20220323-LpW - SDG - 4 - 1-7 - Office Building Plan and Sections - Rev 02
20220323-LpW - SDG - 4 - 1-7 - Office Building Plan and Sections - Rev 02
20220323-LpW - SDG - 4 - 1-7 - Office Building Plan and Sections - Rev 02
5200 5500
NOTES
150
150
600 600 600 1185 NOTES :
955
1. ALL WORKS DONE TO THE
ENTIRE SATISFACTION OF THE
STORE ROOM CONSULTING ENGINEER
2000
PLATFORM
2350
Two Water Pump
2. ALL DIMENSIONS ARE IN (mm)
Plinths 3. GRADE OF CONCRETE IS C20
4. CONCRETE COVER OF
2000
REINFORCEMENT:
BOTTOM SLAB UNDER = 50mm
ELSEWHERE = 35mm
W4 5. ALL FORM WORK TO BE FAIR
5510
FACED AND COATED WITH
5210
3600
5210
APPROVED MOULD OIL.
A STORE ROOM A
W1 6. ALL CONCRETE WORKS TO BE
1800
CURED FOR A MINIMUM 7 DAYS.
C25 Concrete with
A257 wire mesh for 7. ALL ERRORS AND OMISSIONS
Mixing Chamber TO BE REPORTED TO THE
ENGINEER.
8660
1510
D1
1555
150
150
200 900 100
D1
900
75
CORRIDOR
LABORATORY
3000
3000
1800
W1
14160
14160
3150
X
1800
W1
T:\Work\Gopa Infra\PROJECT SCOPE AND NECESSARY REPORTS\WATER TREATMENT PLANT\WTP Layout\20220323-LpW_SDG_4_1-7 -Office building plan and sections- Rev 01 2022 - 04 - 27.dwg (Layout: 1 Of 6)
150
REVISIONS
REPUBLIC OF ZAMBIA
1200
1200
1200
1200
CORRIDOR
1750 900 450 1550 800 350 800 600 150
2675
150
400
D1 D1 MINISTRY OF LOCAL
150
RTU GOVERNMENT AND HOUSING
FILLING CABINET DRYER DRYER
D2 D2
LUAPULA WATER
6250
AND
1450
KITCHEN W.H.B W.H.B
SEWERAGE COMPANY
Designed: M.S Drawn: P.C
Approved: F.W Sheet No: 1 OF 6
KITCHEN
150
4300
4000
4300
1800
2000
FEMALE MALE
SHOWER Berner Strasse 45 P.O. Box 32817
SINK TOILET TOILET
60437 Frankfurt/Main Lusaka, Zambia
Tel +49 69 5000 155 Tel (+260 211) 290-709
1250
Project
Integrated Small
150
150
Towns Water Supply
W1 W2 W3 W5 W3 and Sanitation Program
(ISTWSSP)
Contract
TO SEPTIC TANK
MH Prioritised Urban Centres of
LpWSC
1000 1800 1350 1800 500 1200 400 600 550 1200 300 Title
Standard Drawing
150 3500 150 2500 150 1200 150 1100 150 1500 150
General
Office Block and Laboratary
10700
Drawing No LpW/SDG/4/1-7
FLOOR PLAN
Scale 1:1000 Rev No 01
11100
5200 5900
NOTES
550
550
NOTES :
1. ALL WORKS DONE TO THE
ENTIRE SATISFACTION OF THE
CONSULTING ENGINEER
2. ALL DIMENSIONS ARE IN (mm)
3. GRADE OF CONCRETE IS C20
4. CONCRETE COVER OF
REINFORCEMENT:
BOTTOM SLAB UNDER = 50mm
ELSEWHERE = 35mm
5. ALL FORM WORK TO BE FAIR
FACED AND COATED WITH
5910
4810
4810
APPROVED MOULD OIL.
6. ALL CONCRETE WORKS TO BE
CURED FOR A MINIMUM 7 DAYS.
7. ALL ERRORS AND OMISSIONS
TO BE REPORTED TO THE
ENGINEER.
550
550
650 550 3600
2600
14560
14560
2750
2750
T:\Work\Gopa Infra\PROJECT SCOPE AND NECESSARY REPORTS\WATER TREATMENT PLANT\WTP Layout\20220323-LpW_SDG_4_1-7 -Office building plan and sections- Rev 01 2022 - 04 - 27.dwg (Layout: 2 Of 6)
550
550
REVISIONS
REPUBLIC OF ZAMBIA
650
1200
400
550
MINISTRY OF LOCAL
550
550
GOVERNMENT AND HOUSING
LUAPULA WATER
AND
SEWERAGE COMPANY
5900
3200
3200
Gauff
Ingenieure
H.P. Gauff Ingenieure GmbH & Co. KG - JBG -
Berner Strasse 45 P.O. Box 32817
60437 Frankfurt/Main Lusaka, Zambia
Tel +49 69 5000 155 Tel (+260 211) 290-709
Fax +49 - 69 - 50008 - 179 Fax (+260 211) 290-860
Project
Integrated Small
550
550
Towns Water Supply
and Sanitation Program
(ISTWSSP)
Contract
Rev No 01
NOTES :
1. ALL WORKS DONE TO THE
ENTIRE SATISFACTION OF THE
CONSULTING ENGINEER
2. ALL DIMENSIONS ARE IN (mm)
3. GRADE OF CONCRETE IS C20
4. CONCRETE COVER OF
REINFORCEMENT:
BOTTOM SLAB UNDER = 50mm
ELSEWHERE = 35mm
5. ALL FORM WORK TO BE FAIR
FACED AND COATED WITH
APPROVED MOULD OIL.
6. ALL CONCRETE WORKS TO BE
CURED FOR A MINIMUM 7 DAYS.
7. ALL ERRORS AND OMISSIONS
TO BE REPORTED TO THE
ENGINEER.
M.S P.C
F.W 3 OF 6
ROOF PLAN
Scale 1:1000
Standard Drawing
General
Office Block and Laboratary
LpW/SDG/4/3-7
01
DRAWING REFERENCE
No Drg No Title
NOTES
NOTES :
1. ALL WORKS DONE TO THE
ENTIRE SATISFACTION OF THE
CONSULTING ENGINEER
2. ALL DIMENSIONS ARE IN (mm)
3. GRADE OF CONCRETE IS C20
4. CONCRETE COVER OF
REINFORCEMENT:
BOTTOM SLAB UNDER = 50mm
REAR ELEVATION ELSEWHERE = 35mm
Scale 1:1000 5. ALL FORM WORK TO BE FAIR
FACED AND COATED WITH
APPROVED MOULD OIL.
6. ALL CONCRETE WORKS TO BE
CURED FOR A MINIMUM 7 DAYS.
7. ALL ERRORS AND OMISSIONS
TO BE REPORTED TO THE
ENGINEER.
FRONT ELEVATION
Scale 1:1000
T:\Work\Gopa Infra\PROJECT SCOPE AND NECESSARY REPORTS\WATER TREATMENT PLANT\WTP Layout\20220323-LpW_SDG_4_1-7 -Office building plan and sections- Rev 01 2022 - 04 - 27.dwg (Layout: 4 Of 6)
REPUBLIC OF ZAMBIA
MINISTRY OF LOCAL
GOVERNMENT AND HOUSING
LUAPULA WATER
AND
SEWERAGE COMPANY
Designed: M.S Drawn: P.C
Approved: F.W Sheet No: 4 OF 6
Project
Integrated Small
Towns Water Supply
and Sanitation Program
(ISTWSSP)
Contract
Title
Standard Drawing
General
Office Block and Laboratary
1081
1131
18°
75x50mm
Wall Plate NOTES
800
800
NOTES :
1. ALL WORKS DONE TO THE
ENTIRE SATISFACTION OF THE
100mm Steel CONSULTING ENGINEER
200
200
Pole 2. ALL DIMENSIONS ARE IN (mm)
3. GRADE OF CONCRETE IS C20
3000
BOTTOM SLAB UNDER = 50mm
OFFICE ELSEWHERE = 35mm
1400
5. ALL FORM WORK TO BE FAIR
FACED AND COATED WITH
2000
600
all round
3 Brick Spoon dpc dpc
Drain all round
GL GL
600
800
Scale 1:1000
1108
1158
01 Floor Plan Revised 14.03.22
00 Original Gauff Drawings 14.05.19
Rev. Description Date
18°
REVISIONS
REPUBLIC OF ZAMBIA
75x50mm
Wall Plate
800
1300
MINISTRY OF LOCAL
GOVERNMENT AND HOUSING
300 200
Platform LUAPULA WATER
300
AND
Store Room Stirring Motors SEWERAGE COMPANY
Designed: M.S Drawn: P.C
3000
400
Approved: F.W Sheet No: 5 OF 6
Gauff
Store Room
1700
1700
C25 Concrete with Ingenieure
1000
Platform A257 wire mesh for H.P. Gauff Ingenieure GmbH & Co. KG - JBG -
Berner Strasse 45 P.O. Box 32817
Mixing Chamber
60437 Frankfurt/Main Lusaka, Zambia
600x100mm thk 1000 Tel +49 69 5000 155 Tel (+260 211) 290-709
2000 Fax +49 - 69 - 50008 - 179 Fax (+260 211) 290-860
concrete appron
all round Project
Integrated Small
200
3 Brick Spoon
Drain all round Towns Water Supply
GL GL and Sanitation Program
(ISTWSSP)
Contract
600
800
200mm Thick Reinforced Concrete Water Supply and Sanitation
on Polythene Membrane Improvement Project in the
200
150mm Thick Compacted Laterite Prioritised Urban Centres of
LpWSC
550 4800 550
Title
Strip Foundation Strip Foundation Standard Drawing
General
Office Block and Laboratary
SECTION A-A
Scale 1:1000 Drawing No LpW/SDG/4/6-7
Rev No 01
DRAWING REFERENCE
No Drg No Title
300
300
300
1000
1400
NOTES
2000
2000
NOTES :
1. ALL WORKS DONE TO THE
ENTIRE SATISFACTION OF THE
CONSULTING ENGINEER
2. ALL DIMENSIONS ARE IN (mm)
FRAME
FRAME
FRAME
FRAME
FRAME
MAKE STD. GAUGE PRESSED M.S. SINGLE REBATED,1mmTHK. MAKE STD. GAUGE PRESSED M.S. SINGLE REBATED,1mmTHK. MAKE PURPOSE MADE 75x 32MM WINDOW FRAME MAKE PURPOSE MADE 75x 32MM WINDOW FRAME MAKE PURPOSE MADE 75x 32MM WINDOW FRAME MAKE PURPOSE MADE 75x 32MM WINDOW FRAME MAKE PURPOSE MADE 75x 32MM WINDOW FRAME
FRAME
FRAME
MAT. PRIMER AND TWO FINISHING COATS GLOSS PAINT MAT. PRIMER AND TWO FINISHING COATS GLOSS PAINT MAT. SURROUND NATURAL IRON FINISH MAT. SURROUND NATURAL IRON FINISH MAT. SURROUND NATURAL IRON FINISH MAT. SURROUND NATURAL IRON FINISH MAT. SURROUND NATURAL IRON FINISH 3. GRADE OF CONCRETE IS C20
FINISH FINISH FINISH FINISH FINISH FINISH FINISH
MAKE 1960 x 825 x 44mm SEMI-SOLID CORE FLUSH PANEL, MAKE 1960 x 725 x 44mm SEMI-SOLID CORE FLUSH PANEL,
4. CONCRETE COVER OF
COMMERCIAL VENEER WITH H/W EDGING COMMERCIAL VENEER WITH H/W EDGING REINFORCEMENT:
BOTTOM SLAB UNDER = 50mm
LEAF
LEAF
MAT. MAT. ELSEWHERE = 35mm
OPENING
OPENING
OPENING
OPENING
OPENING
TWO (2) OPENABLE SIDE PANELS TWO (2) OPENABLE SIDE PANELS TWO (2) TOP HUNG OPENABLE PANEL TWO (2) TOP HUNG OPENABLE SIDE PANELS ONE (1) TOP HUNG OPENABLE PANEL
TWO (2) FIXED MIDDLE PANELS 5. ALL FORM WORK TO BE FAIR
FACED AND COATED WITH
FINISH PRIMER AND TWO FINISHING COATS GLOSS PAINT FINISH PRIMER AND TWO FINISHING COATS GLOSS PAINT
APPROVED MOULD OIL.
FANLIGHT FANLIGHT 6. ALL CONCRETE WORKS TO BE
4mm THICK CLEAR GLASS FIXED GASKET 4mm THICK CLEAR GLASS FIXED GASKET 4mm THICK CLEAR GLASS FIXED GASKET 4mm THICK CLEAR GLASS FIXED GASKET 4mm THICK CLEAR GLASS FIXED GASKET
CURED FOR A MINIMUM 7 DAYS.
FIXING WITH LUGS FIXING WITH LUGS GLAZING GLAZING GLAZING GLAZING GLAZING
AND WEDGED WITH SILICONE SEALANT TO GLAZING AND WEDGED WITH SILICONE SEALANT TO GLAZING AND WEDGED WITH SILICONE SEALANT TO GLAZING AND WEDGED WITH SILICONE SEALANT TO GLAZING AND WEDGED WITH SILICONE SEALANT TO GLAZING 7. ALL ERRORS AND OMISSIONS
IRONMONGERY
IRONMONGERY
LOCK LOCK
1x UNION L2277-78 THREE LEVER MORTICE LOCK WITH 1x UNION L2277-78 THREE LEVER MORTICE LOCK WITH AS SUPPLIED BY MANUFACTURER AS SUPPLIED BY MANUFACTURER AS SUPPLIED BY MANUFACTURER AS SUPPLIED BY MANUFACTURER AS SUPPLIED BY MANUFACTURER TO BE REPORTED TO THE
FURNITURE
FURNITURE
FURNITURE
FURNITURE
FURNITURE
78mm BACKSET 78mm BACKSET
1 1/2 PAIRS STANDARD STEEL BUTT HINGES 1 1/2 PAIRS STANDARD STEEL BUTT HINGES BURGLAR BARS TO BE PRE-FABRICATED AND BOLTED BURGLAR BARS TO BE PRE-FABRICATED AND BOLTED BURGLAR BARS TO BE PRE-FABRICATED AND BOLTED BURGLAR BARS TO BE PRE-FABRICATED AND BOLTED BURGLAR BARS TO BE PRE-FABRICATED AND BOLTED ENGINEER.
1x UNION AL6D22-24AS DOVE AL.LEVER HANDLES ON 1x UNION AL6D22-24AS DOVE AL.LEVER HANDLES ON
TO WALL ACROSS OPENING SECTIONS TO INTERIOR TO WALL ACROSS OPENING SECTIONS TO INTERIOR TO WALL ACROSS OPENING SECTIONS TO INTERIOR TO WALL ACROSS OPENING SECTIONS TO INTERIOR TO WALL ACROSS OPENING SECTIONS TO INTERIOR
150x150mm BACKPLATE WITH KEYHOLE CUT OUT 150x150mm BACKPLATE WITH KEYHOLE CUT OUT
1x UNION AL8730AS DOOR STOP 1x UNION AL8730AS DOOR STOP METAL FLY SCREEN MESH ON OPENABLE PANELS METAL FLY SCREEN MESH ON OPENABLE PANELS METAL FLY SCREEN MESH ON OPENABLE PANELS METAL FLY SCREEN MESH ON OPENABLE PANELS METAL FLY SCREEN MESH ON OPENABLE PANELS
T:\Work\Gopa Infra\PROJECT SCOPE AND NECESSARY REPORTS\WATER TREATMENT PLANT\WTP Layout\20220323-LpW_SDG_4_1-7 -Office building plan and sections- Rev 01 2022 - 04 - 27.dwg (Layout: 6 Of 6)
REPUBLIC OF ZAMBIA
MINISTRY OF LOCAL
GOVERNMENT AND HOUSING
LUAPULA WATER
AND
SEWERAGE COMPANY
Designed: M.S Drawn: P.C
Approved: F.W Sheet No: 6 OF 6
Gauff
Ingenieure
H.P. Gauff Ingenieure GmbH & Co. KG - JBG -
Berner Strasse 45 P.O. Box 32817
60437 Frankfurt/Main Lusaka, Zambia
Tel +49 69 5000 155 Tel (+260 211) 290-709
Fax +49 - 69 - 50008 - 179 Fax (+260 211) 290-860
Project
Integrated Small
Towns Water Supply
and Sanitation Program
(ISTWSSP)
Contract
Title
Standard Drawing
General
Office Block and Laboratary
Drawing No LpW/SDG/4/7-7
Rev No 01