Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

MLK/TR/MNL/HIC-SDCC/EL-BM/1662

‘–”ƒ –‘”ǣ
THIRD SAUDI EXPANSION OF THE HOLY MOSQUE & SURROUNDING
AREAS

CONTRACTOR : SAUDI BINLADIN GROUP (HARAMAIN DIVISION) Date : 26-Oct-2023

New Submittal Submittal Ref. No.: DEPARTMENT


SUBMITTAL FOR TECHNICAL
APPROVAL (STA) AR CV ST ME EL LC
Resubmittal MLK-MNL-HIC-EL-BM-G01-00-0025-00

Material Submittal Sample Submittal Pre-qualification Method Statement Other

To : DAR AL- HANDASAH


1. Subject: Operation and Manual of SCADA /BMS System for Malakan Project. Attachments No.

2. Submittal Description: Sample Board

Operation and Manual of SCADA /BMS System for Malakan Project. Catalogue
Shop Drawings
Product Warranty
Design Calculation
Test Report
Tech. Data
Attachments: •‡”––ƒ Š‡† Specification
Introduction
Pre-Qualification
Door Schedule.
Compliance Statement
Approvals
Area of Application
Reply of comments
Certificates
Method Statement

Area Of Application : Malakan Project Other

Drawing Ref. ǣǦǦǦͲʹǦ ͳͲͷǦͲͲǦͲͲͲͳǦͲ͹Ǧ

Specification Ref. ǣǤͳͷͻͲͲ


Attached MAT Approval Copy ǣǦǦ ǦǦǦ ͲͷǦͲͲǦͲͲͷʹǦͲ͵ Code : B

Note: ”‹‰‹ƒŽƒ––ƒ Š‡†ǣ ‘ˆ– ‘’›ƒ––ƒ Š‡†ǣ

3. MANUFACTURER / SUPPLIER:
Manufacturer & Address : Siemense, Sofrel/ ABUNAYAN TRADING CORP. KSA
29-10-2023
Supplier & Address : HASHIM ISMAIL COMPANY / KSA

4. SBG Comments: Please proceed Refer to attached sheet

Submitted by Sub-Contractor QC MANAGER Approved By

Name: Eng. Mahmoud Abdelsattar Eng. Mohamed Gadallah Eng.


Dat a
M nage
ment
Cent re

Signature:

This section will be used by Approving Authority only.

A). Approved
Refer to attached comments B). Approved as Noted

Bahaa Amin, Hossam Tarek, Ahmed Abu Abed, Mohamed Abdelbaky C). Revise & Resubmit

Date: 22/11/2023. D). Rejected

23-11-2023
’’”‘˜ƒŽ•ŠƒŽŽ‘–”‡Ž‹‡˜‡–Š‡‘–”ƒ –‘”‘ˆ‹–•‘„Ž‹‰ƒ–‹‘•ƒ†Ž‹ƒ„‹Ž‹–‹‡•—†‡”–Š‡‘–”ƒ –‘” ‘•–‹–—–‡ƒ—–Š‘”‹œƒ–‹‘‘ˆƒ› Šƒ‰‡–‘‘–”ƒ –
‘ —‡–•ǡƒ†–Š‡”‡ˆ‘”‡•ŠƒŽŽ‘–‹’Ž›ƒ›”‡ ‘‰‹–‹‘™Šƒ–•‘‡˜‡”‘ˆƒ††‹–‹‘ƒŽ–‹‡ƒ†Ȁ‘” ‘•–Ǥ
‘”‘Ǥ ǦͶͲǦǦͲͲǦͲ͵
Dar Comments

Submittal Ref. No.: MLK-TR-MNL-HIC-SDCC-EL-BM-1662

Subject: Operation and Manual of SCADA /BMS System for Malakan Project [Siemense, Sofrel/
ABUNAYAN TRADING CORP. KSA] [HASHIM ISMAIL COMPANY / KSA].

Date Replied: 22-Nov-23

Status Code: Revise & Resubmit C


• MEP Comments:
1. Compliance with SBC & Saudi national water company requirements to be mentioned.
2. Cross reference to related system with SCADA in other O&M manuals to be considered.
3. Operation and maintenance sections don't include all system components such as but not limited to
workstation sensors, server, cabling …etc.
4. Sequence of operation shall include all system modes (normal, emergency stop scenario, fire alarm
scenario) with all set points taking in to consideration that there must be no conflict between SCADA
automatic mode (logic software) and manual mode operation.
5. Complete drawings and diagrams showing the sequence of operation of all systems interfaced with
SCADA to be provided.
6. Ring network diagram shall be provided.
7. Operating system manuals to be provided in details with any applicable licenses.
8. Preventive matrix shall include all system component and devices.
9. Table including all names and tags of devices in the project complying with names in the SCADA
operating system (HMI-Names) shall be attached.

Reviewed by:
Bahaa Amin, Hossam Tarek, Ahmed Abu Abed, Mohamed Abdelbaky

Date: 22/11/2023
.