DIVYAJ VARSHNEY (Mobile No : +91-9267967871,9599678732 & Email id : divyajvarshney1@gmail.

com)

EADUCATION
Indian Institute of Management Rohtak | PMP | Intended Majors – Operations and Project Management May’16 – Nov’16
• Pro Bono Consulting (1/12+ teams)– Consultancy work done for various companies while studying this course like Hero
Motocorp, Hindalco etc.
GLA Institute OF Technology and Management | Bachelor of Engineering (Telecommunication) | CGPA: 7.4Aug’08 – Jun’12
• Ranked in top 10 in a batch of 120+ students in Telecommunication Department
• Core Hostel Committee (5/200+): Won Hostel lite of the Year Award for organizing events for 4+ hostels for 4 years
(social+tech)

NOTABLE ACCOMPLISHMENTS ACROSS THE CAREER


• Drove various initiatives to reduce costs and maximise profitability at L&T. Sekesui DLJM Moulding Pvt Ltd &Phoenix Contact
India Pvt Ltd like:
• Performed Site Load Calculation / Site Design for 500 KVA DG Sets which resulted in saving nearly 8 Lakhs per month
• Maintained Electrical Cost Record in KWH for Jama Masjid, Mandi House & ITO Sites which improved profits for the company
from vendors and other subcontractors like L&T & Haneda Infrastructures Pct. Ltd. And in injection moulding plant for Sekesui
DLJM Moulding Pvt Ltd
• Pivotal in designing cost-effective site planning & layout designing/ product designing such as
A Designing Site Load of 1250A Synchronization Panel (including Cement Plant- 125A & Batching Plant)
B Providing connection to Cement Plant, Batching Plant, Gantry Crane (32/5 ton) and Operations of longest TBM for DMRC
Facilitating Whole Tyre Shredder Assembly and Belt Conveyor Design including PVC & Rubber Belt
• Executed the Delhi Metro Project while working with L&T SUCG JV and successfully completed:
a. 1.4 kms. Tunnelling from Mandi House to ITO & 1.8 km Tunnelling from ITO to Delhi Gate
b. 2 kms. Tunnelling in Hard Rock TBM from Jama Masjid to Delhi Gate
• Internal Auditor for OHSAS
Got Shortlisted from L&t for CV selection for Electrical Engineer Approval from NHRSCL

WORK EXPERIENCE

Dec-22 -Present: Larson & Tubro as a Assistant Manager P& M Bullet Train Project in Section 3
Key Result Areas:
• Handling and Maintaining of all utility and electrical department like DG sets, lifts, cranes, chillers, air compressor, RO STP,
ETP UPSAND DM Plant
• Handling of Air-Compressor 90cfm – 280 cfm of Kaiser and Atlas Copco.
• Handling of ELECTRICAL AND MECHANICAL breakdown.
• Maintenance of DG Set with capacity of 500 kva Cummins make.
• PM planning and making schedule.
• Maintaining documents according to IATF/TS standard16949/2009, ISO and OHSAS Making MIS Maintenance and handling
of machine according to Annual Health Check-up of machine. Knowledge of firefighting system. Team member of emergency
response team.
• Responsible of Machine maintenance, Preventive maintenance, Predictive maintenance. Scheduling Preventive Maintenance
with predictive maintenance done on monthly & Quarterly basis.
• Installation and maintenance of off grid solar roof top system 230 Kw •.
• Installation and maintenance of Batching Plant (Make: Schwing Schlitter), Straddle Carrier, Weigh Bridge (1oo Ton)
• Involved in erection and commissioning of largest casting yard ever built of segment erection in Metro Train Project in India.

Sep 20 -Nov-22: Phoenix Contact India Pvt ltd as Sr. Engineer FEMS
Key Result Areas:
• Handling and Maintaining of all utility and electrical department like DG sets, lifts, cranes, chillers, air compressor, RO STP,
ETP UPSAND DM Plant
• Handling of Air-Compressor 90cfm – 280 cfm of Kaiser and Atlas Copco.
• Handling of ELECTRICAL AND MECHANICAL breakdown.
• Maintenance of DG Set with capacity of 500 kva Cummins make.:

April -18- August 20 Sekesui DLJM Moulding Pvt Ltd ,Gr.Noida as Engineer Maintenance

: Key Result Areas:


• Handling and Maintaining of Injection moulding machine of Ferromatik 450 T to 910 Ton
• 100 Ton to 650 Ton, Toyo Full Electric 100 Ton to 450 Ton, Auxiliary equipment of Mould shop. And Paint Shop.
Handling of Air-Compressor 90cfm – 200 cfm of KAESER All types of conveyor maintenance.
• Handling of ELECTRICAL AND MECHANICAL breakdown. (Including ETP, STP AND WTP)
• Maintenance of DG Set with capacity of 380 kva to 600 kva
• Maintenance of Blowers in Paint Shop & PM planning and making schedule.
• Maintaining documents according to IATF/TS standard16949/2009, Making MIS
• Maintenance and handling of machine according to Annual Health Check-up of machine. Knowledge of firefighting
system. Team member of emergency response team.
• Responsible of Machine maintenance, Preventive maintenance, Predictive maintenance. Scheduling Preventive
Maintenance with predictive maintenance done on monthly & Quarterly basis.

June-15-Aug’17 Maintenance and Commissioning Assignment (With SE Power Ltd & Intelex Electronics)
Key Result Areas:
• Associated with PMU (PIU), AMF Panel, SPS, Synchronized DG, Servo Voltage Stabilizer Project / Operations in Delhi &
Rajasthan for all field related activities like Installation, Commissioning, Preventive Maintenance and Fault
Rectification
• Led a team of 15 Engineers for managing 800+ sites in Delhi & Rajasthan; managed all team movements for achieving
the target of preventive & corrective maintenance in a specified time.
• Maintaining coordination among Production, Testing & QA Departments for field feedback and product modification
to deliver better.

March13-May-15 L&T SUCG JV (Metro Tunnelling Delhi -DMRC CC-05)


Key Result Areas:
▪ Read Electrical & Hydraulic Drawing of Gantry Crane (32/5 Ton) & Hard Rock TBM
▪ (Longest TBM used at any DMRC Project Make -
▪ STEC & Herrecknecht both); contributed in:
▪ Installation, Maintenance & Commissioning of Electrical Air Compressor and Portable Air
▪ Compressor (GAE-75, GA-55 & XAS, 187 - Make –Atlas Copco) with Air Dryer & Water-Cooled Chiller Plant Installation
of CCTV Camera with TFT in Locomotive & using DVR in TBM
▪ Installation, Erection & Maintenance of Diesel Generator of 1010 KVA Administered Electrical Designing & Site
Load Calculation entailing:
▪ Transformer Short Circuit Calculation & its size and Earthing Calculation
▪ Site Load Design of 1250-A Synchronization Panel & Distribution Feeder (Cement Plant125A, Electrical Air
Compressor - 150A
▪ Batching Plant -100A) for 4 DG Sets of 1010 KVA Prepared Daily:
▪ Checklist of Electrical and Diesel Air Compressor, Electrical Distribution Board, DG Sets, Locomotive, Batching Plant &
Hoisting Beam (Single & Double Beam of TBM)
▪ Breakdown Report of Electrical in TBM of both shifts and presenting the same to Incharge
▪ Worked as an In-charge of 11KV HT Station; managed 11 KV HT Cable Jointing, Termination & its Testing from Step-
up Transformer (415V/11KV) to Step Down Transformer (11 KV /380V) in STEC TBM; provided:
▪ Intercom Connection to site & under-tunnel using 20 pairs Coaxial Cable & 10 pairs Coaxial Cable using Matrix Cellular
System
▪ Electrical Connection to Cement / Batching / Water Cooled Chiller Plants, Electrical Air Compressor & Ventilation Fan
▪ Maintained record of all Electrical Items including Pumps, Electrical Cables (HT Line) & RCCBs, ELCB, MCCB; ordered
various electrical items as per requirement; planned & prepared Site for Electrical Audit as per rules and regulations of
DMRC.
INDUSTRIAL TRAINING

▪ Organization: 509, Army Base Workshop, Agra Cantt, Agra Period: 2011