Work Register
Work Register
Work Register
Remarks
Sl. as per AA&ES (2018 - Upto previous During the Upto date
No 2019) month month achievement
Physical Physical Physical Physical
(%)
Financial (%)
Financial (%)
Financial (%)
Financial
9 Dawrpui Vengthar Section 965,000.00 965,000.00 100 965,000 100 965,000 100 965,000
10 Armed Veng Section 371,130.00 371,130.00 100 371,130 100 371,130 100 371,130
11 Bethlehem Section 767,851.00 767,851.00 100 767,851 100 767,851 100 767,851
12 Providing and fixing Pressure Reducing valves 1,360,098.00 1,360,098.00 100 1,360,098 100 1,360,098 100 1,360,098
Total = 9,709,801.00
Add 3% for contigencies = 291,294.03
Grand Total = 10,001,095.03
Total = 10,000,000.00
A 46,634,670.00
B 20,100,000.00
C 10,000,000.00
TOTAL A + B + C = 76,734,670.00
( LALSANGA )
Sr, Executive Engineer, PHED
Aizawl Water Distribution Division South
LIST OF WORS EXECUTED/ BEING EXECUTED UNDER AMRUT SAAP III FOR PAYMENT UNDER AWDD 'S'
Sl.N Estimated
Name of Work Work alloted to Remarks
o. Amount (Rs.)
A. RESERVOIRS
1 Reservoir 1 lakh litre capacity at Hlimen 2,308,027.00 Lalhlimpuia, Hlimen Alloted by Minister, work to being started.
BC Biakngura & VL Dika,
2 Reservoir (10 lakh lits capacity) at Tuikhuahtlang 9,000,100.00 Alloted by Minister, work to being started.
Venghlui
HP Zonunsanga,
3 Overhead Tank at Thakthingtlang (1 lakhs lits) 2,354,000.00 Alloted by Minister, on going work.
Thakthing veng
4 Zonal Tank at YMA Hall Venghnuai (2 lakh lits) 2,419,300.00 Lalhunliana, Venghnuai Alloted by Minister, on going work.
R. Lalhmangaiha, Mission Alloted by Minister, on going work, being
5 Mission Vengthlang (3 lakhs lits) 2,553,750.00
Vengthlang stopped as larger size proposed
6 Bethlehem (6 lakhs lits) 4,660,200.00 Ramngaihawma, Republic Alloted by Minister, on going work.
7 Dawrpui Vengthar ( 3 lakhs lits) 3,151,400.00 Lalrinpuii, Chawnpui Alloted by Minister, not yet started
8 Construction of Reservoir at Melthum Tlang. 1,671,706.00 Langaihawma, Hlimen Alloted by Minister, work to being started.
28,118,483.00
B. IVSS (Tuikhur)
Malsawma Kawlni,
1 IVSS 4 Nos. under Bethlehem Section 657,800.00 Alloted by Minister, work to being started.
Bethlehem
2 Hlimen - 1 no 200,000.00 Lalrinchhana, Hlimen Alloted by Minister, work to being started.
Lalsangliana, Pachuau,
3 Khatla Tlang Section - 1 No 240,000.00 Alloted by Minister, work to being started.
Bungkawn Vengthar
Zoremthanga, Dawrpui
4 Dawrpui Vengthar Section -4Nos 1,350,000.00 Alloted by Minister, work to being started.
Vengthar
5 Char tuikhur 126,600.00 Pahenga Alloted by Minister, work to being started.
6 Dam tuikhur 60,400.00 Lalchhandama Alloted by Minister, work to being started.
7 Ruam tuikhur 221,400.00 Lalsangzuali Alloted by Minister, work to being started.
8 Zawngtah tuikhur 128,200.00 Hrangkunga Fanai Alloted by Minister, work to being started.
9 Khurpui 128,200.00 V. Lalrinsanga Alloted by Minister, work to being started.
10 Zion Tuikhur 133,200.00 HT Para Alloted by Minister, work to being started.
11 Lamhnai Tuikhur 360,400.00 HT Para Alloted by Minister, work to being started.
12 Sih Tuikhur 91,600.00 Departmental work Work being started
13 Phul Tuikhur at Saikhamakawn. 80,000.00 Zokhuma,Saikhamakawn Alloted by Minister, work to being started.
3,777,800.00
C. RETAINING WALL / FENCING HEAD
Retaining Wall for supporting New Reservoir
1 348,500.00 PC Chuangkima, Khatla Alloted by Minister, completed
foundation under AMRUT at Khatla Tlang.
Hrangkunga Fanai,
2 Retaining wall at Bethlehem Section Office 706,300.00 Alloted by Minister, work to being started.
Republic
Construction of Stone Masonry Retaining Wall
3 infront of New Reservoir near Booster Pump House 270,000.00 Ralkapthangi,Tlangnuam Alloted by Minister, completed
Tlangnuam.
71,999,852.00
WORK REGISTER UNDER AMRUT SAAP III
A. RESERVOIRS( 28118483)
Works Done by
Sl.N Estimated Amount First and Final /
Name of Work Section
o. (Rs.) Contractor Supply/Indent Bill
/Departmental
Lalhlimpuia
Lalhlimpuia
Reservoir 1 lakh litre capacity at Hlimen 2,308,027.00 Chhimphei Departmental Lalhlimpuia
1
LT Enterprise
Nezone
TOTAL 2,308,027.00
K Lalchhanhimi
K Lalchhanhimi
K Lalchhanhimi
K Lalchhanhimi
K Lalchhanhimi
K Lalchhanhimi
Sub Total
B Lalrengpuii
B Lalrengpuii
B Lalrengpuii
B Lalrengpuii
B Lalrengpuii
B Lalrengpuii
Sub Total
MS Dawngliani
MS Dawngliani
MS Dawngliani
Constraction of Reservoir (10 lakh lits capacity) at MS Dawngliani
9,000,100.00 Tuikhuahtlang I Departmental
2 Tuikhuahtlang MS Dawngliani
MS Dawngliani
Sub Total
B Lalrinsanga
B Lalrinsanga
B Lalrinsanga
B Lalrinsanga
B Lalrinsanga
B Lalrinsanga
Sub Total
B Lalbiakngura
B Lalbiakngura
B Lalbiakngura
B Lalbiakngura
B Lalbiakngura
B Lalbiakngura
B Lalbiakngura
Sub Total
TOTAL 9,000,100.00
HP Zonunsanga
HP Zonunsanga
HP Zonunsanga
Overhead Tank at Thakthingtlang (1 lakhs lits) 2,354,000.00 Thakthing Departmental HP Zonunsanga
3
H Lalnunsanga
CL Enterprise
Nezone
TOTAL 2,354,000.00
B Lalhmunmawii
B Lalhmunmawii
Undergound Zonal Tank at YMA Hall Venghnuai (2 B Lalhmunmawii
2,419,300.00 Thakthing Departmental
4 lakh lits) B Lalhmunmawii
TP Enterprise
Nezone
TOTAL 2,419,300.00
-
Deduction
Supply or Contract Net Amount Special MR Grant Total Remarks
Value
GST Labour Cess
2,34,007
5,01,000
1,91,366
1% L/Cess aws
1,62,360 collected from the 14,35,834 23,07,634 393
Estimated Amount
5,64,326 3,70,800
2,83,775
14,35,834 8,71,800 23,07,634 393
2,39,592
2,07,700 4,50,360
2,07,700 1% L/Cess aws
collected from the 12,78,092
2,07,700 Estimated Amount
2,07,700 19,07,740
2,07,700
12,78,092
2,16,000 21,920
2,30,579
2,22,750 1% L/Cess aws
collected from the 12,37,877
1,32,546 Estimated Amount
2,28,947
2,07,055
12,37,877
2,39,597
2,01,600
2,01,600 1% L/Cess aws
collected from the 12,47,597
2,01,600 Estimated Amount
89,92,421 7,679
2,01,600
2,01,600
12,47,597
2,26,000
2,43,600
1,90,682 1% L/Cess aws
collected from the 13,22,485
2,28,720 Estimated Amount
2,45,079
1,88,404
13,22,485
2,18,050
2,18,050
2,18,050 1% L/Cess aws
collected from the
2,18,050 Estimated Amount 15,26,350
2,18,050
2,18,050
2,18,050
15,26,350
66,12,401 23,80,020 89,92,421 7,679
2,28,400
2,48,329
2,29,144 1% L/Cess aws
collected from the
2,49,780 Estimated Amount 15,57,116 7,96,800 23,53,916 84
2,46,400
2,82,503
72,560
15,57,116 7,96,800 23,53,916 84
2,40,076
1,17,805
2,45,672 1% L/Cess aws
collected from the 12,35,891 11,83,200 24,19,091 209
2,24,000 Estimated Amount
3,20,884
87,454
12,35,891 11,83,200 24,19,091 209
3,10,200
8,20,880 1,93,800
8,20,880 16,20,000
2,95,120
8,20,880 1% L/Cess aws 7,99,120 555
collected from the
6,69,453 Estimated Amount
1,09,440
1,54,302 9,33,195
8,23,755 8,23,755 1,09,440
16,44,635 9,08,560 25,53,195 555
1,62,360
1,91,366 5,01,000
2,34,007 1% L/Cess aws 10,22,998 16,71,298 408
collected from the
2,93,985 Estimated Amount
1,47,300
1,41,280
10,22,998 6,48,300 16,71,298 408
1,35,08,875 67,88,680 2,02,97,555 9,328
Status
Un Paid
WORK REGISTER UNDER AMRUT SAAP III
B. IVSS (Tuikhur) (Rs 3777800)
1% L/Cess was
1,16,519 collected from the 83,440 1,99,959 41
Estimated amount 1,16,519
Lalbiaknia 2,61,400
Lalbiaknia 2,48,817
Lalbiaknia 2,71,706
Construction of Site Office at Melthum 2,500,000.00 Chhimphei Departmental
1 Lalbiaknia 2,59,310
Lalbiaknia 1,95,500
Lalbiaknia 94,479
Vanlalbuki 5,59,661
H Lalchhanhima 31,232
Construction of Chowkider Quarters at
1,175,500.00 Mission Veng Departmental
Mission Vengthlang
2
2
Zothansangi 2,49,900
Zothansangi 2,17,270
Zothansangi 2,61,120
Zothansangi 1,88,710
Construction of Site Office at Khatla
3,092,000.00 Khatla Departmental
Tlang
3 Zothansangi 2,11,240
Zothansangi 2,33,400
Zothansangi 1,58,480
Zothansangi 1,96,580
M Lalhruaizeli 1,81,355
Construction of RCC Building vertical
Extension of Booster Pump House at 500,000.00 Tlangnuam Departmental
Tlangnuam.
4
1 % Labour
Completed
Cess was
collected
13,31,212 11,68,700 24,99,912 88
from the
Estimated
Amount
1,02,060
1 % Labour
Cess was 1,42,560
collected
Completed
11,75,173 327
from the
Estimated 2,94,300
Amount
45,360
Compl
5,84,280 11,75,173 327
6,87,600
6,87,600
1 % Labour
Cess was
collected
Completed
30,91,900 100
from the
Estimated
Amount
1 % Labour 97,920
Cess was 4,99,475 525
Completed
collected
from the
Estimated
Amount 2,20,200
Completed
2,10,840 3,33,287 13
Ramdinmawia 2,42,457
Ramdinmawia 2,47,997
Nezone 38,763
R Lalmuanpuia 1,70,088
Construction of Retaining Wall for protection
604,100.00 New Secretariat Departmental
of Reservoir at New Capital Complex.
5 B Lalremruata 1,70,287
TOTAL OF C 7,878,500.00
Deduction
1% L/Cess was
collected from the 1,93,370 1,54,800 3,48,170 330
Estimated
Amount.J10
1% L/Cess was
collected from the 4,89,403 2,16,800 7,06,203 97
Estimated
Amount.J10
2,16,800 7,06,203 97
1% L/Cess was
collected from the 1,90,003 79,500 2,69,503 497
Estimated
Amount.J10
1% L/Cess was
collected from the
10,01,772 2,79,000 12,80,772 28
Estimated
Amount.J10
1% L/Cess was
collected from the
10,01,772 2,79,000 12,80,772 28
Estimated
Amount.J10
2,79,000 12,80,772 28
1% L/Cess was
collected from the 3,40,375 2,63,320 6,03,695 405
Estimated
Amount.J10
Completed
46,688 2,33,440 46,68,800 0
WORK REGISTER UNDER AMRUT SAAP III
E. RAIN WATER HARVESTING SCHEME ( Rs 845000)
Works Done by Deduction
Sl.N Estimated Supply or Supply or Contract
Name of Work Section
o. Amount (Rs.) Contractor Contract Value Value
/Departmental
GST
Vanrampari 2,30,089
Rooftop Rain Water Harvesting Scheme at
845,000.00 Tlang I Departmental Lalengkima 2,06,291
1 Tuikhuahtlang
Lalengkima 1,80,161
1% L/Cess was
collected from the
Estimated amount 6,16,541 2,28,420 8,44,961 39
2,28,420 8,44,961 39
WORK REGISTER UNDER AMRUT SAAP III
F. PIPE WORKS (Rs 22884269)
Works Done by
Sl.N Estimated First and Final /
Name of Work Section
o. Amount (Rs.) Contractor Supply/Indent Bill
/Departmental
TOTAL 728,560.00
Nezone
Replacement of Distribution line from
Tlangzawl to Marova Building at New 539,100.00 New Secretariat Departmental
2 Capital Complex.
P&P Enterprise
TOTAL 539,100.00
Zothansangi
TOTAL 1,195,400.00
TOTAL 149,700.00
Robert Huntharmawia
Arrangement of outlet pipe with common
header, changing of alignment using new 400,100.00 Mission Veng Departmental
pipe at Mission Veng Zonal Tank.
5 Nezone
TOTAL 400,100.00
TOTAL 525,600.00
Lalbiakdingi
Extension of Distribution line from Pi
Ari Cluster to Dr. Sawma's House at 450,000.00 Thakthing Departmental Lalnunthari
7 Zobawm.
Extension of Distribution line from Pi
Ari Cluster to Dr. Sawma's House at 450,000.00 Thakthing Departmental
7 Zobawm.
Nezone
TOTAL 450,000.00
TOTAL 375,000.00
TOTAL 143,100.00
C Roenga
Construction of Filtration System at
10 750,000.00 Thakthing Departmental
Sadawr Kawr, Salem Veng.
C Roenga
TOTAL 750,000.00
LT Enterprise
Nezone
Lalrinpuia, Venghlui
Robert Huntharmawia
Replacement of old and corroded
9,557,100.00 Tlang I Departmental
distribution pipe lines under TKT I
12 Road Cutting
Nezone
Lalbiakdingi
Extension of distribution lines from City
Bus Teminal Ngaizel to Ophel Motor 640,000.00 Tlangnuam Departmental Lalnunthari
Works at Ngaizel.
13
Nezone
TOTAL 640,000.00
Shifting of House Water Connections
20mm dia G.I Pipe to existing T-Cluster
299,648.00 Mission Veng Departmental Robert Huntharmawia
near L.R Dingliana House at Mission
14 Veng.
TOTAL 299,648.00
Nezone
Replacement of old and corroded
distribution pipe lines under Bethlehem 515,818.00 Bethlehem Departmental Vanlalhluna
15 Vengthlang
Roar Cutting
TOTAL 515,818.00
Lalbiakdingi
Extension of distribution line from
Bunghnuai to ICDS Tlangnuam 250,000.00 Tlangnuam Departmental
Lalnunthari
16 Vengthar.
Nezone
TOTAL 250,000.00
Construction of Booster Pump
96,000.00 Tlangnuam Departmental M Lalhruaizeli
foundation at Tlangnuam
17
TOTAL 96,000.00
P&P Enterprise
Replacement of Distribution line from
Tlangzawl to New Construction of High 226,000.00 New Secretariat Departmental
Court Building at New Capital Complex.
18 Nezone
TOTAL 226,000.00
TOTAL 726,490.00
Nezone
Improvement of Water Supply at D.
318,600.00 Bethlehem Departmental
Mual, Bethlehem
20 Rohmingthanga
TOTAL 318,600.00
Nezone
TOTAL 507,800.00
52,517
1% was collected
from the Estimated 2,54,887 4,73,000 7,27,887 673
Amount
2,02,370
1,90,456
1% was collected
from the Estimated 2,53,396 2,84,000 5,37,396 1,704
Amount
62,940
68,063
1% was collected
34,612 from the Estimated 3,61,095 8,34,000 11,95,095 305
Amount
1% was collected
from the Estimated 3,61,095 8,34,000 11,95,095 305
Amount
2,58,420
51,517
1% was collected
from the Estimated 2,75,260 1,24,080 3,99,340 760
Amount
2,23,743
1,04,114
2,70,000 3,74,114 886
1% was collected
from the Estimated 1,42,920 1,42,920 180
Amount
2,03,413
1% was collected
from the Estimated 3,83,969 3,66,000 7,49,969 31
Amount
1,80,556
1,89,095
1% was collected
from the Estimated 23,56,808 16,15,680 39,72,488 152
Amount
12,78,641 1% was collected
from the Estimated 23,56,808 16,15,680 39,72,488 152
Amount
5,40,800
3,48,272
41,314
24,55,378
2,00,988
1,38,900
1% was collected
from the Estimated 3,99,458 1,16,220 5,15,678 140
Amount
2,60,558
1,01,185
14,891
1% was collected
from the Estimated 70,451 1,55,520 2,25,971 29
Amount
55,560
1,01,185
1% was collected
from the Estimated 3,79,637 1,28,040 5,07,677 123
Amount
1% was collected
34,712 from the Estimated 3,79,637 1,28,040 5,07,677 123
Amount
2,43,740
Completed
Completed
On going
Completed
WORK REGISTER UNDER AMRUT SAAP III
G. Miscellenous items (Rs 895000)
Works Done by
Sl.N Estimated First and Final /
Name of Work Section
o. Amount (Rs.) Contractor Supply/Indent Bill
/Departmental
TOTAL 895,000.00
Deduction
Supply or Contract Net Amount Special MR Grant Total Balance
Value
GST Labour Cess
8,95,000 15,170
1% was collected from
the Estimated Amount 8,79,830 8,95,000
8,95,000 8,95,000
Status
Completed
Paid
Completed
On going