SOCIEDAD MINERA CERRO VERDE S.A.A.

REUBICACION DE CICLONES DE RELAVES - FASE II


INGENIERIA DE DETALLE
Proyecto GMI N° 160888
Proyecto SMCV N° 09C00040

09C00040-C-3840-5-TI-102
09C00040-C-3840-5-TI-102

TECHNICAL INFORMATION REQUIREMENTS


BOMBAS C-3820-PP-1804/1805
MECÁNICA

Rev. 0
APROBADO POR:

Líder de Disciplina: Jesús Bacilio - GMI

Jefe de Proyecto: Gian Carlo Patiño Patroni - GMI

Cliente: Liliana Gutiérrez - SMCV

Revisión Hecho por: Descripción Fecha Revisado Aprobado


A A. Dávila Emitido para coordinación interna 15MAR2010 J. Bacilio G. Patiño P.
B J. Salazar Emitido para aprobación del cliente 30MAR2010 J. Bacilio G. Patiño P.
0 J. Salazar Emitido para construcción 10MAY2010 J. Bacilio G. Patiño P.

COMENTARIOS DEL CLIENTE:


PR - TECHNICAL INFORMATION REQUIREMENTS

PROJECT NAME : SMCV-REUBICACION DE CICLONES DE RELAVES - FASE II NUMBER:


PROJECT NUMBER : 160888
PROJECT PACKAGE: AREA: -
PR NUMBER : REV 0 FECHA DE REV: Mayo 10, 2010
EMITIDO PARA : Construcción
PR DATE : Junio 10, 2010
DATE AT SITE :

1)COMPLETE EQUIPMENT DESCRIPTION

TECHNICAL DATA SHEET

ITEM NUMBER 2

EQUIPMENT NAME Bombas de alimentación de agua al cajón LA-004B

AREA 3800

TAG NUMBER C-3820-PP-1804/1805

CASE

QUANTITY REQUIRED 2

PUMPS
OPERATING CONDITIONS
Fluid Water
Water Temperature (ºC) 20
Water Ph
Water S.G. - Normal 1
Water Viscosity (cP) 1
PUMPS PERFORMANCE
Capacity per pump - min./design (m3/hr) 1117/3259
Pump total head (TDH) - min./design 21.594 / 26.982
NPSH Available - design. (m) 8.45
Pump shaft power BHP - design (HP) 358.9
Motor recommended (HP) 450
MOTOR
Type / Enclosure TEFC
Motor power rating (HP)/(rpm) @ 2700 mas 450 HP / 1200 rpm
Voltage/phase/Hertz 4000V/3 Ph/60 Hz
Service factor 1.15
Insulation class F
Starting AFD
Mounting Horizontal
Suggested Pump Size 24X20S WSDO

NOTES
1) The proposal must include the pump, coupling, motor and skid according data sheet.
2) The operation speed of the impeller to design conditions must correspond to the speed of the motor operating at a frequency of 60 Hz.
3) The motor will be type TEFC 450 HP / 4000 V / 3 Ph / 60 Hz.

2)ENGINEERING DOCUMENT

DESCRIPTION DOC NUMBER REV


Instructions for supplier drawings and data commitment 0
Mechanical Design Criteria C-DC-55-001 0
Estructural Data for Mechanical Equipments C-ES-15-001 1
SPEC -Standard requirements for mechanical equipment C-ES-55-001 2
SPEC - Paint Specification C-ES-55-003 4
General Electrical Design Criteria C-DC-65-001 0
460 V Induction Motor C-SP-65-008 2
Electrical Requirements for mechanical equipment C-ES-65-001 2
Cad procedures Manual PI-MPC-001 4
Adjustable Frequency Drive C-SP-65-003 0
Sump Pumps C-SP-55-018 2
Hojas de datos de Bombas C-3820-PP-1804/1805 09C00040-C-3840-5-HD- 0
102

SMCV Proyectos e Ingeniería- Concentradora 2 de 4


PR - TECHNICAL INFORMATION REQUIREMENTS

PROJECT NAME : SMCV-REUBICACION DE CICLONES DE RELAVES - FASE II NUMBER:


PROJECT NUMBER : 160888
PROJECT PACKAGE: AREA: -
PR NUMBER : REV 0 FECHA DE REV: Mayo 10, 2010
EMITIDO PARA : Construcción
PR DATE : Junio 10, 2010
DATE AT SITE :
3)SUPPLIER DRAWINGS AND DATA COMMITMENT
DESCRIPTION FOR QUOTN TO BE CONSIDERED IN QUOTATION

DRAWINGS AND DATA REQUIREMENTS


FOR REVIEW CERTIFIED FINAL
P:PRINT COPY ELECTRONIC
R:REPRODUCIBLE COPY PRINT / PRINT /
*DUE DATE **DUE DATE
E: ELECTRONIC FORMAT ELETRONIC ELETRONIC
Supplier drawing list 1E 1 2P / 2E 1
General Arrangement drawings 1E 1 2P / 2E 1
Cross sectional drawings/ Parts lists 1E 1 2P / 2E 1
Foundation requirements drawings 1E 1 2P / 2E 1
including foundation loads
Completed Supplier DATA SHEETS 1E 1 2P / 2E 1
Performance Curves and Data 1E 2P / 2E 1
Catalog Information 1E 2P / 2E 1
Piping and Instrument Diagrams
Electric Schematic and Wiring Diagrams 1E 1 2P / 2E 1
Motor Data Sheets 1E 1 2P / 2E 1
Component &/or shop detail drawings 1E 1 2P / 2E 1
Assembly &/or erection drawings 1E 1 2P / 2E 1
Welding Procedures 2P / 2E 1
Surface Preparation & Painting procedures 2P / 2E 1
Production & Shipping Schedule (see note 1E 1 2P / 2E 1
3)
Shop Inspection and test plan 1E 1 2P / 2E 1
Shop Inspection Reports and Quality Plan 1E 1 2P / 2E 20
(see note 4)
Equipment test certificates (see note 4) 2P / 2E 20
Priced recommended spare part lists 1E 2P / 2E 1
List of shipping weights 1E 1 2P / 2E 1
Progress Report 2P / 2E 1
Control ^ protective Narratives 2P / 2E 1
Control ^ Protective Logic Diagrams 2P / 2E 1
Instrument Index /Data/Sheets/Drawings 2P / 2E 1
Packing List (see note 6) 2P / 2E 5
Installation Operating & Maintenance 2P / 2E 5
Manuals (see note 5)
Others
Notes:
(*) weeks after receipt of order
(**) Weeks After return of reviewed drawings
1 For Instructions on using this form see Instructions for suplier drawings and data commitment
2 Applicable only to specific replacement components such as mill liners
3 Schedule to include engineering , procurement, manufacture, inspection and testing, painting, preparation
for shipment and transportation.
4 Certificates and inspection reports to be issued five days for completion of testing.
5 Manuals shall include complete parts list, lubrication schedules and special tool requirements.
6 To be issued at time of shipment

4) INSPECTION REQUIREMENTS
ITEM Item Item Item Item
AREA
PUMP TESTS
Hydrostatic YES
Performance YES
Run YES
Control Date According with Shop Inspection and Test Plan
Number of procedure
Drawing Number
Equipment Description
Control elements
Dimensions and weights YES
Buyer Inspection YES
Special topics
Classification of inspection MANDATORY

COMMENTS

SMCV Proyectos e Ingeniería- Concentradora 3 de 4


PR - TECHNICAL INFORMATION REQUIREMENTS

PROJECT NAME : SMCV-REUBICACION DE CICLONES DE RELAVES - FASE II NUMBER:


PROJECT NUMBER : 160888
PROJECT PACKAGE: AREA: -
PR NUMBER : REV 0 FECHA DE REV: Mayo 10, 2010
EMITIDO PARA : Construcción
PR DATE : Junio 10, 2010
DATE AT SITE :

5) GENERAL SITE CONDITIONS

Units Details Source REV

1. PROJECT LOCATION
Mine Ubication 16km, to Arequipa
province east - Peru
Altitude masl 2,700 m (8,860 ft)
Latitude Project (degrees/min. grados/min. 16 º32 ' Sur
Length Project (degrees/min.) grados/min. 71 º37 ' Oeste
2 SITE ACCESS
Distance road
Arequipa Km 26
Matarani Km 100
Lima Km 1,100
San José Km 12
3 CLIMATIC CONDITIONS
A. Room temperature
Average Annual Maximum (ºC) ºC 24.7
Average Annual Minimum (ºC) ºC 3.7
Average Daily Change (ºC) ºC 16.6
Maximum Design (ºC) ºC 30
Minimum Design (ºC) ºC O (Only for short
occurrences)
B. Wind
Rays Highs (Km/h) Km/h 100
Viento Predominante direction To the southwest
C. Precipitation
Annual Average Precipitation (mm/year) mm/a 40.7
Highest Rainfall in 24 hours (mm) mm 81.5
D. Evaporation
Evaporation Average Daily (mm/day) mm/d 6.1
E. Solar radiation
Radiation Average Daily (W/m2) W/m2 6,270
Range (W/m2) W/m2 4,230-7.850
F. Barometric pressure
Average Annual (mm Hg) mm Hg 555
Range (mm Hg) mm Hg 551-559
G. Relative Humidity
Average Annual (%)l % 56.1
Range (%) % 8-100

6) RECOMMEND BIDDERS LIST


COMPANY NAME ITT Industrial Process
ADDRESS Av. Canaval y Moreyra 654 Of. 603 - San Isidro
DATE
CITY Lima
TELEPHONE (511) 475-6910/475-7010
FAX
RUC
E-MAIL

7) OTHERS

8) APPROVALS

ISSUED BY: J. Salazar REVIEWED BY: J. Bacilio APPROVED BY: G. Patiño Patroni

SMCV Proyectos e Ingeniería- Concentradora 4 de 4