GAD End of Year Summary 2023

IATA Ground Operations Automation and Digitalization WG


Meetings
GAD Membership LCAM - TEAMS 2 weeks
2023 In person IATA MAD SEP 23

DCAM - TEAMS 4 weeks


In person Eurocontrol BRU OCT 23

GSE - TEAMS and In person

GAD MAKE UP DCAM LCAM GSE TOTAL


26 Airlines

10 12 18 50
1 ATC
1 ACI
5 Airport
2 Aircraft
2 DCS
10 GHSP
3 GSE
Load Control & Digital Ramp
LCAM/Digital Load control/Digital Ramp/IGOM/AHM
AHM E-LIRF IGOM
AHM1110 Updates published. Electronic Load instruction & reporting. CHAPTER 5 Updates continue to
AHM561 Completed and will be finalized A digital standard for CLC and RAMP. make IGOM detailed for the
for review DCS Data approval. BRD made and handed over to tech procedures of load control and
AHM562 proposed – numbering change team. A digital message will be created ramp exchange.
will be part of this on 2024 as well as for systems and teams to exchange Section 1 nearly complete.
addition of standard definitions. loading instructions and report
AHM563 Loading errors. AHM780. 2024 Action plan
update proposed- TOBT. 2024 Action plan Work will continue on this
Sub-group will make an XML message Chapter 5.
2024 Action plan. for review & reach out if SME I needed LOD checklist will be updated
AHM1110. CLC agent role might be from RAMP or Load control from IGOM reform. AHM review
needed. will be included
AHM561 review and vote 2025. A new AHM will be needed or at least
AHM562 loading errors- to be finished. add to AHM514 for this E-LIRF
AHM563 NEW validation of DCS. UWS Update or reform might be a new
system for load control. action from this ELIRF, NOTOC updates
AHM to be reviewed & updated: might need to be considered.
501/505/513/514/515/531/533/537/540
X565 – Tech group for Systems
Digital Data for Weight Balance and Load Control

X565 E-LIRF
X565 is complete and published. BRD Received well.
AHM565 Will be removed from 2025. Tech items covered.
More testers are needed. A flow process for ELIRF produced.
Early adopters and trials sourced.

2024 Action plan


2024 Action plan. Sub-group will make an XML message
Training material needed. for review & reach out if SME is needed
Guidance and implementation plan from RAMP or Load control.
to be devised.
A new AHM will be needed or at least
What support can be given for
add to AHM514 for this E-LIRF.
implementation. Webinars will need to
planned as what “marketing can be UWS Update or reform might be a new
done” action from this ELIRF, NOTOC updates
might need to be considered.
Delay Codes
AHM732/MVT/Implementation & Review
AHM732 AHM
Group meetings continued to review AHM780. MVT addition proposed for
AHM. TOBT message. Format only will be
Webinars and Trials successful. added then XML.
Interest from airports, Airlines & system
2024 Action plan.
providers.
AHM review for MVT using AHM732
Success in READI project in Europe.
AAA codes.
Next steps are needed to help with
AHM review needed to see how it
guidance & support for implementation.
affects other areas including delay
Common requirement for guidance on
reporting other areas e.g. SLA
next steps.
AIDX review and action needed.
2024 Action plan. System providers will need action if
AHM732 review will continue – systems can change – Many systems
language improvement & code accept only IATA 730/731 and AHM780
rationalization. format.
Overlap and redundancy will be
checked.
Early Adopters will be asked to join
group
Sustainability
Agenda Topics will be discussed in 2024
People, Prosperity, Planet.

We need to look after our planet…


We need to see if environmental items fit into Economic
& Operational areas. WHAT? WHY? HOW?

GAD LCAM/DCAM
Some initiatives from GSE TEAM What Can we do in Digital RAMP
CO2 from GSE improvements & load control including paperless - data, time, other
NOISE improvement digital items can add to the sustainable footprints.
SAF - BIO FUEL, Potable water standard might be 1 topic
GSE POOLING ROBOTICS
SUSTAINABLE TAXI - TAXIBOT ERGONOMICS
SINGLE ENGINE TAXI AI
2024 - We will Discuss & Add items to our work plan
GAD LCAM/DCAM
Decide how we meet – TEAMS & Frequency
Updates needed for all group as well as TSB

1st meet to be planned JAN week 2 or 3?


Meets will be agreed and supported by IATA
Team leaders will be asked to manage tasks.
2024 continue work
Focus on completing tasks

Montreal Meet Dates out

March 2024 – Montreal


Here are the dates for each subgroup meetings:
Mar 18 to 20 – Delay codes
March 19 to 21 – Load control /ramp digital
March 18 to 21 – GSE and SAE
(March 18, 19 for SAE and March 20, 21 for IATA GSE
IATA ACCESS KEYS PUBLISHED
IGOM AHM accessible for all GAD,
TEAMS SITE ACCESS AND FAM- reach out
Guidance for team FAM and orientation – reach out.

Happy Holidays
THANKYOU
It has been super year because of us.
.