Contractor : - ------------- Contructor ¾Ñ”²u< M¡ (w`)
Amount ( Birr )
ÉU` 4,688,912.25 We certify that the contractor is now entitled to be paid the sum of birr
Total Birr Two Million Two Hundred Twenty Four Thousand Nine Hundred Eight & 96/100.
BILL OF QUANTITY
Contract
Item Pay Item Description Unit Executed Quantity Executed Amount
Quantity
Series,1000 This This
Previous Todate Unit Rate Previous Todate
General Certificate Certificate
Division-1100 Insurance
11.01
INSURANCE FOR WORKS AND
CONTRACTOR'S EQUIPMENT, INSURANCE
AGAINST INJURY TO PERSONS AND PS
DAMAGE TO PROPERTY,CONTRACTOR'S
PERSONNEL
48,000.00
28,000.00
Division 1000 Total Sum
Series,2000 Setting out & Site Clearing
Division-2100 Setting out the horizontal Alignment
21.01 Setting out horizontal alignement Centre-line pegs
shall be set at 10m intervals on straight sections
and 5m on curves & Chainage or reference pegs
shall be set out and marked at 20m intervals and
located at one metre outside the cleared width and
on both sides of the road)
lm 1.03
Division 2100 Total Sum
Division-2200 Site Clearance
22.01 Grass Cutting & bush clearing (light) m2 0.32
22.02 Bush clearing [haavy] m2 0.45
22.03 Tree cutting
a Thickness in diam [20-50cm] No. 13.09
b Thickness in diam >50cm No. 26.21
22.04 Stumps removal
a Thickness in diam [20-50cm] No. 14.19
b Thickness in diam >50cm No. 51.49
22.05 Boulder Removal
a Dia.(50cm - 100cm ) of out cropped m3 37.99
b Dia.. > 100cm m3 60.02
22.06 Stripping and grubbing removal m2 1.45
m 1.32
31.02 Slotting(Cutting & leveling )
m3 44.30
32.02 Borrow Materials production,loading
unloading,transporting,spreading &
compacting(15cm compacted thick in a layer) ,at a
hauled distance of 0.20km - 1km .
m3 108.49
32.03 Borrow Materials production,loading
unloading,transporting,spreading &
compacting(15cm compacted thick in a layer) , at
a hauled distance of 1km and above.
m3 134.19
Division 3200 Sub Total Sum
Division,3300 Construction of the road formation
m2 6.50
Division 3300 Sub Total Sum
Series 3000 Total Sum
Series,4000 Pavement
Division,5100 Placing Gravel Materials
41.01
a) 0 to 5km m3 125.99
b) 5 to 10km m3 145.15
c) 10 to 15km m3 165.69
d) 15 to 25km m3 180.71
e) 25 to 35km m3 190.01
f) 35 to 45km m3 199.83
41.02
a) 0 to 2km m3 152
b) Above 2km m3 161.95
Division 5100 Sub Total Sum
Series 5000 Total Sum
Series,5000 51OO Minor Drainage Structures (Culvert and Drainage Works )
SUMMARY SHEET -1
INTERIM PAYMENT NO 3
SUMMARY SHEET -2
INTERIM PAYMENT NO 3
This certificate
SN DESCRIPTION Previous Amount Todate
Amount
This certificate
SN DESCRIPTION Previous Amount Amount Todate
SUB TOTAL
1,087,838.00