BILL FORM

Name of Work : Restoration of Ganjibagh Road near Panzan Bridge bwo


Crate Protection work
Name of Contractor : M/S Arshid Ahmad Bhat S/o Ghulam Mohammad
Bhat R/o Kuzwera Chadoora.
Head of Account : 4059 UT
Allotment No: 12425-27 Dtd :04-03-23
Serial No. of Bill : C/C 1st
Date of Start : Date of Completion :

S.no Items of Work Unit Quantity Rate Amount


(Rs)

Earthwork in excavation by mechanical


means(hydraulic excavator) in trenchs for
1 foundation and disposal of excavted earth cum 79.940 252.05 20,148.88
as directed.

P/L of stone soling duly hand packing in


trenches and ramming with iron hand
2 rammers including all leads, lifts, cum 18.580 1,000.00 18,580.00
carriages complete job,

P/L of cement concrete 1:3:6 (1 cement :


3 coarse sand : 6 graded stone aggregate)
using, incl. curing excluding the cost of
3 centering, shuttering, finishing cum 37.44 4,943.4 185,080.90

Centering & shuttering incl. strutting and


propping incl. removal of same
4 Foundation ,Footings, bases of columns sqm 189.24 262.30 49,637.65
etc for mass concrete

12 mm thick cement sand plaster in 1:4 (1


5 cement : 4 fine sand) complete sqm 187.16 260.05 48,670.96

6 Carriage of materials by MT
6.1 Stone agg cum 34.59 375.74 12,996.85
6.2 Sand cum 20.060 349.82 7,017.39
Total Amount = Rs 342,132.62
Deduct (-13.99%) = Rs 47864.35337
Net Payable = Rs 294,268.27

As recorded on M. Book No. 262 (2022-


23) from Page No. 01 to 03.
1st strect
R/S block L/S Block
Width Ht Area Avg area Volume(cft) Width Ht
0 - 1 5 5 0.75 1
10 10 1 1 1 3 30 0.91 1
20 10 1 1 1 1 10 1 1.083
30 10 1 1.083 1.083 1.0415 10.415 1.167 1.167
40 10 1 1 1 1.0415 10.415 0.833 1.083
50 10 1 1.083 1.083 1.0415 10.415 1 1.167
60 10 1 1.083 1.083 1.083 10.83 1 1.083
70 10 1 1 1 1.0415 10.415 1 1.083
80 10 1 1 1 1 10 0.83 1.083
90 10 1 1.083 1.083 1.0415 10.415 0.83 1.083
100 10 0.916 1 0.916 0.9995 9.995 1.16 1.16
110 10 1 1 1 0.958 9.58 1.16 1.083
120 10 1 1.091 1.091 1.0455 10.455 0.83 1
125 5 1 1 1 1.0455 5.2275 0.83 0.91
13.916 18.423 148.1625 13.3 14.985

R/S block L/S Block


Width Ht Area Avg area Volume(cft) Width Ht
0 - 1 1 1 1 1
20 20 1.083 0.91 0.98553 0.992765 19.8553 0.75 1
40 20 1 1 1 0.992765 19.8553 0.83 1.083
60 20 1 1 1 1 20 0.83 0.83
80 20 1.083 1 1.083 1.0415 20.83 1.25 1
100 20 1 1.083 1.083 1.083 21.66 0.75 0.91
123.5 23.5 1 1 1 1.0415 24.47525 0.67 0.83
7.166 6.993 126.67585 6.08 6.653

R/S block L/S Block


Width Ht Area Avg area Volume(cft) Width Ht
0 - 0.83 1 0.83 0.91 1.16
20 20 0.91 0.83 0.7553 0.79265 15.853 0.75 0.91
40 20 0.91 0.83 0.7553 0.7553 15.106 0.75 0.91
60 20 0.83 1 0.83 0.79265 15.853 0.91 1
80 20 0.91 1 0.91 0.87 17.4 1 1.083
100 20 0.91 1 0.91 0.91 18.2 0.67 1.083
120.5 20.5 0.83 1 0.83 0.87 17.835 0.75 0.91
6.13 6.66 100.247 5.74 7.056

width
avg 0.971857 1.145571 0.897143 1.024786

375.08535 cft Total qtty


L/S Block
Area Avg Area Volume
0.75
0.91 0.83 8.3
1.083 0.9965 9.965
1.361889 1.222445 12.22445
0.902139 1.132014 11.32014
1.167 1.03457 10.3457
1.083 1.125 11.25
1.083 1.083 10.83
0.89889 0.990945 9.90945
0.89889 0.89889 8.9889
1.3456 1.122245 11.22245
1.25628 1.30094 13.0094
0.83 1.04314 10.4314
0.7553 0.79265 3.96325
131.7601 cft

L/S Block
Area Avg Area Volume
1
0.75 0.875 17.5
0.89889 0.824445 16.4889
0.6889 0.793895 15.8779
1.25 0.96945 19.389
0.6825 0.96625 19.325
0.5561 0.6193 14.55355
103.1344 cft

L/S Block
Area Avg Area Volume
1.0556
0.6825 0.86905 17.381
0.6825 0.6825 13.65
0.91 0.79625 15.925
1.083 0.9965 19.93
0.72561 0.904305 18.0861
0.6825 0.704055 14.43313
99.40523 cft
334.2997 cft g. total = 709.3851 cft
20.08759 cum
Detailed estimate for Construction of drain and Upgradation of road from Hira public
school to Shariq wani house in Wanbal.
(Road sector 2022-23)
Dimensions (m)
S.No. Description Unit No Quantity Rate
L B H
Earth work in exacavation in foundation in trenches incl
1 dressing of sides & ramming of bottom & getting out
excavated soil to be filled/levelled as directed

cft 1 258.0 3.000 1.00 774.00


cft 1 123.5 3.000 1.00 370.50
cft 1 120.5 3.000 1.00 361.50
1506.00
cum 275.83 187.30

P/L of stone soling duly hand packing in trenches and


2 ramming with iron hand rammers including all leads, lifts,
carriages complete job,

cft 1 32.0 5.00 0.50 80.00


cft 1 125.0 6.00 0.50 375.00
cum 12.88 1000.00
P/L in position cement concrete of specified grade excluding
3 the cost of centering and shuttering. All work upto plinth level
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate
40mm size crushed).
cft 1 32.0 5.00 0.50 80.00
cft 1 125.0 6.00 0.50 375.00
cum 12.88 5202.90

Providing and laying in position cement concrete1:3:6 (1


cement : 3 coarse sand : 6 graded stone aggregate ) of
4 specified grade including curing but excluding the cost of
centring and shuttering

cum 0 0.0 0.31 0.45 0.00 5733.60


Crate work
5

cft 6 16 6 2 1152.00
cft 8 16 5 3 1920.00
cft 8 16 4 4 2048.00
cft 3 16 4 4 768.00
cft 2 16 5 3 480.00
cft 2 16 4 4 512.00
cft 2 16 4 4 512.00
- 7392.00
sqm 209.32 4300.00
Supplying and filling of stone boulders as filter media behind
crate wall incl. carriage complete job.

11 Carriage of material by MT

(a) Stone agg avg lead = 14 km cum #REF! 443.06

(b) sand from marwal cum #REF! 409.94


Total
road from Hira public

Amount

51,662.96

12,884.41

67,036.29 79,920.70

129000
900,084.95

#REF!

#REF!
#REF!
back filling
width ht length cft cum
2.857143 8 22.85714 120 2742.857 77.67053