TAHA ASSOCIATES FSD

Project: Sitara Complex Block # 05 BENDING SCHEDULE Calc. by:

Ckd. by:

Job: Beams,Slab Bar Schedule Date:

Sheet: of
Cut Total
Mark Location Bending Shape C/C Dia No. in each Length
Length Nos.
Beams B1&B2
Bottom Bars 18' 18" #6 28.25 1 14 3 42 1186.50
25'-3"
Curtail Bars #6 21.92 1 14 3 42 920.64
21--11"
Curtail Bars #6 18.58 1 14 3 42 780.36
18'-7"

25'-3"
Top Bars 18' 18" #6 28.25 1 14 2 28 791.00

Extra Bars #6 10.50 1 14 14 196 2058.00


18" 9'-0"

1.75
Rings 0.50 0.50 #3 5.00 1 14 55 770 3850.00

1.75
Beams B10
Bottom Bars 18' 18" #6 164.00 1 1 3 3 492.00
146
Curtail Bars #6 16.00 1 8 3 24 384.00
16

146
Top Bars 18' 18" #6 164.00 1 1 2 2 328.00

Extra Bars #6 7.50 1 1 4 4 30.00


18" 6

Extra Bars #6 13.33 1 8 3 24 319.92

Page 1 of 3
`

TAHA ASSOCIATES FSD

Project: Sitara Complex Block # 05 BENDING SCHEDULE Calc. by:

Ckd. by:

Job: Beams,Slab Bar Schedule Date:

Sheet: of
Cut Total
Mark Location Bending Shape C/C Dia No. in each Length
Length Nos.
13.33
Extra Bars #6 11.33 1 8 1 8 90.64
11.33

1.75
Rings #3 5.00 1 1 352 352 1760.00
0.50 0.50

1.75
Cocelaed Beam
Bottom+Top #6 10.75 1 15 5 75 806.25
10.75
0.50
Rings 7" #3 2.50 1 15 18 270 675.00
0.50 0.50

0.50
Slab
Bottom Bars 6" #3 8.33 1 15 50 750 6247.50
8.33
Top Bars 10" #3 25.00 1 15 13 195 4875.00
25
Stairs Dowels 5" #4 8.00 1 15 6 90 720.00
8
Extra Bars 8" #3 5.00 1 1 220 220 1100.00
5
8" #3 156.00 1 1 6 6 936.00
156
Extra Bars 8" #3 4.00 1 1 25 25 100.00
4
8" #3 16.00 1 1 5 5 80.00
16

Page 2 of 3
`

TAHA ASSOCIATES FSD

Project: Sitara Complex Block # 05 BENDING SCHEDULE Calc. by:

Ckd. by:

Job: Beams,Slab Bar Schedule Date:

Sheet: of
Cut Total
Mark Location Bending Shape C/C Dia No. in each Length
Length Nos.
DIAMETER #3 #4 #6 #8 #3 GRAND TOTAL WEIGHT
TOTAL LENGTH TOTAL
QTY
19623.50 720.00 8187.31 IN KGS 9121.53
Std. Wt. Kg/Rft. 0.170 0.303 0.68
TOTAL WEIGHT 3336.00 218.16 5567.37

Page 3 of 3