VI-SOP-O&M-02

VI-IMSP-O&M-01-F02
JBS ENTERPRISES PVT LTD
First Floor, Bella vista, Oswal
Site: Terralight Solar Energy Sitamau TEST REPORT Park, Pokhran Rd. No. 2,
SS Pvt. Ltd.(TSESSSPL) Thane(W)-400 601
DATE OF TESTING 29/03/23
132 KV BUSBAR SHEET Page 1 of 1

TEST REPORT OF 132 KV MAIN BUS


1.Maintenance Checklist of Busbar:

PREVENTIVE MAINTENANCE OF 132 KV MAIN BUS & TRANSFER BUS


Location: 132kV Main Bus & Transfer Bus
Observation Remarks
Sr No Description R- Phase Y - Phase B - Phase
1 External cleaning of Porcelain insulator. Done Done Done
Visual inspection for damage & defects of Porcelain insulator,
2 Done Done Done
Clamp, Jumper, Connector Disc Insulator etc.
3 Isolator Jumper connection tightness check. Done Done Done
4 Body Earth strip connection healthiness. Done Done Done
5 Insulation Resistance Measurement of Bus bar Done Done Done
The isolator jaw contacts cleaning and applying of petroleum
6 Done Done Done
jelly.
7 External cleaning of Porcelain insulator. Done Done Done
cleaning of

2. Insulation Resistance Measurement:

I.R. value
Particular Applied Voltage
R Phase Y Phase B Phase
132 kv Main Bus 5000 Volt DC 21.4 GΩ 62.7 GΩ 22.4 GΩ
132 kv Transfer Bus 5000 Volt DC 29.4 GΩ 32.5 GΩ 29.4 GΩ

3. Remarks: Test results are found satisfactory.

TESTED BY: WITNESSED BY: Client Rep.:


Mr. DINESH MENDHE JBS ENTERPRISES PVT. LTD. TERRALIGHT SOLAR ENERGY SITAMAU SS PVT. LTD.
(TSESSSPL)
Prepared BY:
Mr. ARVIND KUMAR