Validate Print Help Percentage BoQ

Tender Inviting Authority: Executive Engineer, Water Resources Division Pali

Name of Work: Construction of Incomplete Surface Barrier Near Mota Art

Contract No: IFB No. 10/2023-24

Name of the
Bidder/
Bidding Firm /
Company :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender.
Bidders are allowed to enter the Bidder Name and Values only )

NUMBER # TEXT # NUMBER # TEXT # NUMBER NUMBER # TEXT #


Sl. Item Description Quantity Units Estimated Rate TOTAL AMOUNT TOTAL AMOUNT
No. in Without Taxes in In Words
Rs. P Rs. P

1 2 4 5 6 53 55
0 ,
1 Cutting & clearance of jungle, bushes, shrubs, 2700.000 Sqm 1.450 3915.00 INR Three Thousand Nine Hundred & Fifteen Only
Ankra / Ipomoea, Julieflora typna etc. on canals
and bunds in dry /moist /slushy conditions
including disposal as per instructions of the
Engineer-in-charge. Cost of wood has been
deducted from rates and thus will be property of
contractor after cutting. (a) Ordinary
2 Excavation including loading, unloading, disposal 1273.090 cum 118.000 150224.62 INR One Lakh Fifty Thousand Two Hundred & Twenty
and dressing of excavated earth within initial lead Four and Paise Sixty Two Only
of 50m and lift up to 1.50 m in dry or moist
including dressing of excavated area, dewatering
wherever required complee in all respect, (c)Hard
soil mixed with
kankar/boulders,morrumkankar/boulders,morrum

3 Excavation including loading, unloading, disposal 1963.630 cum 92.000 180653.96 INR One Lakh Eighty Thousand Six Hundred & Fifty
and dressing of excavated earth within initial lead Three and Paise Ninety Six Only
of 50m and lift up to 1.50 m in dry or moist
including dressing of excavated area, dewatering
wherever required complee in all respect, (a)
soft/loose soil
4 providing and laying in position of cement 378.108 cum 4770.000 1803575.16 INR Eighteen Lakh Three Thousand Five Hundred &
concrete Nominal mix (1:3:6) including all leads of Seventy Five and Paise Sixteen Only
all construction materials including
curing,compaction and finishing with rendering in
cement sand mortar1:3(1 cement:3 coarse sand
)and making good the joints excluding the cost of
shuttering and reinforcement. well graded crusher
broken aggregate of maximum size up to 40 mm
size
5 Random rubble stone masonry (using R.R. stone 194.789 cum 4045.000 787921.51 INR Seven Lakh Eighty Seven Thousand Nine Hundred
where 75% stones to be not less than 15 cm in & Twenty One and Paise Fifty One Only
size in any direction and weighing not less than 23
kg.) for foundation including curing all leads of all
construction material including curing etc.
complete.(c) In cement sand mortar 1:5

6 Random rubble stone masonry (using R.R. stone 21.600 cum 4257.000 91951.20 INR Ninety One Thousand Nine Hundred & Fifty One
where 75% stones to be not less than 15 cm in and Paise Twenty Only
size in any direction and weighing not less than 23
kg.) for foundation including curing all leads of all
construction material including curing etc.
complete.(c) In cement sand mortar 1:5 (a)
masonry work in superstructure

7 Nominal mix of Plain Cement Concrete well 1545.000 cum 4500.000 6952500.00 INR Sixty Nine Lakh Fifty Two Thousand Five Hundred
Mixed and laid in position using 20% max Only
ermissible limit of plums above 160 mm and up to
450mm, including curing and finishing etc cluding
all leads of all construction materials complete in
all respect with well graded crusher broken stone
aggregate. The plums shall be distributed evenly
and shall be not closer than 150 mm from the
surface.PCC Nominal Mix 1:3:6 with Plum(c)Max
size of Aggregate 20 mm

8 Supply of wire crates in required sizes made of 1972.000 Sqm 389.000 767108.00 INR Seven Lakh Sixty Seven Thousand One Hundred &
hot dipped G.I. Wire conforming to IS 4826 -1979 Eight Only
having mesh of 10 cm x 10 cm (surface area of
crate will be measured) made of wire of 5 mm
diameter
9 Filling crates with stone, in position at site 870.000 cum 1090.000 948300.00 INR Nine Lakh Forty Eight Thousand Three Hundred
including hinging with hot dipped G.I. Wire 5 mm Only
dia, excluding cost of wire crates, including cost of
stones in position complete in all respects.

10 Side shuttering including propping etc. complete 2694.000 Sqm 185.000 498390.00 INR Four Lakh Ninety Eight Thousand Three Hundred &
(to achieve finish F 2 for :(b)Top or intermediate Ninety Only
bed plates, in between masonry or piers,
abutments
sluice wells etc.
11 Earth work in rough (borrow area) excavation for 2088.000 cum 128.000 267264.00 INR Two Lakh Sixty Seven Thousand Two Hundred &
embankment in hard soil, morrum or highly Sixty Four Only
weathered strata dry or moist including laying in
20 cm. layers (before compaction) and breaking of
clods, sorting of grass, pebbles etc. and dressing
when compacted by vibro compactor,vibro sheep
foot roller,sheep foot roller/pneumatic tyred roller
to obtain dry density of at least 98% of Standard
Proctor's density with initial lift up of 1.5 m
(Excluding charges for compaction and watering)
including loading and un-loading wherever
required complete in all respect.(a) With initial
lead of 250 m

12 Compaction of earth or highly weathered strata By 2088.000 cum 42.000 87696.00 INR Eighty Seven Thousand Six Hundred & Ninety Six
mechanical equipment such as sheep foot roller / Only
pneumatic tyred roller/vibro compactor/vibro
sheep foot compactor required as per site
condition to obtain dry density of at least 98 % of
Standard Proctor's density

13 Watering of earth including cost of carriage of 2088.000 cum 17.600 36748.80 INR Thirty Six Thousand Seven Hundred & Forty Eight
water when source of water is and Paise Eighty Only
upto 2 km lead

14 Providing and Laying Cement concrete coping 11.016 Sqm 480.000 5287.68 INR Five Thousand Two Hundred & Eighty Seven and
in(1:2:4) with maximum size of crusher broken Paise Sixty Eight Only
aggregate upto 20 mm including shuttering etc.
with all leads of material complete in all respect in
thickness of: 75mm

15 Supplying and laying quarry spalls properly 141.300 cum 753.000 106398.90 INR One Lakh Six Thousand Three Hundred & Ninety
graded but not more than 10 mm in size with Eight and Paise Ninety Only
spreading in required profile including all lead &
lifts.

16 Supplying stone, spall and laying R. R. stone 169.740 cum 1702.000 288897.48 INR Two Lakh Eighty Eight Thousand Eight Hundred &
pitching, hammer dressed with packing of voids Ninety Seven and Paise Forty Eight Only
from small stones including all lead & lifts, in
required profile of © 23cm thickness (± 5%
thickness tolerance)

17 Dry boulder filling in required profile with filling of 54.000 cum 1187.000 64098.00 INR Sixty Four Thousand &Ninety Eight Only
voids etc. complete including all lead & lifts, and
well finished surface
18 Flush or ruled pointing on stone masonry including 21.960 Sqm 146.000 3206.16 INR Three Thousand Two Hundred & Six and Paise
racking of joints and curing etc. complete including Sixteen Only
all leads of all construction materials in mortar
ratio. In cement mortar (1:3)

Total in Figures 13044136.47 INR One Crore Thirty Lakh Forty Four Thousand One
Hundred & Thirty Six and Paise Forty Seven Only
Quoted Rate in Figures 0.00 INR Zero Only
Select
Quoted Rate in Words INR Zero Only