Legend:: (2) - Two Storey Residence

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

RIPRAP WALL LIN.

GENERAL NOTES:

1. COORDINATE THE DRAWINGS WITH OTHER DISCIPLINES SUCH


AS THE ENGINEER OR ARCHITECT IF ANY DISCREPANCY HAS
BEEN FOUND THEREIN.
2. ALL PLUMBING INSTALLATION SHALL BE DONE UNDER THE
DIRECT SUPERVISION OF A DULY LICENSED SANITARY
ENGINEER OR REGISTERED MASTER PLUMBER. EVERY TASK
DONE SHALL CONFORM IN ACCORDANCE TO THE RULES AND
REGULATIONS OF THE NATIONAL PLUMBING CODE OF THE
PHILIPPINES AS ADOPTED IN THE LOCALITY. RUN/TAP TO APPLICABLE
3. PROPOSED UTILITIES SHALL CONFORM TO THE ACTUAL RAIN WATER COLECTION TANK
LOCATION, DEPTH AND INVERT ELEVATIONS OF ALL PIPES AND (VERIFY LOCATION)

STRUCTURES.
4. ALL SOLID WASTES AND URINAL SHALL BE DIRECTED TO CB CB CB

SEPTIC VAULT INCLUDING LIQUID WASTE FROM LAVATORY,


FD FD SLGD FD SLGD FD
SINKS AND FLOOR DRAINS. DOWNSPOUTS SHALL BE DIRECTED
TO CATCH BASIN.
5. ALL SEWER LINE AND VENT PIPING SYSTEM SHALL BE
POLYVINYL CHLORIDE PIPE (PVC) CONFORMING TO ASTM C241

0.15m STEEL GRATED RAIN WATER COLLECTION TRENCH


OR EQUIVALENT TO PNS
6. ALL WATER DISTRIBUTION LINE SHALL BE GALVANIZED IRON
RUN/TAP TO APPLICABLE
PIPE SCH. 40 CONFORMING TO ASTM 53 OR PNS 26. STORM DRAINAGE LINE
7. STORM DRAINAGE PIPES SHALL BE NON-REINFORCED (VERIFY LOCATION)
CONCRETE PIPE FOR SIZES 150mm DIAMETER UNLESS
OTHERWISE SPECIFIED. FD

8. ADEQUATE FIXTURES AND DRAINAGE FACILITIES SHALL BE


PROMOTED WHENEVER NECESSARY.
9. ALL PVC PIPES FOR SEWER AND STORM DRAINAGE LINES
SHALL BE IN NOMINAL OUTSIDE DIAMETER BASED ON ISO
STANDARD.
SEPTIC
10. VERIFY LOCATION OF SOIL STACK AND VENT STACK OF TANK
SANITARY LINES. FOR SOIL STACK, A MINIMUM OF PIPE
F
KS

FD

FD
GCO CCO
SLGD
WLGU F SHW SS/VS
GT F

WC
LAV
F
KS
WC
SHW
LAV
FD

F LAV

FD
WC FD
SHW

LEGEND:
CB
GV - GATE VALVE
CV - CHECK VALVE
CB -CATCH BASIN
LAV
WC
SHW FD
F

FD -FLOOR DRAIN F

LAV
WC
SHW FD

SLGD -SEWER LINE GOING DOWN CCO


FD
SLGD
WLGU -WATER LINE GOING UP
WLGD -WATERLINE GOING DOWN
WC -WATER CLOSET
LAV -LAVATORY
F -FAUCET
MH -MANHOLE
HB -HOSE BIBB
UR -URINAL
CP/RCP -CONCRETE PIPE
-DIAMETER
WP -WATER PUMP
S -SOIL
SS -SOIL STACK DEEP WELL
WATER TANK
VS -VENT STACK
VAC -VENT ABOVE CEILING
VSTE -VENT STACK THRU EAVES
1 GND FLR SANITARY/WATER LINE LAYOUT PLAN 2 2ND FLR SANITARY/WATER LINE LAYOUT PLAN
VUS -VENT UNDER SLAB SCALE: 1:100 SCALE: 1:100
CWR -COLD WATER RISER P 1 P 1
KS -KITCHEN SINK
GT -GREASE TRAP
FCO -FLOOR CLEANOUT
GCO -GROUND CLEANOUT
CCO -CEILING CLEANOUT
WM -WATER METER
SHW -SHOWER

GFIsidro
Architectural Design Studio

PROPOSED
(2) - TWO STOREY RESIDENCE

You might also like