Bill Stage Work

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 31

BILL FORM

Name of Work : Beautification, upkeep, and routine repair/maintenance, road


marking with retro reflective road paint of major arterial roads along with footpaths
and road furniture, clearance of drain, painting of poles, washing of kerbs for roads
pertaining to sub division chararisharief.
Name of Contractor : Mr. Mohd Shafi Mir S/o Abdul Aziz Mir R/o Buzgoo Lash
Kalan Chadoora.

Head of Account: 3054 M&R Serial No. of Bill : C/C 1st


Allotment No: 5580-81 Dtd. 27-08-2022
Date of Start : 28-08-2022 Date of Completion :

S.no Description of work / Items Unit Quantity Rate Amount

Engagement of JCB for execution of works of


1 Hour 32 1200 38400
various nature
Slip clearance in ordinary soil including
disposal of same beyond site premises as
2 directed by Engineer in-charge. cum 156.36 140.2 21,921.67

Earthwork in excavation by mechanichal


3 means (hydraulic excavator) in trenchs for cum 390.050 252.02 98,300.40
foundation, drains, pipes, cables etc. not
exceeding 1.5m in width).. And disposalof
Silt clearance from drains wet by manual or
4 mechanical meansincl disposal of rubbish as cum 281.850 168.25 47,421.26
directed by engineer in charge.

Eng of Skilled labour with all machinery like


5 cutters, axe, etc for pruning of trees No. 5.000 850 4,250.00

P/L of RCC spun pipes incl earthwork in


excavation, dressingof sides ramming of
6 bottom, necessary cushon, loading,
unloading & all carriage

12 inch dia
Rft 16.00 800 12800
18 inch dia Rft 24.00 1100 26400
Total 249,493.34
down by 15.11% 37,698.44
Net Amount 211,794.89
As recorded on M. Book No. 199
from Page No. 1 to 3 .
660209
0
BILL FORM
Name of Work : Beautification, upkeep, and routine repair/maintenance, road
marking with retro reflective road paint of major arterial roads along with footpaths
and road furniture, clearance of drain, painting of poles, washing of kerbs for roads
pertaining to sub division chararisharief.
Name of Contractor : Mr. Mohd Shafi Mir S/o Abdul Aziz Mir R/o Buzgoo Lash
Kalan Chadoora.

Head of Account: 3054 M&R Serial No. of Bill : C/C 1st


Allotment No: 5580-81 Dtd. 27-08-2022
Date of Start : 28-08-2022 Date of Completion :

S.no Description of work / Items Unit Quantity Rate Amount

Engagement of JCB for execution of works of


1
various nature
from part 1st Hour 32 1200 38400
Slip clearance in ordinary soil including
disposal of same beyond site premises as
2 directed by Engineer in-charge.

from part 1st cum 156.36 140.2 21,921.67


from part 2nd cum 581.95 140.2 81,589.39
Earthwork in excavation by mechanichal
3 means (hydraulic excavator) in trenchs for
foundation, drains, pipes, cables etc. not
exceeding 1.5m in width).. And disposalof
from part 1st cum 390.050 252.02 98,300.40
from part 2nd cum 607.950 252.02 153,215.56
Silt clearance from drains wet by manual or
4 mechanical meansincl disposal of rubbish as
directed by engineer in charge.

from part 1st cum 281.850 168.25 47,421.26


from part 2nd cum 32.400 168.25 5,451.30
Eng of Skilled labour with all machinery like
5 cutters, axe, etc for pruning of trees
from part 1st No. 5.000 850 4,250.00
from part 2nd No. 7.000 850 5,950.00
P/L of RCC spun pipes incl earthwork in
excavation, dressingof sides ramming of
1 bottom, necessary cushon, loading,
unloading & all carriage

from part 1st


12 inch dia
Rft 16.00 800 12800
18 inch dia Rft 24.00 1100 26400
Total 495,699.58
down by 15.11% 74,900.21
Net Amount 420,799.38
As recorded on M. Book No. 199
from Page No. to .
0
Part 3rd

BILL FORM
Name of Work : Beautification, upkeep, and routine repair/maintenance, road
marking with retro reflective road paint of major arterial roads along with footpaths
and road furniture, clearance of drain, painting of poles, washing of kerbs for roads
pertaining to sub division chararisharief.
Name of Contractor : Mr. Mohd Shafi Mir S/o Abdul Aziz Mir R/o Buzgoo Lash
Kalan Chadoora.

Head of Account: 3054 M&R Serial No. of Bill : C/C 1st


Allotment No: 5580-81 Dtd. 27-08-2022
Date of Start : 28-08-2022 Date of Completion :

S.no Description of work / Items Unit Quantity Rate Amount


Earthwork in excavation by mechanichal
1 means (hydraulic excavator) in trenchs for
foundation, drains, pipes, cables etc. not
exceeding 1.5m in width).. And disposalof
cum 289.300 252.02 72,909.39
Silt clearance from drains wet by manual or
2 mechanical meansincl disposal of rubbish as
directed by engineer in charge.

cum 179.860 168.25 30,261.45


Eng of Skilled labour with all machinery like
3 cutters, axe, etc for pruning of trees

No. 26.000 850 22,100.00


P/L of RCC spun pipes incl earthwork in
excavation, dressingof sides ramming of
6 bottom, necessary cushon, loading,
unloading & all carriage

12 inch dia
Rft 16.00 800 12800
18 inch dia Rft 24.00 1100 26400
Total 164,470.83
down by 15.11% 24,851.54
Net Amount 139,619.29
As recorded on M. Book No. 199
from Page No. to .
0
RD Length width Height Area M.Area Volume
km 19
0 - 11.5 4 46
50 50 10.5 4 42 44 2200
2200 62.282

RD Length width Height Area M.Area Volume


km 19
0 - 14 5 70
150 150 15 6 90 80 12000
12000 339.72

RD Length width Height Area M.Area Volume

km 19th

0 - 4 2.6666667 10.666667
200 200 5 3 15 12.833333 2566.666667
2566.666667 72.66233
474.6643
RD(ft) Length width Height Area M.Area Volume(cft)
km 1st near showkat thoker
0 - 6 1.5 9
100 100 8 2 16 12.5 1250
200 100 5 0.5 2.5 9.25 925
300 100 6 0.5 3 2.75 275
400 100 7 2 14 8.5 850
7 2.5 17.5
460 60 7 1.5 10.5 14 840
4140 117.2034

km 22nd
RD Length width Height Area M.Area Volume
0 - 2.75 1.125 3.09375
100 100 2.75 2.75 7.5625 5.328125 532.8125 15.08392

Slip near bridge


0 - 3 1 3
100 100 3 1 3 3 300
200 100 4 2 8 5.5 550
850 24.0635 5523
Watal mode 156.3561
0 - 1 0.5 0.5
50 50 4 1.5 6 3.25 162.5
100 50 6 2 12 9 450
150 50 5 2.5 12.5 12.25 612.5
200 50 7 3.5 24.5 18.5 925
250 50 8 4 32 28.25 1412.5
300 50 12 2.25 27 29.5 1475
335 35 6 2 12 19.5 682.5
5720 161.9332
318.284
566.85
738.31
103511.06
Near junc new basti
RD Length width Height Area M.Area Volume
0 - 2.5 2.25 5.625
100 100 1.5 1.5 2.25 3.9375 393.75
200 100 3 2.375 7.125 4.6875 468.75
300 100 3 2.5 7.5 7.3125 731.25
400 100 3 2 6 6.75 675
500 100 2.75 1.75 4.8125 5.40625 540.625
600 100 2.75 1.5 4.125 4.46875 446.875
700 100 2.75 1.25 3.4375 3.78125 378.125
800 100 2.75 1 2.75 3.09375 309.375
900 100 4 1 4 3.375 337.5
1000 100 3.75 3.25 12.1875 8.09375 809.375
1080 80 4 1.25 5 8.59375 687.5
5778.125 163.5787

RD Length width Height Area M.Area Volume


0 - 2.75 1.5 4.125
100 100 3 1.75 5.25 4.6875 468.75
200 100 2.5 2.5 6.25 5.75 575
300 100 2.75 1.75 4.8125 5.53125 553.125
400 100 2.75 1.75 4.8125 4.8125 481.25
500 100 3 2 6 5.40625 540.625
2618.75 74.13681

kakaw ring junc pmgsy


RD Length width Height Area M.Area Volume
0 - 3 2.25 6.75
150 150 3 2 6 6.375 956.25
350 200 3 2.75 8.25 7.125 1425
2381.25 67.41319

behind café
RD Length width Height Area M.Area Volume
0 - 3 2 6
100 100 3 3.5 10.5 8.25 825
200 100 3 2 6 8.25 825
500 300 3 1 3 4.5 1350
3000 84.93 390.0587 13778.13
390.0587

0 - 3 1.75 5.25
575 575 3 2.25 6.75 6 3450
3450 97.6695
Near towards Holiday café
RD Length width Height Area M.Area Volume
0 - 3 2 6
100 100 3 2 6 6 600
200 100 3 2 6 6 600
300 100 3 2.5 7.5 6.75 675
1875 53.08125

0 - 3 2.5 7.5
100 100 3 2.75 8.25 7.875 787.5
200 100 3 2 6 7.125 712.5
300 100 3 2.5 7.5 6.75 675
400 100 3 3 9 8.25 825
500 100 3 3 9 9 900
600 100 3 2.75 8.25 8.625 862.5
700 100 3 2.5 7.5 7.875 787.5
800 100 3 2 6 6.75 675
900 100 3 2.5 7.5 6.75 675
1000 100 3 2.5 7.5 7.5 750
1100 100 3 1.5 4.5 6 600
1200 100 3 1.5 4.5 4.5 450
1300 100 3 1.75 5.25 4.875 487.5
1400 100 3 2 6 5.625 562.5
1500 100 3 2 6 6 600
1600 100 3 1.5 4.5 5.25 525
1700 100 3 2 6 5.25 525
1800 100 3 2.5 7.5 6.75 675
1900 100 3 2 6 6.75 675
2000 100 3 2.25 6.75 6.375 637.5
2100 100 3 2.25 6.75 6.75 675
2200 100 3 2 6 6.375 637.5
2300 100 3 2.5 7.5 6.75 675
2400 100 3 1.5 4.5 6 600
15375 435.2662
0 - 2 1 2
100 100 3 2 6 4 400
200 100 3 2 1.5 3.75 375
775 21.94025
607.9572
Degree college
0 - 1.5 1.5 2.25
800 800 1.5 1.5 2.25 2.25 1800
1800 50.958
Dard pora
0 - 3.5 3.75 13.125
300 300 3.5 3.75 13.125 13.125 3937.5
3937.5 111.4706

Zagipora
0 - 2.5 1 2.5
500 500 2.5 1.25 3.125 2.8125 1406.25
1406.25 39.81094
Charipora
0 - 1.5 1.5 2.25
700 700 1.5 1.5 2.25 2.25 1575
0 1575 44.58825
0
Shankerpora 0
0 - 1.5 2 3
250 250 1.5 2 3 3 750
0 750 21.2325
0
Dalwan main 0
0 - 1.5 2 3
250 250 1.5 2 3 3 750
750 21.2325
289.2928

1287.3
324464.0

2184.559

643.6545
2.25
1.5
2.375
2.5
2
1.75
1.5
1.25
1
1
3.25
1.25

1.5
1.75
2.5
1.75
1.75
2

2.25
2
2.75

2
3.5
2
1

1.75
2.25

2
2
2
2.5

2.5
2.75
2
2.5
3
3
2.75
2.5
2
2.5
2.5
1.5
1.5
1.75
2
2
1.5
2
2.5
2
2.25
2.25
2
2.5
1.5

1
2
2

1.5
1.5
3.5
3.5

1
1.25

1.5
1.5

2
2

2
2

252.02

738

3240 816544.8
Detailed estimate for Stage contract for beatification, Upkeep and routine
repair/maintenance, road marking with
Dimensions (ft)
S.No. Description Unit No Quantity Rate Amount
L B H
1 Eng of JCB
hour 16 16.00 1200.00 19200.00
Earthwork in excavation by manual or mechanical means
over areas including dressing of sides and ramming of
2 bottom including all leads and lifts and disposal of
excavated earth as directed by Engineer incharge

k. drain cft 1
cum 1192.00 252.05 300443.60
Slip clearance in ordinary soil including disposal of same beyond
3 site premises as directed by Engineer in-charge

cft 1 0.0 10.00 5.500 0


316.00 140.20 44,303.20
P/L of RCC spun pipes incl earthwork in excavation,
4 dressingof sides ramming of bottom, necessary cushon,
loading, unloading & all carriage
dia
L(ft) (inch) Qty (rft)

rft 4 8.0 12.00 - 32.00 800.00 25,600


rft 6 8.0 18.00 - 48.00 1100.00 52,800
Total 442,346.80
down by 15.11% 66,838.60
Net payment 375,508.20
RD Length width Height 1 Height 2 Area M.Area Volume

km 21st near showkat thoker


0 - 6 3 0.5 10.5 - -
100 100 6 3.5 0.5 12 11.25 1125
200 100 5 2 0.5 6.25 9.125 912.5
300 100 7 3 0.5 12.25 9.25 925
400 100 7 3 0.5 12.25 12.25 1225
500 100 4 5 0.5 11 11.625 1162.5
600 100 6 5 0.5 16.5 13.75 1375
700 100 8 2 0.5 10 13.25 1325
800 100 6 2 0.33 6.99 8.495 849.5
900 100 8 1.5 0.5 8 7.495 749.5
1000 100 9 5.5 0.5 27 17.5 1750
1100 100 8 0.75 0.5 5 16 1600
1200 100 8 1 0.5 6 5.5 550
1300 100 8 2 0.5 10 8 800
1400 100 6 3 0.5 10.5 10.25 1025
1500 100 8 3 0.5 14 12.25 1225
16599 469.9177

km 22nd
RD Length width Height Height 2 Area M.Area Volume
0 - 6 1 0.5 4.5
100 100 6 2 0.5 7.5 6 600
200 100 6 1 0.5 4.5 6 600
300 100 10 1 0.5 7.5 6 600
400 100 7 1 0.5 5.25 6.375 637.5
2437.5 69.00563

RD Length width Height Height 2 Area M.Area Volume


0 - 6 4 0.5 13.5
100 100 6 4 0.5 13.5 13.5 1350
1350 38.2185

RD Length width Height 1 Height 2 Area M.Area Volume

0 - 8 1 0.5 6 - -
100 100 9 1 0.5 6.75 6.375 637.5
200 100 9 1 0.5 6.75 6.75 675
300 100 6 2 0.5 7.5 7.125 712.5
400 100 7 2 0.5 8.75 8.125 812.5
500 100 6 1 0.5 4.5 6.625 662.5
600 100 6 0.75 0.5 3.75 4.125 412.5
700 100 4 2 0.5 5 4.375 437.5
4350 123.1485

RD Length width Height 1 Height 2 Area M.Area Volume

0 - 4 1 0.5 3 - -
100 100 4 1 0.5 3 3 300
200 100 4 1 0.5 3 3 300
300 100 5 2 0.5 6.25 4.625 462.5
400 100 7 1 0.5 5.25 5.75 575
500 100 5 1 0.5 3.75 4.5 450
600 100 5 3 0.5 8.75 6.25 625
700 100 6 3 0.5 10.5 9.625 962.5
800 100 5 1 0.5 3.75 7.125 712.5
900 100 6 2 0.5 7.5 5.625 562.5
1000 100 8 1 0.5 6 6.75 675
1100 100 6 2 0.5 7.5 6.75 675
6300 178.353

km 22nd
0 - 4 2 0.5 5 - -
100 100 5 1 0.5 3.75 4.375 437.5
200 100 5 1 0.5 3.75 3.75 375
300 100 6 2 0.5 7.5 5.625 562.5
1375 38.92625

RD Length width Height 1 Height 2 Area M.Area Volume

0 - 7 1 0.5 5.25 - -
100 100 6 1 0.5 4.5 4.875 487.5
200 100 5 1 0.5 3.75 4.125 412.5
300 100 4 1 0.5 3 3.375 337.5
400 100 4 2 0.5 5 4 400
500 100 6 2 0.5 7.5 6.25 625
600 100 7 2 0.5 8.75 8.125 812.5
700 100 8 1.5 0.5 8 8.375 837.5
800 100 7 2 0.5 8.75 8.375 837.5
900 100 4 1 0.5 3 5.875 587.5
1000 100 7 1.5 0.5 7 5 500
1100 100 7 1 0.5 5.25 6.125 612.5
1200 100 7 1 0.5 5.25 5.25 525
1300 100 9 2 0.5 11.25 8.25 825
1400 100 10 2 0.5 12.5 11.875 1187.5
1500 100 6 2 0.5 7.5 10 1000
1600 100 6 4 0.25 12.75 10.125 1012.5
1700 100 9 1 0.5 6.75 9.75 975
1800 100 10 1 0.5 7.5 7.125 712.5
1900 100 9 2 0.5 11.25 9.375 937.5
2000 100 8 2 0.5 10 10.625 1062.5
2100 100 9 1 0.5 6.75 8.375 837.5
2200 100 7 1 0.5 5.25 6 600
2300 100 11 0.75 0.5 6.875 6.0625 606.25
2400 100 11 1 0.5 8.25 7.5625 756.25
2500 100 6 0.75 0.5 3.75 6 600
2600 100 8 1 0.5 6 4.875 487.5
2700 100 8 1 0.5 6 6 600
2800 100 6 2 0.5 7.5 6.75 675
2900 100 6 2 0.5 7.5 7.5 750
3000 100 5 2 0.5 6.25 6.875 687.5
21287.5 602.6491

RD Length width Height 1 Height 2 Area M.Area Volume

0 - 3 2 0.5 3.75 - -
50 50 7 6 0.5 22.75 13.25 662.5
100 50 8 7 1 32 27.375 1368.75
150 50 11 9 2 60.5 46.25 2312.5
200 50 15 12 5 127.5 94 4700
250 50 16 15 3 144 135.75 6787.5
300 50 15 5 1 45 94.5 4725
20556.25 581.9474

Total 2102.166
420
58800
49392
kakaw ring 85 0.46 0.46 17.986
km 26 800 0.46 0.46 169.28 187.266
km 27 447 0.46 0.46 94.5852 281.8512
km 25 850 0.46 0.46 179.86
461.7112

494.11
83134.01
8.4
Detailed workdone estimate for Stage contract for Beautification, upkeep, and routine
repair/maintenance, road marking with retro reflective road paint of major arterial
roads along with footpaths and road furniture, clearance of drain, painting of poles,
washing of kerbs for roads pertaining to sub division chararisharief.

Dimensions (ft)
S.No. Description Unit No Quantity Rate
L B H
1 Engagement of JCB for execution of works of various nature
hour 32 32.00 1200.00
Earthwork in excavation by mechanical means over areas
including dressing of sides and ramming of bottom including
2 all leads and lifts and disposal of excavated earth as directed
by Engineer incharge(all kinds of soil)

k. drain cum 1 1083.48 0.6 0.6 390.05 252.05


Slip clearance in ordinary soil including disposal of same beyond
3 site premises as directed by Engineer in-charge

cum 1 1230 0.45 0.6 156.36 140.20


Silt clearance from drains wet by manual or mechanical meansincl
4 disposal of rubbish as directed by engineer in charge.

cum 1 1332 0.46 0.46 281.85 168.25


Eng of Skilled labour with all machinery like cutters, axe, etc for
5 pruning of trees

No. 5 5.00 850.00


P/L of RCC spun pipes incl earthwork in excavation,
6 dressingof sides ramming of bottom, necessary cushon,
loading, unloading & all carriage
dia
L(ft) (inch) Qty (rft)

rft 2 8.0 12.00 - 16.00 800.00


rft 3 8.0 18.00 - 24.00 1100.00
Total
660195.20
, upkeep, and routine
int of major arterial
in, painting of poles,
ararisharief.

Amount

38400.00

98312.81

21,921.67

47,421.46

4,250.00

12,800
26,400

249,505.94
Detailed workdone estimate for Stage contract for Beautification, upkeep, and routine
repair/maintenance, road marking with retro reflective road paint of major arterial
roads along with footpaths and road furniture, clearance of drain, painting of poles,
washing of kerbs for roads pertaining to sub division chararisharief.

Dimensions (ft)
S.No. Description Unit No Quantity Rate
L B H
Earthwork in excavation by mechanical means over areas
including dressing of sides and ramming of bottom including
1 all leads and lifts and disposal of excavated earth as directed
by Engineer incharge(all kinds of soil)

k. drain cum 1 1688.75 0.6 0.6 607.95 252.05


Slip clearance in ordinary soil including disposal of same beyond
2 site premises as directed by Engineer in-charge

cum 1 1450 0.45 0.6 581.947 140.20


Silt clearance from drains wet by manual or mechanical meansincl
3 disposal of rubbish as directed by engineer in charge.

cum 1 153 0.46 0.46 32.3748 168.25


Eng of Skilled labour with all machinery like cutters, axe, etc for
4 pruning of trees

No. 7 7.00 850.00


Total
n, upkeep, and routine
aint of major arterial
ain, painting of poles,
hararisharief.

Amount

153233.7975 607.95

81,588.97

5,447.06

5,950.00

246,219.83
Detailed workdone estimate for Stage contract for Beautification, upkeep, and routine
repair/maintenance, road marking with retro reflective road paint of major arterial
roads along with footpaths and road furniture, clearance of drain, painting of poles,
washing of kerbs for roads pertaining to sub division chararisharief.

Dimensions (ft)
S.No. Description Unit No Quantity Rate
L B H
Earthwork in excavation by mechanical means over areas
including dressing of sides and ramming of bottom including
1 all leads and lifts and disposal of excavated earth as directed
by Engineer incharge(all kinds of soil)

k. drain cum 1 803.5 0.6 0.6 289.26 252.05


Silt clearance from drains wet by manual or mechanical meansincl
2 disposal of rubbish as directed by engineer in charge.

cum 1 850 0.46 0.46 179.86 168.25


Eng of Skilled labour with all machinery like cutters, axe, etc for
3 pruning of trees

No. 26 26.00 850.00


P/L of RCC spun pipes incl earthwork in excavation,
4 dressingof sides ramming of bottom, necessary cushon,
loading, unloading & all carriage
dia
L(ft) (inch) Qty (rft)

rft 2 8.0 12.00 - 16.00 800.00


rft 3 8.0 18.00 - 24.00 1100.00
Total
n, upkeep, and routine
aint of major arterial
ain, painting of poles,
hararisharief.

Amount

72907.983

30,261.45

22,100.00

12,800
26,400

164,469.43

You might also like