ER1.2 Risk Assesment-1

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 17

Engineering Risk Assessment

Project: ABB Celda de Robot Soldador


Lead Engineer: Integrantes del equipo 2
Reviewed By: Profesores de la materia de Diseño y Desarrollo de Robots
Date: May 3, 2024
Score
Technology 3 - Medium Risk
This defines the degree of technical complexity the Lead Engineer or engineering team will face in executing the
project.
1 The project will use off-the-shelf technology.
3 Engineers will purchase and modify off-the-shelf technology.
5 The project will require the development of new technology.

Environmental Impact 1 - Low Risk


This defines the potential level of environmental impact.
1 There will be no environmental impact.
3 The project may have some environmental impact but will not require an environmental assessment, as
determined by FESHM.
5 The project will require an environmental impact statement.

Vendor Issues 1 - Low Risk


This defines the degree of complexity to be expected with vendors. Complicating factors may include long-lead-
time items and issues with vendor qualification and reliability.
1 Vendors could cause minor issues.
3 Vendors could cause manageable complications.
5 Vendor issues could result in significant schedule delays or cost overruns or could otherwise jeopardize the
successful completion of the project.

Resource Availability 1 - Low Risk


This defines the availability of internal and external resources to plan and execute the project.
1 Resources will be readily available.
3 Resources could be somewhat restricted.
5 The difficulty of obtaining resources puts the project schedule at high risk.

Quality Requirements 3 - Medium Risk


This determines the effort required to achieve the quality level the customer assigns to the final product.

1 The quality requirements can be met easily with existing infrastructure.


3 The quality requirements are challenging but can be met with existing infrastructure.
5 The quality requirements are beyond the capability of existing infrastructure.

Safety 3 - Medium Risk


This defines the safety issues the project team will encounter while completing the project.
1 The project will require standard safety considerations.
3 The project will require increased diligence due to its location, the configuration of the product or the type of
work required. This includes work requiring review according to FESHM.
5 The project will require very restrictive safety considerations. This includes work requiring review and personnel
safety systems.

Manufacturing Complexity 5 - High Risk


This defines the degree of complexity to be expected when combining the elements of technology, operations and
schedule in product manufacturing.
1 The manufacturing processes will be routine.
3 The project will require an existing technology that the manufacturer has not previously used.
5 The project will require new or complex manufacturing methods.

Transportation and Rigging Complexity 4 - Medium to High Risk


This defines the expected complexity of transporting and rigging major components of the project.
1 The transportation and rigging processes will be routine.
3 The project will require some analysis to ensure safe transportation or rigging.
5 The project will require analysis and testing validation to ensure safe transportation or rigging.

Schedule 5 - High Risk


This defines how much time the Lead Engineer or engineering team will have to complete the schedule.

1 Time will be unlimited.


3 The schedule will be somewhat constrained.
5 The subproject will be on the overall project critical path and has no schedule contingency.

Interfaces 1 - Low Risk


This defines the risk associated with the complexity of integrating multiple subprojects.
1 One department at Fermilab will be involved with a standalone project.
3 Project success depends upon contributions from multiple departments at Fermilab.
5 Project success depends upon contributions from multiple institutions.

Experience/Capability 3 - Medium Risk


This defines the level of experience and capability project team members will have.
1 Only experts will participate.
3 A blend of experts and inexperienced personnel will participate.
5 Only inexperienced personnel will participate.

Regulatory Requirements 3 - Medium Risk


This identifies the degree to which oversight by governmental or other regulatory agencies will impact the project.

1 Regulatory agencies will have minor to no involvement.


3 The Department of Energy, DOE, will have direct regulatory involvement.
5 DOE, as well as state or federal government, will have regulatory involvement.
Project Funding 1 - Low Risk
This defines the availability and approval status of project planning and execution funds.
1 A single source within Fermilab will fund the project.
3 A source outside of Fermilab will fund the project.
5 Multiple sources outside of Fermilab will fund the project.

Project Reporting Requirements 3 - Medium Risk


This indicates the level of reporting to the senior management the project requires.
1 Reports to senior management about the project will not be required.
3 The project will require quarterly performance reports.
5 The project will be highly visible. Top management or outside agencies will schedule visits and issue monthly
performance reports.

Public Impact 1 - Low Risk


This indicates how much the project will affect the public or public opinion.
1 The public will not be affected.
3 The public may be somewhat affected and should be informed with news releases.
5 The project may have an impact on the public. The public should be involved through public forums and may
participate in advisory councils.

Project Cost 3 - Medium Risk


This defines how much the project is projected to cost.
1 The project will be within the department operating budget.
3 The project will require divisional budget planning.
5 The project will require laboratory or DOE budget tracking and reporting.

Conclusiones
Evel Sandoval: La importancia de conocer nuestras limitantes y posibles situaciones de riesgo, es primordial para el desarrollo

Gianni Cucalon: Los posibles riesgos en un proyecto de simulación de una celda de soldadura industrial son de gran importanc
Santiago Pagés: Tras evaluar detenidamente los riesgos asociados con la implementación de la celda de construcción, concluy
Frida Rodea: Al evaluar sobre el análisis de riesgos realizado para la implementación de la celda de construcción, estoy conven
Link de Miro: https://miro.com/welcomeonboard/Y3l5WmU2M0tFTm1mdDFNampEeldmcWhTdlEyeFZ4RGFWSGZwR2lx

ore
3
executing the

ment, as

1
ude long-lead-

pardize the

3
oduct.

3
or the type of

w and personnel

5
, operations and

5
dule.

3
pact the project.
1

ssue monthly

ums and may

rimordial para el desarrollo de nuestro proyecto final ya que de esta manera, tendremos en cuenta lo que queremos y lo que no deseamo

strial son de gran importancia debido a su impacto potencial en la seguridad, la calidad del producto y el éxito general del proyecto. Estos
da de construcción, concluyo que la seguridad operativa y la integridad de las piezas producidas son aspectos críticos que requieren una a
construcción, estoy convencida de la necesidad de un enfoque holístico que integre la seguridad, la calidad y la eficiencia en todas las eta
WhTdlEyeFZ4RGFWSGZwR2lxNGF2Vld6Skh5Z0Uyc0ZiNlRxOWF3RThMN3wzMDc0NDU3MzUwOTc4Nzg2NjE4fDI=?share_link_id=9704902
ueremos y lo que no deseamos encontrar en el. Gracias esto evitaremos tener contratiempos dentro de esta entrega y todo aquello que im

o general del proyecto. Estos riesgos podrían incluir desde fallas en el equipo de simulación hasta errores en la programación, pasando po
s críticos que requieren una atención especial. Es evidente que el mal funcionamiento del robot soldador y los posibles problemas de man
y la eficiencia en todas las etapas del proyecto. Es evidente que los riesgos identificados, como los problemas de mantenimiento no progr
?share_link_id=970490242861
ega y todo aquello que implica la misma.

ogramación, pasando por posibles irregularidades entre la simulación y la realidad del entorno de producción. Identificar, evaluar y mitiga
sibles problemas de mantenimiento podrían afectar significativamente nuestra capacidad para cumplir con los objetivos de producción y g
mantenimiento no programados en el robot soldador y los posibles retrasos en la producción, pueden tener un impacto significativo en nu
entificar, evaluar y mitigar estos riesgos es esencial para garantizar una simulación precisa y efectiva, así como para evitar costosos contra
mo para evitar costosos contratiempos y riesgos para la seguridad durante la implementación y operación de la celda de soldadura indust
e la celda de soldadura industrial
Engineering Risk Assessment
Project: ABB Celda de Robot Soldador
Lead Engineer: Integrantes del equipo 2
Reviewed By: Profesores de la materia de Diseño y Desarrollo de Robo
Date: May 3, 2024

Engineering Risk Element High


Chapter A B C D E F G H Risk Subtotal Assessment
1 Requirements and Specifications 3 1 3 4 ≥ 12 11 Standard Risk
3 Requirements and Specification Review 3 1 1 3 3 4 ≥ 18 15 Standard Risk
4 System Design 3 1 1 3 3 5 4 ≥ 21 20 High Risk
5 Engineering Design Review 3 1 1 3 3 5 4 ≥ 21 20 High Risk
6 Procurement and Implementation 1 1 3 3 5 4 ≥ 18 17 High Risk
7 Testing and Validation 3 3 3 5 4 ≥ 15 18 High Risk
8 Release to Operations 3 ≥4 3 Standard Risk
9 Final Documentation 1 3 ≥7 4 Standard Risk

Project Risk Element High


I J K L M N O P Risk Subtotal Assessment
5 1 3 3 1 3 1 3 ≥ 25 20 Standard Risk

Engineering Risk Elements Project Risk Elements


A Technology I Schedule
B Environmental Impact J Interfaces
C Vendor Issues K Experience / Capability
D Resource Availability L Regulatory Requirements
E Quality Requirements M Project Funding
F Safety N Project Reporting Requirements
G Manufacturing Complexity O Public Impact
H Transportation and Rigging Complexity P Project Cost
Values Chapters Engineering Risk
1 1 - Low Risk 1 Requirements and Specifications A
2 2 - Low to Medium Risk 2 Engineering Risk Assessment B
3 3 - Medium Risk 3 Requirements and Specification Review C
4 4 - Medium to High Risk 4 System Design D
5 5 - High Risk 5 Engineering Design Review E
6 Procurement and Implementation F
Assessment 7 Testing and Validation G
Standard Risk 8 Release to Operations H
High Risk 9 Final Documentation
Project Risk El
I
J
K
L
M
N
O
P
Engineering Risk Element
Technology
Environmental Impact
Vendor Issues
Resource Availability
Quality Requirements
Safety
Manufacturing Complexity
Transportation and Rigging Complexity

Project Risk Element


Schedule
Interfaces
Experience / Capability
Regulatory Requirements
Project Funding
Project Reporting Requirements
Public Impact
Project Cost

You might also like