PROPOSAL DRAWINGS

PROJECT : CEBU WAREHOUSE OP1


ITEM : STEEL STRUCTURE
Location : PHILIPPINES
INDEX
No DRAWING DRAWING TITLE DATE REV

01 D 01 GENERAL NOTE 23/02/2022 01


02 D 02 COLUMN PLAN 23/02/2022 01
03 D 03 ROOF PLAN 23/02/2022 01
04 D 04 ROOF BRACING PLAN 23/02/2022 01
05 D 05 ROOF PURLIN PLAN 23/02/2022 01
06 D 06 ELEVATION A & K 23/02/2022 01
07 D 07 ELEVATION 1 & 8 23/02/2022 01
08 D 08 STEEL FRAME SF2 23/02/2022 01

TOTAL DRAWING: 08
A B C D E F G H I J

7
REMARK: 7

1.DESIGN STANDARDS & CALCULATED LOADINGS: 2.3 BOLT CATEGORY 3. FABRICATION STANDARDS: REVISION
2.3.1 ANCHOR BOLT
1.1 DESIGN STANDARDS:
L
T2 T1

DxP
SAB W
TACK WELD @3POINT N REV.
1.2 CALCULATED LOADINGS: PROJECTION MIN 5MM
(OR 2 THREAD PICH) H (MIN 12xD) PRO
DATE DESCRIPTION DRAW. CHECK PPD.

STRAIGHT ANCHOR BOLT DIMENSIONS


6 6
COMPONENT DxP T1 T2 L PRO
SYM. SIZE
ID (mm) (mm) (mm) (mm) (mm)
M20 SAB:20 M20 x 2.5 125 30 450 80 PROPOSAL DRAWINGS
M24 SAB:24 M24 x 3.0 145 35 510 95
M30 SAB:30 M30 x 3.5 165 40 630 110 4. ERECTION REQUIREMENTS
M36 SAB:36 M36 x 4.0 190 45 750 130
M42 SAB:42 M42 x 4.5 230 55 870 160
M48 SAB:48 M48 x 5.0 260 60 980 180

2. FABRICATED MATERIAL: 2.3.2 PRIMARY BOLT (HIGH STRENGTH) T.M.L VIET NAM Co.,Ltd

2.1 PRESENTATION MATERIALS:

5 5

5. CONVENTION FOR SYMBOL


12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04
5.1 - BUILT UP I BEAM:
TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

2.2 WELDING SPECIFICATION (AWS D1.1 - 2008) GENERAL DIRECTOR

5.2 - PURLIN C:
PHAN THANH LONG
4 4
TECHNICAL MANAGER

2.2.1 CORNER WELDING


5.3 - CONNECTION BOLTS
M.ENG HUONG THANH KHANG
CHECKER

Eng.
2.2.2 WELDS END PLATE
2.3.3 TIGHTEN MOMENT FOR BOLT
6. PAINTING SYSTEM: DESIGNER

3 3

Eng.
DRAWING
7. METHOD TO JOINT STEEL:
7.1 JOINT STEEL SHAPE (I, H, U)
Eng.
PROJECT

CEBU WAREHOUSE
2 2

2.2.1 BUTT WELDING LOCATION: PHILIPPINES


ITEM:
7.2 JOINT BUILT UP (I, H)
STEEL STUCTURE

DRAWING NAME:

GENERAL NOTE
1 1

No. : REV: 01 LEV:

DATE: 23/02/2022 No. Dra: D01 Job No.

A B C D E F G H I J
A B C D E F G H I J

7 7

REVISION

16000
FUTURE EXTENSION

REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6

8
PROPOSAL DRAWINGS

7000
7
T.M.L VIET NAM Co.,Ltd
7200

5 5

6
7200

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

5 GENERAL DIRECTOR
O/O OF STEEL LINE
50000

7200

PHAN THANH LONG


4 4
TECHNICAL MANAGER
4
7200

M.ENG HUONG THANH KHANG


CHECKER

3
Eng.
7200

DESIGNER

3 3

2
Eng.
DRAWING
7000

1 Eng.
PROJECT

7000 7000 7000 7000 8000 8000 7000 7000 7000 7000
36000 36000
CEBU WAREHOUSE
2 72000 2
O/O OF STEEL LINE
LOCATION: PHILIPPINES
A B C D E F G H I J K ITEM:

STEEL STUCTURE

COLUMN PLAN
DRAWING NAME:

COLUMN PLAN
1
NOTE: 1

No. : REV: 01 LEV:

DATE: 23/02/2022 No. Dra: D02 Job No.

A B C D E F G H I J
A B C D E F G H I J

7 7

REVISION

16000
FUTURE EXTENSION

REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6

8
PROPOSAL DRAWINGS

7000
7
T.M.L VIET NAM Co.,Ltd
7200

10% 10%

5 5

6
7200

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

5 GENERAL DIRECTOR
O/O OF STEEL LINE
50000

7200

PHAN THANH LONG


4 4
TECHNICAL MANAGER
4
7200

M.ENG HUONG THANH KHANG


CHECKER

3
Eng.
7200

10% 10%
DESIGNER

3 3

2
Eng.
DRAWING
7000

1 Eng.
4000

PROJECT

CEBU WAREHOUSE
2
7000 7000 7000 7000 8000 8000 7000 7000 7000 7000 2
36000 36000
LOCATION: PHILIPPINES
72000
ITEM:
O/O OF STEEL LINE

A B C D E F G H I J K STEEL STUCTURE

ROOF PLAN DRAWING NAME:

COLUMN PLAN
1
NOTE: 1

No. : REV: 01 LEV:

DATE: 23/02/2022 No. Dra: D03 Job No.

A B C D E F G H I J
A B C D E F G H I J

7 7

REVISION

16000
REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6
STEEL FRAME SF1
8
PROPOSAL DRAWINGS

7000

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST
7
STEEL FRAME SF2 T.M.L VIET NAM Co.,Ltd
7200

X BRACING
5 5

6
STEEL FRAME SF2 X BRACING
7200

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

5 GENERAL DIRECTOR
O/O OF STEEL LINE

STEEL FRAME SF2


50000

7200

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST
PHAN THANH LONG
4 4
TECHNICAL MANAGER
4
STEEL FRAME SF2
7200

M.ENG HUONG THANH KHANG


CHECKER
STEEL FRAME SF2
3
Eng.
X BRACING
7200

DESIGNER

3 3
STEEL FRAME SF2
2
Eng.
DRAWING
7000

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST
1 Eng.
2000

STEEL FRAME SF3


PROJECT

7000 7000 7000 7000 8000 8000 7000 7000 7000 7000 CEBU WAREHOUSE
2 36000 36000 2

72000 LOCATION: PHILIPPINES


O/O OF STEEL LINE
ITEM:

A B C D E F G H I J K
STEEL STUCTURE

ROOF BRACING PLAN DRAWING NAME:

ROOF BRACING PLAN


1 1

No. : REV: 01 LEV:

DATE: 23/02/2022 No. Dra: D04 Job No.

A B C D E F G H I J
A B C D E F G H I J

7 7

REVISION

16000
REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6

8
PROPOSAL DRAWINGS

7000
7
T.M.L VIET NAM Co.,Ltd
7200

5 5

6
7200

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

5 GENERAL DIRECTOR
O/O OF STEEL LINE
50000

7200

PHAN THANH LONG


4 4
TECHNICAL MANAGER
4
7200

M.ENG HUONG THANH KHANG


CHECKER

3
Eng.
7200

DESIGNER

3 3

2
Eng.
DRAWING
7000

1 Eng.
2000

PROJECT

7000 7000 7000 7000 8000 8000 7000 7000 7000 7000 CEBU WAREHOUSE
2 36000 36000 2

72000 LOCATION: PHILIPPINES


O/O OF STEEL LINE
ITEM:

A B C D E F G H I J K
STEEL STUCTURE

ROOF PURLIN PLAN DRAWING NAME:

ROOF PURLIN PLAN


1 1

No. : REV: 01 LEV:

DATE: 23/02/2022 No. Dra: D05 Job No.

A B C D E F G H I J
A B C D E F G H I J

7 7

+11.100

3600
REVISION
+7.500

11100
7500

5000
REV. DATE DESCRIPTION DRAW. CHECK PPD.

2000
±0.000
6 6

PROPOSAL DRAWINGS
4000 7000 7200 7200 7200 7200 7200 7000

50000 16000
C/C OF STEEL LINE

1 2 3 4 5 6 7 8 8 T.M.L VIET NAM Co.,Ltd

5
ELEVATION K 5

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM
+11.100
GENERAL DIRECTOR
3600

+7.500
11100

PHAN THANH LONG


4 4
TECHNICAL MANAGER
7500

5000
2000

±0.000
M.ENG HUONG THANH KHANG
CHECKER

7000 7200 7200 7200 7200 7200 7000 4000

16000 50000
Eng.
C/C OF STEEL LINE
DESIGNER

3 8 8 7 6 5 4 3 2 1 3

Eng.
DRAWING

ELEVATION A
Eng.
PROJECT

CEBU WAREHOUSE
2 2

LOCATION: PHILIPPINES
ITEM:

STEEL STUCTURE

DRAWING NAME:

ELEVATION A & K
1 1

CORNER TRIM DETAIL CORNER TRIM DETAIL No. : REV: 01 LEV:


GABLE TRIM DETAIL
DATE: 23/02/2022 No. Dra: D06 Job No.

A B C D E F G H I J
A B C D E F G H I J

7 7

REVISION

+11.100
10% 10%

+7.500 3600 REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6
11100

PROPOSAL DRAWINGS
7500

2000
±0.000

T.M.L VIET NAM Co.,Ltd

7000 7000 7000 7000 8000 8000 7000 7000 7000 7000
36000 36000
5 5

72000
O/O OF STEEL LINE

A B C D E F G H I J K 12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

GENERAL DIRECTOR

ELEVATION 8
PHAN THANH LONG
4 4
TECHNICAL MANAGER

M.ENG HUONG THANH KHANG


CHECKER

+11.100
10% 10%
Eng.
3600

DESIGNER

3
+7.500 3
11100

Eng.
DRAWING
7500

5000

2000
Eng.
±0.000
PROJECT

7000 7000 7000 7000 8000 8000 7000 7000 7000 7000 CEBU WAREHOUSE
2 2
36000 36000
LOCATION: PHILIPPINES
72000 ITEM:
O/O OF STEEL LINE
STEEL STUCTURE
A B C D E F G H I J K
DRAWING NAME:

ELEVATION 1
ELEVATION 1 & 8
1 1

No. : REV: 01 LEV:

DATE: 23/02/2022 No. Dra: D07 Job No.

A B C D E F G H I J
A B C D E F G H I J

7 7

REVISION

* * * *
+11.100 * * * *
* * * *
10% * * * * 10%
* * * *
* * * *
* *

3600
* * * *
* * * * * * REV. DATE DESCRIPTION DRAW. CHECK PPD.
+7.500

6 6
11100 * *

7500 PROPOSAL DRAWINGS


* *

* *

1000

1000
±0.000

T.M.L VIET NAM Co.,Ltd

7000 7000 7000 7000 8000 8000 7000 7000 7000 7000
36000 36000
5 5

72000
O/O OF STEEL LINE

A B C D E F G H I J K 12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

GENERAL DIRECTOR

STEEL FRAME SF2


PHAN THANH LONG
4 4
TECHNICAL MANAGER

M.ENG HUONG THANH KHANG


CHECKER

Eng.

DESIGNER

3 3

Eng.
DRAWING

Eng.
PROJECT

CEBU WAREHOUSE
2 2

LOCATION: PHILIPPINES
ITEM:

STEEL STUCTURE

DRAWING NAME:

STEEL FRAME SF2


1 1

No. : REV: 01 LEV:

DATE: 23/02/2022 No. Dra: D08 Job No.

A B C D E F G H I J

You might also like