Montemar Project - VC0-Report
Montemar Project - VC0-Report
PVsyst TRIAL
PVsyst - Simulation report
Grid-Connected System
PVsyst TRIAL
PVsyst TRIAL
Author
PVsyst TRIAL
Project: Nuevo Proyecto
Variant: Nueva variante de simulación
PVsyst V7.4.6
VC0, Simulation date:
22/04/24 01:13
PVsyst TRIAL
with V7.4.6
Project summary
Geographical Site Situation Project settings
Montemar Latitude -32.96 °S Albedo 0.20
Chile Longitude -71.51 °W
Altitude 176 m
Time zone UTC-4
Weather data
Montemar
Meteonorm 8.1 (2010-2019), Sat=100% - Sintético
System summary
PVsyst TRIAL
Grid-Connected System No 3D scene defined, no shadings
System information
PV Array Inverters
Nb. of modules 120 units Nb. of units 2 units
Pnom total 72.0 kWp Pnom total 72.0 kWac
Pnom ratio 1.000
Results summary
Produced Energy 125881 kWh/year Specific production 1748 kWh/kWp/year Perf. Ratio PR 87.76 %
PVsyst TRIAL
Project and results summary
Main results
Loss diagram
Predef. graphs
Table of contents
PVsyst TRIAL
PVsyst TRIAL
22/04/24 PVsyst Evaluation mode Page 2/7
Project: Nuevo Proyecto
Variant: Nueva variante de simulación
PVsyst V7.4.6
VC0, Simulation date:
22/04/24 01:13
PVsyst TRIAL
with V7.4.6
General parameters
Grid-Connected System No 3D scene defined, no shadings
PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 31.9 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate
PVsyst TRIAL
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model JKM-600N-66HL4M-BDV Model SUN2000-36KTL-M3-380V
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 600 Wp Unit Nom. Power 36.0 kWac
Number of PV modules 120 units Number of inverters 2 units
Nominal (STC) 72.0 kWp Total power 72.0 kWac
Modules 6 string x 20 In series Operating voltage 200-1000 V
At operating cond. (50°C) Max. power (=>45°C) 40.0 kWac
Pmpp 66.8 kWp Pnom ratio (DC:AC) 1.00
U mpp 748 V Power sharing within this inverter
I mpp 89 A
PVsyst TRIAL
Total PV power Total inverter power
Nominal (STC) 72 kWp Total power 72 kWac
Total 120 modules Max. power 80 kWac
Module area 324 m² Number of inverters 2 units
Pnom ratio 1.00
Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 137 mΩ Loss Fraction -0.8 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
IAM loss factor
Incidence effect (IAM): Fresnel, AR coating, n(glass)=1.526, n(AR)=1.290
PVsyst TRIAL
22/04/24 PVsyst Evaluation mode Page 3/7
Project: Nuevo Proyecto
Variant: Nueva variante de simulación
PVsyst V7.4.6
VC0, Simulation date:
22/04/24 01:13
PVsyst TRIAL
with V7.4.6
Main results
System Production
Produced Energy 125881 kWh/year Specific production 1748 kWh/kWp/year
Perf. Ratio PR 87.76 %
PVsyst TRIAL
Balances and main results
PVsyst TRIAL
February 162.8 67.23 21.88 162.4 158.4 10201 9996 0.855
March 155.6 64.27 19.87 175.5 171.7 11146 10921 0.864
April 115.7 46.58 15.45 148.5 146.1 9639 9441 0.883
May 90.0 36.45 11.80 132.2 130.3 8781 8598 0.903
June 76.4 31.68 8.68 119.9 118.2 8101 7933 0.919
July 86.9 30.34 8.22 135.1 133.3 9091 8900 0.915
August 113.1 39.24 10.30 158.0 155.7 10493 10277 0.903
September 143.1 54.49 12.56 167.4 164.0 10910 10687 0.887
October 186.4 69.06 15.78 195.2 191.1 12569 12312 0.876
November 209.7 69.92 18.68 196.4 191.8 12452 12199 0.863
December 227.3 82.15 21.33 202.6 197.2 12745 12487 0.856
Year 1784.0 664.61 15.58 1992.1 1951.0 128511 125881 0.878
PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
22/04/24 PVsyst Evaluation mode Page 4/7
Project: Nuevo Proyecto
Variant: Nueva variante de simulación
PVsyst V7.4.6
VC0, Simulation date:
22/04/24 01:13
PVsyst TRIAL
with V7.4.6
Loss diagram
1784 kWh/m² Global horizontal irradiation
+11.7% Global incident in coll. plane
PVsyst TRIAL
-0.57% PV loss due to irradiance level
PVsyst TRIAL
PVsyst TRIAL
22/04/24 PVsyst Evaluation mode Page 5/7
Project: Nuevo Proyecto
Variant: Nueva variante de simulación
PVsyst V7.4.6
VC0, Simulation date:
22/04/24 01:13
PVsyst TRIAL
with V7.4.6
Predef. graphs
Diagrama entrada/salida diaria
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
22/04/24 PVsyst Evaluation mode Page 6/7
PVsyst V7.4.6
VC0, Simulation date:
22/04/24 01:13
PVsyst TRIAL
with V7.4.6
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL