Apd-Light Tower-Rev00-03.04.2023
Apd-Light Tower-Rev00-03.04.2023
TOTAL DRAWING: 17
A B C D E F G H I J
7
REMARK: 7
APPROVAL DRAWINGS
4. ERECTION REQUIREMENTS
GENERAL DIRECTOR
5.2 - PURLIN C:
PHAN THANH LONG
4 4
TECHNICAL MANAGER
CHECKER
S1 (mm) <=4 5-6 7-9 10 - 15 16-21 22-30
Hh (mm) >3 >4 >5 >6 >7 >8
S2
Eng.
s Eng.
t
200
2
50
t Q DRAWING
t/4 f 19 6 t 4035° 7. METHOD TO JOINT STEEL:
0 5 t 19 L=100mm
7.1 JOINT STEEL SHAPE (I, H, U)
Eng.
PROJECT
LIGHT TOWER
2 2.2.1 BUTT WELDING 2
LOCATION: SINGAPORE
ITEM:
g
e (mm) 7 8 9
b
g (mm) 1.5 1.5 2
DRAWING NAME:
GENERAL NOTE
1 1
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
5640
4260
6 6
APPROVAL DRAWINGS
5 5
Eng.
DESIGNER
3 3
Eng.
DRAWING
Eng.
PROJECT
LIGHT TOWER
2 2
LOCATION: SINGAPORE
ITEM:
STEEL STRUCTURE
DRAWING NAME:
LIGHT TOWER
1 1
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
1268
2580
1312
REV. DATE DESCRIPTION DRAW. CHECK PPD.
6 6
5435 4790 4790 4790 4935
1 2 3 4 5 6
T.M.L STEEL PTE. LTD
5 5
1000
1290
160 ROBINSON ROAD
3580
#14-04 SINGAPORE (068914)
1290
GENERAL DIRECTOR
2580
PHAN THANH LONG
4 4
TECHNICAL MANAGER
7 8
M.ENG HUONG THANH KHANG
CHECKER
Eng.
DESIGNER
3 3
1268
Eng.
2580
DRAWING
1312
Eng.
LIGHT TOWER
2 2
9 10 11 12 13 14 15
LOCATION: SINGAPORE
ITEM:
STEEL STRUCTURE
DRAWING NAME:
A B C D E F G H I J