JOB REPORT FORM

INSTRUCTIONS:
1.
Job #
Location Teak AC
Job Description Troubleshoot unit Jacket water pump fail to start.

Equipment IR3 Jacket Water pump motor

Requested By E & I Supervisor


Craft MECH ELEC INST AUTO HVAC OPER OTHER ______________
Permit #
Technician(s) Name Signature Hours Worked
N. Constance 2
Job Completed
By

Start Date End Date


Schedule
23/06/2021 23/06/2021
Work Completed Tasks conducted on the Teak AC.
(Tasks done)
 Troubleshoot reported unit Jacket water pump motor fail to start
 Informed the area authority of tasks to be conducted.
 Equipment to be worked on was identified.
 Isolations were done to ensure completion of tasks.

 Isolate field control panel main breaker for jacket water pump motor.
 Check for continuity from breaker to contactor. OK.
 De-isolate and check L1- 276V, L2-276, L3-276, to contactor. OK.
 Check for 120v supply from relay to coil A. OK.
 Check for 120v supply to function switch OK.
 Check return from switch to coil no supply.
 Check for slack connection, noted return from switch poorly terminated. Same
was corrected.

FIG.1 Corrected slack return to contactor coil.


JOB REPORT FORM

INSTRUCTIONS:
1.
 Continue checks for slack connections.

FIG.2 Slack connections

 Conduct insulation resistance test on Jacket water pump motor.


Jack water motor results:
PHASE TO GROUND
L1-G- 550V
L2-G -550V
L3-G–550V

BETWEEN PHASES
L1-L2:0Ω
L2-L3:0Ω
L1-L3:0Ω.
PS. No picture shown due to camera battery power.

 Running Amps Checks LI – 61.9, L2-62.4, L3-61.7.

. FIG.3 Amp check


JOB REPORT FORM

INSTRUCTIONS:
1.

 Function test Jacket water pump

Jacket pump left available for use.


Housekeeping conducted and work area was left safe.
AA authority was inform upon completion of task.
Name (Print) Signature Date

OUS N. Constance. 23/06/2021