Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

List of Equipments/ item required for Training Hall

Requesting Department Souma Mazumdar


Equipment / Item Type/ Model /Make /
Sr. No. Reference Image Qty Required Area/Reason
Name Specificaton

1 Table 1 Training Hall

2 Front Chair 4 Training Hall

3 Hall Chair 40 Training Hall

4 Podium 1 Training Hall

High Quality Wall


5 40 watt/Ahuja 6 Training Hall
Speaker

Bluetooth, UHF, Wi-Fi,


6 Blue Tooth Mic 2 Training Hall
USB

7 Frost Film to Glass All glass Training Hall

Acousti Ceiling
8 Training Hall

9 Ceiling Light Training Hall

Screen Resolution 1920 x 1080


Interactive Flat RAM Size 8 GB
10 1 Training Hall
Panel 75" Built-in OPS
Windows + Android 11

11 Cubbered 1 Training Hall

All-in-One Printer (Print, Scan, Copy)


Print resolution - 5760 x 1440
12 Printer WIFI 1 Training Hall
COLOR Printer
13 Lan Connection 2 Training Hall

14 Stage 1 Training Hall


d for Training Hall
Date 11.12.2023
Status as
Received 12.02.2023
Pending Qty Responsibility
Qty

0 1 Mr. Abhishek/ Mr. Ankit Pending

0 4 Mr. Abhishek/ Mr. Ankit Pending

40 40 Mr. Abhishek/ Mr. Ankit DONE

0 1 Mr. Abhishek/ Mr. Ankit Pending

6 6 Mr. Abhishek/ Mr. Ankit DONE

2 2 Mr. Abhishek/ Mr. Ankit DONE

0 All glass Mr. Abhishek/ Mr. Ankit Pending

As Required As Required Mr. Abhishek/ Mr. Ankit DONE

As Required As Required Mr. Abhishek/ Mr. Ankit DONE

1 1 Mr. Abhishek/ Mr. Ankit DONE

0 1 Mr. Abhishek/ Mr. Ankit Pending

0 1 Mr. Abhishek/ Mr. Ankit Pending


1 2 Mr. Ravi/ Mr. Ankit DONE

0 1 Mr. Abhishek/ Mr. Ankit Pending


List of Equipments/ item required for factory beautification
Requesting Department Souma Mazumdar 06.03.2024

Equipment / Item Type/ Model /Make / Required Status as 06.03.2024


Sr. No. Reference Image Qty Responsibility
Name Specificaton Area/Reason

Mr. Samir Vyas


1 GPCB board 1 Factory Gate Pending
Mr. Akash S

Rayzon Solar display Pending Discussion with


2 1 Main Gate Pending
board MD

Factory Pending Discussion with


3 Direction Board 2 Pending
Entrance MD

Mr. Akash
Display Board for Production
4 As Required Mr. Piyush Pending
Machine Floor
Mr. Soumya

Production Mr. Akash


5 Excilence Display Board Magnetic As per Line Pending
Floor Mr. Soumya

Replaceable Ware house Pending Discussion with


6 As per Requirment 2 Ware House Pending
identification Mr. Bhargav

Mr. Akash
7 Safety display board All glass Main Gate Pending
Mr. Piyush

Hazards
Hazards Material
Chemicle Mr. Akash
8 Storage Pending
Container and Mr. Piyush
Scrap

Emergency EXIT Door All Emergency Mr. Abhishek/ Mr.


9 Pending
light Door Ankit

Mr. Abhishek/ Mr.


10 Exit Door Light Need to visible in dark All exit Pending
Ankit

Floor Marking Color Mr. Abhishek/ Mr.


11 Floor Marking DMEU_TDS_00061_
std.lang.all.pdf Coading.pdf 1 All plant Pending
Ankit

Mr. Abhishek/ Mr.


12 Area Demarcation 1 All plant Pending
Ankit

Flex pole for Inside


13 factory Premices for 2 Training Hall Mr. Ravi/ Mr. Ankit Pending
advertisement

RAYZON SOLAR PRIVATE LIMITED RAYZON SOLAR PRIVATE LIMITED RAYZON SOLAR PRIVATE LIMITED TO THE SHOP FLOOR

RECEPTION & ADMINISTRATIVE BLOCK SCRAP YEARD


FG WARE HOUSE TO THE SHOP FLOOR
CAR PARKING
AUTO FRAME CUTTING
FIRE PUMP HOUSE
BIKE PARKING RESEARCH & DEVELOPMENT
LINE 02 UTILITY HOUSE
PRODUCTON LINE 04 & 05 LABORATORY
VISITOR ENTRY
ELLECTRICAL SWITCH YARD -02 EMPLOYEE CANTEEN
EMPLOYEE ENTRY LINE 01, LINE-04,LINE 05 ENVIRONMENTAL TEST CHAMBER-01
FIRE PUMP HOUSE-1
EMPLOYEE ENTRY LINE 02, LINE-03
EMPLOYEE ENTRY LINE 04, LINE-05 ENVIRONMENTAL TEST CHAMBER-02
OUTDOOR TEST BED
EMPLOYEE ENTRY LINE 01
EMERGENCY ASSEMBLY POINT -01 POTENTIAL INDUCED DEGRADATION
EMERGENCY ASSEMBLY POINT -02
FG WARE HOUSE TESTER

EMERGENCY ASSEMBLY POINT -03 EMERGENCY ASSEMBLY POINT -02 ULTRAVIOLET & DAMP HEAT
TEST CHAMBER
PRODUCTION LINE 03 VEHICLE LOADING AREA

PRODUCTION LINE 02 VEHICLE UN-LOADING AREA MECHANICAL LOAD TEST BENCH


PRODUCTION LINE 01 HAZARDOUS CHEMICLE STORAGE

PRODUCTON LINE 04 & 05


PV MODULE FLASH TESTER
LINE 01 UTILITY HOUSE
ELLECTRICAL SWITCH YARD -01
LINE 04 & LINE 05 UTILITY HOUSE
ELLECTRICAL SWITCH YARD -02
HAIL IMPACT TESTER
VEHICLE LOADING AREA
OLD ADMIN BUILDING
VEHICLE UN-LOADING AREA CURRENT CONTROL & MONITORING
EMPLOYEE CANTEEN
UNIT
RESEARCH & DEVELOPMENT LAB
SCRAP YARD

ELECTROLUMINESCENCE TESTER
FIRE PUMP HOUSE-1 RAW FRAME STORAGE ELECTROLUMINESCENCE TESTER
FIRE PUMP HOUSE-2

OCCUPATIONAL HEALTH CENTER HI-POT TESTER


FG WARE HOUSE

VEHICLE UN-LOADING AREA

VEHICLE LOADING AREA

You might also like