BILL OF QUANTITIES

No Description Unit Qty Rate Amount

PROPERTY OWNER:

LOCATION OF PROPERTY:

DIMENSIONS:

SCOPE OF WORKS:
1/ LAND PREPARATION
2/ ERECTION OF BRIDGE
3/ PAVING OF YARD

1:0 LAND FILLING:


1:1 Supply, spread and compact sand to elevate the land level/
demolition of section of concrete fence, that includes
labour, equipment and transportation cost. Sum. $65,000.

2:0 FENCE/ ERECTION OF BRIDGE:


2:1 Cement Sack 16 1,960. $31,360.
2:2 Sand Ton 3 4,000. 12,000.
2:3 Stone Ton 3 15,000. $45,000.
2:4 Binding wire Lbs 1 285. $285.
2:5 3/4" Bar Length 3 3,414. $10,242.
2:6 3/8" Bar " 2 741. $1,482.
2:7 1/4" Bar " 2 600. $1,200.
2:8 Nails Lbs 1 400. $400.
2:9 Formboard 12" x 1 " SW B.M 64 300. $19,200.
Total: $121,169.

SUMMARY

1
BILL OF QUANTITIES

MATERIAL COST: $121,169.


LABOUR COST: $46,000.
TRANSPORTATION COST: $8,000.
TOTAL: $175,169.

3:0 PAVING OF YARD:


3:1 B.R.C Fabric Rolls 1 21,796. $21,796.
3:2 Cement Sacks 26 1,960. $50,960.
3:3 White Sand Tons 3 4,000. $12,000.
3:4 Crushed Stone ¾” Tons 4 15,000. $60,000.
3:5 Binding Wire Lbs. 1 285. $285.
3:6 Formboards 4”x1” S.W B.M 14 300. $4,200.
3:7 Formboards 12”x1” S.W B.M 40 300. $12,000.
3:8 Construction plastic Rolls 1 6,760. $6,760.
Total: $168,001.

SUMMARY
MATERIAL COST: $168,001.
LABOUR COST: $75,000.
TRANSPORTATION COST: $8,000.
TOTAL: $251,001

GRAND TOTAL: $491,170.

PREPARED BY:

S. A. LUYKEN

2
BILL OF QUANTITIES

Cement Sacks 330


White Sand Tons 34
Crushed Stone ¾” Tons 61
Binding Wire Lbs. 4
Formboards 4”x1” S.W B.M 260
Formboards 6”x1” S.W B.M 200
B.R.C Fabric #65 Rolls 8
Cement Sacks 330