MẪU PHIẾU THAO TÁC

CHALEUN SEKONG Vote: / KH / 2023


ENERGY- NK3 HPP
OPERATION SHEET
OPERATION WORKSHOP Page number: 01 /....

Operation ticket name: ...... Restore circuit break MC901 after repair.......................................
Vote writer: .......................................................... Position:...................................................................
Vote reviewer: ...................................................... Position:..............................................................
Vote Supervisor: ..................................................Position:..............................................................
.....................................................................................................................................................................
Vote operator: …...................................................... Position:...............................................................
.....................................................................................................................................................................
Purpose of operation:.............. Restore circuit break MC901 after repair.......................................
Intend time:
Begin: .................... h .......... Day..................Month ............... Year....................................................
End: ……........... h ........... Day ..................Month ............... Year ...................................................
The unit recommends the operation: Repair workshop.............................................................................
Necessary conditions for implementation: (if any)
1. ...............................................................................................................................................................
2.................................................................................................................................................................
3.................................................................................................................................................................
Note: (if any)
1..................................................................................................................................................................
2..................................................................................................................................................................
3..................................................................................................................................................................
3..................................................................................................................................................................
Delivery and acceptance of electrical lines and equipment before operation: (if any)
Time Workshop Full name Content
Vote: 01/ KH/2023

Page number: 02/....

Sequence of operation items:


Sequence of operations Time Person
Locatio
Item
n Begi Get
Step Content Made End Command
n order

I NK3 1 The unit registers to put the


equipment to work. All work
sheets have been locked,
people and vehicles have
withdrawn from the scene,
all mobile grounding devices
have been removed,
confirming that the
equipment is ready to restore
power.

2 Remove signs and barriers

3 Close AB TUC91

4 Close AB TU9H12

5 Close AB TU9H11

6 Close AB TU0H1

7 Open DTĐ 901-05. Check


open well.

8 Put MC901 into working


position. Restore control
sources and resources

9 Put MC902 into working


position. Restore control
sources and resources

10 Put MC903 into working


position. Restore control
sources and resources

11 Put MC931 into working


position. Restore control
sources and resources. Close
MC931 and pulse Bus bar
C91

12 Put MC932 into working


position. Restore control
sources and resources.
Synchronize MC932, close
the loop

13 Put MC941 into working


position. Restore control
sources and resources. Close
MC941. Electrical pulse to
transformer TD91

14 Put MC942 into working


position. Restore control
sources and resources. Close
MC942. Electrical pulse to
transformer TD92

15 Put MC971 into working


position. Restore control
sources and resources. Close
MC971. Check close well.

16 Put MC972 into working


position. Restore control
sources and resources. Close
MC972. Check close well
tốt.

17 Restore self-use power

18 Tell A0 to return generator


units H1, H2, H3
Vote: 01/ KH/2023

Page number: 03/....

Delivery and acceptance of electrical lines and equipment after operation: (if any)
Time Workshop Full name Content

Day.........Month........Year....... Day.........Month........Year.......

Vote writer Vote reviewer

(Sign and write full name) (Sign and write full name)

Abnormal events during operations:………………………………….................................................


……………………………………………………………………………………………………………
Person performing the operation
Day.........Month........Year.......

Supervisor The operator

(Sign and write full name) (Sign and write full name)

Diagram: (attached if necessary) Vote: / /

Page number: /