وذﻟك‬2-1) ‫ﺗورﯾد وﺗﻧﻔﯾذ ﺗﻼﺑﯾس ﺑﺳﻣﺎﻛﺔ‬
ceiling work with splashing layer by cement mortar with Sicka using Portland ‫ﻛﯾس ﺳﻣﻧت( وذﻟك ﺑﺎﺳﺗﺧدام أﺳﻣﻧت ﺑورﺗﻼﻧدي ورﻣل‬/‫ﻛﺟم‬1) ‫ﺑواﺳطﺔ اﻟﻣوﻧﺔ اﻻﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟﺳﯾﻛﺎ‬
cement and Sana'a crushed sand or equivalent sand from nearest area mixing 7 ‫( ﻣﻊ اﻟرش ﻟﻣدة ﻻ ﺗﻘل ﻋن‬3:1) ‫ ﻛﺳﺎره ﺻﻧﻌﺎﻧﻲ او ﻣﺎ ﯾﻛﺎﻓﺋﮫ ﻣن اﻗرب ﻣﻧطﻘﺔ وﯾﺳﺗﺧدم ﺑﻧﺳﺑﺔ ﺧﻠط‬m2
(1:3) and spraying by water for 7days, the work must be carried out by strings ‫ أﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل ﺑواﺳطﺔ اﻟﺧﯾوط واﻟﻣﺳطرة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد‬2‫م‬ 43.00
and ruler, the work must be carried out professionally and the price includes .‫وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
everything necessary to implement the item, and the work must be done
according to the specifications, drawings, and the directives of the supervising
5.4.2 engineer.
Intrior paint of walls and floor of tank: :‫دھﺎن ﺟدران وارﺿﯾﺔ اﻟﺧزان ﻣن اﻟداﺧل‬
supply and implement paint by (Master seal 180) or epoxy for intrior walls and ‫ وﯾﻧﻔذ اﻟﻌﻣل‬،‫( او اﯾﺑوﻛﺳﻲ ﻷرﺿﯾﺔ وﺟدران اﻟﺧزان ﻣن اﻟداﺧل‬180 ‫ﺗورﯾد وﺗﻧﻔﯾذ دھﺎن )ﻣﺎﺳﺗر ﺳﯾل‬
floor of tank, the work must be carried out professionally and the price includes ‫ ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت‬m2 43.00
everything necessary to implement the item, and the work must be done .‫ اﻟﻣﮭﻧدس اﻟﻣﺷرف‬2‫م‬
according to the specifications, drawings, and the directives of the supervising
engineer.
Total amount of Plastering & Painting Works ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﺗﻠﺑﯾس‬

5.5 Metal & Wood Works: : ‫اﻷﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﻧﺟﺎرة‬


5.5.1 Aluminum ladder inside the tank: :‫ﺳﻠم اﻟﻣﻧﯾوم داﺧل اﻟﺧزان‬
Supply and install Aluminum ladder inside the tank, approved type, length fits ‫ ﺑطول ﯾﺗﻧﺎﺳب ﻣﻊ ارﺗﻔﺎع اﻟﺧزان ﻣﻊ اﻟﺗﺛﺑﯾت وﯾﻧﻔذ‬،‫ﺗورﯾد وﺗرﻛﯾب ﺳﻠم ﻣن اﻷﻟﻣﻧﯾوم ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة‬
with hight of tank include well fixing, the work must be carried out professionally ‫ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت‬pcs
and the price includes everything necessary to implement the item, and the work .‫ﻋدد وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 1.00
must be done according to the specifications, drawings, and the directives of the
supervising engineer.
5.5.2 Tank led: :‫ﻏطﺎء ﻟﻠﺧزان‬
Supply and install Steel led of heavy sheet size (0.6*0.6m),with heavy steel ‫ﺳم( ﻣﻊ ﺑرواز ﺟﺎﻓﻲ و‬60×60)‫ﺗورﯾد وﺗرﻛﯾب ﻏطﺎء ﻣن اﻟﺣدﯾد اﻟﺻﺎج اﻟﻣﺣﺑب اﻟﻘوي ) دﺑل ( ﻣﻘﺎس‬
frames and bars, support the frame before concrete casting, install all ‫ﻣدﻋم ﺗﺣت اﻟﺻﺎج ﺑﺣدﯾد ﺟﺎﻓﻲ وﯾرﻛﯾب اﻟﺑرواز ﺣول ﻓﺗﺣﺔ اﻟﺧزان أﺛﻧﺎء اﻟﺻب وﯾﺷﻣل اﻟﺗﺛﺑﯾت‬
belongings excellent quality (hands, joints, lock) include anti-moisture paint, the ‫ واﻟﻣﻔﺻﻼت واﻟدھﺎن اﻟﻣﻘﺎوم ﻟﻠرطوﺑﺔ ﻣﻊ اﻟﻘﻔل وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد‬pcs
1.00
work must be carried out professionally and the price includes everything .‫ﻋدد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
necessary to implement the item, and the work must be done according to the
specifications, drawings, and the directives of the supervising engineer.

Total amount of Metal & Wood Works ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﺧﺷﺑﯾﺔ‬

5.7 Sanitary Works : : ‫اﻻﻋﻣﺎل اﻟﺻﺣﯾﺔ‬


5.7.1 water pump to lift the water from subground tank to upper tanks in roof: :‫دﯾﻧﺎﻣو ﻟرﻓﻊ اﻟﻣﯾﺎه ﻣن اﻟﺧزان اﻻرﺿﻲ اﻟﻰ اﻟﺧزاﻧﺎت ﻓوق اﻟﺳطﺢ‬
Supply and install water pump original quality with lifting capacity not less than ‫ ﻣﺗر ﻟرﻓﻊ اﻟﻣﯾﺎه ﻣن اﻟﺧزان‬30 ‫ﺗورﯾد وﺗرﻛﯾب دﯾﻧﺎﻣو )ﻣﺿﺧﺔ( ﻧوﻋﯾﺔ اﺻﻠﯾﺔ ﺑﻘدرة رﻓﻊ ﻻ ﺗﻘل ﻋن‬
30 meters to raise water from the subground tank to upper tanks in roof, with its ‫ ﻣﻊ اﻟﺷﻔﺎط ﻣﻊ ﺗرﻛﯾﺑﮭﺎ ﻓﻲ اﻟﺻﻧدوق ﺣدﯾدي ﻟﺣﻣﺎﯾﺔ اﻟﻣﺿﺧﺔ ﻣﻊ اﻟﻘﻔل‬،‫اﻟﺳﻔﻠﻲ إﻟﻰ اﻟﺧزاﻧﺎت اﻟﻌﻠوﯾﺔ‬
suction and install it in steel box to protect the pump, with lock and electrical ‫وﻣﻊ ﻣﻔﺗﺎح ﻛﮭرﺑﺎء ﯾﺛﺑت ﻋﻠﻰ اﻟﺟدار وﻣﺣﻣﻲ ﻣن اﻻﻣطﺎر وﻣن ﻋﺑث اﻻطﻔﺎل وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد‬
pcs
switch fixed to the wall and protected from rain and children, all materials must ‫ﺟودة ﻣﻣﺗﺎزة وﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب‬ 1.00
‫ﻋدد‬
be excellent and approved, the work must be carried out professionally and the .‫اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
price includes everything necessary to implement the item, and the work must
be done according to the specifications, drawings, and the directives of the
supervising engineer.
Total amount of sanitary works ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل ﻟﻼﻋﻣﺎل اﻟﺻﺣﯾﺔ‬
Total of water tank work ‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم أﻋﻣﺎل ﺑﻧﺎء ﺧزان ﻣﯾﺎه‬
6 ‫أﻋﻣﺎل ﻣﺗﻔرﻗﺔ داﺧل ﻣدرﺳﺔ اﻟﺻﺎﻟﺢ‬

Various works inside Alsaleh School


6.1 Metal signboard: :‫ﻟوﺣﺔ ﻣﻌدﻧﯾﺔ‬
Supply and install of a metal signboard for the project, a 4-digit model with ‫ ﺧﺎﻧﺎت ﺗﺣﻣل ﺷﻌﺎر اﻟﻣﻧظﻣﺔ واﻟﻣﻣول واﺳم‬4 ‫ﺗورﯾد وﺗرﻛﯾب ﻟوﺣﺔ اﺳﻣﯾﺔ ﻣﻌدﻧﯾﺔ ﻟﻠﻣﺷروع ﻧﻣوذج‬
clarification for the name of the project, name and logo of the organization and ‫ وذﻟك ﺧﻼل ﻣدة اﻗﺻﺎھﺎ اﺳﺑوﻋﯾن ﻣن ﺗﺎرﯾﺦ ﺗﺳﻠﯾم‬،‫ ﺣﺳب اﻟﻧﻣوذج اﻟﺧﺎص ﺑﺎﻟﻣﻧظﻣﺔ‬،‫اﻟﻣﺷروع واﻟﻣوﻗﻊ‬
doner, and the year of implementation, install it within a maximum period of two ‫ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ‬،‫ ﺷﺎﻣل اﻻﻋﻣدة اﻟﻣﻌدﻧﯾﺔ واﻟﺣﻔر واﻟﻘواﻋد واﻟﺗرﻛﯾب‬،‫ اﻟﻣوﻗﻊ‬pcs
weeks from the date of site handover , the price include metal columns, .‫ﻋدد ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 1.00
excavation, bases and installation
the work must be carried out professionally and the price includes everything
necessary to implement the item, and the work must be done according to the
specifications, drawings, and the directives of the supervising engineer.
Total Amount of Seperate Works ‫إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﻣﺗﻔرﻗﺔ‬

Total summation ‫اﻹﺟﻣﺎﻟﻲ اﻟﻌﺎم أﻋﻣﺎل أﺧرى داﺧل اﻟﻣدرﺳﺔ‬

‫اﻹﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻹﻧﺷﺎء و إﻋﺎدة اﻟﺗﺎھﯾل ﻓﻲ ﻣدرﺳﺔ اﻟﺻﺎﻟﺢ‬

7 ‫ اﻹذاﻋﺔ اﻟﻣدرﺳﯾﺔ ﻣدرﺳﺔ اﻟﺻﺎﻟﺢ‬+ ‫أﻋﻣﺎل ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ‬

7.1 School sound loudspeaker system: ‫ ﻛل ﻣﻧظوﻣﺔ ﺗﺗﻛون ﻣن‬،‫ ﻣﻧظوﻣﺔ ﺗﻛﺑﯾر ﺻوﺗﻲ ﻟﻺذاﻋﺔ اﻟﻣدرﺳﯾﺔ ﻧوﻋﯾﺔ ﻣﻣﺗﺎزه‬1 ‫ﺗورﯾد وﺗرﻛﯾب ﻋدد‬
:‫اﻟﺗﺎﻟﻲ‬
7.1.1 Wireless Handheld Microphones for at least 150-250 m with rechargeable batteries ‫ ﻣ ﻋ اﻷﻗﻞ ﻣﻊ ﻄﺎر ﺎت ﻗﺎ ﻠﻪ‬150-250 ‫ ﺟ ﺪ ﺣ‬،‫ ﻋﺪد ﺟﻬﺎز ﻣ ﻜﺮوﻓﻮن ﻻﺳﻠ ﻣﺤﻤﻮل ﺎﻟ ﺪ‬pcs 1.00
‫ﻋدد ﻟﻠﺸﺤﻦ‬
7.1.2 Speakers (trumpet / conical shape) weather resistant 16 inch diameter ‫ ﻫ ﺶ‬16 ‫( ﻣﻘﺎوم ﻟﻠﻄﻘﺲ ﻗﻄﺮ‬ ‫ﺷ ﻞ ﻣﺨﺮو‬/ ‫ ﻋﺪد ﺳﻤﺎﻋﺔ ﻣﻜ اﻟﺼﻮت )ﺑﻮق‬pcs 2.00
‫ﻋدد‬
7.1.3 Audio amplifier (mixer) able to operate the components of system at same time, able to ‫ ﻤﻜﻦ ﺸﻐ ﻠﺔ ﻣﻦ‬،‫ﻧﻔﺲ اﻟﻮﻗﺖ‬ ‫ ﻋﺪد ﻣﻀﺨﻢ ﺻﻮ )ﺧﻼط(ﻗﺎدر ﻋ ﺸﻐ ﻞ ﻣﻜﻮﻧﺎت اﻟﻤﻨﻈﻮﻣﺔ‬pcs 1.00
work from battery 12V. ‫ ﻓﻮﻟﺖ‬12 ‫ﻋدد ﻄﺎر ﺔ‬
(It is preferable that the device be able to operate from the solar system, either by 12- ‫ ﻓﻮﻟﺖ او ﻨﻈﺎم‬12 ‫) ﻔﻀﻞ ان ﻜﻮن اﻟﺠﻬﺎز ﻗﺎدر ﻋ اﻟﻌﻤﻞ ﻣﻦ اﻟﻤﻨﻈﻮﻣﺔ اﻟﺸﻤﺴ ﺔ اﻣﺎ ﺑﻨﻈﺎم‬
volt system or by 220-volt system together) (‫ﻓﻮﻟﺖ ﻣﻌﺎ‬220
7.1.4 With cable rolls wire (The length of the roll is 70 metres) and necessary accessories ‫اﻟﻤﺪارس‬ ‫ ﻣ (ﻣﻊ اﻟﺘﻮاﺑﻊ اﻟﻼزﻣﺔ ﻟ ﺸﻐ ﻞ اﻟﻤﻨﻀﻮﻣﺔ‬70 ‫ ﺗﻮر ﺪ ﻋﺪد ﻟﻔﻪ ﺎ ﻼت )ﻃﻮل اﻟﻠﻔﺔ‬Roll 1.00
needs to operate the system in schools ‫ﻟﻔﺔ‬

Total Amount of Loudspeaker system ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻹذاﻋﺔ اﻟﻣدرﺳﯾﺔ‬


7.2 Supply and install 1 excellent quality school solar system, each system :‫ ﻛل ﻣﻧظوﻣﺔ ﺗﺗﻛون ﻣن اﻟﺗﺎﻟﻲ‬،‫ ﻣﻧظوﻣﺔ طﺎﻗﺔ ﺷﻣﺳﯾﺔ ﻣدرﺳﯾﺔ ﻧوﻋﯾﺔ ﻣﻣﺗﺎزه‬1 ‫ﺗورﯾد وﺗرﻛﯾب ﻋدد‬
contains the following:
Notes : ‫ـ‬:‫ﻣﻼﺣظﺎت‬
- All materials and accessories must be of the highest quality and conform to international .‫ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد واﻷدوات ﻣن أﺟود اﻷﻧواع وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﻘﯾﺎﺳﯾﺔ اﻟﻌﺎﻟﻣﯾﺔ‬-
standards.
‫ ﺟﻣﯾﻊ ﺑﻧود اﻷﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ ﺷﺎﻣﻠﺔ ﺗورﯾد اﻟﻣواد واﻟﺗرﻛﯾب واﻟﺗﺟرﺑﺔ واﻟﺗﺷﻐﯾل وان ﺗﻛون اﻟﺗﻣدﯾدات‬-
- All electrical work items will include supply of materials, installation, testing and commission.
Internal wiring for all networks shall be concealed inside plastic conduits of PVC type, ‫ وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ‬PVC ‫داﺧﻠﯾﺔ ﻣﺧﻔﯾﺔ ﻟﺟﻣﯾﻊ اﻟﺷﺑﻛﺎت داﺧل ﻣواﺳﯾر ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣن ﻧوع‬
conforming to British specifications BS-4607 and shall have electrical insulation resistance of ‫ ﯾﺟب اﺳﺗﻌﻣﺎل ﻣواﺳﯾر‬. ‫ ﻣﯾﺟﺎ أوم‬100 ‫ وأن ﺗﻛون ﻣﻘﺎوﻣﺔ اﻟﻌزل اﻟﻛﮭرﺑﻲ ﺑﮭﺎ أﻛﺛر ﻣن‬BS-4607
more than 100 Mega ohm. ‫ﺳم وﺗﺳﺗﻌﻣل اﻟﻣواﺳﯾر اﻟﻣﻌدﻧﯾﺔ اﻟﻣرﻧﺔ ﻟﺣﻣﺎﯾﺔ اﻷﺳﻼك‬20 ‫ﻣﺳﺗﻘﻠﺔ ﻟﻛل داﺋرة ﻛﮭرﺑﺎﺋﯾﺔ ﺑﻘطر ﻻ ﯾﻘل ﻋن‬
Independent conduits for each electric circuit shall be used with a diameter not less than 20 ‫واﻟﻛواﺑل اﻟﻣﺗﺣرﻛﺔ او اﻟﻣﻌرﺿﺔ ﻟﻠﺗﺣرﯾك ﻣﺛل ﺗوﺻﯾﻼت اﻷﺟﮭزة واﻟﻣوﺗورات وﻋﻧد ﻓواﺻل اﻟﺗﻣدد‬
cm. Flexible metal conduits shall be used to protect wires and movable cables, such as ‫ وﻻ ﯾﺳﻣﺢ ﺑﺎﻟﺗﻣدﯾدات اﻟظﺎھرة وأي ﺧطﺎء ﻓﻲ اﻟﺗﻣدﯾدات ﯾﺗﺣﻣل اﻟﻣﻘﺎول إﻋﺎدة اﻟﻌﻣل‬,.‫ﻟﻠﻣﺑﻧﻰ إن وﺟدت‬
connections of devices and motors and at the expansion joints of the building, if any. No
‫ ﻛﻣﺎ ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات ﻟﻛل ﺷﺑﻛﺔ ﻣﺳﺗﻘﻠﺔ ﻋن اﻷﺧرى ) ﺷﺑﻛﺔ اﻹﻧﺎرة اﻟﻛﮭرﺑﺎﺋﯾﺔ‬. ‫ﺑﺎﻟﺷﻛل اﻟﺳﻠﯾم‬
visible wiring is accepted , The contractor will bear responsibly of any mistakes in the
installation and shall re-install them properly . The wiring for each network must be ( ‫ﺗﻠﻔزﯾون وﻏﯾرھﺎ‬، ‫ ﺣرﯾﻖ‬،‫ﻛﻣﺑﯾوﺗر‬، _ ‫ ﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر‬- ‫ ﺷﺑﻛﺔ اﻟﺗﻠﻔون‬- ‫ ﺷﺑﻛﺔ اﻟﻣﺄﺧذ اﻟﻛﮭرﺑﺎﺋﯾﺔ‬-
independent of each other (Electrical lighting network, electrical sockets network, telephone ‫ ﻛﻣﺎ ﯾﺟب ﻣراﻋﺎة وﺟود ﻣﺳﺎﻓﺔ ﻻ ﺗﻘل ﻋن‬, ‫وﻻ ﯾﺳﻣﺢ اﻟﺧﻠط ﺑﯾﻧﮭﺎ ﻓﻲ اﻟﻣواﺳﯾر أو اﻟﻘﺳﺎﻣﺎت واﻟﻌﻠب‬
network, computer network, fire, television, etc.). They are not allowed to be mixed in . ‫ﺳم ﺑﯾن ﺷﺑﻛﺔ اﻟﻛﮭرﺑﺎء وﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر واﻟﺗﻠﻔون‬40
conduits , partitions or boxes. A minimum distance of 40 cm should be considered between ‫ ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ اﻟداﺋرﯾﺔ واﻟﻣرﺑﻌﺔ واﻟﻣﺳﺗﺧدﻣﺔ ﻟﻠﻣﻔﺎﺗﯾﺢ ﻣﺻﻧوﻋﺔ ﻣن اﻟﺑﻼﺳﺗﯾك اﻟﺟﯾد واﻟﻣﻘﺎوم‬-
the power network and the computer and telephone networks. - The circular and squared ‫ ﻋﻠﻰ أن ﯾﻛون ﻟﮭﺎ أﻏطﯾﺔ ﺧﺎﺻﺔ‬BS-4662 ، VDE-3676 ‫ﻟﻠﺣرﯾﻖ وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ‬
assembly boxes used for the switches shall be made of good plastic, Fire resistant and ‫ﺗﻣﻧﻊ ﺗﺳرب اﻟرطوﺑﺔ واﻟﺣﺷرات ﻟﮭﺎ و ﯾﺟب أن ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ ﻣﺻﻧﻌﺔ ﻣن ﻧﻔس اﻟﻣﺻﻧﻊ اﻟﻣﺻﻧﻊ‬
comply with the British specifications BS4662, VDE-3676 and shall have special covers to
prevent penetration of moisture and insects. Those boxes will be made by the same factory
,IEC 60889) ‫ﻟﻣواﺳﯾر اﻟﻛﮭرﺑﺎء ﻛﻣﺎ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣﺂﺧذ ﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺗﺎﻟﯾﺔ‬
which manufactured the electrical pipes, All sockets shall comply with (IEC 60889, 60309) (60309
specifications.
- The contractor must submit the drawings which illustrate all electrical installations , path of
pipes , places of the circuit breakers and electrical boards before starting any work for
approval by the Engineer

7.2.1 Integrated grounding unit for lightning rods: L.S: Supply, implementation and testing of ‫ ﺗﻮر ﺪ وﺗﻨﻔ ﺬ واﺧﺘ ﺎر وﺣﺪة ﺗﺄر ﺾ ﻣﺘ ﺎﻣﻠﺔ‬:‫ ﺎﻟﻌﺪد‬:‫وﺣﺪة ﺗﺄر ﺾ ﻣﺘ ﺎﻣﻠﺔ ﻟﻤﺎﻧﻌﺎت اﻟﺼﻮاﻋﻖ‬
an integrated grounding unit for lightning rods, which includes excavation and ‫م وﺗﺮﻛ ﺐ اﺛﻨ أﺳ ﺎخ‬2 ‫م و ﻌﻤﻖ‬1.5×1.5 ‫ﻟﻤﺎﻧﻌﺎت اﻟﺼﻮاﻋﻖ و ﺸﻤﻞ أﻋﻤﺎل اﻟﺤﻔﺮ واﻟﺮدم ﻤﺴﺎﺣﺔ‬
backfilling with an area of 1.5 x 1.5 m and a depth of 2 m, installing two 120 cm long ‫ﺳﻢ ﻋ ﺻﻔﺎﺋﺢ ﻧﺤﺎﺳ ﺔ واﻟﺪﻓﻦ ﺣﻮﻟﻬﺎ ﻣﻊ اﻟﻔﺤﻢ واﻟﻤﻠﺢ واﻟﺘﻮﺻ ﻞ ﺑ‬120 ‫ﻣﻦ اﻟﻨﺤﺎس ﻄﻮل‬
copper skewers on copper plates, burying around them with coal and salt, connecting ‫ﺳﻢ وﻣﻦ ﺛﻢ‬30×30 ‫ ﺎﻟ ﻠﻴ ﺎت اﻟﺨﺎﺻﺔ وﺗﻮﺻ ﻠﻬﺎ إ ﻏﺮﻓﺔ ﺗﻔﺘ ﺶ‬2‫ﻣﻢ‬35 ‫اﻷﺳ ﺎخ ﺴﻠﻚ ﻣﻜﺸﻮف‬
the skewers with open wire 35 mm 2 with special clips and connecting them to an ‫اﻟﺘﻮﺻ ﻞ إ ﺑ ﺎر ﻧﺤﺎس ﻣﻊ اﻟﻠﺤﺎم واﻟﻌﺰل ﺤﺴﺐ اﻟﻤﺨﻄﻄﺎت وﻣﻦ ﺛﻢ ﺗﻮر ﺪ وﺗﻤﺪ ﺪ ﻂ‬
inspection room 30 x 30 cm, and then connect to a copper pipe with welding and ‫ ﻣﻊ ﺟﻤﻴﻊ ﻣﺎ‬. ‫ﺳﻢ ﻣﻜﺘﻮب ﻋﻠ ﺔ ﻋ ﺎرات ﺗﺤﺬﻳ ﺔ ﻗ ﻞ اﻟﺮدم‬15 ‫ ﺗﺤﺬﻳﺮ ﻣﻦ اﻟ ﻼﺳ ﻚ اﻷﺻﻔﺮ ﻋﺮض‬pcs
1
insulation according to the plans, and then supplying and extending a yellow plastic ‫ﻋدد ﻠﺰم ﻹﻧﻬﺎء اﻟﺒﻨﺪ ﻣﻦ ﺗﻜﺴ و ﻋﺎدة ﺤﺴﺐ اﻟﻤﺨﻄﻄﺎت وﺗﻌﻠ ﻤﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف ﻣﻊ ﻋﺮض‬
warning tape, 15 cm wide, with warning phrases written on it before backfilling. With ‫ ﻣﻊ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﻹﻧﻬﺎء اﻟﻌﻤﻞ‬. ‫ﻋﻴﻨﺔ ﻣﻦ ﺟﻤﻴﻊ اﻟﻤﻮاد ﻗ ﻞ اﻟ ﻛ ﺐ ﻋ اﻟﻤﻬﻨﺪس ﻟﻠﻤﻮاﻓﻘﺔ ﻋﻠﻴﻬﺎ‬
all that is necessary to finish the item of crushing and recycling according to the plans .‫ﻣﻊ ﻋﻤﻞ ﻣﺄﺧﺬ ﻓﺤﺺ اﻟﻨﻮازل ﻋ ارﺗﻔﺎع ﻣ ﻦ ﻣﻦ ﺳﻄﺢ اﻷرض‬.IEC 60364 . ‫وﻓﻖ اﻟ ﻮد اﻟﻘ ﺎ‬
and instructions of the supervising engineer, with the presentation of a sample of all
materials before installation to the engineer for approval. With everything needed to
finish the work according to the standard code. IEC 60364. With the upstream socket
working at a height of two meters from the ground.
7.2.2 Metal structure of Holder for solar panels : :‫ﻫ ﻞ ﻣﻌﺪ ﺣﺎﻣﻞ ﻟﻸﻟﻮاح اﻟﺸﻤﺴ ﺔ‬
lump sum: the supply and installation of a fixed metal structure that must meet the ‫ﺗﻮر ﺪ وﺗﺮﻛ ﺐ ﻫ ﻞ ﻣﻌﺪ ﺛﺎ ﺖ ﺠﺐ أن ﺗﺘﻮﻓﺮ ﻓﻴﻬﺎ اﻻﺷ اﻃﺎت اﻟﺘﺎﻟ ﺔ‬:‫ﺎﻟﻤﻘﻄﻮﻋ ﺔ‬
following requirements :- ‫ ﺗﺮﺗ ﻂ وﺗﻠﺤﻢ ﻣﻊ ﺣﺎﻣﻞ‬،‫ﻣﻢ‬2 ‫ﻫ ﺶ وﺳﻤﺎ ﺔ‬2 ‫ اﻟﻬ ﻞ ﻳﺘﻜﻮن ﻣﻦ اﻋﻤﺪە ﺣﺪ ﺪ ﻪ ﺷﻠﻤﺎن ﺄ ﻌﺎد‬-
- The structure consists of Schulman iron columns with dimensions of 2 inches and ‫ﻣﻠﻢ وان ﺗﻜﻮن ﻘﻮە ﺗﺤﻤﻞ ﺎﻓ ﺔ ﻟﺤﻤﻞ اﻷﻟﻮاح‬1.80 ‫ﻫ ﺶ وﺳﻤﺎ ﺔ‬1.50 ‫اﻷﻟﻮاح ﺣﺪ ﺪ ﺷﻠﻤﺎن ﺄ ﻌﺎد‬
thickness of 2 mm. They are connected and welded to the Schlman iron plate holder ‫ﻣﻢ ﺗ ﺖ ﻧﻬﺎ ﺔ اﻷﻋﻤﺪة‬2 ‫ﻫ ﺶ ﺴﻤﺎ ﺔ‬2 ‫وﺗﺤﻤﻞ ﺷﺪة اﻟ ﺎح اﻟﻌﺎﺗ ﺔ ﻣﻊ ﻋﻤﻞ ﻗﻮاﻋﺪ ﻣﻌﺪﻧ ﻪ ﺷﻠﻤﺎن‬
with dimensions of 1.50 inches and thickness of 1.80 mm and to be of sufficient bearing .‫اﻻﺳﻔﻞ‬
strength to carry the panels and withstand the intensity of high winds with the work of ‫درﺟﺔ واﻟﻬ ﺎ ﻞ ﻜﻮن ﻣﺼﻨ ع ﻣﻦ اﻟﺤﺪ ﺪ اﻟﻤﻄﺎوع اﻟﻤﻄ ﻤﺎدة‬20‫ ﻳﺘﻢ ﺗ ﺒ ﺖ اﻻﻟﻮاح ﻋ زوا ﺔ‬-
Schulman metal bases 2 inches with a thickness of 2 mm that fix the end of the columns ‫ ﺛﻢ اﻟﻄﻼء ﺎﻟﻠﻮن اﻟﻤﻄﻠﻮب‬.(‫ ﻣﻘﺎوﻣﺔ ﻟﻠﺼﺪاء )ﺑ ﻤﺮ‬Lum
at the bottom. ‫ﺠﺐ أن ﺗﺼﻤﻢ اﻟﻬ ﻞ اﻟﻤﻌﺪ اﻟﺤﺎﻣﻞ ﺤ ﺚ ﺴﻤﺢ ﺎﺳ ﺪال اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ ﺴﻬﻮﻟﻪ وﻛﺬ ا‬- 1
Sum
- The panels are installed at an angle of 20 degrees and the structures are made of .‫ﻟ ﺴﻬ ﻞ ﻋﻤﻠ ﻪ اﻟﺘﻨﻈ ﻒ وﻏﺴﻞ اﻻﻟﻮاح اﻟﺸﻤﺴ ﺔ‬
wrought iron coated with a rust-resistant material (primer). Then paint in the desired ‫ﻟﺘﺄﻣ اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ ﻳ ﺖ ﻗﻔﻞ ﻳ ﻂ ﺑ اﻟﻔﺘﺤﺔ اﻟﺨﻠﻔ ﺔ ﻟﻠ ح اﻟﺸﻤ واﻟﻘﺎﻋﺪة‬-
color ‫واﻟﺜﻤﻦ ﺸﻤﻞ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﺤﺴﺐ اﻟﻤﺨﻄﻄﺎت واﻟﺮﺳﻮﻣﺎت اﻟﺘﻔﺼ ﻠ ﺔ اﻟﻤﺮﻓﻘﺔ وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس‬
- The carrier steel structure must be designed to allow easy replacement of the solar ‫اﻟﻤ ف‬
panels, as well as to facilitate the process of cleaning and washing the solar panels.
- Secure the solar panels, a lock is installed between the back opening of the solar panel
and the base,The price includes all that is needed according to the attached detailed
plans and drawings and the directions of the supervising engineer
"Note ‫ﻣﻼﺣﻈﺔ‬
: 1. Solar panels ‫ اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ‬.1
1.1.The concept of solar panel A solar cell made of semiconductor materials such as ‫ﻣﻔﻬﻮم اﻟﻠ ح اﻟﺸﻤ‬.1.1
silicon is the main component of a solar panel. Many solar cells are connected to . ‫اﻟﻠ ح اﻟﺸﻤ‬ ‫ﺗﻌﺘ اﻟﺨﻠ ﺔ اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻌﺔ ﻣﻦ ﻣﻮاد ﺷ ﺔ ﻣﻮﺻﻠﺔ ﺎﻟﺴﻠ ﻜﻮن اﻟﻤﻜﻮن اﻷﺳﺎ‬
metallic busbars to form an array of cells known as the solar panel. ‫ﺣ ﺚ ﻳﺘﻢ ﺗﻮﺻ ﻞ اﻟﻌﺪ ﺪ ﻣﻦ اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ ﺨﻄﻮط ﺗﻮﺻ ﻞ ﻣﻌﺪﻧ ﺔ )اﻟ ﺎﺳ ﺎر( ﻟ ﺸ ﻞ ﻣﺼﻔﻮﻓﺔ‬
1.2.Types of solar panels made of crystalline silicon . ‫ﻣﻦ اﻟﺨﻼ ﺎ ﺗﻌﺮف ﺎﻟﻠ ح اﻟﺸﻤ‬
Solar panels made of crystalline silicon cells are divided into two main types: ‫أﻧﻮاع اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﻣﺎدة اﻟﺴﻠ ﻜﻮن اﻟﻤﺘ ﻠﻮر ﺗﻨﻘﺴﻢ اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ‬.1.2
1. Mono-crystalline: It consists of monocrystalline cells (containing crystals of the same :‫اﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﺧﻼ ﺎ اﻟﺴﻠ ﻜﻮن اﻟﻤﺘ ﻠﻮر إ ﻧﻮﻋ رﺋ ﺴ ﻫﻤﺎ‬
shape and dimensions and having the same optical and physical properties). ‫ ﺗﺘﻜﻮن ﻣﻦ ﺧﻼ ﺎ أﺣﺎد ﺔ اﻟﺘ ﻠﻮر )ﺗﺤﺘﻮي ﻋ ﻠﻮرات ﻣﺘﻤﺎﺛﻠﺔ‬:(Mono-crystalline) ‫أﺣﺎد ﺔ اﻟﺘ ﻠﻮر‬.1
2. Poly-crystalline: It consists of polycrystalline cells (containing crystals of different .(‫ﺔ واﻟﻔ ﺎﺋ ﺔ‬ ‫اﻟﺸ ﻞ واﻹ ﻌﺎد وﺗﻤﺘﻠﻚ ﻧﻔﺲ اﻟﺨﺼﺎﺋﺺ اﻟ‬
shapes and dimensions, and differing in optical and physical properties). ‫ ﺗﺘﻜﻮن ﻣﻦ ﺧﻼ ﺎ ﻣﺘﻌﺪدة اﻟﺘ ﻠﻮر )ﺗﺤﺘﻮي ﻋ ﻠﻮرات ﻣﺨﺘﻠﻔﺔ‬:(Poly-crystalline) ‫ﻣﺘﻌﺪدة اﻟﺘ ﻠﻮر‬.2
1.3.Components of solar panels made of silicon cells. .(‫ﺔ واﻟﻔ ﺎﺋ ﺔ‬ ‫اﻟﺨﺼﺎﺋﺺ اﻟ‬ ‫اﻟﺸ ﻞ واﻹ ﻌﺎد وﺗﺘﻔﺎوت‬
Solar panels: It is a number of solar cells connected in series to obtain the total voltage .‫ﻣﻜﻮﻧﺎت اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﺧﻼ ﺎ اﻟﺴﻠ ﻜﻮن‬.1.3
required for the panel, and is equal to the sum of the voltages for each solar cell, but ‫ ﻋ ﺎرة ﻋﻦ ﻋﺪد ﻣﻦ اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ اﻟﻤﻮﺻﻠﺔ ﻋ اﻟﺘﻮا ﻟﻠﺤﺼﻮل ﻋ اﻟﺠﻬﺪ‬: ‫اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ‬
the total current of the panel is equal to the current of the solar cell since the cells ‫ وﻟ ﻦ اﻟﺘ ﺎر اﻟ ﻟﻠ ح ﺴﺎوي ﻧﻔﺲ‬،‫ و ﺴﺎوي ﻣﺠﻤ ع اﻟﺠﻬﻮد ﻟ ﻞ ﺧﻠ ﺔ ﺷﻤﺴ ﺔ‬،‫اﻟ اﻟﻤﻄﻠﻮب ﻟﻠ ح‬
straight connected ‫ﺗ ﺎر اﻟﺨﻠ ﺔ اﻟﺸﻤﺴ ﺔ ﻤﺎ أن اﻟﺨﻼ ﺎ ﻣﻮﺻﻠﺔ ﻋ اﻟﺘﻮا‬
1. It is required that the minimum power that can be obtained from a single panel ‫ﻤﻜﻦ اﻟﺤﺼﻮل ﻋﻠﻴﻬﺎ ﻣﻦ اﻟﻠ ح اﻟﻮاﺣﺪ ﺗﺤﺖ ﻇﺮوف اﻟﻔﺤﺺ‬ ‫ﺸ ط أن ﺗﻜﻮن اﻟﻄﺎﻗﺔ اﻟﺪﻧ ﺎ اﻟ‬.1
under the standard test conditions is not less than the capacity of the panel. .‫اﻟﻤﻌ ﺎري ﺤ ﺚ ﻻ ﺗﻘﻞ ﻋﻦ ﻗﺪرة اﻟﻠ ح‬
2. The minimum efficiency of solar panels should not be less than 16% under standard .‫ﯾﺷﺗرط أن ﯾﻛون اﻟوﺟﮫ اﻷﻣﺎﻣﻲ ﻟﻠﺧﻼﯾﺎ اﻟﺷﻣﺳﯾﺔ ﻣﻘﺎوﻣﺎ ً ﻷﺛر اﻟﺻدﻣﺎت‬.18
measurement conditions. ‫ﻛل إطﺎر ﻟوح ﺿوﺋﻲ ﯾﺟب أن ﯾﺟﮭز ﺑﺻﻧدوق ﻗﺎﺑل ﻟﻠﻔﺗﺢ ﻟوﺻل أو اﺳﺗﺑدال اﻟﻛﯾﺑﻼت ﻋﻧد اﻟﻠزوم وﻣﻧﮫ ﯾؤﺧذ ﻣﺧرج اﻟﻠوح‬.19
3. It is required that the frame of the panel be made of aluminum and be compatible with the ‫ وﯾﺣﺗوي ﻋﻠﻰ ﻓﯾوزات‬،‫ ھذا اﻟﺻﻧدوق ﯾﺟب أن ﯾﻛون ﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ أو ﻣﺎ ﯾﻌﺎدﻟﮭﺎ وﯾﺗﺣﻣل اﻟﻌواﻣل اﻟﺟوﯾﺔ‬،‫اﻟﺿوﺋﻲ‬
material of the props. .‫اﻟﺣﻣﺎﯾﺔ ﻣن اﻟﺷورت اﻟﻛﮭرﺑﺎﺋﻲ واﻟﺗﯾﺎر اﻟﻌﻛﺳﻲ‬
4. The panels operating system 24V. .‫م‬2020 ‫ﺳﻧﺔ ﺗﺻﻧﯾﻊ اﻟﺧﻼﯾﺎ اﻟﺷﻣﺳﯾﺔ واﻷﻟواح ﯾﺟب أﻻ ﺗﻛون ﻗﺑل‬.20
:‫ﻛل اﻟﻣﻌﻠوﻣﺎت اﻟﺗﺎﻟﯾﺔ ﯾﺟب أن ﺗﻛون ﻣﻧﺣوﺗﺔ ﻋﻠﻰ ﻛل ﻟوح ﺷﻣﺳﻲ ﺑطرﯾﻘﺔ ﻏﯾر ﻗﺎﺑﻠﺔ ﻟﻠﻣﺣﻲ‬.21
5. 12 V . operating system panels
.‫اﺳم اﻟﺟﮭﺔ اﻟﻣﺻﻧﻌﺔ‬.a
6.Application Class A panels (free from workmanship defects).
.‫اﻟرﻗم اﻟﺗﺳﻠﺳﻠﻲ ﻟﻠوح ورﻗم ﻣودﯾﻠﮫ‬.b
7. The fill factor must not be less than 75%. .‫ﺷﮭر وﺳﻧﺔ اﻟﺗﺻﻧﯾﻊ‬.c
8. Internal diodes designed to prevent reverse currents. .‫ﻣﻧﺣﻧﻰ اﻟﺗﯾﺎر واﻟﻔوﻟﺗﯾﺔ‬.d
9. Approved standard system IEC-61215 or IEC-61730. .(Peak Wattage) ‫اﻟواﺗﯾﺔ اﻟﻘﺻوى‬.e
10. To have passed the IEC-61730 safety test, Parts 1 and 2, successfully. .(Im, Vm and FF) ‫اﻟﺗﯾﺎر اﻷﻋظﻣﻲ واﻟﺟﮭد اﻷﻋظﻣﻲ وﻣﻌﺎﻣل اﻟﻣﻠﺊ‬.f
11. The short circuit current is 8.5 amperes. .‫ﺑﻠد اﻟﻣﻧﺷﺄ‬.g
13. The maximum power voltage is 29 volts. .‫ﺿﻣﺎن ﺟودة اﻷﻟواح اﻟﺷﻣﺳﯾﺔ ﻻ ﺗﻘل ﻋن ﺳﻧﺔ‬.22
14. The return of the collector is 15%. .‫ ﺳﺎﻋﺔ‬/‫ ﻛم‬120 ‫ﻗواﻋد ﺗﺛﺑﯾت اﻟﻠواﻗط ﻣﻐﻠﻔﻧﺔ وﺗﺗﺣﻣل ﺳرﻋﺔ رﯾﺎح‬.23
15. The degree of protection is 66 IP. .‫ ﺳﻧﺔ‬25 ‫ ﻟﻣدة‬%80 + %30 ‫ إﻟﻰ‬0 ‫ ﻣن ﺳﻣﺎﺣﯾﺔ ﻗدر ة اﻟﺧروج ﻣن‬%90 ‫ﺿﻣﺎن اﻷداء ﻻ ﯾﻘل ﻋن‬.24
16. 1X4mm2 galvanized copper wires, red for the positive and black for the negative. :‫ﻋﻧد ﺗرﻛﯾب اﻷﻟواح اﻟﺷﻣﺳﯾﺔ ﯾﺟب اﻟﺗﺄﻛد ﻣن ﺧﻣﺳﺔ ﻋواﻣل أﺳﺎﺳﯾﺔ ﺗﺿﻣن أداء اﻷﻟواح اﻟﺷﻣﺳﯾﺔ ﺑﻔﻌﺎﻟﯾﺔ وﻛﻔﺎءة ﻋﺎﻟﯾﺔ‬.25
17. The performance of the panels is guaranteed for 25 years, so that the percentage of .‫ وﺟود ظﻼل ﻟﻌواﺋﻖ وإن ﻛﺎﻧت ﺻﻐﯾرة ﻣﺛل أﻋﻣدة اﻟﺧرﺳﺎﻧﺔ اﻟﻣﻌدﻧﯾﺔ ﺗﻘﻠل ﻛﺛﯾرا ﻣن ﻗدرة اﻟﻠوح اﻹﻧﺗﺎﺟﯾﺔ‬:‫اﻟﺗظﻠﯾل اﻟﺟزﺋﻲ أو اﻟﻛﻠﻲ‬.‫أ‬
‫ ﺗﻌﺗﺑر اﻟﯾﻣن ﻣن اﻟﺑﻠدان اﻟواﻗﻌﺔ ﻓﻲ ﻧﺻف اﻟﻛرة اﻟﺷﻣﺎﻟﯾﺔ ﻟﻸرض وﯾﻌﺗﻣد ﻧوع اﻟﺗﺛﺑﯾت ﻋﻠﻰ ﻣدى وإﻣﻛﺎﻧﯾﺔ‬:‫ﺗوﺟﯾﮫ وﻣﯾﻼن اﻷﻟواح‬.‫ب‬
performance decrease is not less than 20% after 25 years and 10 years for any technical
‫ﺗوﺟﯾﮫ وﻣﯾﻼن اﻷﻟواح‬
defect.
‫ ﻗد ﺗﺿﻣن زﯾﺎدة ﻓﻲ ﻣﺗوﺳط ﻋدد ﺳﺎﻋﺎت اﻹﺷﻌﺎع اﻟﺷﻣﺳﻲ ﺑﻧﺳﺑﺔ ﺗﺻل إﻟﻰ‬:‫ أو ﻗواﻋد ﻣزودة ﺑﻣﺗﺗﺑﻊ ﻷﺷﻌﺔ اﻟﺷﻣس‬،‫ﻗواﻋد ﻣرﻧﺔ‬.‫ج‬
A. (The decrease in the efficiency of electric power production does not exceed 10% after 10
.‫ ﻋن ﻣﺗوﺳط ﻋدد ﺳﺎﻋﺎت اﻹﺷﻌﺎع اﻟﺷﻣﺳﻲ ﻟﻠﻘواﻋد اﻟﻣﺛﺑﺗﺔ‬25%
years and 20% after 25 years and the date of commercial operation). ‫ وﻋﻠﻰ‬،‫ واﻟﺗوﺻﯾل ﻋﻠﻰ اﻟﺗوازي ﻟﻐرض زﯾﺎدة اﻟﺗﯾﺎر‬،‫ ﯾﺗم ﺗوﺻﯾل اﻷﻟواح ﻋﻠﻰ اﻟﺗواﻟﻲ ﻟﻐرض زﯾﺎدة ﻓرق اﻟﺟﮭد‬:‫ﺗوﺻﯾل اﻷﻟواح‬.‫د‬
.(PV Array) ‫اﻟﺗواﻟﻲ واﻟﺗوازي ﻟﺗﻌرف ﻣﺟﻣوﻋﺔ اﻷﻟواح ﺑﻣﺻﻔوﻓﺔ اﻷﻟواح‬

7.2.3 solar panels 300 watt multi-cell 24V system: :24V ‫وات ﻣﺘﻌﺪد اﻟﺨﻼ ﺎ ﻧﻈﺎم‬300‫اﻟﻮاح ﻃﺎﻗﺔ ﺷﻤﺴ ﺔ ﻗﺪرة‬
Number: Supplying and installing high quality solar panels and capturing solar energy ‫وات‬300‫ ﺗﻮر ﺪ وﺗﺮﻛ ﺐ اﻟﻮاح ﺷﻤﺴ ﺔ ﻋﺎﻟ ﺔ اﻟﺠﻮدة واﻻﻟﺘﻘﺎط ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴ ﺔ ﻗﺪرة‬:‫ﺎﻟﻌﺪد‬
with a capacity of 300 watts and with the following specifications: ‫ ﺠﺐ أن ﻜﻮن اﻟﻠ ح ﻣﺼﻨ ع ﻣﻦ اﻟﺴﻠ ﻜﻮن اﻟﻤﺘ ﻠﻮر ﻣﺘﻌﺪد اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ‬- :‫و ﺎﻟﻤﻮاﺻﻔﺎت اﻟﺘﺎﻟ ﻪ‬
The panel shall be made of polycrystalline silicon solar cells. (Poly crystalline silicon solar cells )
- The minimum power that can be obtained from a single panel under standard test ‫ﻤﻜﻦ اﻟﺤﺼﻮل ﻋﻠﻴﻬﺎ ﻣﻦ اﻟﻠ ح اﻟﻮاﺣﺪ ﺗﺤﺖ ﻇﺮوف اﻟﻔﺤﺺ اﻟﻤﻌ ﺎر ﺔ ﺠﺐ اﻻ‬ ‫اﻟﻄﺎﻗﺔ اﻟﺪﻧ ﺎ اﻟ‬-
conditions should not be less than 300 watts ‫وات‬300 ‫ﺗﻘﻞ ﻋﻦ‬
Operating system 24V 24V ‫ﻧﻈﺎم اﻟ ﺸﻐ ﻞ‬-
- To be in conformity with international standards - IEC61215,IEC 61730 IEC61215,IEC 61730 - ‫ أن ﻜﻮن ﻣﻄﺎﺑﻖ ﻟﻠﻤﻮاﺻﻔﺎت اﻟﻌﺎﻟﻤ ﺔ‬-
Have successfully passed the IEC61730 Part One and Part Two safety examination or its ‫اﻟﺠﺰﺋﻴ اﻷول واﻟﺜﺎ أو ﻣﺎ ﻌﺎدﻟﻬﻤﺎ ﺑﻨﺠﺎح‬ IEC61730 ‫ أن ﻜﻮن ﻗﺪ اﺟﺘﺎزت ﻓﺤﺺ اﻷﻣﺎن‬-
equivalent ‫ ﺧﺎﻟ ﻪ ﻣﻦ اﻟﻌﻴﻮب اﻟﻤﺼﻨﻌ ﺔ‬،Application Class A ‫ ﻧﻮﻋ ﻪ اﻟﻠ ح ﻣﻦ اﻟﻨ ع‬-
Application Class A board type, free from workmanship defects .Standard Test Conditions: Air mass 1.5; Irradiance = 1000W/m2; cell temp -
pcs
- Standard Test Conditions: Air mass 1.5; Irradiance = 1000W/m2; cell temp. 25°C 25°C 4
‫ﻋدد‬
Open circuit voltage not less than 38.5V 38.5V ‫ ﺗﻮﺗﺮ اﻟﺪارة اﻟﻤﻔﺘﻮﺣﺔ ﻻ ﻘﻞ ﻋﻦ‬-
Short circuit current? 10A 10A ? ‫ ﺗ ﺎر اﻟﺪارة اﻟﻘﺼ ة‬-
Maximum power current: 8.5 amps ‫ أﻣﺒ‬8.5 ? : ‫ ﺗ ﺎر اﻟﻄﺎﻗﺔ اﻷﻋﻈ‬-
Maximum power potential: ? 29 volts ‫ ﻓﻮﻟﺖ‬29 ? : ‫ ﺟﻬﺪ اﻟﻄﺎﻗﺔ اﻷﻋﻈ‬-
Receiver yield? 15th % % 15 ? ‫ ﻣﺮدود اﻟﻼﻗﻂ‬-
Built-in diodes designed to prevent reverse currents ‫ دﻳﻮدات داﺧﻠ ﺔ ﻣﻦ ﺗﺼﻤ ﻢ اﻟﻠ ح ﻟﻤﻨﻊ اﻟﺘ ﺎرات اﻟﻌﻜﺴ ﺔ‬-
IP degree of protection? 66 IP ? 66 ‫ درﺟﺔ اﻟﺤﻤﺎ ﺔ‬-
- Approved Standard IEC-61215 or IEC-61730 IEC -61730 ‫ أو‬IEC-61215 ‫ اﻟﻨﻈﺎم اﻟﻘ ﺎ اﻟﻤﻌﺘﻤﺪ‬-
- The degree of inclination of the board is 45? or the nature of the area. .‫ ?أو ﻃﺒ ﻌﺔ اﻟﻤﻨﻄﻘﺔ‬45 ‫ درﺟﺔ ﻣ ﻼن اﻟﻠ ح‬-
- 1x4mm2 galvanized copper jumper wires, red for the positive and black for the ‫ ﻟﻮن أﺣﻤﺮ ﻟﻠﻤﻮﺟﺐ وﻟﻮن أﺳﻮد ﻟﻠﺴﺎﻟﺐ‬1x4mm2 ‫ أﺳﻼك اﻟﺘﻮﺻﻞ ﻣﻦ اﻟﻨﺤﺎس اﻟﻤﺠﻠﻔﻦ‬-
negative .‫ ﺳﻨﻮات ﻟﺠﻤﻴﻊ اﻟﻤﻮاد وﺿﺪ ﺳﻮء اﻟﺘﺼ ﻴﻊ‬10 ‫ ﺿﻤﺎن ﻟﻤﺪة‬-
negative .‫ ﺳﻨﻮات ﻟﺠﻤﻴﻊ اﻟﻤﻮاد وﺿﺪ ﺳﻮء اﻟﺘﺼ ﻴﻊ‬10 ‫ ﺿﻤﺎن ﻟﻤﺪة‬-
10-year warranty on all materials and against improper workmanship.
‫ﺳﻨﺔ ﺤ ﺚ ﻻ ﺗﻘﻞ ﺴ ﺔ اﻧﺨﻔﺎض اﻷداء‬10‫ﻋ اﻟﻤﺘﻘﺪم ارﻓﺎق اﻟﺒ ﺎﻧﺎت اﻟ ﺗﻀﻤﻦ أداء اﻷﻟﻮاح ل‬-
- The applicant must attach the data that guarantees the performance of the panels for . ‫ وﻋ ﺳﻨﻮات ﻷي ﺧـﻠﻞ ﻓ‬، ‫ﺳﻨﺔ‬25 ‫ ﻌﺪ‬%80 ‫ﻋﻦ‬
10 years, so that the rate of decline in performance is not less than 80% after 25 years, %16 ‫ اﻟ ﻔﺎءة اﻟﺪﻧ ﺎ ﻟﻸﻟﻮاح اﻟﺸﻤﺴ ﺔ ﺠﺐ أﻻ ﺗﻘﻞ ﻋﻦ‬-
and ten years for any technical defect. %75 ‫( ﺠﺐ أﻻ ﻘﻞ ﻋﻦ‬Fill Factor) ‫ ﻣﻌﺎﻣﻞ اﻟﻤﻸ‬-
The minimum efficiency of solar panels should not be less than 16%. ‫ﺠﺐ أن ﺠﻬﺰ ﺼﻨﺪوق ﻗﺎ ﻞ ﻟﻠﻔﺘﺢ ﻟﻮﺻﻞ واﺳ ﺪال اﻟ ﻴ ﻼت ﻋﻨﺪ اﻟﻠﺰوم وﻣﻨﻪ‬ ‫ ﻞ إﻃﺎر ﻟ ح ﺿﻮ‬-
Fill factor must not be less than 75%. ‫ ﻫﺬا اﻟﺼﻨﺪوق ﺠﺐ أن ﻜﻮن ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت اﻟ ﻄﺎﻧ ﺔ أو ﻣﺎ ﻌﺎدﻟﻬﺎ‬. ‫ﻳﺆﺧﺬ ﻣﺨ ج اﻟﻠ ح اﻟﻀﻮ‬
- Each light panel frame must be equipped with an openable box to connect and replace ‫ و ﺤﺘﻮي اﻟﺼﻨﺪوق ﻋ ﻓﻴﻮازات اﻟﺤﻤﺎ ﺔ ﻣﻦ اﻟﺸﻮرت اﻟ ﻬ ﺎ و اﻟﺘ ﺎر‬،‫و ﺘﺤﻤﻞ اﻟﻌﻮاﻣﻞ اﻟﺠ ﺔ‬
cables when necessary, from which the light panel output is taken. This box must be . ‫اﻟﻌﻜ‬
according to British specifications or its equivalent and bear weather factors, and the 2018 ‫ ﺳﻨﺔ ﺗﺼ ﻴﻊ اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ واﻷﻟﻮاح ﺠﺐ أﻻ ﺗﻜﻮن ﻗ ﻞ‬-
box contains protection fuses from electrical shorts and reverse current. .‫ﺳﺎﻋﺔ‬/‫ ﻢ‬120 ‫ ﻗﻮاﻋﺪ ﺗ ﺒ ﺖ اﻟﻠﻮاﻗﻂ ﻣﺠﻠﻔﻨﺔ وﺗﺘﺤﻤﻞ ﻋﺔ ر ﺎح‬-
- The year of manufacture of solar cells and panels should not be earlier than 2018 :‫ﻄ ﻘﺔ ﻏ ﻗﺎ ﻠﺔ ﻟﻠﻤﺤـﻲ‬ ‫ ﻞ اﻟﻤﻌﻠﻮﻣﺎت اﻟﺘﺎﻟ ﺔ ﺠﺐ أن ﺗﻜﻮن ﻣﻨﺤﻮﺗﺔ ﻋ ﻞ ﻟ ح ﺷﻤ‬-
- The bases for fixing the coils are galvanized and withstand a wind speed of 120 km/h. . ‫ اﺳﻢ اﻟﺠﻬﺔ اﻟﻤﺼﻨﻌﺔ‬-
- All of the following information must be engraved on each solar panel in an indelible ‫ اﻟﺮﻗﻢ اﻟ ﺴﻠﺴ ﻟﻠ ح ورﻗﻢ ﻣﻮد ﻠﻪ‬-
way: ‫ ﺷﻬﺮ وﺳﻨﺔ اﻟﺼﻨﻊ‬-
- The name of the manufacturer. ‫ ﻣﻨﺤ اﻟﺘ ﺎر واﻟﻔﻮﻟﺘ ﺔ‬-
- Serial number and model number of the board (Peak Wattage) ‫ اﻟﻮاﺗ ﺔ اﻟﻘﺼﻮى‬-
Month and year of manufacture (Im, Vm and FF) ‫ اﻟﺘ ﺎر اﻷﻋﻈ واﻟﺠﻬﺪ اﻷﻋﻈ وﻣﻌﺎﻣﻞ اﻟﻤ‬-
- current and voltage curve ‫ ﻠﺪ اﻟﻤ ﺸﺄ‬-
Peak Wattage
7.2.5 Note ‫ﻣﻼﺣﻈﺔ‬
Supply and installation of a Gel battery type C10 - Deep cycle (high quality storage, an ‫ ) ﺗﺨ ﻦ ذات ﺟﻮدة ﻋﺎﻟ ﺔ ﻣﺎرﻛﺔ ﺗﺠﺎر ﺔ أﺻﻠ ﺔ‬C10 - Deep cycle ‫ ﻧ ع‬Gel ‫ﺗﻮر ﺪ وﺗﺮﻛ ﺐ ﻄﺎر ﺔ‬
original brand), where the cell is the main component of the battery. Such as the ‫ ﻓﻮﻟﺖ ﺑ ﻨﻤﺎ‬2 ‫وﺗ ﺘﺞ اﻟﺨﻠ ﺔ ﻏﺎﻟ ﺎ ﺟﻬﺪا ﻛﻬ ﺎﺋ ﺎ ﻣﻘﺪارە‬, ‫( ﺣ ﺚ ﺗﻌﺘ اﻟﺨﻠ ﺔ اﻟﻤﻜﻮن اﻟﺮﺋ ﺴ ﺔ ﻟﻠ ﻄﺎر ﺔ‬
internal resistance and drain current of the cell. The battery can consist of one cell or ‫ﺷﺤﻦ اﻷﻣﺒ ﻋ ﺧﺼﺎﺋﺺ أﺧﺮى‬/‫ و ﻌﺘﻤﺪ ﻣﻘﺪار ﺗﻔ ــﻎ‬،‫اﻷﻣﺒ اﻟﻤﺴﺘﻮﻋﺐ ﻓﻴﻬﺎ ﻳﺘﻐ ﺑﺘﻐ ﻣﺴﺎﺣﺘﻬﺎ‬
several cells, and the common type is six cells (6 cells x 2 volts = 12 volts) - it is of a deep- ‫ واﻟ ﻄﺎر ﺔ ﻤﻜﻦ أن ﺗﺘﻜﻮن ﻣﻦ ﺧﻠ ﺔ واﺣﺪة أو ﻋﺪة‬.‫ﻣﺜﻞ اﻟﻤﻘﺎوﻣﺔ اﻟﺪاﺧﻠ ﺔ وﺗ ﺎر اﻻﺳﺘ اف ﻟﻠﺨﻠ ﺔ‬
cycle type and provided with gel as a medium to transfer the reactions between the ‫أن ﺗﻜﻮن ﻣﻦ ﻧ ع ﻋﻤ ﻘﺔ اﻟﺪورة‬- (‫ ﻓﻮﻟﺖ‬12 = ‫ ﻓﻮﻟﺖ‬x 2 ‫ ﺧﻼ ﺎ‬6) ‫ واﻟﻨ ع اﻟﺸﺎﺋﻊ ﺳﺘﺔ ﺧﻼ ﺎ‬،‫ﺧﻼ ﺎ‬
lead plates. .‫وﻣﺰودة ﻤﺎدة اﻟﺠﻞ ﻛﻮﺳ ﻂ ﻟﻨﻘﻞ اﻟﺘﻔﺎﻋﻼت ﺑ أﻟﻮاح اﻟﺮﺻﺎص‬
- That the battery production period should not be more than a year. The efficiency of ‫ ﻣﻦ‬%90 ‫ﻛﻔﺎءة اﻟﺸﺤﻦ واﻟﺘﻔ ــﻎ ﻻ ﺗﻘﻞ ﻋﻦ‬. ‫ ان ﻻ ﻜﻮن ﻗﺪ ﻣﺮ ﻋ ﻓ ة اﻧﺘﺎج اﻟ ﻄﺎر ﺔ أ ﻣﻦ ﻋﺎم‬-
charging and discharging is not less than 90% of the charge in the battery. - The number 50 ‫ دورة ﻋﻨﺪ‬3000 ‫ ﻋﺪد دورات اﻟﺸﺤﻦ واﻟﺘﻔ ــﻎ ﺠﺐ ان ﻻ ﺗﻘﻞ ﻋﻦ‬-.‫اﻟﺸﺤﻨﺔ اﻟﻤﻮﺟﻮدة ﺎﻟ ﻄﺎر ﺔ‬
of charging and discharging cycles should not be less than 3000 cycles at 50% of the load -:‫ ﻣﻦ اﻟﺤﻤﻞ وﻓﻘﺄ ﻟﻠﻤﻮاﺻﻔﺎت اﻟﺘﺎﻟ ﺔ‬%
According to the following specifications:-
7.2.6 Moisture-proof iron solar battery base:In number: Supplying a moisture-resistant iron ‫ ﺗﻮر ﺪ ﻗﺎﻋﺪة ﻄﺎر ﺎت ﺷﻤﺴ ﺔ ﺣﺪ ﺪ ﻣﻘﺎوم‬:‫ ﺎﻟﻌﺪد‬:‫ﻗﺎﻋﺪة ﻄﺎر ﺎت ﺷﻤﺴ ﺔ ﺣﺪ ﺪ ﻣﻘﺎوم ﻟﻠﺮﻃ ﺔ‬
solar battery base (original brand - at least one full year guarantee) and the price ‫ ﺿﻤﺎن ﺳﻨﺔ ﺎﻣﻠﺔ ﻋ اﻻﻗﻞ( واﻟﺴﻌﺮ ﺸﻤﻞ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﻹﻧﺠﺎز‬- ‫ﻟﻠﺮﻃ ﺔ )ﻣﺎرﻛﺔ ﺗﺠﺎر ﺔ أﺻﻠ ﺔ‬
pcs
includes all that is needed to complete the item according to the specifications and .‫ﻋدد اﻟﺒﻨﺪ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت وﺗﻌﻠ ﻤﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬ 2
instructions of the supervising engineer.

7.2.7 Battery Gel Deep cycle 150Ah : :Deep cycle ‫ أﻣﺑﯾر‬150 ‫ﺑطﺎرﯾﺔ ﺟل‬
Number: Supply and installation of a 150 amp deep cycle gel battery (original brand ‫ ﺿﻣﺎن ﺳﻧﺗﯾن‬-Gel ‫ )ﻣﺎرﻛﺔ ﺗﺟﺎرﯾﺔ أﺻﻠﯾﺔ‬Deep cycle ‫ أﻣﺑﯾر‬150 ‫ ﺗورﯾد وﺗرﻛﯾب ﺑطﺎرﯾﺔ ﺟل‬:‫ﺑﺎﻟﻌدد‬
Gel - full two years warranty at least) and the price includes all necessary according to .‫ ﻛﺎﻣﻠﺔ ﻋﻠﻰ اﻻﻗل( واﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬pcs 2
‫ﻋدد‬
the attached specifications and instructions of the supervising engineer.

7.2.8 note :- Inverters Supply, installation, commissioning and testing of a String inverter. The word ‫ﻛﻠﻣﺔ اﻟﻌﺎﻛس‬, (String inverter )‫ ﻟﻌواﻛس ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل وإﺧﺗﺑﺎر ﻣﺣول اﻟﻌﻛس‬: ‫ﻣﻼﺣظﺔ‬
“Inverter” means reversing the current from DC to alternating current (AC). The direct current comes ‫اﻟﺗﯾﺎر اﻟﻣﺳﺗﻣر ﻣﺻدره إﻣﺎ ﻣن اﻟﺑطﺎرﯾﺎت‬,(AC) ‫( إﻟﻰ ﻣﺗردد‬DC) ‫( ﺗﻌﻧﻲ ﻋﻛس اﻟﺗﯾﺎر ﻣن ﻣﺳﺗﻣر‬Inverter)
from either batteries or solar panels or both according to the following specifications:-
-:‫أو اﻷﻟواح اﻟﺷﻣﺳﯾﺔ أو ﻛﻠﯾﮭﻣﺎ وﻓﻘﺄ ﻟﻠﻣواﺻﻔﺎت اﻟﺗﺎﻟﯾﺔ‬

7.2.9 Inverter works in two systems (24V-240V (Hybrid solar inverter) with a capacity of 2500VA: :2500VA ‫ ( وﺑﻘدرة‬24V-240V(Hybrid solar inverter) ‫اﻧﻔرﺗر ﯾﻌﻣل ﺑﻧظﺎﻣﯾن‬
Quantity: Supply, installation, commissioning and testing of an inverter operating in two systems 24V-240V(Hybrid solar inverter ) ‫ ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل واﺧﺗﺑﺎر اﻧﻔرﺗر ﯾﻌﻣل ﺑﻧظﺎﻣﯾن‬:‫ﺑﺎﻟﻌدد‬
24V-240V (Hybrid solar inverter) with a capacity of 2500VA so that it can withstand at least twice ‫ﺑﺣﯾث ﯾﺗﺣﻣل ﻣﺎ ﻻ ﯾﻘل ﻋن ﺿﻌف ﻗدرﺗﮫ ﻟﺑﺿﻊ ﺛواﻧﻲ وذو ﺣﻣﺎﯾﺔ اﺗوﻣﺎﺗﯾﻛﯾﺔ ﯾﻔﺻل ﻓﻲ ﺣﺎل‬2500VA ‫وﺑﻘدرة‬
‫ واﻟﻌﻣل ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻹﻧﺟﺎز اﻟﻌﻣل وﺑﺣﺳب‬%95 ‫ وﻛﻔﺎءه ﻻ ﺗﻘل ﻋن‬.‫ زﯾﺎدة اﻟﺣﻣل او ارﺗﻔﺎع اﻟﺣرارة‬pcs
its capacity for a few seconds and has an automatic protection that disconnects in the event of an
increase in the load or an increase in temperature. And an efficiency of not less than 95%, and the 1
work includes everything needed to complete the work, according to the attached specifications
‫ﻋدد اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
and the instructions of the supervisin

7.2.10 Solar system installation accessories: ‫ ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل وإﺧﺗﺑﺎر ﺟﻣﯾﻊ‬:‫ ﺑﺎﻟﻣﻘطوﻋﯾﺔ‬:‫ﻣﻠﺣﻘﺎت ﺗرﻛﯾب ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ وﺗﺷﻐﯾﻠﮭﺎ‬
In the cut: the supply, installation and processing of applications for the supply ‫اﻟﻣﻠﺣﻘﺎت اﻟﻣطﻠوﺑﺔ ﻹﺗﻣﺎم ﺗرﻛﯾب وﺗﺟﮭﯾز ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ وﺗﺷﻐﯾﻠﮭﺎ وﻓﻘﺎ ً ﻟﻠﻧظم واﻟﻣﻌﺎﯾﯾر‬
and processing of energy - :‫اﻟﻌﺎﻟﻣﯾﺔ ﻛﻣﺎ ﯾﻠﻲ‬
1. Two 63 amp circuit breakers. .‫ أﻣﺑﯾر‬63 ‫ ﻗواطﻊ‬2 ‫ ﻋدد‬.1
2. 1 MCCB breaker, 150 amps. .‫ اﻣﺑﯾر‬150 ‫ ﻗوة‬MCCB ‫ﻗﺎطﻊ‬1‫ ﻋدد‬.2
3. 3-line assembly box. .‫ ﺧط‬3 ‫ ﺻﻧدوق ﺗﺟﻣﯾﻊ‬.3 Ls
4. 2-line arrester. .‫ﺧط‬2 ‫ ﻗﺎطﻊ ﺻواﻋﻖ‬.4 ‫ﻣﻘطو‬ 1
5. amps and amps amps amps. .‫ أﻣﺑﯾر‬6‫ أﻣﺑﯾر و‬20‫ أﻣﺑﯾر و‬63 ‫ ﺑول‬2 ‫ ﻗواطﻊ ﺣﻣﺎﯾﺔ‬.5 ‫ﻋﯾﺔ‬
6. A voltage monitor 100 amps 275 volts. .‫ ﻓوﻟت‬275 ‫ أﻣﺑﯾر‬100 ‫ ﻣراﻗب ﻓوﻟﺗﯾﺔ‬.6
7... DC and AC insulated copper wires with sizes suitable for the amounts of .‫ ﻣن اﻟﻧﺣﺎس ﺑﻣﻘﺎﺳﺎت ﻣﻧﺎﺳﺑﺔ ﻟﻛﻣﯾﺎت اﻟﺗﯾﺎر اﻟﻛﮭرﺑﺎﺋﻲ اﻟﻣﺎر ﻓﯾﮭﺎ‬AC‫ و‬DC ‫ اﺳﻼك ﻣﻌزوﻟﺔ‬. .7
electric current passing through them. ‫واﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﻣﻠﺣﻘﺎت اﻟﻣطﻠوﺑﺔ ﻟﺗﺟﮭﯾز ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ ﺑﺎﻟﺷﻛل اﻟﻣطﻠوب‬
And the price includes all the services and accessories required to supply the ‫وﻓﻘﺎ ﻟﻠﻣﻌﺎﯾﯾر اﻟﻌﺎﻟﻣﯾﺔ وان ﺗﻛون ﺟﻣﯾﻊ اﻟﻣﻠﺣﻘﺎت ذات ﺟودة ﻋﺎﻟﯾﺔ وﺧﺎﺿﻌﺔ ﻟﻣواﻓﻘﺔ اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
solar energy as required. ‫وﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
Total Amount of solar energy system work ‫إﺟﻣﺎﻟﻲ اﻋﻣﺎل ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ‬

Total summation ‫ اﻹذاﻋﺔ اﻟﻣدرﺳﯾﺔ‬+ ‫إﻻﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ‬

‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم‬