API 653 Certification
Data Sheets
SL.
Answer
Reference
Reference Documents
Fitness for Service (FES)
(2 | apisso Risked Based Inspection
3 | apr6zo Low Pressre Storage Tanks
Cathodte Protection
s | apies2 TTenk Bottom Linings
Welding on n-Service Equipment containing Flamnables pn) jets"
7 ont NDE Procedure Guidelines
8 ASME See Acceptance Standards for RT, MT & PTs of Welds
‘ASME Seo. : ; ;
LTA’s
9 | ee Altemative code to evaluate pits and
Welder Qualification Code
Weld Procedure Qualification Code
| AsT™ Impact Testing Method and Equipment Requirements =
| A370 | we 1B Equipment Reg
3 | ie | Requirement for new welding elestrodes |
re pss] | NDE Personnel Qualfsien (RT & UT Flay Deteon)
1S Annex F API 650 Annex for Frangible Roofs
16 [2.02% LF API 650 Amex for Hot Tanks
Answer
Reference
AIRR
JUIC
Joc
Class Abbreviations
[API 653 Sompe (Alteration, inspect, Repair, ae
‘API 653 Al's Employer (Jurisdiction, User, Insurance company,
Contractor)
(Authorized by Jurisdiction, Owner,
Paget of 12API653 Certification
Data Sheets
Answer | Reference Dimensions
| 6-40 Linings “Typically anchor profile of steel surface required for the
ils installation of «tank bottom lining
1164" ‘Welds - Maximum undercut of a vertical weld & nozzle weld
‘Welds - Maximum undercut of a horizontal weld
‘Welds - Maximum diameter ofa surface porosity cluster
‘Weld Qualification - Max allowed discontinuity in a Bend Test
‘Namephtes- Minimum size of nameplate letters
ottoms- Minimum external projection of botiom plate on an
existing tank (rom toe of shell-o- bottom FW)
Reconstruction - Max amount of peaking allowed in vert. welds
‘Shell Celes - When calculating tan for shell CTA, minimum distance
away from a weld where "E"is always 10
‘Shell Patch - Minimum overlap of shell lap-patch used to cover a
10 r hole (edge of hole to edge of patch)
i ‘NDE When performing aPT examination, minimum distance to clean
i r beyondthe area to be examined
= NDE- When performing a MT examinaiTon, minimum distance te
clean beyond the area to be examined
‘Resonstuction- Maximum amount of banding allowed in «
horizortal welds
Botioans~ Minimam overlap required for single-welded lap
joints
Batons ~ Msimum extemal projection of bottom plate ona new
2 z tank
roe ‘Vacuum Box: Minimum ovelap of previously test surfaces
! when wsinga vacuum box
a Bottom Patch Minimum overlap of Botan lap patch wed t cover
i corrodal area (edge of corrosion to eg of patch)
BBotiom Paich- Minimum distance botom lap-pach filet weld 10
Lala the nearest existing bottom weld
» | ay ‘Shell Patch - Minimum radius ofa shell lap-patch
= Reconsrucion- Irrasing Foto plates, min distance to cut from
ea ing bate welds i pleasent deseamed)
pila Reconstruction - IF reusing roof plates, min distance to cut from
isting roof welds (if plates are not deseamed)
Shell Fiting - Maximum allowed vertical lengihof pis ona
eh e tank shell
Page 2 of 12APL653 Certification
Data Sheets
Answer | Reference
Dimensions (continued)
Bottom Pitting- Maximum allowed length of pitsin the critical
zone that can be repaired by weld-buildup
By Bottoms - Radial length of critical zone measured from shell
as] aan Bottoms - Suggested sand pad thickness
%6 a Welds - Min distance between clusters of surface porosity
7 ” Shell Petch - Minimum dimension ofa shell lap-patch
28 e Shell Patch - Minimum radius ofa shell lusk-patch
Shell Cales= When calculating in for shell LTA, minimum
5 im Bottom Paich - Minimum size of kottom lap-patch that does |
30 NOT cross a bottom seam =
Fi ‘Botiom Patch - Minimum distance between a bottom lap-patch and | —
i the shell for patches that do NOT extend to the shell
3p e Reconstruction - If reusing shell plates, min distance to cut from
isting shell welds (i'plates are not dessamed)
a RI - Minimum diagnostic length ofa RT for vertical or
| ay) horizontal welds
a ey ‘Weld Qualify - Minimum weld length when qualifying a welder
2 with RT/UT using a coupon or Ist production weld
z e ‘Weld Qualify -Mirimum weld length when qualfjing a welding
4 operator with RT/UT of atest coupon
a 2 Shell Patch Minimum distance to overlapa shell weld when
dl | using alap-patch
37 Corrosion - Area to dig when checking for sil1o-air corresion
38 | 6-24" NDE - Distance of eye-to-partto countas a Visual Exam
39 | 6x30" ‘Vosuum Box - Typical size ofa vacuum box
| al Shell Patch - Minimum dimension ofa shell fush-patch_
ii ortomss- Minimum dimension thata apjointcan be fom other
BE 3-1ps, te shell, or annular pate joints
faa Bene ‘Bottom Patch - Minimum dimension of bottom lap-paich that
crosses a bottom seam
alee Foundations - Suggested height above grade for new tik
oH botioms
Shell Patch - When acing shell Tush-paich tha extends toa
a horizontal shell weld, minimum distance to cut the horizontal
t
‘eld past thenew vertical welds
Page 3 of 12API 653 Certification
Data Sheets
Answer | Reference Dimensions (continued)
@lesin Shell Patch Dimension ofa shell Mush-poich this
‘considered either a major repair or alteration
“a Definition = Dimension of shel vertical weld if repaired or
replaced is considered a major repair or major alteration
41 | 2 Botiom Patch - Max width of bottom patch in the critical zone
Aloe Booms - Minin radial wicth of annular pate stance
: betwen shell and nearest boitom fillet weld)
a] 24" ‘NDE - Max distance of eye-to-part to count as a Visual Exam
=| lee Tot Tap Minimum height of iquid above new nozzle during the
3 hottap operation
om ‘Weld Qualify Minimum weld nh when qualifying e welding
ates | operator with RT/UT of first prouction weld
aAleiee ‘NDE: Lengih of sweep board used when checking for banding or
3 a
= ea ‘Welds - Maximum distance between welder ID siamps on a tank
weld
rg eh Shell Patch - Maximum size of shell lap-patch (vertical & |
ou |e horizontal dimensions) |
lee Setlement- Maximum distance between tank settlement survey
oT points across the inside of the tank i
36 Roofs - Maximum shunt spacing on floating roof Z
st] <2 (CP Typical tank size for Galvanie CP systems
aren Saiilement = Maximum distance between tank setlement survey
ints around the outside diameter ofthe tank
| 0! 'NDE- Maximum distance between RTs in horizontal welds |
when welding to existing shel pates
> ae Shell Cakes - Tank diameter when Variable Point Design method
£ a Id always be used to cale shell minimum thickness 4
a ‘Shell Mininoum offset between vertical welds in adjacent
courses ‘
@ | FulFillet Botoms- Minimum sizeof bottom welds g
Page 4of 12API 653 Certification
Bata Sheets
Answer Reference Line Sizes
1 Repad - Nozzle size that never requires a repad
Repairs - On existing tank, new nozale must use insert plate if
2 >2NPS shell is over 4" thick and shell material does not meet
current MDMT requirements
5 ‘SNPS RT - Maximum pipe size when using a RT elliptical shot (double
G-1/2" 0.D.) wall technique, double-wall view)
4 Hot Tap - Maximum nozzle size that can be hot tapped when
es ikea eee as
=| Sites Definition - When adding a new nozzle, nozzle size to be
ie considered a major alteration
Answer | Reference Percentages
ee NDE - Limits of 8T Film Density of weld as compared tolQI
1 | 1510 +30% y
(rage)
= om AT Amount of time inspector mast be involved in inspection
= at activities - required to maintain API 653 certification
alas RT Reconstruction -% to of weld intersections (new welds to old
svi welds) to beRT'd
4 | 20% Maximum relative humidity when installing tank bottom Linings
°% to RT when installing a new insert plate with anozzle into an
3 Loe ‘existing shell plate
7 1
Page 5 of 12API 653 Certification
Data Sheets
Answer Reference Temperatures
1 ‘eer Reconstruction - Base metal remp where welding is net allowed
- Reconstruction = Base metal icmp when hand-warm pre heat is
2 0-32°F =
required
3 aes: | Linings - Minimum temp when installing, tank bottom linings
4 ‘Comosion - The corrosion rate of steel tank bottoms may
doable with hisrise in temperature
5 : 25°F UT Calibration - Calibration Block must be within what
temperature of the part to be examined, |
6 | 40-125°F ‘Vacuum Box - Standard temperature range for VB exam 4
7 | 40-125°F PT- Standard temperature range for a PT exam 4
és) Sa | Impact Test- Design metal iemporature that requires weld Z
} procedure used for vertical welds to be impacted tested é
tae Brle- Tank metal temperature where brite fracture is NOT
concern
oe Bottom Lap Patches - Metal temp where lap-patches are NOT
coy ees allowed in critical zone on ‘SS tank
ly <110°F Tntervals - IFtank product solidify below this temperature, the
i code maximum interval rules do not apply
12| 140F Preheat - Approximate temp of a required hand-warm pre-heat
a Corrosion - Temperature when high strength caustic causes:
:| en Geus eonoson in CS and 300 SS
Ga Tyepb _ | Prebeat- Required preheat temperature or shell welds over 1.5"
| eae thick during Recenstruction |
Bottom Lap Patches - Metal temperature where lap-patches
are NOT allowed in the critical zone on CS tanks
“Temperature Range for API 650 App M
‘Comroston - Most aggressive temperature range for CUL
My Range for APISIS and API 571
eer Preheat Minimum pre-heat emperature, when pre-beatis 7
By substituted for PWHT ei
19, | 1000°F Maximum temperature for UT readings
20 | 1100-1200 °F PWHT Temperature
21
22
Page 6 of 12API 653 Certification
Data Sheets
Answer | Reference Thicknesses
i Linings - Thickness ofa thin film lining
le Bottorn - Minimum allowed bottom plate thickness when there s a
g Reinforced Liner that is > 0.050" thick
al” ans Bottom - Minimum allowed bottom plate thickness when there B@
means to Detect and Contain a leak £
4 | oot Roofs -Minimum allowed average thickness of eomreded roof pate
Aa Shell - Minimum arbitrary shell thickness (used when caloulated
< fminimurn thickness is below this number)
calcio Bottom = Minimum allowed thickness of bottom plate ai we of the
extemal shell-io-bottom fillet weld
5 Bottom = Minimum allowed bottom plate thickness away from
critical one or an annular plate
3] oro | Bottom - Minimum allowed plate thickness in critical zone that can
L be repaired by weld-buildup
9 | 0.100" Roof Rim - Minimum allowed roof thickness
10 ee, Roof - Minimum thickness of new roof plate (cone & floating)
lm Roof Rim - Minimurn thickness of new roof rim
12 | 14" (0.236%) Bortom Normal minimum thickness of new bottom plate
ie ua" Bottom Patch - Maximum thickness of lap-patch in critical zone
| 14 eT Brittle - Thickness when brittle fracture is NOT a concern
is [12 Shell Peto ~ Max shell thickness when lap-patches are allowed
16] 12" Shell Petch - Maximum patch thickness for shell lap-patch
mie ‘Weld Qualification- When can UT be used in lieu of RT to Qualify a
Welder/Welding Operator
a NDE - When welding exising shell plate. Thickness that requires
10096 examination by RT’ and MT or PT.
alee [NDE - Plate thickness which requires 100% of verticals weld to be
fadiographed
ai Reconstruction - Shell plate thiskness that requires all welds tobe
[ heated to t least 200 °F,
21 | Caeain| [Shel Pits - Minimum remaining thickness allowed below @ pit
Page 7 of 12API 653 Certification
Data Sheets
Answer Reference ‘Time Intervals
1 | Seconds ‘Vacuum Box - Minimum duration of each vacuum-testing exam
yaaa NDE = Minimum time an examines should bein a darkened area prior
nes | tousing a black light for MT & PT exams
z 10-60 INDE Find interpretation of PT exam after application of developer
2 minutes, 1c range)
TGs "Testing - Minimum time fo le oil to penetrate when performing a
a dics! oil test of shell-to-bottom weld
“Testing - Minimum duration for a tank hydrotest to be held at full
S| 2thour ages
6 1 day NDE. Mex Calibrating Interval - Permanent magnet MIT Yoke
7 | Amonth Intervals - Meximam Interval - Routine In-Service inspection
i CP Maximum Interval - Routine check of CP impressed current
sourees
NDE - Max Calibrating Interval - RT densitometer
Reconstruction - Maximum allowed age of last thickness
readings, used to design @ reconstructed tank
Weld Qualification - Maximum Time - Welder or operator maintains
qualifications for a welding process without using that process
NDE - Max Calibrating Interval - Electromagnetic MT Yeke
TP Maximum Interval - Detailed check of CP impressed current
ae "
3 facilities
4 (CP ~ Maximum Interval - CP surveys (field potential measuremen's)
| NDE - Minimum Time - To keep RTs acquired during tank repairs
a il in cep RTs acquired during tank rep
8) | a “and reconstructions
16 | 1year__| Vac Box Max Test Inervel -Jaeger 2 eye test for VB oper
17 | Lyear INDE - Max Test Interval - Jaeger? eye test for PT/ MT tech
18 | 3ycar [AI - Time period between API Al recertification
ie oe ~ intervals - Maximum Interval - UT readings ofa tank shell when the
corrosion rata is unknown a
2 Intervals Maximum Interval - External Inspection
2 | 6year ‘AL Time period beween API Al on-line revertficaion
Tatervals~ Maximum Interval Intiel Internal Inspection (without
2 | Goyen” RBI or other special situations)
Page 8 of 12API 653 Certification
Data Sheets
Answer
Reference
‘Time Intervals (continued)
B
RBI- Maximum Interval - RBI reassessments
oes |
a eae
Intervals - Maximum Interval - UT readings ofa tank shell when the
corrosion rate is known
20 yr. or full Tntervals - Maximum Interval - Internal Inspection when the
bottom life corrosion rate is known (without RBI assessment)
26 | >20years | C {Linings = Typical life ofa properly applied tank lining
a Before & NDE - Max Calibrating Interval - Check the light intensity of a black
after use L lightused in a MT or PT exam
Answer Reference Pressures
L 25 psig ‘Scope - Maximum intemal pressure for tanks in API 650 & 653
2 | Basen ‘Vacuum Box Normal vacuum required when vacuum testing
[Pressure Test Pressure used whan alr testing the shall-to botiom wel
; |e (airbetween bottom fillet welds)
+] 1Spsig Pressure Test - Pressure used when ar testing a repad
s | 15psig Scope- Maximum intemal pressure for tanks in API 620
Answer | Reference Stopes
1 | to Typizal minimum upward lope of atank bottom
2 [16 Minimum slope of cone roof tank (for water runoft)
== Maximum roof sope on ; ameter (Froofis considered to
4 14 Maximum taper (steepest slope) allowed for a shell insert plate
5
Page9 of 22API 653 Certification
Data Sheets:
Reference
Miscellaneous Numbers
‘cofs - Maximum amount of primary seal that can be removed for |
repair while tank is still in service
INDE - Minimum number of RTs required on a circular shell
2 u heplacement plate
3 10 FPS — Current joint efficiency “E” in API 650 3
IFES - Joint Eificiency "E" - Calculating tmin, for an LTA, when
4 a& LTA is away from rivets by > 6"
IFFS - Joint Efficiency "E"- Calculating twin for an LTA, when
5 oe [LTA is away from weld by greater of: 1" or 2t
q B [Reconstruction - Number of sets oF center punch marks
[located on top and bottom edges of each shell piece
7 e ‘Weld Qualification - Number of tension tests to qualify a WPS
B Weld Qualification - Number of bend tests to qualify a welder or
‘welding operator in welding positions 1G-4G
3 g NDE- Minimum # of exposures to RT 360° of a weld wsing @
double-wall technique, double-wall view (elliptical shot)
rf NDE- RT film Density Range - allowed for the weld & 1QI when
3 — using a gamma ray source |
e NDE- Minimum # of exposures to RT 360° of a weld using a
ae double-wall technique, single-wall view
; impact Test - Number of test bars required in each set of impact tes
o| SB ee
é ‘NDE - When using a shim under a hole-type IQI, the number of
im ides ofthe 1QI that must be seen in the RT image
Hoot Tap - Minimum number of UT readings around the
7 4 jeld Qualification - Number of bend tesis to qualify e WPS
ie | A ‘Weld Qualification - Number of bend tests required to qualify a
elder in welding positions 5G & 6G
if = FFS - Corrosion Averaging in a Sheil LTA - Minimum # of UT
headings to take on each designated vertical lin.
DE - Minimum number of RTs required on a square or rectangul
if hell replacement plate
Settlement - Minimum number of settlement poinis around
19 ircumference
2
21
n
Page 10 of 12API 653 Certification
Data Sheets
Reference ]
Answer Miscellaneous Other
Lee Reconstructed - Mi lowed out-of plum
fel stelabe }econstructed - Maximum allowed oul-of-plumbness
2 | <3.0pH Corrosion - pH level that causes corrosion to increase
3 | 10ppm Corrosion - Chloride level where pitting on stel begins
4[ ii NDE - Weight used to check magnetic strength ofan AC yoke 7
Groundling - Maximum electrical resistance permitted from tank fo
: | ean “
6 | 30 degrees NDE - Min engle of eye-to-part to count as a Visual Exam?
7 | 400. NDE - Weight used to check magnetic strenath of a DC yoke
100 fe ‘NDE - Minimum light intensity when performing non-lunrescent
8) aaa MT orPT exams
100 fe ‘Vacuum Box - Minimum light intensity when performing vacuum
2 | candles ‘tasting
=< looess NDE - Minimum black fight intensity when performing fluorescent |
10 ieee Mr orPT exams.
11 | <7000 psi Britle~ Shell stress when britle fracture is NOT a concern
F NDE - Hole size that must be visible in RT when using a holeaype
‘Weld Qualification - Maximum allowed thickness on a WPS
3 | ar based on the plate thickness (T) of aPQR test coupon
[6G ‘Weld Qualification - The “all-position’ test coupon
NDE - Lead Iettr used during RT to cheok for backscatler |
1s B radiation |
16 NDE - Lead letter used during RT to indicatea film-side IQ] |
17 = ‘NDE - Lead letter used during RT to indicate a repaired weld
is Repairs - Material where pre-heat can be substituted for a required
1g) Pa PWHT
Repairs - Materials where control deposition welding can be |
19 | PI,P5,P4 substituted fora required PWHT
20 | Extra Strong,
Hot Taps - Nozzle thickness for ht tapped nozzles
Page 14 of 12API 653 Certification
Data Sheets
Answer Reference Miscellaneous Other (continued)
|
2) fcaw, Preheat or Controlled Deposition welding fora required PWHT
GTAW
22 [Anode ‘Corrosion - In a corrosion call, the part that corredes
2B Corrosion - In a corrosion cell, the part that doesnt corrode
4 Linings - Minimum surface prep prior to applying lining
S| ‘Weld Qualification - Rejectable in RT when qualifying 2 welder
5E ‘Weld Qualification Which welding process can a welder NOT be et
qualified by RT/UT |
Essential &
oT eee Welding ~ Variables needed on WPS
28 | Esseatial ‘Welding - Variables needed on PQR
Page 12 of 12API 653 Certification
Data Sheets
sL | Answer | Reference Reference E
1 16 Fitness for Service (FFS)
2 $42.22 | Rished Based Inspection
3 2 Low Pressure Storage Tans
4 653:6.3.4.1 | Cathodic Preretion
5 653:443.4 | Tank BottomLinings
6 653:9.142 | Wellingon Service Lauipment containing Fanmebles
650: 6.1.3.1
7 | 821,833, | NDE Procedure Guideins
|e - |
5
8 fo igeas | Acceptance Standards for RT, MT & PTs of Welds
5 653:4.3.6 | Alternative code to evaluate pits and LTAS
16 | esatita | Wekler Qualification Code
u 653: (111 | Weld Procedure Quilifcation Code
2 6504-294. | tmpacr Testing Method and Equipment Requirements
3 653: 74 Requirement for new welling etscredes
a 68.5132 | Noe panel Quien (RT& UT Raw Dee
15 653:42.4.1 | APL650 Annex for Frangible Roofs
16 6554243 _ | API650 Annex for Hot Tanks
Answer | Reference | Class Abbreviations
1 653: 1
APL653 Scope (Alteration, Inspect, Repair, Revonstruction)
‘APL6S3 Al's Employer (Jurisdiction, User, Insurance company,
Contractor)
API6S3 Repair Organization (Authorized by Jurisdiction, Owner,
Contractor)
Page Lof 12API653 Certification
Data Sheets
Answer | Reference Dimensions
1 Linings - Typically anchor profile of steel surface required for the
| installation of a tank bottom fining
2 Welds - Maximum undercut of a vertical weld & nozzle weld
| 3 Welds - Maximum undereut ofa horizontal weld
4) 332" Welds - Maximum diameter of a surface porosity cluster
ss ‘Weld Qualification - Max allowed discontinuity in a Bend Test
6 | si" Nameplates Minimum size of nameplate letters
7) oe | Bostoms - Minimum extemal projection of bottom plate onan
existing tank (from toe of shell-o-bottom FW)
sf ow Reconstruction - Max amount of peaking allowed invert welds
9) ren ‘Shell Cales- When calculating tea for shell LTA, minimum éisiance
o sway from a weld where "E" is always 1.)
i” ‘Shell Patch - Minimum overlap of shell lap-patch used tocover a |
r hole (edge of hole to edge of patch)
rm ‘NDE- When performing a PT examination, minimum distance to lean
Q bbeyoad the area to be examined -
D NDE - When performing aMT examination, minimum distance 0
2 r | clean beyond the ace to be examined
B Resonstuston - Maximum amoun ofbanding llow=dina
r horizontal welds
1 r Btems - Minima overlap required for sngle-welied Tap
| Joints
Tele Bottoms - Minimum external projeaion of batem plas one pow
{ : tank,
i ‘Veeuum Box - Mirimum overlap of previously test suraces
‘|? when using vacuum box
vl? otiom Patch - Minimum overlap of bottom lap-patch used to cover
2 corroded area (edge of comrosion to edge of patch)
wl 2 Bottom Patch - Minimum distance bottom lap-patch fillet weld to
the nearest existing bottom weld
w] 2 | Stell Patch - Minimum radias ofa shell lap-patck
»l 2 ‘Reconstruction -Ifreasing boom plates, min distance to cut from
| existing bottom welds (ifplates are not deseamed)
ot _ Reconstruction -[freusing roof plates, min distance t9 cut Gom
existing roof welds if plates are not deseamed) |
loa | one ine Stell Biting - Maximum ellowed vertical length of pits on 8 |
tank shell
Page 2 of 12API653 Certification
| weld past the new verticl welds
Page3 of 12
Data Sheets
Answer | Reference Dimensions (continued)
5 Bottom Fitting - Maximum allowed length of pits in fe critical
23 OSS: 810-160 | sone that canbe repaid by veld buildup
4 653:3:10 Bottoms - Radial length of critical zone measured from shell
2 650:B.3.2 | Bottoms - Suggested sand pad thickness
26 650:85.2.0 | Welds - Min distance between clusters of surface porosity
7 653:93.1.7 | Shell Patch - Minimum dimension ofa shell leppatch
693:Fig 9.1°R" ch - Minimum radius of a shell usin
28 oars Shell Patch - Minimum radius of shell flash-patch |
5 [Shell Cales= When calouating tes for shell LTA, minimum
» S83:454.1 [stance aay fm ativel where E" is alvays 10
- Bottom Pach - Minimum size of bottom lap-patch that dees
20 695: 9:10.1-16 | NOT cross abottom seat
I ‘653: Fig9.13 | Botom Patch - Minimum distance betweea a botiom lap patch and
3 r9.10.1.3.b _| the shell for patches that co NOT extend tothe shell
3: 10.33.1¢ [Reconstruction Ireusing shell plates, min distance to cut from
2 53: 10.33.16
653: 1033.16 [iting shel welds (f plates rere deseemed)
33 650:8.1.2.8 | RT-Minimum diagnostic length of RT fer verical or
[653512217 | horizontal welds
34 | 1X: QW.302.2. | Weld Qualify - Minimum weld length when qualify ing a welder
5 1X: QW-304.1 | with RTVUT using a coupon ar Ist production weld
5 502.2 | Weld Quali Minimum weld length when qualifying a welling
38 PE QW302.2 | peratorwith RUT ofa test coupon -
5 cnos Stell Patch Minimum distance o overlapa shell weld when]
36 6539215 | hea lgomeh -
37 8.2.10 | Corrosion - Area to dig when checking for soil-to-ar corrosion
38 577:03.Le __ | NDE -Distance ofeye-to-pat to coun asa Visual Exam
x 650: 8.6.1 Vacuum Box - Typieal size ofa vacuum box
40 653:9.2.2.1 | Shell Patch- Minimum dimension oF shell fush-patch
co Bestoms - Minium dimension ata }lapjcint canbe fiom: other
a G50: 51542 | 5-taps, the shell, or annular plate joints
os Boatom Patch - Minimam dimeasion of botom lap-patch tat
2 653:9.10.1.1.0
5 «esses. botom seam
" 3 Foundations Suggested eightabove grade for new tank
43 690:B3.1 | fonoms
be. Shell Patch - When adding a shell flush-patch that extends toa
“a SxBP1 | tovzonalstell weld minimum distance the horzortal“Answer | Reference Dimensions (continued) |
API 653 Certification
Data Sheets
| 63: 3.20.6
43 ‘Shell Patch - Dimension of a shell flush-patch thats |
considered sithior a major repair or alteration _ |
4 Definition - Dimension of shell vertical weld ifrepaired or |
6 653: 3.206 | replaced is considered a major epair ar major alteration |
653: Fig9.13
7 com Patch - Max: width of tom patch in the critical zone
4 Qe Bottom Patch - Max width of bottom pateh in che evitical
® 650: 3.1.5.4.3 | Botoms Minimum adid wid ofsielarplte (isan
& between shell and nearest bottom fillet weld)
» 575: 9.2.1 | NDE Max distance of eye-to-parto count as a Visual Exam
0 653 9.1412 ; Tiguid shove new nozale during the
. Weld Qualify-Minimurn weld length when cualifvinga welding
ay TX: QW-305.1 | onerator with RT/LIT of first production weld
2 653: 10.547 5 | NDE- Lena of scp Boa usd when cecing fr ancing or
pecking |
a 650, 94 Welds ~ Masini distance betwaen welder ID damps ona ik
S 5 weld
La _
653: 93.1.7 | Soll Pash Minami of el op pach al
worizonul dimensions) _|
Setlement- Maximum distance Btwvon tank sotlerent survey
>| 655: FigB2 | soins across the inside of the tank
56 650: 63.1.6 | Roofs -Maxinnam shunt spacing on floating roof
37 651: 6.21 (CP Typical tank size for Galvanie CP systems
3s 653: FigB1/ [Settlement - Maximum distance between tank setlement survey
| 1252 points around the outside diameter of the tank
39 | [65312212 | NDE- Maximumdistance between RT sin horizontal welds
| | we ‘when welding to existing shell plates
al 5343.34 | Stell Calos Tank diameter when Variable Point Design method
| 34 _bhould atwaysbe used to cae shell minimum thickness
Bs S152 | Siell- Minimum offser between vetival welds in alaccoh
o
6
courses
650: 5.1.54.3 | Botoms um size of bottom welds
pee E—E—E——E—I—