Professional Documents
Culture Documents
HEAD MANUFACTURING-Boiler Building-REV00-05.01.2022
HEAD MANUFACTURING-Boiler Building-REV00-05.01.2022
HEAD MANUFACTURING-Boiler Building-REV00-05.01.2022
TOTAL DRAWING: 08
A B C D E F G H I J
7
REMARK: 7
1.DESIGN STANDARDS & CALCULATED LOADINGS: 2.3 BOLT CATEGORY 3. FABRICATION STANDARDS: REVISION
2.3.1 ANCHOR BOLT
1.1 DESIGN STANDARDS:
L
T2 T1
DxP
SAB W
TACK WELD @3POINT N REV.
1.2 CALCULATED LOADINGS: PROJECTION MIN 5MM
(OR 2 THREAD PICH) H (MIN 12xD) PRO
DATE DESCRIPTION DRAW. CHECK PPD.
2. FABRICATED MATERIAL: 2.3.2 PRIMARY BOLT (HIGH STRENGTH) T.M.L VIET NAM Co.,Ltd
5 5
5.2 - PURLIN C:
PHAN THANH LONG
4 4
TECHNICAL MANAGER
Eng.
2.2.2 WELDS END PLATE
2.3.3 TIGHTEN MOMENT FOR BOLT
6. PAINTING SYSTEM: DESIGNER
3 3
Eng.
DRAWING
7. METHOD TO JOINT STEEL:
7.1 JOINT STEEL SHAPE (I, H, U)
Eng.
PROJECT
HEAD MANUFACTURING
2 2
DRAWING NAME:
GENERAL NOTE
1 1
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
E
7600
REV. DATE DESCRIPTION DRAW. CHECK PPD.
6 6
D
PROPOSAL DRAWINGS
7600
O/O OF STEEL LINE
5 5
7600
GENERAL DIRECTOR
7600
7500 7000 7000 7000 7000 7000 7500 8662 8663 M.ENG HUONG THANH KHANG
67325 CHECKER
1 2 3 4 5 6 7 8 9 10 Eng.
DESIGNER
3 3
COLUMN PLAN SC: 1/200
Eng.
DRAWING
Eng.
PROJECT
L
T2 T1
HEAD MANUFACTURING
DxP
2 2
SAB W
PROJECTION MIN 5MM TACK WELD @3POINT N
LOCATION: PHILIPPINES
A (OR 2 THREAD PICH) H (MIN 12xD) PRO
ITEM:
A B C D E F G H I J
A B C D E F G H I J
7 7
2000
2000
2000
REVISION
E
7600
REV. DATE DESCRIPTION DRAW. CHECK PPD.
6 6
10%
10%
10%
D
PROPOSAL DRAWINGS
7600
O/O OF STEEL LINE
3500
5 5
7600
10%
10%
GENERAL DIRECTOR
7600
7500 7000 7000 7000 7000 7000 7500 8662 8663 M.ENG HUONG THANH KHANG
67325 CHECKER
1 2 3 4 5 6 7 8 9 10 Eng.
DESIGNER
3 3
ROOF SHEETING PLAN SC: 1/200
Eng.
DRAWING
Eng.
PROJECT
HEAD MANUFACTURING
2 2
LOCATION: PHILIPPINES
SECTION A ITEM:
A E
BOILER BUILDING
DRAWING NAME:
A B C D E F G H I J
A B C D E F G H I J
7 7
ST ST ST ST ST REVISION
E
7600
REV. DATE DESCRIPTION DRAW. CHECK PPD.
6 6
ST ST ST ST ST
D
PROPOSAL DRAWINGS
7600
O/O OF STEEL LINE
5 5
7600
GENERAL DIRECTOR
7600
7500 7000 7000 7000 7000 7000 7500 8662 8663 M.ENG HUONG THANH KHANG
67325 CHECKER
1 2 3 4 5 6 7 8 9 10 Eng.
DESIGNER
3 3
ROOF BRACING PLAN SC: 1/200
Eng.
DRAWING
Eng.
PROJECT
HEAD MANUFACTURING
2 2
LOCATION: PHILIPPINES
ITEM:
BOILER BUILDING
DRAWING NAME:
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
E
7600
REV. DATE DESCRIPTION DRAW. CHECK PPD.
6 6
D
PROPOSAL DRAWINGS
7600
O/O OF STEEL LINE
5 5
7600
GENERAL DIRECTOR
7600
7500 7000 7000 7000 7000 7000 7500 8662 8663 M.ENG HUONG THANH KHANG
67325 CHECKER
1 2 3 4 5 6 7 8 9 10 Eng.
DESIGNER
3 3
ROOF PURLIN PLAN SC: 1/200
Eng.
DRAWING
Eng.
PROJECT
HEAD MANUFACTURING
2 2
LOCATION: PHILIPPINES
ITEM:
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
+9.090
9090
6 6
±0.000 1200
350 PROPOSAL DRAWINGS
1 2 3 4 5 6 7 8 9 10
5 5
GENERAL DIRECTOR
+9.090
5400
5400
5400
1200
±0.000 CHECKER
350
7500 7000 7000 7000 7000 7000 7500 8662 8663 Eng.
67325 DESIGNER
O/O OF STEEL LINE
3 3
1 2 3 4 5 6 7 8 9 10
Eng.
DRAWING
HEAD MANUFACTURING
2 2
LOCATION: PHILIPPINES
ITEM:
BOILER BUILDING
DRAWING NAME:
ELEVATION GL.A,E
1 1
A B C D E F G H I J
A B C D E F G H I J
3500
7 7
+9.090
REVISION
6 6
PROPOSAL DRAWINGS
9090
±0.000
5 5
+9.090 Eng.
DESIGNER
3 3
Eng.
DRAWING
9090
Eng.
PROJECT
HEAD MANUFACTURING
2 2
LOCATION: PHILIPPINES
350 1200
ITEM:
±0.000
BOILER BUILDING
30400
O/O OF STEEL LINE ELEVATION GL.1 & 10
1 1
A B C D E
No. : REV: 00 LEV:
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
3500
6 6
PROPOSAL DRAWINGS
10% * 10%
* * *
* *
* *
* *
* * * *
* *
5 5
* *
* *
GENERAL DIRECTOR
* *
PHAN THANH LONG
4 4
TECHNICAL MANAGER
350 1200
±0.000
M.ENG HUONG THANH KHANG
CHECKER
30400
Eng.
O/O OF STEEL LINE
DESIGNER
3
A B C D E 3
Eng.
DRAWING
HEAD MANUFACTURING
2 2
LOCATION: PHILIPPINES
ITEM:
BOILER BUILDING
DRAWING NAME:
STEEL FRAME
1 1
A B C D E F G H I J