APROVAL DRAWINGS

PROJECT : LIFESTYLE AREA


ITEM : STEEL STRUCTURE
LOCATION : SINGAPORE
INDEX
No DRAWING DRAWING TITLE DATE REV

01 D 01 GENERAL NOTE 15/04/2022 10


02 D 02 1ST COLUMN PLAN 15/04/2022 10
03 D 03 2ND COLUMN PLAN 15/04/2022 10
04 D 04 3 RD COLUMN PLAN 15/04/2022 10
05 D 05 2ND FLOOR PLAN 15/04/2022 10
06 D 06 2ND FLOOR PLAN 15/04/2022 10
07 D 07 3RD FLOOR PLAN 15/04/2022 10
08 D 08 STAIR FL 1ST TO FL 2ND 15/04/2022 10
09 D 09 STAIR FL 2ND TO FL 3RD 15/04/2022 10
10 D 10 ROOF PLAN 15/04/2022 10
11 D 11 ROOF BRACING PLAN 15/04/2022 10
12 D 12 ROOF PURLIN PLAN 15/04/2022 10
13 D 13 FRAME SECTION GL .T1 15/04/2022 10
14 D 14 FRAME SECTION GL .T2 15/04/2022 10
15 D 15 FRAME SECTION GL .T3 15/04/2022 10
16 D 16 FRAME SECTION GL .T4 15/04/2022 10
17 D 17 FRAME SECTION GL .T5 15/04/2022 10
18 D 18 FRAME SECTION GL .T6 15/04/2022 10
19 D 19 FRAME SECTION GL .T7 15/04/2022 10
20 D 20 FRAME SECTION GL .T8 15/04/2022 10
21 D 21 FRAME SECTION GL .T9 15/04/2022 10
22 D 22 FRAME SECTION GL .T10 15/04/2022 10
23 D 23 FRAME SECTION GL .T11 15/04/2022 10
24 D 24 FRAME SECTION GL .T12 15/04/2022 10
25 D 25 FRAME SECTION GL .T13 15/04/2022 10
26 D 26 DETAIL 15/04/2022 10
27 D 27 DETAIL 15/04/2022 10
28 D 28 DETAIL GLASS RAILING 15/04/2022 10

TOTAL DRAWING: 28
A B C D E F G H I J

7
REMARK: 7

1.DESIGN STANDARDS & CALCULATED LOADINGS:


1.1 DESIGN STANDARDS: 2.3 BOLT CATEGORY 3. FABRICATION STANDARDS: REVISION
2.3.1 ANCHOR BOLT

REV. DATE DESCRIPTION DRAW. CHECK PPD.

1.2 CALCULATED LOADINGS:


6 6

APPROVAL DRAWINGS

4. ERECTION REQUIREMENTS

2.3.2 PRIMARY BOLT (HIGH STRENGTH) T.M.L STEEL PTE. LTD


2. FABRICATED MATERIAL:
2.1 PRESENTATION MATERIALS:
5 5

5. CONVENTION FOR SYMBOL


160 ROBINSON ROAD
5.1 - BUILT UP I BEAM:
#14-04 SINGAPORE (068914)

GENERAL DIRECTOR

2.2 WELDING SPECIFICATION (EN STANDARD)

5.2 - PURLIN C:
PHAN THANH LONG
4 4
TECHNICAL MANAGER

2.2.1 CORNER WELDING


5.3 - CONNECTION BOLTS
S1 M.ENG HUONG THANH KHANG
1 1 S2>S1
Hh

CHECKER
S1 (mm) <=4 5-6 7-9 10 - 15 16-21 22-30
Hh (mm) >3 >4 >5 >6 >7 >8
S2

Eng.

2 3 4 2.3.3 TIGHTEN MOMENT FOR BOLT


6. PAINTING SYSTEM: DESIGNER
2 3 4 STIFFENER WELD
3 D 9 t 16 3
Q 45° s = D/2 WELD
f

s Eng.
t

200
2

50

t Q DRAWING
t/4 f 19 6 t 4035° 7. METHOD TO JOINT STEEL:
0 5 t 19 L=100mm
7.1 JOINT STEEL SHAPE (I, H, U)
Eng.
PROJECT

LIFESTYLE AREA
2 2.2.1 BUTT WELDING 2

LOCATION: SINGAPORE
ITEM:
g

e t (mm) 2-3 4-5 6-8 7.2 JOINT BUILT UP (I, H)


b (mm) 2 2 2 STEEL STRUCTURE
t

e (mm) 7 8 9
b
g (mm) 1.5 1.5 2
DRAWING NAME:

GENERAL NOTE
1 1

No. : REV: 10 LEV:

DATE: 15/04/2023 No. Dra: D01 Job No.065.23.01

A B C D E F G H I J
A B C D E F G H I J
T.N
DETAILED NOTE TABLE
T.M 00
36 SING SECTION NOTE

C3 C5 C5 C5 C5 C1 BH-375.5W-300.14F Q345
7 T.1 C2 BH-375.6W-350.14F Q345 7

C2A BH-375.6W-350.16F Q345

6600
4900
C2B BH-375.8W-350.16F Q345
C1 C2 C2 C2 C2 C3
T.2 C3 BH-375.5W-300.10F Q345
REVISION
TIE BEAM 3700 C3A BH-375.5W-250.10F Q345

6600
D90X4.0
C4 BH-375.6W-300.12F Q345
C1 C2 C2 C2 C2 C2 C3
T.3 C5 BH-375.5W-300.12F Q345
C6 BH-375.5W-350.14F Q345

6600
C5 C7 REV. DATE DESCRIPTION DRAW. CHECK PPD.
C6A BH-375.16W-350.20F Q345
C6 C2A C2 C2 C2 C2 C7 C6B BH-375.20W-375.20F Q345
6 C7 T.4 6
C7 BH-375.5W-250.10F Q345

6000
C5
C7 C7A BH-375.5W-250.8F Q345 APPROVAL DRAWINGS
C1 C2 C2 C2 C2 C2 C2
C6A T.5 C8 BH-250.5W-165.8F Q345
C3A C3A C7 C9 BH-250.5W-200.8F Q345

6000
3500
C5 C10 BH-250.5W-250.10F Q345
C5 C2 C2 C2 C2 C2 C2 C2
C7 T.6 C11 BH-300.5W-250.10F Q345

3300
C5 T.M.L STEEL PTE. LTD
C3A C3A

6000

C/C OF STEEL COLUMN


C7
C6 C2 C2 C2 C2 C2 C2 C5
C7 T.7

79800
6000
5 5
C5
C7
C3 C2 C2 C2 C2 C3 C2A C2 C2A
500
C5 T.8
C7

6000
C11 C11
C7 160 ROBINSON ROAD

2100

2100
C3 C2 C2A C2 C2 C11 C2A C2A C2A C2A #14-04 SINGAPORE (068914)
C5 T.9
3000 C5

6000
3000 GENERAL DIRECTOR

C2A C2 C2 C2 C2 C2B C2A C7


C3 C3 T.10
1000

C1

6000
C3 PHAN THANH LONG
4 4
C3 C2 C2 C2 C2 C2 C2 C2A C1 TECHNICAL MANAGER
T.11
C7

6000
C1
C3
C3 C2 C2 C2 C2 C2 C2B C2B C2 M.ENG HUONG THANH KHANG
C5
C5
T.12 CHECKER

6000
C5
C3 C6A C6A C6A C6A C3 C6A C6A C6B C6A C2 C3
T.13

3000 3000
Eng.
C2 C2A C1 C1 C3 C3
T.14 DESIGNER
C3 C1 C3 C1 C6 C6 C3
3 T.15 3
3000 3000
Eng.
DRAWING

6000 6000 3000 3000 6000 6000 6000 6000 6000 6000 6000 6000
66000
C/C OF STEEL COLUMN Eng.
PROJECT
T.A T.B T.CT.CCT.D T.E T.F T.G T.H T.I T.J T.K T.L
LIFESTYLE AREA
2 1ST COLUMN PLAN +3.300 SC: 1/350 STEEL COLUMN 2

10 10 A A
LOCATION: SINGAPORE
PL-10mm

10
150 ITEM:
PL-25mm +3.300
40 70 40
STEEL STRUCTURE
PL-25mm Weld TIE BEAM :D90x4.0MM

40 70 40
300

150
DRAWING NAME:

10
10 10 GUSSET 4M20(8.8)
10

10 10 PL-10mm 1ST COLUMN PLAN


1 NOTE: 1
A-A COLUMN CONNECTION DETAIL
NOTE :
No. : REV: 10 LEV:
1. All bolts shall be Grade 8.8 .
2. All welding, please refer weld map
DATE: 15/04/2023 No. Dra: D02 Job No.065.23.01

A B C D E F G H I J
A B C D E F G H I J
T.N
DETAILED NOTE TABLE
T.M 00
36 SING SECTION NOTE
C1 BH-375.5W-300.14F Q345
C3 C3 C3 C3 C3
7 T.1 C2 BH-375.6W-350.14F Q345
C2A BH-375.6W-350.16F Q345

6600
C2B BH-375.8W-350.16F Q345
C5 C6 C6 C6 C6 C3
T.2 C3 BH-375.5W-300.10F Q345
REVISION
C3A BH-375.5W-250.10F Q345

6600
C4 BH-375.6W-300.12F Q345
C2 C6 C6 C6 C6 C2A C3
T.3 C5 BH-375.5W-300.12F Q345
C6 BH-375.5W-350.14F Q345

6600
C7 C7 REV. DATE DESCRIPTION
C6A BH-375.16W-350.20F Q345
C6 C6 C6 C6 C6 C6 C7 C6B BH-375.20W-375.20F Q345
6 C7 T.4
C7 BH-375.5W-250.10F Q345

6000
C7
C5 C7A BH-375.5W-250.8F Q345 APPROVAL DRAW
C5 C6 C6 C6 C6 C6 C6
T.5 C8 BH-250.5W-165.8F Q345
C2
C3A C3A C7 C9 BH-250.5W-200.8F Q345

6000
3500
C7 C10 BH-250.5W-250.10F Q345
C5 C6 C6 C6 C6 C6 C6 C6
C7 T.6 C11 BH-300.5W-250.10F Q345

3300
C7 T.M.L STEEL PTE. L
C3A C3A

6000

C/C OF STEEL COLUMN


C7
C6 C6 C6 C6 C6 C2 C5
C7 T.7

79800
6000
5
C7
C7
C3 C6 C6 C6 C6 C2A C6 C6
C5 T.8
C7

6000
C7 160 ROBINSON ROAD
C3 C6 C2A C6 C6 C11 C2A C6 C2A C2A #14-04 SINGAPORE (0689

3000 C7 T.9
3000 C7

6000
GENERAL DIRECTOR

C2A C6 C6 C6 C6 C2B C2A C7


C3 C3 T.10

1000
C1

6000
C7 PHAN THANH LONG
4
C3 C6 C6 C6 C6 C6 C2B C2A C1 TECHNICAL MANAGER
T.11
C2A

6000
C1
C3
C3 C6 C6 C6 C6 C6 C2B C2B C2 M.ENG HUONG THANH KHAN
C7
C7
T.12 CHECKER

6000
C7
C1 C6A C6A C6A C6A C3 C6A C6 C6 C6 C6 C3
T.13

3000 3000
Eng.
C6 C6 C5 C5 C3 C3
T.14 DESIGNER
C3 C1 C3 C1 C6 C6 C3
3 T.15
3000
Eng.
DRAWING

6000 6000 3000 3000 6000 6000 6000 6000 6000 6000 6000 6000 3000
66000
C/C OF STEEL COLUMN Eng.
PROJECT
T.A T.B T.CT.CCT.D T.E T.F T.G T.H T.I T.J T.K T.L
LIFESTYLE AR
2 2ND COLUMN PLAN SC: 1/350
LOCATION: SINGAPORE
ITEM:

STEEL STRUCTU

DRAWING NAME:

2ND COLUMN P
1 NOTE:

No. : REV: 10

DATE: 15/04/2023 No. Dra: D03

A B C D E F G H I J
A B C D E F G H I J
T.N
DETAILED NOTE TABLE
T.M 00
36 SING SECTION NOTE
C1 BH-375.5W-300.14F Q345
7 T.1 C2 BH-375.6W-350.14F Q345 7

C2A BH-375.6W-350.16F Q345

6600
C2B BH-375.8W-350.16F Q345
T.2 C3 BH-375.5W-300.10F Q345
REVISION
C3A BH-375.5W-250.10F Q345

6600
C4 BH-375.6W-300.12F Q345

T.3 C5 BH-375.5W-300.12F Q345


DET 2 C6 BH-375.5W-350.14F Q345

6600
REV. DATE DESCRIPTION DRAW. CHECK PPD.
C7A C6A BH-375.16W-350.20F Q345
DET 2 DET 2
C6B BH-375.20W-375.20F Q345
6
C7A C7A T.4 6
C7 BH-375.5W-250.10F Q345

6000
DET 3 DET 1 DET 1 DET 1 DET 1 DET 1 DET 1 DET 2
C7A BH-375.5W-250.8F Q345 APPROVAL DRAWINGS
C7A
C10 C10 C10 C10 C10 C10 C10
T.5 C8 BH-250.5W-165.8F Q345
DET 2
C7A C9 BH-250.5W-200.8F Q345

6000
C8 DET 2 C10 BH-250.5W-250.10F Q345
C8 C8 C8 C8 C8 C8 C8
DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 C7A T.6 C11 BH-300.5W-250.10F Q345
T.M.L STEEL PTE. LTD
C8 C8

6000
DET 3

C/C OF STEEL COLUMN


DET 3
C8 C8 C8 C8 C8 C8 C9 DET 2
DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 C7A
T.7

79800
DET 2

6000
5 5
C7A
C8 C8 C8 C8 C10 C10 C8 C8
DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 T.8

6000
160 ROBINSON ROAD
C8 C8 C8 C8 C10 C10 C8 C8 DET 2 #14-04 SINGAPORE (068914)
DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 C7A T.9

6000
GENERAL DIRECTOR
DET 2
C8 C8 C10 C8 C8 C8 C8 C7A
DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 DET 3
DET 3 C7A T.10
C8 C8

6000
DET 2 PHAN THANH LONG
C7A
4 4
C8 C8 C8 C8 C8 C8 C8 C9 C7A TECHNICAL MANAGER

DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 DET 2


C7A
T.11
DET 2

6000
C7A
C8 C8 C8 C8 C8 C8 C8 C8 C8 DET 2 M.ENG HUONG THANH KHANG
DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 DET 3 T.12 CHECKER
C7A
DET 2

6000
DET 1 DET 3 DET 3 DET 3 DET 3
C10 C10 C10 C10 C10 C8 C8 C8 C8 C8 C8
DET 3 T.13

3000 3000
DET 1 DET 1 DET 1 DET 1 Eng.
C10 C10 C10 C10 C10
C10
T.14 DESIGNER
DET 1 DET 1 DET 1 DET 1 DET 1
3 DET 3 T.15 3

3rd COLUMN A1 A1
TYPE 3rd COLUMN SIZE D (MM) A1(mm) A2(mm) T(mm) G(mm)
Eng.

A2
A A PL
C10 BH-250.5W-250.10F 24 100 50 20 470
D1
DRAWING

G
2nd COLUMN

A2
6000 6000 3000 3000 6000 6000 6000 6000 6000 6000 6000 6000 PL-6MM
10 10

66000
C/C OF STEEL COLUMN DET 1 SECTION A-A Eng.
PROJECT
T.A T.B T.CT.CCT.D T.E T.F T.G T.H T.I T.J T.K T.L
3rd COLUMN A1 A2 A2 A1 LIFESTYLE AREA
2 3 RD COLUMN PLAN SC: 1/350 B B PL TYPE 3rd COLUMN SIZE D (MM) A1(mm) A2(mm) T(mm) G(mm) 2

A1
D1

G
C7A BH-375.5W-250.8F 24 50 120 20 300
LOCATION: SINGAPORE

A1
2nd COLUMN
NOTE : PL-6MM
ITEM:
1. All bolts shall be Grade 8.8 .
2. All welding, please refer weld map DET 2 SECTION B-B
STEEL STRUCTURE
3. 2nd column, 3rd column Pls prefer
column plan section
3rd COLUMN
A1 A1 DRAWING NAME:
TYPE 3rd COLUMN SIZE D (MM) A1(mm) A2(mm) T(mm) G(mm)

A2
C C PL
D1 C8 BH-250.5W-165.8F 24 100 50 20 470

3 RD COLUMN PLAN
G

2nd COLUMN C9 BH-250.5W-200.8F 24 100 50 20 470

A2
1 NOTE: 10 10
1
C10 BH-250.5W-250.10F 24 100 50 20 470

DET 3 SECTION C-C


No. : REV: 10 LEV:

DATE: 15/04/2023 No. Dra: D04 Job No.065.23.01

A B C D E F G H I J