Professional Documents
Culture Documents
Drum PDS
Drum PDS
Drum PDS
PDS
CLIENT Rev. Date Made by Checked by Page
Revision
LOCATION
DRUM
UNIT
1 ITEM
2 SERVICE
3 OPERATING PROCESS DESIGN
4 Pressure bar g. bar g.
5
6 (1) TL
7 Temperature °C °C
8
10 (1)
13 Corrosion allow.
14
15 Fluid :
16 Density at T : kg/m³
Between TL
17 Insulation
18 Lining
19 Lower TL elevation above ground = min.
20 Notes :
21
22
23
24
25 NOZZLE DATA
26 REF. Nb Ø SERVICE
27 A Inlet
TL
28
29
30 D Drain
31 E Vent
32 F Bottom outlet
33 H Manhole I.D.
34 L Tie-line
35 N Steam-out
36 S Outlet
37 T Top outlet
38 V Steam inlet
39 RD Relief device
40 LG Level gauge
41 LT Level transmitter
42
43
44 TI Temp. connection
45 PI Pressure connection (1) When applicable, H 2 and H2S partial pressure and / or depressuring conditions
46 (T,P) shall be also specified.
47 (2) Only in case of specific Process requirement, specify internals and corresponding
48 materials / corrosion allowance.
PDS 9 - Rév. 3 - ANG - XL97 W:\Data-Snk003\Gaz_Upstream\UTC - CM06\Doc\[Drum PDS.xls]PD009A13 PD009A13