Initial Environmental Examination (IEE) Checklist Report for Building Projects

BUILDING PROJECTS
INITIAL ENVIRONMENTAL EXAMINATION (IEE) CHECKLIST REPORT FORM

I. ENVIRONMENTAL IMPACT AND MANAGEMENT PLAN

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost
LAND
 Consistency with Current land use w/in 1km radius  See attached proof of compatibility with
land use (as per zoning ordinance): land use
 Residential  Limit project activities to what is
 Commercial/ Institutional compatible to the land use

 Industrial  Others , specify

 Agricultural/ Recreational


Protected Areas
 Others, specify

Actual land uses w/in 1km


radius:
 Residential


Commercial/ Institutional
 Industrial
 Agricultural/ Recreational
 Protected Areas
 Others, specify

LGU Guiuan Tourist Rest Area


Project Name: __________________________________________ Page 1 of 12
Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost
 Land tenure / Identify land tenure /  Obtain appropriate clearances/ permits  Regularly monitor
compatibility issue compatibility issues: from concerned agencies presence/absence of
 CARP  Resettlement Plan prepared complaints
 CADC/ CADT/ CALC/ CALT  Provide relocation/disturbance  Regular coordination with
 ROW compensation packages LGU or appropriate agencies
 Informal settlers  Ensure participation of IPs in
✔
Ecologically sensitive or consultations and dialogues  Others, specify
protected area  MOA prepared/signed
 Others, specify  Provide adequate buffer
 ✔
Others, specify
Protected Areas MAnagement Board (PAMB)
Resolution allowing the construction of the Tourist
Rest Area and for the acquisition of the required
ECC.

 Disturbance to Existing vegetation in the area:  Comply with conditions of DENR/LGU  Annual inspection of area
wildlife due to  Forestland
SLUP, Tree Cutting Permit, ROW, PCA replanted/ re-vegetated
vegetation clearing

Permit
 Others, specify
Marshland  Limit land clearing as much as possible
✔
Grassland  Provide temporary fencing for
 Mangrove vegetation that will be retained
 Wetland  Promote restoration of damaged or
destroyed vegetation where possible
✔
Others, specify (e.g., tree planting)
Shrubs and pioneer beach forest
species.

LGU Guiuan Tourist Rest Area


Project Name: __________________________________________ Page 2 of 12
Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost
 Change in surface Slope: Considering the natural hazards and
climate projections in the area:
 Regular inspection of slope  Slope/ Erosion
landform/ 

Flat (0-3%) protection measures in Control Cost:
topography/
 Gently sloping to rolling (3-
 Provide erosion control and slope erosion-prone areas
terrain/slope
18%)
protection measures  Regular inspection for new
  Designate a Spoils Storage Area, with eroded areas near the site
 Soil Erosion Steep (>18%) topsoil set aside for later use and allow  Others, specify
maximum re-use of spoils
 Construct during dry season
 Others, specify
Is the project site located in an  Stabilize embankment with grasses or
area identified by MGB/PAG- other soil cover
ASA/ PHIVOLCS as hazard
prone?
 Conduct Engineering Geological and
Geo-hazard Assessment (EGGA) and
 Yes implement corresponding
✔
No recommendation
 Others, specify

Building of Structure Presence of visually significant  Set up temporary fence around the  Daily inspection of waste
and Improper solid landforms/landscape/structures? construction area handling including
waste disposal leading
to:
✔
Yes ✔
Implement landscaping and other
segregation in

  No beautification measures
waste/recycling bins
Impairment of visual Solid Waste Management  Provide adequate buffer
 Weekly inspection of waste
aesthetics Scheme in the area: accumulation and disposal
 Devaluation of land  SLF  Compensate adjacent property owners
 Regular inspection of
values  Implement re-use and recycling of
 MRF

waste materials
landscaping and other
beautification activities
 Composting  Provide receptacles / bins for solid  Regular monitoring of buffer
 Regular Collection of Solid
✔ wastes and implement proper zones
segregation, collection and disposal of
Wastes
domestic wastes in designated areas  Regular monitoring for
presence/absence of
✔
Coordinate with the municipal / city complaints from adjacent
waste collectors property owners

LGU Guiuan Tourist Rest Area


Project Name: __________________________________________ Page 3 of 12
Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost
 Engage third party company for waste  Others, specify
collection
✔
Others, specify
Waste management and disposal to be handled by
the Barangay LGU and the LGU of Guiuan.

WATER

Specify nearest/receiving water  Set up proper and adequate sanitary


Regular (ocular) inspection of  Cost integrated in the
water body for: construction/
body: facilities
✔
Ensure strict observance of proper
 Drainage/canal systems operation cost
waste handling and disposal and  Wastewater treatment facility
proper sanitation including by the (i.e., grease trap, septic tank,
 Increased siltation contractors and its workers (if any) etc.
due to project
activities
 Provide wastewater treatment facility Regular monitoring of the
Distance to nearest/receiving (e.g., oil and water separator, etc.) following:
 Water quality water body:  Set up silt trap/stilling ponds to Parameter Frequency
degradation
 0 to less than 0.5 km minimize downstream siltation
 pH  Annual
 Others, specify
 
____________ 0.5 to 1 km Provide three-chambered septic tank
 Semi-
 More than 1 km
for domestic sewage
annual
 Provide ring canals around fuelling
 Quarterly
Classification of nearest water tanks/ motorpool/ maintenance areas
body:  Others, specify
 TSS  Annual
 Freshwater  Marine/
concentration  Semi-
annual
coastal water
 Quarterly
 AA  ✔
SA
 BOD  Annual
A  ✔
SB  Semi-
B  SC annual

C  SD  Quarterly

LGU Guiuan Tourist Rest Area


Project Name: __________________________________________ Page 4 of 12
Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost
D

Current Use of nearest/ receiving


water body:
 Fishery


Tourist Zone / Park

✔ Recreational
 Industrial
 Agricultural
 Others, specify:

Distance of project area to the


nearest well used:
 0 to less than 0.5 km
 0.5 to 1 km


More than 1 km

Use of nearest well:


 Drinking/Domestic


Industrial
 Agricultural
 Competition in Size of population using  Implement rainwater harvesting  Regular monitoring for
water use proposed water source: and similar measures as an presence/absence of
 Depletion of water  ≤ 1,000 persons alternative source of water
 Observe water conservation
complaints
resources  >1,000 and ≤ 5,000 persons measures
 Regular coordination with
concerned agencies

LGU Guiuan Tourist Rest Area


Project Name: __________________________________________ Page 5 of 12
Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost
 >5,000 persons  Carefully select project site to avoid  Regular monitoring for
disruption of traditional water uses occurrences of water
Current Use of water source :  Obtain Water Permit from NWRB
shortages
 Fishery  Improve efficiency of water supply and
 Others, specify


Tourist Zone / Park distribution system


Recreational  Others, specify
 Industrial
 Agricultural
 Others, specify

Available/nearest water source.


 Deepwell
✔
Water district/LGU
 Surface water
 Others, specify

LGU Guiuan Tourist Rest Area


Project Name: __________________________________________ Page 6 of 12
Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost
 Increased Is the project site located in an ✔
Use appropriate design for project  Regular monitoring for
occurrence of area identified by MGB/ facilities presence/absence of
PAG-ASA as flood prone?
flooding
  Implement appropriate drainage
complaints
Yes system  Regular coordination with
✔
No  Regularly remove debris and other
concerned agencies
materials that may obstruct water flow  Regular monitoring for
increased frequency of
 Use appropriate technology (e.g., flooding
raised hand-pumps) to protect drinking
water from flood contamination  Others, specify
 Others, specify

AIR / NOISE
Air quality degradation Distance to nearest community:  Properly operate and maintain all  Regular monitoring for  Cost integrated in the
 0 to less than 0.5 km emission sources (e.g. vehicles, presence/absence of construction/
 0.5 to 1 km generator, etc) complaints operation cost

✔
More than 1 km  Strictly enforce good housekeeping

 Quarterly Monitoring of TSP
practices during construction stage
Is the wind direction blowing
towards the nearest community  Control vehicle speed to lessen
Regular (ocular) inspection of:
most of the year? suspension of road dust
 Conduct water spraying to suppress  Absence of white or black
 Yes smoke from vehicles,
dust sources and minimize discomfort to
✔
No nearby residents
generator, etc.

 Use covered vehicles to deliver


✔  Presence of truck cover
during deliveries
materials that may generate dust
 Others, specify

LGU Guiuan Tourist Rest Area


Project Name: __________________________________________ Page 7 of 12
Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost
 Nuisance due to Distance to nearest community:  Properly operate and maintain all noise  Regular monitoring for  Cost integrated in the
noise generation  0 to less than 0.5 km sources (e.g., vehicles, generator, etc.) presence/absence of construction/
 0.5 to 1 km  Install appropriate noise control
complaints operation cost



More than 1 km device/s (e.g., mufflers, silencer, sound  Regular monitoring of buffer
barriers, etc.) zones
 Provide adequate buffer and planting of
trees
 Others, specify

PEOPLE

 Displacement of Size of population of host  Provide relocation/disturbance  Regular monitoring for  Cost integrated in the
residents including barangay: compensation packages presence/absence of construction/
indigenous people (if
 ≤ 1,000 persons  Prioritize local residents for complaints operation cost
any) in the project
 >1,000 and ≤ 5,000 persons employment  Regular coordination with
site and within its
vicinity  >5,000 persons  Promptly pay local taxes and other LGU

financial obligations  Others, specify
 Enhanced

 Indigenous People Size:
employment and/or
livelihood  Regular coordination with LGU
opportunities  Prior consultation and coordination to
 Reduced minimize disruption of daily domestic
activities
employment and/or
livelihood  Ensure participation of IPs in
opportunities Classification of host barangay: consultations and dialogues & consider
 Increased revenues

 Urban IP rights and cultural practices in the
provision of relocation/disturbance
for LGU ✔
Rural compensation packages
 Disruption/  Provide appropriate traffic/warning
Competition in Employment/Livelihood Opportunity
delivery of public Rate in the host Municipality:
signs, lighting, etc
services (e.g.,
✔
High
 Others, specify
education, peace

LGU Guiuan Tourist Rest Area


Project Name: __________________________________________ Page 8 of 12
Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost
and order, etc.)
 Low
 Enhanced delivery of

Description
public services (e.g.,
education, peace
and order, etc.)
 Increase in traffic
volume and
worsening of traffic
flow
Available services within/near
the host barangay:


Schools (e.g. elementary,
high school, college)


Health facilities (e.g., clinics,
hospitals, etc.)


Peace and order (e.g., police
outpost, Brgy. Tanod, etc.)


Recreation and sports
facilities
 Others, specify

 Destruction/disturban Physical Cultural resources  Implement appropriate protocols based  Regular coordination with
ce of physical cultural within the vicinity of the project on NM, NHCP, NCAA and LGU NM, NHCP, NCAA and LGU
resources. site guidelines including those for chance
( if project site has been finds (if any). Specify:
identified to have such by NM,
NHCP, NCAA and LGUs)

LGU Guiuan Tourist Rest Area


Project Name: __________________________________________ Page 9 of 12
Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost
 Impacts on Source of risks (please specify)  Regularly coordinate with LGU  Regular monitoring for  Cost integrated in the
community health  Explosives :  Provide appropriate warning signs, presence/absence of construction/
and safety lighting and barricades, whenever complaints operation cost
 Others, specify practicable  Regular coordination with
 Observe proper housekeeping LGU
 Provide on-site medical services for
 Regular submission of
any emergency. reports to concerned agency

 Flammable substances:  Participate in public awareness


 Others, specify
programs on health and safety
 Implement appropriate safety programs
for both community and workers
 Strictly comply with fire, safety and
similar regulatory requirements

 Toxic substances:
 Others, specify

 Others, specify

LGU Guiuan Tourist Rest Area


Project Name: __________________________________________ Page 10 of 12