No. Items Description Materials Specification Unit Quantity Unit Price (USD) Total Price (USD)

A Steel Main Frame 143,694 0$ -

1 Main framing: B/U section B/U: Q345 (or equivalent), Fy = 34.5 kN/cm2. kg 78,675 0.000 $ -

Hot rolled: SS400 (JIS), ASTM A-36 (or Equi.), Fy = 24.5


3 Main framing: Hot rolled section kg 22,210 0.000 $ -
kN/cm2.

Steel Purlin & Girt: Galvanized cold formed ASTM A653, Grade G450 (or Equi), Galvanized Z275
4 kg 31,187 0.000 $ -
(C&Z) & accessories. Fy = 45.0 kN/cm2

5 Anchor bolts Class 8.8 - Electrol galvanized kg 3,645 0.000 $ -

A325, DIN933 (or equivalent)


Class 8.8 - Fu = 72-83 kN/cm2
6 Connection bolts kg 2,290 0.000 $ -
Class 4.6 - Fu = 40 kN/cm2
Electrol galvanized

Other secondary members & accessories ASTM A653, Grade G450 (or equivalent), Galvanized
7 (Flange brace, angle. etc) Z275. Kg 500 0.000 $ -
Fy = 45.0 kN/cm2

Other secondary members & accessories SS400 (JIS), ASTM A-36 ( or equivalent)
8 Kg 5,186 0.000 $ -
(Rod bracing) Fy = 24.5 kN/cm2. Hot dipped galvanized.

Cleaning shot blasting SA 2.0


Epoxy Jotun/ Hempel/ Kansai Painting, 130 micron DFT
Surface cleaning & painting for steel
10 total m2 0 0.000 $ -
structutre.
Hempel/ Kansai Painting, 130 micron DFT total
thickness

B B FINISHING & OTHERS 20,623 $ -

Hot rolled: SS400 (JIS), ASTM A-36 (or Equi.), Fy = 24.5


11 Staircase kg 1,440 0.000 $ -
kN/cm2.

Hot rolled: SS400 (JIS), ASTM A-36 (or Equi.), Fy = 24.5


11 Rail kg 3,520 0.000 $ -
kN/cm2.

11 Crane beam B/U: Q345 (or equivalent), Fy = 34.5 kN/cm2. kg 15,663 0.000 $ -

12 Checker plate m2 245 0.000 $ -

Customer: TRANSPORTATION FEE (CIF) $ -


12 Container Skid cost 1 Container ~ 14 Tons cont 0.000 $ -
Transportation from Factory to Bangkok
13 - cont 0.000 $ -
Port
No. Items Description Materials Specification Unit Quantity Unit Price (USD) Total Price (USD)
Transportation from Bangkok Port to Job
14 Excluded cont - - $ -
Site
15 Import Tax Consider Tax Exemption, Provide form D cont - - $ -

E TOTAL EX-WORK PRICE (A+B+C) Lump sum 1.0 $ -

F TOTAL CIF PRICE (A+B+C+D) Lump sum 1.0 $ -

Note:
1. Validity period of quotation: 15 days from the date of quotation.
2. Design by TML, subject to lump sum price
3. TThis quotation excludes the below items:
- Doors & Windows of all kinds.
- Metal sheet louvers & accessories
- Roof & wall panel including accessories.
- Eave Gutter, Downspouts & accessories.
- Decking panel & shear studs.
4. The quotation includes the above listed items.
5. The price is include shop drawing design fee, raw material cost, fabrication cost,
6. The price is not included VAT.
ESTIMATE WORK SHEET Frame Type :
PROJECT : ISUZU TRUCK SKD BUILDING
Width (M):
\ Bldg 1 Area 1 Live Load (KN/m2) on purlins : 0.57
Rev: 0 Base on PIF Rev/CO: 1 Collateral on frame (KN/m2):
34.5kN/cm2 (BU); 45.0kN/cm2 (CF) Occupancy category:
YIELD GRADE:
24.5kN/cm2 (HR) Seismic: Zone 4
Done BY: LMTT Building Area (WidthXLength) (M2) =
Chk. By: Khang Total weight (Kg) =
Date: 9-Feb-21 Weight per Square Meter =

PART#01 : MAIN MATERIAL


1 2 3 4

Line Piece
Description of Material Type
No. Quantity
1 Main Frames:
2 BUilt up frames including connections @GL.1 BU 1
3 BUilt up frames including connections @GL.2,3 BU 2
4 BUilt up frames including connections @GL.4 BU 1
5 BUilt up frames including connections @GL.5-11 BU 7
6 BUilt up frames including connections @GL.12 BU 1
7 BUilt up frames including connections @GL.13 BU 1
8 BUilt up frames including connections @GL.14 BU 1
9 200X100X5.5X8 HR1 14
10 D114X2.0 HR1 9
11 D114X2.0 HR1 40
12 D114X2.0 HR1 9
13 PORTAL BU 5
14 Flange Brace HR1 340
15 V75X.6 HR1 20
16 V50X4 HR1 104
17 Purlins
18 Purlins Z1501.5 CF 34
19 Purlins Z1501.5 CF 68
20 Purlins Z1501.5 CF 288
21 Purlins Z150X2.0 CF 34
22 Purlins Z150X2.0 CF 34
23 Side Wall Girts Right
24 C200X1.5 CF 8
25 C200X2.0 CF 8
26 C200X1.5 CF 12
27 C200X2.0 CF 4
28 C200X1.5 CF 1
29 Side Wall Girts LEFT
30 C200X1.5 CF 8
31 C200X2.0 CF 8
32 C200X1.5 CF 24
33 C200X2.0 CF 4
34 C200X1.5 CF 1
35 End Wall Girts
36 Purlins Z150x1.5 CF 7
37 Purlins Z150x1.5 CF 11
38 RM
39 Purlins Z1501.5 CF 16
40 Purlins Z1501.5 CF 4
41 CANOPY 2M
42 BUilt up frames including connections BU 12
43 Z-200X1.5 CF 12
44 Z-200X1.5 CF 4
45 Z-200X1.5 CF 4
46 WALK WAY
47 frame BU 48
48 frame BU 2
36 C-150X1.5 CF 160
51 OFFICE
52 SBX HR1 3
53 SBX HR1 5
54 SB1 HR1 2
55 Roof monitor
56 Sheeting
57 Roof Panel 0.5mm HiRibs-32 RS1 0
58 Roof Panel 0.5mm HiRibs-32 Roof moitor RS1 0
59 Roof Panel 0.5mm HiRibs-32 Canopy RS1 0
60 Side Wall Panel 0.5mm HiRibs-32 WS 0
61 End Wall Panel 0.5mm HiRibs-32 WS 0
62 Fasica Panel 0.5mm HiRibs-32 WS 0
63 Sky light SW WS 0
64 Sky light EW WS 0
65 Frame Openings
66 Frame opening (6x5m) for EW CF 6
66 Frame opening (6x5m) for LW CF 16

PART#02 :SPECIAL STRUCTURE


1 2 3 4

Line Piece
Description of Material Type
No. Quantity
1 Double - Truss - Staircase …
2 Staircase SP2 1
3 Rail SP2 1
3 Rail SP2 2
4 Crane beam 5T BU 2
5 Crane beam 5T BU 2
6 Crane beam 5T BU 2
7 Crane beam 5T BU 2

PART#03: ACCESSORIES MATERIAL


1 2 3 4

Line Piece
Description of Material Type
No. Quantity
1 Miscellanoueus for Main Frames:
2 Mechine Bolts BO 1
3 High Bolts BO 1
4 Anchor Bolts-Hot dip galvanized AB 1
5 Cable Bracing 20mm diameter M24 roof CB 10
6 Cable Bracing 16mm diameter M24 Roof CB 30
7 Cable Bracing16mm diameter M24 sw CB 0
8 Cable Bracing 16mm diameter M24 ew CB 0
9 Cable Bracing 16mm diameter M24 RM CB 0
10 Cable Bracing 16mm diameter M24 CN CB 0
10 Sag Rod roof SR 15
11 Sag Rod Roof sw SR 30
12 Sag Rod end wall SR 16
13 Sag Rod RM SR 0
14 Sag Rod end canopy SR 24
15 Sag Rod end Fascia SR 0
16 Sheeting Accessories
17 Louver TR 1
18 Eave Angle, Gable angle, Base Angle/Ridge angle/Sheeting angle TR 1
19 Eave Angle for Mezz TR 1
20 Trim type 1: <= 600mm FL 1
21 Foam closure FM-001 1
22 Eave Gutter 0.6mm FL 1
23 PVC Down Spouts d168 DS 1

MATERIAL FORECAST
BUILT-UP COLD-FORMED HOT-ROLLED
Thk(mm) Weight(kg) Section Weight(kg) Section Weight(kg)
4.00 200Z1.5 L50x50x 4
5.00 …… L63x63x 5
6.00 …… L75x75x 6
8.00 …… L90x90x 8
10.00 …… L120x120x10
14.00 L100x100x10
16.00 …… L100x100x11
20.00 …… Tube 150x150x4.5
Total(Kg) 0 0.00 0.00

STEEL FACE
BUILT UP (M2) 0 HR(M2) 0

Note:
CS C.H (M) : 12 Roof slope:

44.6 Length (M) 79.6 1.8/10


ad (KN/m2) on purlins : 0.57 On frame :0.35 Wind Speed (kM/Hr) : 120 I A
al on frame (KN/m2): On roof: Enclosure condition: II B
II Explosure: C Enclosed III C
Bays spacings: SEE DRAWING IV D
ng Area (WidthXLength) (M2) = 3550.16 Note:
weight (Kg) = 143,694 HiRibs-32 RS1
t per Square Meter = 40.48 Iseam360+ RS2
Decking DE
HiRibs-32 WS
5 6 7 8 9 SP1 Lacing column, truss, curved tr
Piece Weight Weight SP2 Staircase,Handrails, cage ladde
Unit
Measure PEUnit Piece (kg) (Kg) HR1 Square tube (150x150x4.5,
HR2 Angle & H-beam (HR) less t
5109.6 Kg Kg 5110 HR3 Checker Plate
3201.1 Kg Kg 6402 HR3 Checker Plate
4601.2 Kg Kg 4601 HR3 Checker Plate
4601.2 Kg Kg 32208 HR3 Checker Plate
4830.0 Kg Kg 4830 HR3 Checker Plate
4152.8 Kg Kg 4153 HR3 Checker Plate
7250.2 Kg Kg 7250 HR3 Checker Plate
666.1 Kg 1.00 Kg 9326 HR3 Checker Plate
4.5 M 6.00 Kg 244 HR3 Checker Plate
6.8 M 6.00 Kg 1627 HR3 Checker Plate
8.1 M 6.00 Kg 439 HR3 Checker Plate
1495.0 Kg Kg 7475 HR3 Checker Plate
6.0 Kg Kg 2040 BU1: Lean-to frame
12.0 Kg 13.40 Kg 3205 BU1: Lean-to frame
1.7 Kg 5.00 Kg 897 BU1: Lean-to frame
BU2:Roof Extension, canopy frame
4.5 M 3.42 Kg 518 BU3: Parapet, Fascia..
6.8 M 4.10 Kg 1904 BU3: Parapet, Fascia..
6.8 M 4.10 Kg 8066 BU3: Parapet, Fascia..
10.8 M 4.56 Kg 1669 BU3: Parapet, Fascia..
8.5 M 4.56 Kg 1316 BU3: Parapet, Fascia..
BU4:Jack roof monitor, ridge vent fram
66.2 M 4.35 Kg 2305 BU3: Parapet, Fascia..
16.1 M 5.81 Kg 750 BU3: Parapet, Fascia..
6.2 M 4.35 Kg 324 BU3: Parapet, Fascia..
7.5 M 5.81 Kg 173 BU3: Parapet, Fascia..
82.8 M 4.35 Kg 360 BU3: Parapet, Fascia..
BU4:Jack roof monitor, ridge vent fram
66.2 M 4.35 Kg 2305 BU3: Parapet, Fascia..
16.1 M 5.81 Kg 750 BU3: Parapet, Fascia..
6.2 M 4.35 Kg 648 BU3: Parapet, Fascia..
7.5 M 5.81 Kg 173 BU3: Parapet, Fascia..
82.8 M 4.35 Kg 360 BU3: Parapet, Fascia..
DSW: Crane beam, crane Bracket
53.4 M 4.35 Kg 1626 BU3: Parapet, Fascia..
53.4 M 4.35 Kg 2555 BU3: Parapet, Fascia..
DSW: Crane beam, crane Bracket
6.8 M 4.10 Kg 448 BU3: Parapet, Fascia..
24.9 M 4.10 Kg 409 BU3: Parapet, Fascia..
DSW: Crane beam, crane Bracket
69.0 Kg Kg 828 HR3 Checker Plate
6.2 M 4.36 Kg 325 DSW: Double side welding (Crane,outsi
8.7 M 5.23 Kg 182 DSW: Double side welding (Crane,outsi
19.9 M 4.36 Kg 347 DSW: Double side welding (Crane,outsi
DSW: Crane beam, crane Bracket
34.5 Kg Kg 1657 HR3 Checker Plate
103.5 m 20.10 Kg 4161 HR3 Checker Plate
1.6 M 3.42 Kg 850 BU3: Parapet, Fascia..
DSW: Crane beam, crane Bracket
11.5 M 22.00 Kg 759 BU1: Lean-to frame
25.6 M 22.00 Kg 2821 BU1: Lean-to frame
11.5 M 37.00 Kg 851 BU1: Lean-to frame
DSW: Crane beam, crane Bracket

5973.9 M2 1.00 M2 0
865.0 M2 1.00 M2 0
21.7 M2 1.00 M2 0
372.3 M2 1.00 M2 0
382.5 M2 1.00 M2 0
135.7 M2 1.00 M2 0
3.6 M2 1.00 M2 0
5.0 M2 1.00 M2 0

36.7 M 5.23 Kg 1152


18.0 M 5.80 Kg 1670
130,402

5 6 7 8 9
Piece Weight Weight
Unit
Measure PEUnit Piece (kg) Total (kg)
8.0 M 180.00 Kg 1440
16.0 M 20.00 Kg 320
80.0 M 20.00 Kg 3200
73.6 m 43.63 Kg 6422 HR3 Checker Plate
17.9 m 61.65 Kg 2212 HR3 Checker Plate
55.2 m 43.63 Kg 4817 HR3 Checker Plate
17.9 m 61.65 Kg 2212 HR3 Checker Plate
20,623

5 6 7 8 9
Piece Weight Weight
Unit
Measure PEUnit Piece (kg) Total (kg)

467.8 Kg Kg 468
1822.6 Kg Kg 1823
3645.2 Kg Kg 3645
80.5 kg 2.51 KG 2021
17.3 kg 2.51 KG 1299
23.0 kg 3.62 kg 0
17.3 kg 3.62 kg 0
18.4 kg 1.61 kg 0
9.9 kg 1.61 kg 0
60.0 M 0.90 Kg 810
24.0 M 0.90 Kg 648
18.0 M 0.90 Kg 259
2.3 M 0.90 Kg 0
6.9 M 0.90 Kg 149
9.5 M 0.90 Kg 0

64.8 m2 Kg 0
200.0 M 2.50 Kg 500
0.0 M 5.00 Kg 0
1287.7 M 1.00 Kg
0.0 M M
200.0 M 1.00 Kg
196.0 M 196.00 M
11,621

Weight of Built up (kgs): BU 94,338


Weight of Built up 1 (kgs): BU1 0
Weight of Built up 2 (kgs): BU2 0
Weight of Built up 3 (kgs): BU3 0
Weight of Built up 4 (kgs): BU4 0
Weight of Built up 5 (kgs): BU5 0
Weight of DSW (kgs): DSW 0
Weight of SP1 (kgs): SP1 0
Weight of SP2 (kgs): SP2 4,960
Weight of HR1 (kgs): HR1 22,210 164,317
Weight of HR2 (kgs): HR2 0
Weight of HR3 (kgs): HR3 0
Weight of HR4 (kgs): HR4 0
Weight of roof sheeting (kgs): RS 0
Weight of wall sheeting (kgs): WS 0
Weight of decking (kgs): DE 0
Weight of cold form (kgs): CF 31,187
Weight of Non-Discountable(kgs)Other 11,621
Total 143,694

neu (Pro-Roof, Peb-Lok, Peb-seam) co


NHO ADD ANGLE FOR SKY LIGHT FOR
#REF!
Enclosed None
Partially Enc Zone 1
Opening Zone 2A
Zone 2B
Zone 3 5000
BU Zone 4 179208.82 (35,515)
HR yes 35.841763
CF

Lacing column, truss, curved truss, box columns, Crane bracing…


Staircase,Handrails, cage ladder
Square tube (150x150x4.5, 150x150x2.5, 200x200x3)
Angle & H-beam (HR) less than 250mm
Checker Plate
Checker Plate
Checker Plate
Checker Plate
Checker Plate
Checker Plate
Checker Plate
Checker Plate
Checker Plate
Checker Plate
Checker Plate
Checker Plate

ension, canopy frame

f monitor, ridge vent frame

f monitor, ridge vent frame


beam, crane Bracket

beam, crane Bracket

beam, crane Bracket


Checker Plate
side welding (Crane,outside structure,…)
side welding (Crane,outside structure,…)
side welding (Crane,outside structure,…)
beam, crane Bracket
Checker Plate
Checker Plate

beam, crane Bracket

beam, crane Bracket


Checker Plate
Checker Plate
Checker Plate
Checker Plate

trim warehoues 675.8


RM 459.5

CP 152.4
of, Peb-Lok, Peb-seam) co insulation (fiber glass) vua co sky light thi cung cap sheeting angle cho sky light, insulation (air bub
GLE FOR SKY LIGHT FOR LOK SEAM (co hay khong co insulation)
ight, insulation (air bubble) thi khong can sheeting angle cho cho sky light ma cap 10m dai 1 hang sheeting angle.
eting angle.

You might also like