Professional Documents
Culture Documents
4.4 Joint Calculation
4.4 Joint Calculation
4.4 Joint Calculation
ROOF TOP
Joint Calculation
CALCULATION OF COLUMN BASE PLATE
SST 20M FOUR LEG_RT ( LIGHT DUTY )
Used D= 25 cm
fv=P/A 33.63 kg/cm2
5. Notation
Fy = Yield strength of concrete
Fv = Allowable bearing strength of the concrete
Tf = Applied uplift force per anchore bolt
tp = Required thickness of base plate
M = Bending Moment Tributary to coulomn by one bolt
fb = Bending stress
fc' = Compressive strength of concrete
Abase = Total area of Base Plate
P = Total compression at tower base per one leg
T = Total Uplift at tower base per one leg
b= Distance from bolt center line to the face of coulmn
Z = 1/6 b h2
m = Distance from bolt center line to the edges of Base plate
CALCULATION OF ANCHOR BOLT
SST 20M FOUR LEG_RT ( LIGHT DUTY )
4. Notation
fy = Yield strength of concrete
Fv = Allowable bearing strength of the concrete
Ft = Allowable tensil stress of anchore bolt
Fts = Allowable tensile stress for bolts subject to combined tension and shear
Fcv = Allowable bond stress of concrete
fv = actual shear stress of anchore bolt
ft = Actual tensil stress of anchore bolt
fc' = Compressive strength of concrete
A = Total area of anchore bolt
P = Total compression at tower base per one leg
T = Total Uplift at tower base per one leg
S = Total Shear force at tower base per one leg
Le = Required embeded length of anchore bolt in concrete