Vote: / /

Page number: /

PHỤ LỤC 1. MẪU PHIẾU THAO TÁC

CHALEUN SEKONG
ENERGY- NK3 HPP
OPERATION SHEET
OPERATION WORKSHOP

Operation ticket name: Isolate MC 901 for repair....................................................


Vote writer: .......................................................... Position:...................................................................
Vote reviewer: ...................................................... Position:..............................................................
Vote Supervisor: ..................................................Position:..............................................................
.....................................................................................................................................................................
Vote operator: …...................................................... Position:...............................................................
.....................................................................................................................................................................
Purpose of operation: Isolate MC 901 for repair...................................................................................
Intend time:
Begin: .................... h .......... Day..................Month ............... Year....................................................
End: ……........... h ........... Day ..................Month ............... Year ...................................................
The unit recommends the operation: .............................................................................
Necessary conditions for implementation: (if any)
1. ...............................................................................................................................................................
2.................................................................................................................................................................
3.................................................................................................................................................................
Note: (if any)
1..................................................................................................................................................................
2..................................................................................................................................................................
3..................................................................................................................................................................
3..................................................................................................................................................................
Vote: / /

Page number: /

Delivery and acceptance of electrical lines and equipment before operation: (if any)
Time Workshop Full name Content

Sequence of operation items:


Location Sequence of operations Time Person

Item Mad Comman Get


Step Content Begin End
e d order

I NK3 1 Please A0: Stop making power


units H1, H2, H3 unavailable

2 Check MC 901,902,903 and


QE1,QE2,QE3 open three
phases well

3 Convert self-use to region grid


or diesel generator

4 Isolate the control source and


resources and move MC901 to
the repair location
5 Isolate the control source and
resources and move MC902 to
the repair location

6 Isolate the control source and


resources and move MC903 to
the repair location

7 Open MC941, Isolate control


source, power source and take
test location
Vote: / /

Page number: /

8 Open MC942, Isolate control


source, power source and take
test location

9 Open MC971, Isolate control


source, power source and take
test location

10 Open MC972, Isolate control


source, power source and take
test location

11 Open MC931, Isolate control


source, power source and take
test location

12 Open MC931, Isolate control


source, power source and take
test location

13 Check Bus bar C91 has no


power

14 Close DTĐ901-05 and check


that it is closed well

15 Open AB TUC91

16 Open AB TU9H11

17 Open AB TU9H12

18 Open AB TU0H1

19 Install mobile Grounding to


Bus bar C91

20 Implement safety measures,


post signs, barricades and
allow the work team to work
Vote: / /

Page number: /

Delivery and acceptance of electrical lines and equipment after operation: (if any)
Time Workshop Full name Content

Day.........Month........Year....... Day.........Month........Year.......

Vote writer Vote reviewer

(Sign and write full name) (Sign and write full name)

Abnormal events during operations:………………………………….................................................


……………………………………………………………………………………………………………
Person performing the operation
Day.........Month........Year.......

Supervisor The operator

(Sign and write full name) (Sign and write full name)
Vote: / /

Page number: /

Diagram: (attached if necessary)