Estimate 024 2024
Estimate 024 2024
PROPERTY OWNER:
LOCATION OF PROPERTY:
DIMENSIONS:
SCOPE OF WORKS:
1/ LAND PREPARATION
2/ ERECTION OF BRIDGE
3/ PAVING OF YARD
SUMMARY
1
BILL OF QUANTITIES
SUMMARY
MATERIAL COST: $168,001.
LABOUR COST: $75,000.
TRANSPORTATION COST: $8,000.
TOTAL: $251,001
PREPARED BY:
S. A. LUYKEN
2
BILL OF QUANTITIES