Miscellaneous Equipment

Tag Description: Tag No.:

P. O. No.: Inspection Classification Area/Unit:

Subcontractor: Subcontractor Owner Turnover System:

Work Package: Company Other Sub – System:


Item Description of Check Subcontractor Client
01 All shipping stops, bracing and packaging removed.
02 Nameplate details correct and in accordance with the data
sheet. Nameplate securely attached, readable not obscured.
03 Unit installed according to vendor instructions, with location
and orientation correct, holding down arrangement complete
and secure.
04 Supplier / vendor equipment release note available.
05 Unit free from external damaged and all paint work in good
condition.
06 Where preservation materials are installed, equipment is
suitably marked “PRESERVATION INSIDE”.
07 Piping, tubing and cable connections complete and correct.
08 All valves accessible, visible and operable.
09 Instrumentation complete, correct, accessible, visible and
operable.
10 Relief valves fitted, tagged and certified with valid calibration
date.
11 Lubricants filled and to vendor’s specification.
12 Unit rotates freely (manually).
13 Provision for expansion correct.
14 Couplings, belts and guards installed correctly.

Notes:

Company
Name:

Signature:

Date: