Bill Crate Panzan
Bill Crate Panzan
6 Carriage of materials by MT
6.1 Stone agg cum 34.59 375.74 12,996.85
6.2 Sand cum 20.060 349.82 7,017.39
Total Amount = Rs 342,132.62
Deduct (-13.99%) = Rs 47864.35337
Net Payable = Rs 294,268.27
width
avg 0.971857 1.145571 0.897143 1.024786
L/S Block
Area Avg Area Volume
1
0.75 0.875 17.5
0.89889 0.824445 16.4889
0.6889 0.793895 15.8779
1.25 0.96945 19.389
0.6825 0.96625 19.325
0.5561 0.6193 14.55355
103.1344 cft
L/S Block
Area Avg Area Volume
1.0556
0.6825 0.86905 17.381
0.6825 0.6825 13.65
0.91 0.79625 15.925
1.083 0.9965 19.93
0.72561 0.904305 18.0861
0.6825 0.704055 14.43313
99.40523 cft
334.2997 cft g. total = 709.3851 cft
20.08759 cum
Detailed estimate for Construction of drain and Upgradation of road from Hira public
school to Shariq wani house in Wanbal.
(Road sector 2022-23)
Dimensions (m)
S.No. Description Unit No Quantity Rate
L B H
Earth work in exacavation in foundation in trenches incl
1 dressing of sides & ramming of bottom & getting out
excavated soil to be filled/levelled as directed
cft 6 16 6 2 1152.00
cft 8 16 5 3 1920.00
cft 8 16 4 4 2048.00
cft 3 16 4 4 768.00
cft 2 16 5 3 480.00
cft 2 16 4 4 512.00
cft 2 16 4 4 512.00
- 7392.00
sqm 209.32 4300.00
Supplying and filling of stone boulders as filter media behind
crate wall incl. carriage complete job.
11 Carriage of material by MT
Amount
51,662.96
12,884.41
67,036.29 79,920.70
129000
900,084.95
#REF!
#REF!
#REF!
back filling
width ht length cft cum
2.857143 8 22.85714 120 2742.857 77.67053