Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

BARTOLOME, ROHAN SIEGFRIED B.

ARC 155 – MODULE 7


UP-FA1-BSAR4-01

ACTIVITY 1

1. Is contract administration important?


- For construction projects to be completed on time, under budget, and with transparency preserved,
contract management is essential. Project success is aided by its promotion of accountability, clar-
ification of roles, and resolution of alterations, hold-ups, and difficulties.

2. How does the proper handling of the Construction Process contribute to project success?
- The effective management of the construction process is essential to the success of a project be-
cause it guarantees effective time management, cost control, adherence to quality standards, pro-
active risk mitigation, and clear communication, all of which eventually result in the prompt delivery
of a final product that is safe, high-quality, and satisfying.

ACTIVITY 3

1. CONSTRUCTION ADMINISTRATION
2. CONTRACT ADMINISTRATION
3. CONTRACT AGREEMENT
4. COST ESTIMATES
5. PLANS/WORKING DRAWINGS
6. PROCUREMENT
7. REPUBLIC ACT NO. 9184
8. COMMISSIONING & STARTUP
9. CONSTRUCTION SCHEDULE
10. INSURANCE COVERAGE

ACTIVITY 5

1. Discussions on considerations in choosing a site for the temporary facility.

- Selecting the best location for a temporary facility requires careful consideration of various aspects,
including infrastructure, accessibility, and environmental impact. These factors are essential to
guaranteeing the effectiveness and operation of the temporary arrangement.

2. Identify different types of construction close out.


- COMMISSIONING AND STARTUP
- SNAG / PUNCHLIST / ADMINISTRATION
- DOCUMENTATION
- FINAL CLOSE OUT

ACTIVITY 6

1. Information that could help me in my field.


2. Gather and understand more topics regarding the lesson.

You might also like