بارجة

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

1 2 3 4 5 6 7 8

07 08 09
A A
4000 3800

A
22 February 2024
PRMT-24-0001085

2800
B

B B

2882

7000
482

NC1 NC1

2133

2133
C

C C

27403
7000
2882
482

EXISTING COLUMNS NC NC2

1833
482

144

144
D
2882

NC2 NC2

3000
D D
482 Sub Contractor:-

170

170
E ‫الوحده‬ ‫م‬.‫م‬.‫ذ‬.‫لهبدسة المعادن ش‬
2882
AL WAHDA Metal Engineering L.L.C
NC1 NC1 W P.O. BOX 3754, RAS AL KHAIMAH, UAE; TEL. 07-2285630
MOBILE : 0506904781, 0503904781.

CLIENT :

AMERICAN UNIVERSITY OF
RAS AL KHAIMACH

6800
E HOME OF ARCHITECTURE
FOR ENGINEERING CONSULTANTS
E
Head office: Project office:
TEL.: 07-2278822 TEL. : 07-2444080
F FAX.: 07-2278811 FAX. : 07-2444090
P.O.BOX : 30008

Website : WWW.homeofarchitecturerak.com
E-mail : office@ homeofarchitecturerak.com

4000 3800 Client AMERICAN UNIVERSITY OF RAK (AURAK)

Project RENOVATION OF BUILDING "A"

07 08 09 Drg.Title NECK COLUMN LAYOUT

Area SEIH AL ARAIBI Floortype

Case ID. 2431968 Draw. Type. STRC

Sec No. Com. No.

F Block No. Plot No. 206134012 F


Bldg. No. BLD-18-11870 Floor No.

NECK COLUMN LAYOUT Date 12-02-2024 Sht. No. S01

Scale 1:150@ A3 Job No. 868

G.Manager Architect Drawn by

Sherif M.Fathi Sherif M.Fathi Eng.ASWATHI S

1 2 3 6 7 8
1 2 3 4 5 6 7 8

A A

07 08 09 22 February 2024
4000 3800

PRMT-24-0001085

2800
B B
B

7000
CF-02

1175
100 1150

2800
STB(200X600)

C 4200
C
C

7000

27403
7000
1750
900

500
F-01
F-00

1450
900
EXISTING FOUNDATIONS
600

CF-02
D D

1175

2800
D Sub Contractor:-
STB(200X600) 1150
‫الوحده‬ ‫م‬.‫م‬.‫ذ‬.‫لهبدسة المعادن ش‬
4200 AL WAHDA Metal Engineering L.L.C
W

3000
P.O. BOX 3754, RAS AL KHAIMAH, UAE; TEL. 07-2285630
MOBILE : 0506904781, 0503904781.

CF-01
775

2000

CLIENT :
E
STB(200X600) AMERICAN UNIVERSITY OF
550
RAS AL KHAIMACH

3600

E E
6800

HOME OF ARCHITECTURE
FOR ENGINEERING CONSULTANTS

Head office: Project office:


TEL.: 07-2278822 TEL. : 07-2444080
FAX.: 07-2278811 FAX. : 07-2444090
P.O.BOX : 30008

Website : WWW.homeofarchitecturerak.com
E-mail : office@ homeofarchitecturerak.com

Client AMERICAN UNIVERSITY OF RAK (AURAK)

F Project RENOVATION OF BUILDING "A"

Drg.Title FOUNDATION LAYOUT

Area SEIH AL ARAIBI Floortype


4000 3800
Case ID. 2431968 Draw. Type. STRC

Sec No. Com. No.

F 07 08 09 Block No. Plot No. 206134012 F


Bldg. No. BLD-18-11870 Floor No.

Date 12-02-2024 Sht. No. S02

FOUNDATION LAYOUT Scale 1:150@ A3 Job No. 868

G.Manager Architect Drawn by

Sherif M.Fathi Sherif M.Fathi Eng.ASWATHI S

1 2 3 6 7 8
1 2 3 4 5 6 7 8

07 08 09

4000 3800

A A

22 February 2024

2800
PRMT-24-0001085
B

B B

7000
TB1(200X400)

10cm

TB3(200X700)

TB3(200X700)
T10@ 200
T&B

+0.35
T.O.C

C C

27403
7000
TB1(200X400)

TB2(200X600)
EXISTING COLUMNS

TB2(200X600)
10cm

T10@ 200
T&B

+0.35
T.O.C

TB1(200X400)
D

TB2(200X600)
TB2(200X600)

3000
D E
D
TB1(200X400)
Sub Contractor:-

‫الوحده‬ ‫م‬.‫م‬.‫ذ‬.‫لهبدسة المعادن ش‬

AL WAHDA Metal Engineering L.L.C


W P.O. BOX 3754, RAS AL KHAIMAH, UAE; TEL. 07-2285630
MOBILE : 0506904781, 0503904781.

6800
CLIENT :

AMERICAN UNIVERSITY OF
RAS AL KHAIMACH

E F HOME OF ARCHITECTURE
FOR ENGINEERING CONSULTANTS
E
Head office: Project office:
TEL.: 07-2278822 TEL. : 07-2444080
FAX.: 07-2278811 FAX. : 07-2444090
P.O.BOX : 30008
4000 3800
Website : WWW.homeofarchitecturerak.com
E-mail : office@ homeofarchitecturerak.com

Client AMERICAN UNIVERSITY OF RAK (AURAK)


07 08 09
Project RENOVATION OF BUILDING "A"

Drg.Title TIE BEAM LAYOUT

TIE BEAM LAYOUT


Area SEIH AL ARAIBI Floortype

Case ID. 2431968 Draw. Type. STRC

Sec No. Com. No.

F Block No. Plot No. 206134012 F


Bldg. No. BLD-18-11870 Floor No.

Date 12-02-2024 Sht. No. S03

Scale 1:150@ A3 Job No. 868

G.Manager Architect Drawn by

Sherif M.Fathi Sherif M.Fathi Eng.ASWATHI S

1 2 3 6 7 8
1 2 3 4 5 6 7 8

SCHEDULE OF NECK COLUMNS


550
550 550
25 500 25
A A

25 400 25
14 T16

450

450

450
T8@ 150

Steel column
22 February 2024
NECK COLUMN -NC1
PRMT-24-0001085
Scale 1:20 50mm Grouting by Civil contractor

550 + 0.35
550 550
T10@ 20

25 500 25
T.O.C

50
25 400 25

100
14 T16 ±0.00
TIE BEAM
450

450

450
G.L

200
20cm road base

T8@ 150
B B
200
NECK COLUMN -NC2
Scale 1:20 Neck column

200 200 AS PER SCH

4 T16
200

200
T8@ 150
AS PER SCH.
-1.15

F.L

P.C.C

C NECK COLUMN -NC 20cm road base C


Scale 1:20 200 100 AS PER SCH 100 200

TYPICAL SECTION NC WITH STEEL COLUMN

SCHEDULE OF FOOTING: B.C =AS PER SOIL REPORT


Bottom RFT. Top RFT.
Type SIZE (cm) Remarks
Long Bars Short Bars Long Bars Short Bars

F-00 90X90X40 T12@ 150 T12@ 150 ------ ------ Isolated Footing

F-01 145X175X45 T16@ 150 T16@ 150 T12@ 150 T12@ 150 Isolated Footing

200x360x45 T16@ 150 T16@ 150 T16@ 150 T16@ 150 Combined Footing
D CF1
D
CF2 280x420x45 T16@ 150 T16@ 150 T16@ 150 T16@ 150 Combined Footing
Sub Contractor:-

SCHEDULE OF TIE BEAMS ‫الوحده‬ ‫م‬.‫م‬.‫ذ‬.‫لهبدسة المعادن ش‬

AL WAHDA Metal Engineering L.L.C


W
LONG. REINFORCEMENT P.O. BOX 3754, RAS AL KHAIMAH, UAE; TEL. 07-2285630
MOBILE : 0506904781, 0503904781.
SIDE BARS SHEAR TIES
BEAM SIZE BOTTOM BARS TOP BARS
CLIENT :

MARKS (cm) Remarks


ADDITIONAL AMERICAN UNIVERSITY OF
CONTINIOUS ADDITIONAL CONTINIOUS AT SUPPORT AT MID SPAN NO. OF RAS AL KHAIMACH
(B1) AT MID SPAN AT INTERNAL SUPPORT FOR EACH SIDE
(B2) (S1) (S2) BRANCHES
(T1) (T2)

TB1 20X40 3T16 -------- 3T16 -------- -------- T8@ 200 T8@ 200 2 --------

TB2 20X60 3T16 -------- 3T16 -------- -------- T8@ 200 T8@ 200 2 --------

E TB3 20X60 3T16 -------- 2T16 1T16 -------- T8@ 200 T8@ 200 2 -------- HOME OF ARCHITECTURE
FOR ENGINEERING CONSULTANTS
E
* T2 BAR FOR EACH SPAN CONTINUE TO THE ADJACENT SPAN WITH 1/3 LENGTH THE BIGGER OF THE TWO SPAN. Head office: Project office:
TEL.: 07-2278822 TEL. : 07-2444080
* FOR TIE BEAM CROSS SECTION,SEE PLAN. FAX.: 07-2278811 FAX. : 07-2444090
P.O.BOX : 30008
* 2T12@ 300 C/C SIDE BARS TO BE PROVIDED FOR BEAMS HAVE MORE THAN 600mm DEPTH.
Website : WWW.homeofarchitecturerak.com
E-mail : office@ homeofarchitecturerak.com

SCHEDULE OF STRAP BEAMS


Client AMERICAN UNIVERSITY OF RAK (AURAK)

LONG. REINFORCEMENT Project RENOVATION OF BUILDING "A"


SIDE BARS SHEAR TIES
Drg.Title STRUCTURAL SCHEDULES & SECTION
BEAM SIZE BOTTOM BARS TOP BARS
Remarks Area SEIH AL ARAIBI Floortype
MARKS (cm) ADDITIONAL
CONTINIOUS ADDITIONAL CONTINIOUS AT SUPPORT AT MID SPAN NO. OF
FOR EACH SIDE Case ID. 2431968 Draw. Type. STRC
(B1) AT MID SPAN AT INTERNAL SUPPORT
(B2) (S1) (S2) BRANCHES
(T1) (T2)
Sec No. Com. No.
STB1 25X60 3T14 -------- 3T16 -------- -------- T8@ 200 T8@ 200 2 --------
F Block No. Plot No. 206134012 F
* T2 BAR FOR EACH SPAN CONTINUE TO THE ADJACENT SPAN WITH 1/3 LENGTH THE BIGGER OF THE TWO SPAN. Bldg. No. BLD-18-11870 Floor No.

* FOR TIE BEAM CROSS SECTION,SEE PLAN.


Date 12-02-2024 Sht. No. S04
* 2T12@ 300 C/C SIDE BARS TO BE PROVIDED FOR BEAMS HAVE MORE THAN 600mm DEPTH.
Scale 1:150@ A3 Job No. 868

G.Manager Architect Drawn by

Sherif M.Fathi Sherif M.Fathi Eng.ASWATHI S

1 2 3 6 7 8
1 2 3 4 5 6 7 8

Load Table
2
Dead Load : 0.25 kN/m
2
Live Load : 0.60 kN/m
8 9 10 2

A Collateral Load
Solar Load
: 0.50 kN/m
: 0.20 kN/m
A
2
Wall Stone Load : 0.75 kN/m (Applied Vertically)

3750 3300 200


Wind Speed : 165 kmph (3 Sec Gust)
Exposure : Category- C 22 February 2024
Loads applied as per : MBMA-2012

100
Seismic Load : Zone 2A (UBC 1997)
PRMT-24-0001085

200
Stone tile cladding
A

150
Temperature Load : +25

Loads applied as per : MBMA-2012


Design as per : AISC ASD

2809
B
B B
GENERAL NOTES

1. ALL DIMENSIONS ARE IN MM.

2. ALL LEVELS ARE IN METERS, UNFINISHED.

3. ANY DISCREPANCIES SHOULD BE BROUGHT TO THE NOTICE OF DIA-GRID


BEFORE EXECUTION.

6900
4. DO NOT SCALE THE DRAWINGS FOLLOW ONLY THE STATED DIMENSIONS

5. DISCREPANCIES OR MISSING DETAILS MUST BE BROUGHT TO THE STEEL

CONTRACTOR FOR DECISION PRIOR TO EXECUTING THE RELATED WORK.


190
B2 B2
6. YIELD STRENGTH OF STEEL = 345000 KN/M2

7. YIELD STRENGTH OF REINFORCEMENT FY=460 N/MM2


8. COMPRESSIVE STRENGTH OF CONCRETE Fcu=40 N/MM2
9. ALL THE BOLTS SHALL CONFORIM TO GR. 8.8 (GI)
C 10. MINIMUM THROAT THICKNESS OF WELD SHALL BE 6mm
C 11. WIND LOAD DESIGNED TO 162KM/PH C

6841

26750
13040

B2

B1 B1
D
D D
3050

Sub Contractor:-

‫الوحده‬ ‫م‬.‫م‬.‫ذ‬.‫لهبدسة المعادن ش‬


B1 B1
AL WAHDA Metal Engineering L.L.C

E W P.O. BOX 3754, RAS AL KHAIMAH, UAE; TEL. 07-2285630


MOBILE : 0506904781, 0503904781.

CLIENT :

AMERICAN UNIVERSITY OF
RAS AL KHAIMACH

New extension area


6750
6856

E HOME OF ARCHITECTURE
FOR ENGINEERING CONSULTANTS
E
Head office: Project office:
150 100 TEL.: 07-2278822 TEL. : 07-2444080
FAX.: 07-2278811 FAX. : 07-2444090
P.O.BOX : 30008
C
L OF COLUMN C
L OF COLUMN L

F
Website : WWW.homeofarchitecturerak.com
150

200

500 500 E T E-mail : office@ homeofarchitecturerak.com


L OF COLUMN

L OF COLUMN
= = = =
100

Client
60

60
C AMERICAN UNIVERSITY OF RAK (AURAK)
EQ

EQ
L
400

400
C

C
R
EQ

EQ
Project RENOVATION OF BUILDING "A"
60

60

X
3750 3300 200 NUT

WASHER
20mm Plate 120 120 20mm Plate 100 100100
Drg.Title Base Plate and Anchor Bolt Plan

LEGEND :-
ANCHOR BOLT ASSEMBLY.
QTY :- QUANTITY Area SEIH AL ARAIBI Floortype
PROJ.

PROJ.

100 100
T :- THREADED BOLT PROJECTION
150

150

E :- EMBEDMENT LENGTH
L :- VERTICAL LENGTH Case ID. 2431968 Draw. Type. STRC
NOTE:- X :- HOOK LENGTH

8 9 10 EACH SUPPLIED ASSEMBLY CONSISTS OF Lo :- OVERALL LENGTH


MIN.

MIN.
150

150
(BY OTHERS)

(BY OTHERS)
1 - 'L' SHAPED ANCHOR BOLT
50 THK. GROUT

50 THK. GROUT
Com. No.
Wt :- WEIGHT
GROUND LEV. GROUND LEV. 2 - HEXAGONAL NUTS AND R :- BEND RADIUS
Sec No.
1 - WASHER

F F
Lc :- CENTERLINE LENGTH
24mmØ 24mmØ
ANCHOR BOLT ANCHOR BOLT
Block No. Plot No. 206134012
T E L X Lo Wt R
PART MARK DIAMETER QTY
(mm) (mm) (mm) (mm) (mm) (kg) (mm)

Base Plate and Anchor Bolt Plan


Bldg. No. BLD-18-11870 Floor No.
SAB002 24 mm 48 150 650 800 150 950 1.77 50

B1-MAIN FRAME COLUMN B2-MAIN FRAME COLUMN ANCHOR BOLT SCHEDULE Date 12-02-2024 Sht. No. S05

Scale 1:150@ A3 Job No. 868

G.Manager Architect Drawn by

Sherif M.Fathi Sherif M.Fathi Eng.ASWATHI S

1 2 3 6 7 8
1 2 3 4 5 6 7 8

Load Table
FRAME LOAD H1 V1 Z1 H2 V2 Z2
2
Dead Load : 0.25 kN/m
2 1 DEAD LOAD -1.553 106.05 3.092 1.504 13.499 0.487
Live Load : 0.60 kN/m

A A
2
Collateral Load : 0.50 kN/m 2 LIVE LOAD -0.846 42.504 1.424 0.799 -7.989 0.08
Solar Load : 0.20 kN/m
Wall Stone Load : 0.75 kN/m
2
(Applied Vertically) 3 WL1 -17.49 -177.007 -4.413 -26.338 113.512 0.204
Wind Speed : 165 kmph (3 Sec Gust)
4 WR1 25.307 56.223 -0.057 16.896 -84.556 -0.236
Exposure : Category- C

Loads applied as per


Seismic Load
: MBMA-2012
: Zone 2A (UBC 1997)
5 WL2 -26.199 -134.318 -2.367 -15.265 96.695 0.005 22 February 2024
6 WR2 16.717 99.453 1.989 28.086 -101.9 -0.435
Temperature Load : +25

Loads applied as per : MBMA-2012 7 WLONG1 16.415 -100.041 -19.31 -18.933 10.136 -13.751 PRMT-24-0001085
Design as per : AISC ASD FRAME 4
8 WLONG2 6.515 -72.53 12.007 -10.135 44.822 14.124
9 S X+ -0.681 -9.987 -1.112 -0.656 6.401 0.185
10 S X- 0.681 9.988 1.112 0.656 -6.401 -0.185
GENERAL NOTES
11 TEMP + 0.058 0.146 0.113 -0.044 0.132 0.107
1. ALL DIMENSIONS ARE IN MM.

2. ALL LEVELS ARE IN METERS, UNFINISHED.


12 TEMP - -0.059 -0.155 -0.114 0.043 -0.124 -0.106
B 3. ANY DISCREPANCIES SHOULD BE BROUGHT TO THE NOTICE OF DIA-GRID 13 S Z+ 1.974 9.593 -3.064 1.919 -23.147 -1.898 B
BEFORE EXECUTION.
4. DO NOT SCALE THE DRAWINGS FOLLOW ONLY THE STATED DIMENSIONS 14 S Z- -1.974 -9.588 3.063 -1.918 23.137 1.896
5. DISCREPANCIES OR MISSING DETAILS MUST BE BROUGHT TO THE STEEL
1 DEAD LOAD - - - -0.941 42.56 0.435
CONTRACTOR FOR DECISION PRIOR TO EXECUTING THE RELATED WORK.

6. YIELD STRENGTH OF STEEL = 345000 KN/M2 2 LIVE LOAD - - - -0.456 -4.686 0.264
7. YIELD STRENGTH OF REINFORCEMENT FY=460 N/MM2
8. COMPRESSIVE STRENGTH OF CONCRETE Fcu=40 N/MM2 3 WL1 - - - -22.869 45.144 -0.44
9. ALL THE BOLTS SHALL CONFORIM TO GR. 8.8 (GI)
4 WR1 - - - 14.576 -23.479 0.178
10. MINIMUM THROAT THICKNESS OF WELD SHALL BE 6mm

11. WIND LOAD DESIGNED TO 162KM/PH 5 WL2 - - - -9.565 28.434 -0.879


6 WR2 - - - 27.964 -40.247 -0.253
7 WLONG1 - - - -22.925 -41.968 -13.077
FRAME 3
8 WLONG2 - - - -9.759 91.055 13.765
9 S X+ - - - -3.169 15.756 0.492
C C
10 S X- - - - 3.169 -15.754 -0.492

+ve (Mz)
11 TEMP + - - - 0.008 -1.22 -0.055
+ve (Fz) FRAME REACTION 12 TEMP - - - - -0.006 1.225 0.057
+ve (Fx)
13 S Z+ - - - -0.941 -18.721 -4.606
( ALL FORCES ARE IN kN AND MOMENTS ARE IN kNm )
14 S Z- - - - 0.938 18.747 4.606
1 DEAD LOAD -0.191 109.917 -4.064 1.182 33.078 0.05
+ve (Fy)

FRAME 1 AND 2 2 LIVE LOAD -0.085 43.737 -1.978 0.588 -7.84 0.211
3 WL1 -9.567 -159.864 5.575 -13.208 73.633 -0.925
4 WR1 10.226 20.687 -0.33 6.668 -35.07 0.445
5 WL2 -10.25 -94.4 4.125 -5.621 42.355 -0.884
D 6 WR2 9.557 86.388 -1.794 14.27 -66.539 0.493 D
7 WLONG1 0.186 -127.53 -3.205 -14.533 154.82 -8.126 Sub Contractor:-
FRAME 2
8 WLONG2 1.608 -103.568 9.879 -5.333 -64.363 7.694 ‫م‬.‫م‬.‫ذ‬.‫لهبدسة المعادن ش‬
‫الوحده‬
9 S X+ -2.717 -33.391 0.36 -2.617 21.222 0.07 AL WAHDA Metal Engineering L.L.C
W P.O. BOX 3754, RAS AL KHAIMAH, UAE; TEL. 07-2285630
10 S X- 2.717 33.391 -0.36 2.617 -21.224 -0.07 MOBILE : 0506904781, 0503904781.

11 TEMP + 0.01 -0.145 -0.053 -0.033 1.088 -0.111


CLIENT :

12 TEMP - -0.011 0.154 0.051 0.033 -1.1 0.112 AMERICAN UNIVERSITY OF


RAS AL KHAIMACH
13 S Z+ -1.498 -9.558 -2.654 -1.454 41.833 -2.677

1 2 14 S Z- 1.499 9.554 2.657 1.455 -41.849 2.678

H1 H2 1 DEAD LOAD -0.667 52.995 0 0.667 30.529 0


2 LIVE LOAD -0.332 14.747 0 0.332 -3.512 0
E 3 WL1 -6.933 -62.675 0 -10.637 44.792 0
HOME OF ARCHITECTURE E
V1 V3 FOR ENGINEERING CONSULTANTS

Head office: Project office:


4 WR1 10.504 23.942 0 6.989 -35.272 0 TEL.: 07-2278822 TEL. : 07-2444080
FAX.: 07-2278811 FAX. : 07-2444090

A H 5 WL2 -11.042 -52.405 0 -6.417 41.919 0 P.O.BOX : 30008

Website : WWW.homeofarchitecturerak.com
6 WR2 6.395 34.213 0 11.208 -38.145 0 E-mail : office@ homeofarchitecturerak.com

[ALL VALUES ARE UNFACTORED]


7 WLONG1 7.324 -24.481 -9.521 -7.517 6.598 -9.635 Client AMERICAN UNIVERSITY OF RAK (AURAK)
FRAME 1
8 WLONG2 3.434 -23.864 9.521 -3.516 5.981 9.636 Project RENOVATION OF BUILDING "A"

9 S X+ -0.855 -7.456 0.003 -0.826 7.456 0.002 Drg.Title Base Plate and Anchor Bolt Plan

10 S X- 0.855 7.456 -0.003 0.826 -7.456 -0.002 Area SEIH AL ARAIBI Floortype

11 TEMP + 0.024 0 0 -0.024 0 0 Case ID. 2431968 Draw. Type. STRC

12 TEMP - -0.024 0 0 0.024 0 0 Sec No. Com. No.

F 13 S Z+ 0 -0.035 0 0 0.035 0 Block No. Plot No. 206134012 F


14 S Z- 0 0.035 0 0 -0.035 0 Bldg. No. BLD-18-11870 Floor No.

Date 12-02-2024 Sht. No. S06

Scale 1:150@ A3 Job No. 868

G.Manager Architect Drawn by

Sherif M.Fathi Sherif M.Fathi Eng.ASWATHI S

1 2 3 6 7 8
1 2 3 4 5 6 7 8
Load Table
2
Dead Load : 0.25 kN/m
2
Live Load : 0.60 kN/m
2
Collateral Load : 0.50 kN/m
Solar Load : 0.20 kN/m
2
Wall Stone Load : 0.75 kN/m (Applied Vertically)

Wind Speed : 165 kmph (3 Sec Gust)

8 9 10 8 9 10 Exposure

Loads applied as per


: Category- C

: MBMA-2012

A A
Seismic Load : Zone 2A (UBC 1997)
Temperature Load : +25

Loads applied as per : MBMA-2012


Design as per : AISC ASD

3750 3300 200 3750 3300 200

GENERAL NOTES

1. ALL DIMENSIONS ARE IN MM.


22 February 2024

100

100
2. ALL LEVELS ARE IN METERS, UNFINISHED.

3. ANY DISCREPANCIES SHOULD BE BROUGHT TO THE NOTICE OF DIA-GRID

200

200
Stone tile cladding

Stone tile cladding


A A

150

150
BEFORE EXECUTION.
4. DO NOT SCALE THE DRAWINGS FOLLOW ONLY THE STATED DIMENSIONS

5. DISCREPANCIES OR MISSING DETAILS MUST BE BROUGHT TO THE STEEL


PRMT-24-0001085
CONTRACTOR FOR DECISION PRIOR TO EXECUTING THE RELATED WORK.

6. YIELD STRENGTH OF STEEL = 345000 KN/M2

2809

2809
7. YIELD STRENGTH OF REINFORCEMENT FY=460 N/MM2
8. COMPRESSIVE STRENGTH OF CONCRETE Fcu=40 N/MM2
9. ALL THE BOLTS SHALL CONFORIM TO GR. 8.8 (GI)

10. MINIMUM THROAT THICKNESS OF WELD SHALL BE 6mm

11. WIND LOAD DESIGNED TO 162KM/PH

B B

B 375
C
L

375
B
45 100 45

100
50
W ELDED CLIP

6900

6900
w /2-M12x35 HSB

Frame-4 RAFTER

FLANGE BRACE

w / M12x35 HSB

50
GUSSET PLATES

53

660 660

12Ø-SAG ROD

(TYP).
SLOPE PURLIN LAP DETAIL
portable Bracing

WITH DOUBLE SIDE FLANGE BRACE

C C C
L
Struct Tube

SLOPE
C C
100
Portable jack Beam

100
4-inch pipe 3mm Thick
Pipe BRACING

(TYP). SLOPE

50
W ELDED CLIP
w /2-M12x35 HSB

RAFTER

FLANGE BRACE
L-ANGLE 60X60X6MM
6841

6841
26750

26750
w / M12x35 HSB
13040

13040

50
GUSSET PLATES

53

660 750

Frame-3

PURLIN LAP DETAIL


Struct Tube

Struct Tube
Portable
Bracing

200Z20 Purlin

THREAD

Frame-2 LENGTH

4-inch pipe 3mm Thick D D 100

Pipe BRACING
12Ømm
(TYP).

D D
SAGROD

45
Struct Tube

Struct Tube

Struct Tube

Struct Tube

3050

3050
±30

SLOPE SLOPE PROJ.


Sub Contractor:-

110
Frame-1 ‫الوحده‬ ‫م‬.‫م‬.‫ذ‬.‫لهبدسة المعادن ش‬

E E AL WAHDA Metal Engineering L.L.C


W

45
P.O. BOX 3754, RAS AL KHAIMAH, UAE; TEL. 07-2285630
MOBILE : 0506904781, 0503904781.

PURLIN SAGROD DETAIL

CLIENT :

AMERICAN UNIVERSITY OF

C 150 RAS AL KHAIMACH


L OF COLUMN / RAFTER

10 75 75
SMP011

2xM16 HSB
6750

6750
6856

6856

150
STRUT TUBE
40 ISNB88MM

E E
8m m THK PLT SMP001

12m m THK PLT

HOME OF ARCHITECTURE
FOR ENGINEERING CONSULTANTS

150 100 150 100 Head office: Project office:


TEL.: 07-2278822 TEL. : 07-2444080
FAX.: 07-2278811 FAX. : 07-2444090

F F
P.O.BOX : 30008
150

150
200

200
Website : WWW.homeofarchitecturerak.com

STRUT TUBE ISNB88mm WEB CONNECTION E-mail : office@ homeofarchitecturerak.com


100

100

DETAIL-X

Client AMERICAN UNIVERSITY OF RAK (AURAK)


8 NOS. ∅24m m . BOLTS 250
3750 3300 200 3750 3300 200
Gr. 8.8 70 110 70
E
Project RENOVATION OF BUILDING "A"

100 50
100
E
END PLATE Drg.Title Roof Framing Plan
700x250x20MM

Area SEIH AL ARAIBI Floortype

400
500

700
4500MMTOP OF FF
WEB - 500X6
FLANGE- 250X8

8 9 10 8 9 10 Case ID. 2431968 Draw. Type. STRC


6
TYP

50 100
100
2 M16 BOLTS GR. 8.8
Sec No. Com. No.
@ 800 m m C/C

F SECTION-E Block No. Plot No. 206134012 F

Roof Plan
Bldg. No. Floor No.

Roof Framing Plan


BLD-18-11870
WEB - 400X10
FLANGE- 300X16
Date 12-02-2024 Sht. No. S07
DETAIL - X

F.F.L+0.0M Scale 1:150@ A3 Job No. 868

Struct Tube -4inch pipe 3.0mm Thick G.Manager Architect Drawn by

PORTAL FRAME ELEVATION Sherif M.Fathi Sherif M.Fathi Eng.ASWATHI S

1 2 3 6 7 8
1 2 3 4 5 6 7 8

Load Table
A Dead Load : 0.25 kN/m
2 A
2
Live Load : 0.60 kN/m
2
Collateral Load : 0.50 kN/m
400 400 400 400 400 400
400 400 400 400 Solar Load : 0.20 kN/m
F-250X10 F-250X10
300 300
22 February 2024
F-250X10 F-250X10 2
W-400X6 W-400X6
Wall Stone Load : 0.75 kN/m (Applied Vertically)
SP-2 SP-2
W-400X6 W-400X6
F-250X8 F-250X8
W-(300-400)X6 SP-2 W-(300-400)X6 SP-2 Wind Speed : 165 kmph (3 Sec Gust)
block work block work Exposure : Category- C

Loads applied as per : MBMA-2012


SHS 100x100x4mm SHS 100x100x4mm
Seismic Load : Zone 2A (UBC 1997)
@ 60cm once (TYP) @ 60cm once (TYP)
Temperature Load : +25 PRMT-24-0001085
Loads applied as per : MBMA-2012
Design as per : AISC ASD

SHS 100x100x4mm SHS 100x100x4mm


@ 60cm once (TYP) @ 60cm once (TYP)

GENERAL NOTES
existing building

existing building
B B

F-300X12

F-300X12
W-450X6

W-450X6
1. ALL DIMENSIONS ARE IN MM.

F-300X12

F-300X12
W-450X6

W-450X6
2. ALL LEVELS ARE IN METERS, UNFINISHED.

3. ANY DISCREPANCIES SHOULD BE BROUGHT TO THE NOTICE OF DIA-GRID


BEFORE EXECUTION.
SHS 100x100x4mm SHS 100x100x4mm
@ 60cm once (TYP) @ 60cm once (TYP) 4. DO NOT SCALE THE DRAWINGS FOLLOW ONLY THE STATED DIMENSIONS

5. DISCREPANCIES OR MISSING DETAILS MUST BE BROUGHT TO THE STEEL

CONTRACTOR FOR DECISION PRIOR TO EXECUTING THE RELATED WORK.

6. YIELD STRENGTH OF STEEL = 345000 KN/M2

7. YIELD STRENGTH OF REINFORCEMENT FY=460 N/MM2


8. COMPRESSIVE STRENGTH OF CONCRETE Fcu=40 N/MM2
9. ALL THE BOLTS SHALL CONFORIM TO GR. 8.8 (GI)
SHS 100x100x4mm SHS 100x100x4mm
@ 60cm once (TYP) @ 60cm once (TYP)
10. MINIMUM THROAT THICKNESS OF WELD SHALL BE 6mm

11. WIND LOAD DESIGNED TO 162KM/PH

C C
600

600
Frame-1 Frame-2

550 550
550 550
550 550 550
550 550
350 350

D D
F-250X12 F-250X12

SP-3 W-550X6 W-550X6


F-250X8 F-250X12 F-250X8 F-250X12
W-(300-500)X6
JACK BEAM
F-250X10
W-550X6
SP-1
W-(300-500)X6
SP-1 W-550X6
SP-1
W-630X6

Sub Contractor:-
SHS 100x100x4mm
@ 60cm once (TYP)
‫الوحده‬ ‫م‬.‫م‬.‫ذ‬.‫لهبدسة المعادن ش‬

AL WAHDA Metal Engineering L.L.C


W P.O. BOX 3754, RAS AL KHAIMAH, UAE; TEL. 07-2285630
W-(450-750)X10

W-(450-750)X10
MOBILE : 0506904781, 0503904781.

W-(450-750)X10
CLIENT :
F-350X12

F-350X12
SHS 100x100x4mm AMERICAN UNIVERSITY OF
@ 60cm once (TYP)
RAS AL KHAIMACH

F-350X12
existing building

existing building

E SHS 100x100x4mm
@ 60cm once (TYP)
HOME OF ARCHITECTURE
FOR ENGINEERING CONSULTANTS
E
25mm Plate Thick 25mm Plate Thick 25mm Plate Thick Head office: Project office:

30mm Dia Bolt 30mm Dia Bolt 30mm Dia Bolt TEL.: 07-2278822 TEL. : 07-2444080
FAX.: 07-2278811 FAX. : 07-2444090
P.O.BOX : 30008

350 350 Website : WWW.homeofarchitecturerak.com


350
E-mail : office@ homeofarchitecturerak.com

110 130 110 110 130 110 110 130 110

SHS 100x100x4mm
@ 60cm once (TYP) Client AMERICAN UNIVERSITY OF RAK (AURAK)

60
60
60

120
118
118
Project

110
RENOVATION OF BUILDING "A"

120

110
Drg.Title FRAME -1,2,3 & 4 DETAILS

120

110
120
Area SEIH AL ARAIBI Floortype

Case ID. 2431968 Draw. Type. STRC

1010
774

170

490
250

150
600

474

710
150
Sec No. Com. No.

120
F Block No. Plot No. 206134012 F
Frame-3 Frame-4 120

110
Bldg. No. BLD-18-11870 Floor No.

60 120

60 110
60 110
118

120
118
Date 12-02-2024 Sht. No. S08

Scale 1:150@ A3 Job No. 868

SSS-6-6-30Ø-ABC HSS-6-6-30Ø-ABC G.Manager Architect Drawn by


HSS-8-8-30Ø-ABC
SP1 H - HORIZONTAL SP2 S-SLOPE SP3 H-HORIZONTAL
S - STIFFENED ON TOP S - STIFFENED ON TOP S - STIFFENED ON TOP
S - STIFFENED ON BOTTOM S - STIFFENED AT BOTTOM S - STIFFENED AT BOTTOM Sherif M.Fathi Sherif M.Fathi Eng.ASWATHI S

1 2 3 6 7 8
1 2 3 4 5 6 7 8

Load Table
2
GENERAL NOTES
Dead Load : 0.25 kN/m

A Live Load : 0.60 kN/m


2

2
1. ALL DIMENSIONS ARE IN MM.
A
Collateral Load : 0.50 kN/m 2. ALL LEVELS ARE IN METERS, UNFINISHED.

Solar Load : 0.20 kN/m 3. ANY DISCREPANCIES SHOULD BE BROUGHT TO THE NOTICE OF DIA-GRID
2
Wall Stone Load : 0.75 kN/m (Applied Vertically)
BEFORE EXECUTION.
Wind Speed
Exposure
: 165 kmph (3 Sec Gust)
: Category- C
4. DO NOT SCALE THE DRAWINGS FOLLOW ONLY THE STATED DIMENSIONS

5. DISCREPANCIES OR MISSING DETAILS MUST BE BROUGHT TO THE STEEL 22 February 2024


Loads applied as per : MBMA-2012 CONTRACTOR FOR DECISION PRIOR TO EXECUTING THE RELATED WORK.

Seismic Load : Zone 2A (UBC 1997) 6. YIELD STRENGTH OF STEEL = 345000 KN/M2

Temperature Load : +25 7. YIELD STRENGTH OF REINFORCEMENT FY=460 N/MM2

Loads applied as per : MBMA-2012


8. COMPRESSIVE STRENGTH OF CONCRETE Fcu=40 N/MM2
PRMT-24-0001085
9. ALL THE BOLTS SHALL CONFORIM TO GR. 8.8 (GI)
Design as per : AISC ASD
10. MINIMUM THROAT THICKNESS OF WELD SHALL BE 6mm

11. WIND LOAD DESIGNED TO 162KM/PH

B B

C
E

B
F

A
26750

200 6750 3050 6841 6900 2809 200

C C
SHS 100x100x4mm
@ 60cm once (TYP)

SHS 100x100x4mm
@ 60cm once (TYP)
Frame-1

Frame-2

Frame-3

Frame-4
11800

D D
Sub Contractor:-
SHS 100x100x4mm
@ 60cm once (TYP)
‫الوحده‬ ‫م‬.‫م‬.‫ذ‬.‫لهبدسة المعادن ش‬

AL WAHDA Metal Engineering L.L.C


W P.O. BOX 3754, RAS AL KHAIMAH, UAE; TEL. 07-2285630
MOBILE : 0506904781, 0503904781.

SHS 100x100x4mm CLIENT :


@ 60cm once (TYP)
AMERICAN UNIVERSITY OF
RAS AL KHAIMACH

SHS 100x100x4mm
@ 60cm once (TYP)

E HOME OF ARCHITECTURE
FOR ENGINEERING CONSULTANTS
E
Head office: Project office:
TEL.: 07-2278822 TEL. : 07-2444080
FAX.: 07-2278811 FAX. : 07-2444090
P.O.BOX : 30008

Website : WWW.homeofarchitecturerak.com
E-mail : office@ homeofarchitecturerak.com

Client AMERICAN UNIVERSITY OF RAK (AURAK)

Project RENOVATION OF BUILDING "A"

Drg.Title Front elevation framing

Front elevation framing


Area SEIH AL ARAIBI Floortype

Case ID. 2431968 Draw. Type. STRC

Sec No. Com. No.

F Block No. Plot No. 206134012 F


Bldg. No. BLD-18-11870 Floor No.

Date 12-02-2024 Sht. No. S09

Scale 1:150@ A3 Job No. 868

G.Manager Architect Drawn by

Sherif M.Fathi Sherif M.Fathi Eng.ASWATHI S

1 2 3 6 7 8

You might also like