PROPOSAL DRAWINGS

PROJECT : JACKBUILT CHB BLDG


ITEM : STEEL STRUCTURE
Location : PHILIPPINES
INDEX
No DRAWING DRAWING TITLE DATE REV

01 D 01 GENERAL NOTE 26/01/2022 00


02 D 02 COLUMN PLAN 26/01/2022 00
03 D 03 MEZZANINE PLAN LEVEL +5.0M 26/01/2022 00
04 D 04 ROOF SHEETING PLAN 26/01/2022 00
05 D 05 STEEL FRAME PLAN & ROOF BRACING 26/01/2022 00
06 D 06 PURLIN & SAG ROD ROOF PLAN 26/01/2022 00
07 D 07 ELEVATION A-H, H-A 26/01/2022 00
08 D 08 ELEVATION 1-8 26/01/2022 00
09 D 09 ELEVATION 8-1 26/01/2022 00
10 D 10 STEEL FRAME FS2 26/01/2022 00
11 D 11 STEEL FRAME FS3 26/01/2022 00

TOTAL DRAWING: 10
A B C D E F G H I J

7
REMARK: 7

1.DESIGN STANDARDS & CALCULATED LOADINGS: 2.3 BOLT CATEGORY 3. FABRICATION STANDARDS: REVISION
2.3.1 ANCHOR BOLT
1.1 DESIGN STANDARDS:
L
T2 T1

DxP
SAB W
TACK WELD @3POINT N REV.
1.2 CALCULATED LOADINGS: PROJECTION MIN 5MM
(OR 2 THREAD PICH) H (MIN 12xD) PRO
DATE DESCRIPTION DRAW. CHECK PPD.

STRAIGHT ANCHOR BOLT DIMENSIONS


6 6
COMPONENT DxP T1 T2 L PRO
SYM. SIZE
ID (mm) (mm) (mm) (mm) (mm)
M20 SAB:20 M20 x 2.5 125 30 450 80 PROPOSAL DRAWINGS
M24 SAB:24 M24 x 3.0 145 35 510 95
M30 SAB:30 M30 x 3.5 165 40 630 110 4. ERECTION REQUIREMENTS
M36 SAB:36 M36 x 4.0 190 45 750 130
M42 SAB:42 M42 x 4.5 230 55 870 160
M48 SAB:48 M48 x 5.0 260 60 980 180

2. FABRICATED MATERIAL: 2.3.2 PRIMARY BOLT (HIGH STRENGTH) T.M.L VIET NAM Co.,Ltd

2.1 PRESENTATION MATERIALS:

5 5

5. CONVENTION FOR SYMBOL


12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04
5.1 - BUILT UP I BEAM:
TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

2.2 WELDING SPECIFICATION (AWS D1.1 - 2008) GENERAL DIRECTOR

5.2 - PURLIN C:
PHAN THANH LONG
4 4
TECHNICAL MANAGER

2.2.1 CORNER WELDING


5.3 - CONNECTION BOLTS
M.ENG HUONG THANH KHANG
CHECKER

Eng.
2.2.2 WELDS END PLATE
2.3.3 TIGHTEN MOMENT FOR BOLT
6. PAINTING SYSTEM: DESIGNER

3 3

Eng.
DRAWING
7. METHOD TO JOINT STEEL:
7.1 JOINT STEEL SHAPE (I, H, U)
Eng.
PROJECT

JACKBUILT CHB BLDG


2 2

2.2.1 BUTT WELDING LOCATION: PHILIPPINES


ITEM:
7.2 JOINT BUILT UP (I, H)
STEEL STRUCTURE

DRAWING NAME:

GENERAL NOTE
1 1

No. : REV: 00 LEV:

DATE: 25/01/2022 No. Dra: D01 Job No. 063.22.01

A B C D E F G H I J
A B C D E F G H I J

7 7

1
C3 C3
C1 C1 C1 C1 C1 C1

4310
REVISION

C3 C3 C3
2

4310
REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6
C3 C3 C3

17235
3
PROPOSAL DRAWINGS

4310
(CENTER TO CENTER OF STEEL COLUMNS)

C3 C3 C3
4
T.M.L VIET NAM Co.,Ltd
30170

4310

5 5
C3 C3 C3
5
C2
4310

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

C3 C3 C3
6 GENERAL DIRECTOR
12935
4310

PHAN THANH LONG


4 4
C3 C3 C3 TECHNICAL MANAGER

7
4310

M.ENG HUONG THANH KHANG


CHECKER
C1 C1 C1 C1 C1 C1 C3 C3

8
Eng.
6000 6000 6000 6000 6000 5425 5425
DESIGNER
40850
3 (CENTER TO CENTER OF STEEL COLUMNS) 3

A B C D E F G H Eng.
NOTE:
DRAWING

COLUMN PLAN SC: 1/150

Eng.
PROJECT

250 250 JACKBUILT CHB BLDG


2 200 2

LOCATION: PHILIPPINES
ITEM:
450

450

350

STEEL STRUCTURE

DRAWING NAME:

C1 C2 C3 COLUMN PLAN
1 1

No. : REV: 00 LEV:

DATE: 25/01/2022 No. Dra: D02 Job No. 063.22.01

A B C D E F G H I J
A B C D E F G H I J

7 7

1
93 87
32 8 1 23 49 68

4310
REVISION

185 158 156


2

4310
REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6
186 163 161

17235
3
PROPOSAL DRAWINGS

4310
(CENTER TO CENTER OF STEEL COLUMNS)

187 168 166


4
T.M.L VIET NAM Co.,Ltd
30170

4310

5 5
188 173 171
5
43
4310

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

189 178 176


6 GENERAL DIRECTOR
12935
4310

PHAN THANH LONG


4 4
190 183 181 TECHNICAL MANAGER

7
4310

M.ENG HUONG THANH KHANG


CHECKER
35 11 4 26 52 71 92 85

8
Eng.
6000 6000 6000 6000 6000 5425 5425
DESIGNER
40850
3 (CENTER TO CENTER OF STEEL COLUMNS) 3

A B C D E F G H Eng.
NOTE:
DRAWING

JOINT LABLE SC: 1/150

1 Eng.
PROJECT

3
JACKBUILT CHB BLDG
2
2 2

LOCATION: PHILIPPINES
ITEM:

STEEL STRUCTURE

DRAWING NAME:

JOINT LABLE
1 1

No. : REV: 00 LEV:

DATE: 25/01/2022 No. Dra: D03 Job No. 063.22.01

A B C D E F G H I J
A B C D E F G H I J

7 7

REVISION

REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6

PROPOSAL DRAWINGS

T.M.L VIET NAM Co.,Ltd

5 5

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

GENERAL DIRECTOR

PHAN THANH LONG


4
COLUMN REACTION SC: 1/150 TECHNICAL MANAGER
4

M.ENG HUONG THANH KHANG


CHECKER

Eng.

DESIGNER

3 3

Eng.
DRAWING

Eng.
PROJECT

JACKBUILT CHB BLDG


2 2

LOCATION: PHILIPPINES
ITEM:

STEEL STRUCTURE

DRAWING NAME:

COLUMN REACTION
1 1

No. : REV: 00 LEV:

DATE: 25/01/2022 No. Dra: D04 Job No. 063.22.01

A B C D E F G H I J
A B C D E F G H I J

7 7

4310
REVISION

4310
REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6

3
PROPOSAL DRAWINGS

4310
(CENTER TO CENTER OF STEEL COLUMNS)

4
T.M.L VIET NAM Co.,Ltd
30170

4310

5 5

5
4310

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

6 GENERAL DIRECTOR
4310

PHAN THANH LONG


4 4
TECHNICAL MANAGER

7
4310

M.ENG HUONG THANH KHANG


CHECKER

8
Eng.
6000 6000 6000 6000 6000 5425 5425
DESIGNER
40850
3 (CENTER TO CENTER OF STEEL COLUMNS) 3

A B C D E F G H Eng.
DRAWING

MEZZANINE PLAN LEVEL +5.0M SC: 1/150

Eng.
PROJECT

JACKBUILT CHB BLDG


SHEAR STUD MEZZANINE DECKING PANEL 0.75mm
2 2

LOCATION: PHILIPPINES
ITEM:

125
STEEL STRUCTURE

DRAWING NAME:
JOIST

MEZZANINE PLAN LEVEL +5.0M


1 1

BEAM
No. : REV: 00 LEV:

DATE: 25/01/2022 No. Dra: D05 Job No. 063.22.01

A B C D E F G H I J
A B C D E F G H I J

7 7

4310
REVISION

4310
REV. DATE DESCRIPTION DRAW. CHECK PPD.

SLOPE

SLOPE
6 6

3
PROPOSAL DRAWINGS

4310
(CENTER TO CENTER OF STEEL COLUMNS)
4
T.M.L VIET NAM Co.,Ltd
30170

4310

5 5

5
4310

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

6 GENERAL DIRECTOR

SLOPE

SLOPE
4310

PHAN THANH LONG


4 4
TECHNICAL MANAGER

7
4310

M.ENG HUONG THANH KHANG


CHECKER

8
Eng.
6000 6000 6000 6000 6000 5425 5425
DESIGNER
40850
3 (CENTER TO CENTER OF STEEL COLUMNS) 3

A B C D E F G H Eng.
NOTE:
DRAWING

ROOF SHEETING PLAN SC: 1/150

Eng.
PROJECT

JACKBUILT CHB BLDG


2 2

LOCATION: PHILIPPINES
SECTION A ITEM:

A E
STEEL STRUCTURE

DRAWING NAME:

ROOF SHEETING PLAN


1 1

SECTION E ROOF SHEET DETAIL No. : REV: 00 LEV:


PANEL INSTALLATION DETAIL ROOF SHEET INSTALLATION DETAIL
DATE: 25/01/2022 No. Dra: D06 Job No. 063.22.01

A B C D E F G H I J
A B C D E F G H I J

SBRT SBRC

7 7

4310
REVISION

4310
REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6

3
PROPOSAL DRAWINGS

4310
(CENTER TO CENTER OF STEEL COLUMNS)

FRAME SF1

FRAME SF2

FRAME SF2

FRAME SF2

FRAME SF2

FRAME SF3
4 30170
T.M.L VIET NAM Co.,Ltd
4310

5 5

5
4310

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

6 GENERAL DIRECTOR
4310

PHAN THANH LONG


4 4
TECHNICAL MANAGER

7
4310

M.ENG HUONG THANH KHANG


CHECKER

8
Eng.
6000 6000 6000 6000 6000 5425 5425
DESIGNER
40850
3 3
(CENTER TO CENTER OF STEEL COLUMNS)
A B C D E F G H Eng.
DRAWING

STEEL FRAME PLAN & ROOF BRACING SC: 1/150

Eng.
PROJECT

JACKBUILT CHB BLDG


2 2

LOCATION: PHILIPPINES
ITEM:

STEEL STRUCTURE

DRAWING NAME:

STEEL FRAME PLAN & ROOF BRACING


1 1

No. : REV: 00 LEV:


CABLE BRACING DETAIL
DATE: 25/01/2022 No. Dra: D07 Job No. 063.22.01

A B C D E F G H I J
A B C D E F G H I J

7 7

4310
REVISION

4310
REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6

3
PROPOSAL DRAWINGS

4310
(CENTER TO CENTER OF STEEL COLUMNS)
4 30170
T.M.L VIET NAM Co.,Ltd
4310

5 5

5
4310

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

6 GENERAL DIRECTOR
4310

PHAN THANH LONG


4 4
TECHNICAL MANAGER

7
4310

M.ENG HUONG THANH KHANG


CHECKER

8
Eng.

DESIGNER

3
6000 6000 6000 6000 6000 5425 5425 3

40850
Eng.
NOTE:
(CENTER TO CENTER OF STEEL COLUMNS)
DRAWING
A B C D E F G H

PURLIN & SAG ROD ROOF PLAN SC: 1/250


Eng.
PROJECT

JACKBUILT CHB BLDG


2 2

LOCATION: PHILIPPINES
ITEM:

DETAIL PURLIN PEAK


STEEL STRUCTURE
SECTION A-A
DRAWING NAME:

PURLIN & SAG ROD ROOF PLAN


1 1

PURLIN BRACING DETAIL No. : REV: 00 LEV:


FLANGE BRACING DETAIL (H>600MM) FLANGE BRACING DETAIL (H<600MM)
DATE: 25/01/2022 No. Dra: D08 Job No. 063.22.01

A B C D E F G H I J
A B C D E F G H I J

7 7

REVISION

REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6
900 900

+13.000 PROPOSAL DRAWINGS

4258
T.M.L VIET NAM Co.,Ltd
+8.742

3742
13000

5 5

+5.000

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


4000

4000
VOID VOID VOID VOID VOID TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM

+1.000 GENERAL DIRECTOR


1000

±0.000

PHAN THANH LONG


4
6000 6000 6000 6000 6000 5425 5425 4
TECHNICAL MANAGER

40850
(CENTER TO CENTER OF STEEL COLUMNS)
A B C D E F G H M.ENG HUONG THANH KHANG
CHECKER

ELEVATION A-H, H-A SC: 1/250

Eng.

DESIGNER

3 3

Eng.
DRAWING

Eng.
PROJECT

JACKBUILT CHB BLDG


2 2

LOCATION: PHILIPPINES
ITEM:

STEEL STRUCTURE

DRAWING NAME:

ELEVATION A-H, H-A


1 1

CORNER TRIM DETAIL CORNER TRIM DETAIL No. : REV: 00 LEV:


GABLE TRIM DETAIL
DATE: 25/01/2022 No. Dra: D09 Job No. 063.22.01

A B C D E F G H I J
A B C D E F G H I J

7 7

REVISION

REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6

PROPOSAL DRAWINGS
+13.000

SLOPE SLOPE
T.M.L VIET NAM Co.,Ltd
4258

5 5
+8.742

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


3742

TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM


13000

GENERAL DIRECTOR

+5.000

PHAN THANH LONG


4 4
TECHNICAL MANAGER
4000

M.ENG HUONG THANH KHANG


+1.000
CHECKER
1000

±0.000

Eng.

DESIGNER

3 1000 4310 4310 4310 4310 4310 4310 4310 1000 3

30170 Eng.
(CENTER TO CENTER OF STEEL COLUMNS)
DRAWING

1 2 3 4 5 6 7 8
Eng.
ELEVATION 1-8 SC: 1/100 PROJECT

JACKBUILT CHB BLDG


2 2

LOCATION: PHILIPPINES
ITEM:

STEEL STRUCTURE

DRAWING NAME:

ELEVATION 1-8
1 1

No. : REV: 00 LEV:

DATE: 25/01/2022 No. Dra: D10 Job No. 063.22.01

A B C D E F G H I J
A B C D E F G H I J

7 7

REVISION

REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6

PROPOSAL DRAWINGS
+13.000

SLOPE

T.M.L VIET NAM Co.,Ltd


4258

5 5
+8.742

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


3742

TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM


13000

GENERAL DIRECTOR

+5.000

PHAN THANH LONG


4 4
TECHNICAL MANAGER
4000

M.ENG HUONG THANH KHANG


+1.000
CHECKER
1000

±0.000

Eng.

DESIGNER

3 1414 4310 4310 4310 4310 4310 4310 4310 1414 3

30170 Eng.
(CENTER TO CENTER OF STEEL COLUMNS)
DRAWING

8 7 6 5 4 3 2 1
Eng.
ELEVATION 8-1 SC: 1/100 PROJECT

JACKBUILT CHB BLDG


2 2

LOCATION: PHILIPPINES
ITEM:

STEEL STRUCTURE

DRAWING NAME:

ELEVATION 8-1
1 1

No. : REV: 00 LEV:

DATE: 25/01/2022 No. Dra: D11 Job No. 063.22.01

A B C D E F G H I J
A B C D E F G H I J

7 7

REVISION

REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6

PROPOSAL DRAWINGS
+13.000
* *
SLOPE
* * SLOPE
* *
* *
T.M.L VIET NAM Co.,Ltd
* *
4258

* *
* *
5 * * * * 5
+8.742

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


*
3742

* TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM


13000

GENERAL DIRECTOR

+5.000
* *
PHAN THANH LONG
4 4
TECHNICAL MANAGER
4000

M.ENG HUONG THANH KHANG


+1.000
CHECKER
1000

±0.000

Eng.

DESIGNER

3 1000 4310 4310 4310 4310 4310 4310 4310 1000 3

30170 Eng.
(CENTER TO CENTER OF STEEL COLUMNS)
DRAWING

1 2 3 4 5 6 7 8
Eng.
STEEL FRAME FS2 SC: 1/100 PROJECT

JACKBUILT CHB BLDG


2 2

LOCATION: PHILIPPINES
ITEM:

STEEL STRUCTURE

DRAWING NAME:

STEEL FRAME FS2


1 1

No. : REV: 00 LEV:

DATE: 25/01/2022 No. Dra: D12 Job No. 063.22.01

A B C D E F G H I J
A B C D E F G H I J

7 7

REVISION

REV. DATE DESCRIPTION DRAW. CHECK PPD.

6 6

PROPOSAL DRAWINGS
+13.000
* *
SLOPE
* * SLOPE
* *
* *
T.M.L VIET NAM Co.,Ltd
* *
4258

* *
* *
5 * * * * 5
+8.742

12th FLOOR, HAI AU BUILDING, 39B TRUONG SON, WARD 04


*
3742

* TAN BINH DISTRICT, HO CHI MINH CITY, VIET NAM


13000

MEZZANINE DECKING
GENERAL DIRECTOR

+5.000

125
* *
PHAN THANH LONG
4 4
TECHNICAL MANAGER
4000

M.ENG HUONG THANH KHANG


+1.000
CHECKER
1000

±0.000

Eng.

DESIGNER

3 1000 4310 4310 4310 4310 4310 4310 4310 1000 3

30170 Eng.
(CENTER TO CENTER OF STEEL COLUMNS)
DRAWING

1 2 3 4 5 6 7 8
Eng.
STEEL FRAME FS3 SC: 1/100 PROJECT

JACKBUILT CHB BLDG


2 2

LOCATION: PHILIPPINES
ITEM:

STEEL STRUCTURE

DRAWING NAME:

STEEL FRAME FS3


1 1

No. : REV: 00 LEV:

DATE: 25/01/2022 No. Dra: D13 Job No. 063.22.01

A B C D E F G H I J