Construction For Four Laning Of Rohtak-Jind Section From Km. 307.000 to Km. 347.

800 FM/RJRP/QC-005
Of NH-71 And Connecting Link From Km. 347.800 Of NH-71 To Km. 9+400 Of NH-71A Rev : 00
Date : 17.08.2020
(Balance Work) On EPC Mode Under Bharatmala (Left Out In NHDP) In State Of Haryana

Client: National Highways Authority of India.

Authority Engineer: M/S ICT Pvt. Ltd. In association vedom Engineering Services Pvt. Ltd.
Epc Contractor : A Joint Venture of VRC Construction (I) Pvt. Ltd & S&P Infrastructure Developers (P) Ltd (JV)

ATTERBERG LIMITS (LL:PL)


(IS2720 part 5, 1985)
Sample Location : Hot Mix Plant, Kilazafargarh . Date Sampled : 03.12.2020

Source of Materials : khanak Haryana

Description of Sample : Hot Bin 3 (6mm to 0mm Materials) Date Tested : 07.12.2020

Observation Sheet

Liquid Limit Plastic Limit


Determination No.
1 2 3 4 1 2
1 Penetration of Cone 14 19 22 26
(mm)
2 Container No. 1 2 4 3 - -

3 Mass of Container (gm) 20.51 22.04 22.00 23.53 - -

4 Mass of Wet Soil + Container (gm) 55.59 62.50 67.86 71.91 - -

5 Mass of Container + Oven dry soil (gm) 50.34 56.15 60.46 63.84 - -

6 Mass of Water (gm) 5.25 6.35 7.40 8.07 - -

7 Mass of oven dry soil (gm) 29.83 34.11 38.46 40.31 - -

8 Water content (6) / (7) x 100 (WL) (%) 17.60 18.62 19.24 20.02 - -

Average PL Np

20.50

20.00

19.50

19.00

18.50

18.00

17.50
Water Content(%)

17.00

16.50 Liquid Limit : 18.80 (%)


Plastic Limit : Np (%)
16.00
10 15 20 25 30 Plasticity Index : Np (%)

Description of works Emb.,Sub-Gra. GSB WMM

MOST Specification Limit LL < 50 , PI < 25 LL < 25 , PI < 6 LL < 25 , PI < 6

Remarks : Cone Penetration (mm)

Submitted By: Witnessed By:

Epc contractors Rep. Authority Engineers Rep.