Professional Documents
Culture Documents
ME23014-Modified Working Drawings 13.12.2023 Wednesday
ME23014-Modified Working Drawings 13.12.2023 Wednesday
F +973 17550063
E info@mass-bh.com WITH MEZZANINE
www.mass-bh.com
C.R.No.129676-1
AT -JIDHAFS, KINGDOM OF BAHRAIN
License No. BN/220 ABDULJALIL ABDULLA ALI MAKI ALBAQALI
THERMAL INSULATION
1- THE CONTRACTOR SHALL CO-ORDINATE THE SEQUENCE OF THE WORK WITH
AREA STATEMENT
· THERMAL INSULATION SHALL BE PROVIDED FOR ALL EXTERNAL WALLS INCLUDING
THE SUPERVISING OFFICER PRIOR TO COMMENCEMENT OF CONSTRUCTION.
EXPOSED COLUMNS, BEAMS, STAIR CASES AND LIGHT WELLS/SHAFTS.EXTERNAL
2- ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE
WALLS OF THE BUILDING ABUTTING ADJOINING BUILDING(S) IF ANY SHALL ALSO BE
INSULATED.
PLOT NO: 04043319
TECHNICAL SPECIFICATIONS.
12
STOREY BUILDING WITH
114.4 %
11
% MEZZANINE @ JIDHAFS
10
09
LOWEROOF CLIENT
13
ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
ROOD
FECK
SHEET CONTENT
08
SITE PLAN
VODI
LOCATION PLAN
AREA STATEMENT
07
TOR
POOF
DRAWN O.M.V
REV NO.
04043319 DWG NO. AR-01 ---
840.00 SQ-M
03
3
02
01
LOWEROOF
SECTION
A
T +973 17550062
01 01 F +973 17550063
E info@mass-bh.com
MECHAN
VENLA
TIO
CIAL
TIN
www.mass-bh.com
12 13 D1 C.R.No.129676-1
UP W9 W8
02 02 License No. BN/220
D5 MALETOLI.
UP 81M
02.x0
03 03 PROJECT
UP
OPENABOVE SHOP-14
83M
AREA4-0S0Q
.M
60
9.x5
.
PROPOSED TWO
WASH
11 UP FEMALETOLI.
SHOP-09
81M
0.x STOREY BUILDING WITH
OPENABOVE
83M
60
1.x
SHOP-11
GW1 AREA3-69S0Q
83M
.M
50
9.x7
. 87M
0
3.x MEZZANINE @ JIDHAFS
AREA3-01S0Q
.M .
04 04
GW1 UP
05 10
UP 05 CLIENT
UP
GW1 GW1
06 OPENABOVE 06
CORRIDOR
SHOP-13
GW1 83M
20
9.x5 ABDULJALIL ABDULLA
LFIT OPENABOVE AREA3-07S0Q
.M .
SHOP-08
OPENABOVE 83M
0
9.x6
81M
0.x SECTION ALI MAKI ALBAQALI
AREA3-08S0Q
.M .
09
B
07 07
UP UP
08 SHOP-10 SHOP-12
08 SHEET CONTENT
UP UP UP 03M
80
7.x OPENABOVE GW3 GW3 OPENABOVE 03M
80.x4
AREA2-05S0Q
.M . AREA2-48S0Q
.M .
OPENABOVE
GROUND FLOOR PLAN
09 09
UP
SHOP-07 SHOP-06 SHOP-05 UP UP UP
76M
83.x0 27M
80
3.x
96M
83.x0
AREA3-01S0Q
.M .
ELE4 AREA2-59S0Q
.M
. AREA3-0SQ .M
.
ARCHITECT JAFFAR SALMAN
SHOP-04 SHOP-03 SHOP-02 SHOP-01
CORRIDOR
5M89
3.x0 65M80
3.x ELE2 CHECKED
AREA2-43S0Q.M
.
06M
80
3.x 26M
80
4.x5 JAFFAR SALMAN
AREA2-3S0Q.M
. AREA2-05S0Q
.M . AREA2-78S0Q
.M .
1
08 07 06 05 2
04 03
02 3
01
11
11
ELE1
SECTION
A
T +973 17550062
01 01 F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
02 02 License No. BN/220
03 DN 03
SHOP-14
PROJECT
OPENBELOW
83M
60
9.x5
DN
AREA3-79S0Q
.M .
PROPOSED TWO
SHOP-09
83M
50
9.x7
STOREY BUILDING WITH
OPENBELOW SHOP-11
GW1
AREA2-7S2Q
.M .
87M
AREA2-71S0Q
.M
0
3.x
.
DN MEZZANINE @ JIDHAFS
04 04
GW1
DN
05 05 CLIENT
GW1 GW1
06 OPENBELOW SHOP-13
83M
20
9.x5
06
GW1
SHOP-08
DN
LFIT OPENBELOW
AREA2-95S0Q
.M .
ABDULJALIL ABDULLA
83M
0
9.x6 SECTION
OPENBELOW AREA2-6S0Q
.M .
81M
0.x
ALI MAKI ALBAQALI
B
07 07
OPENBELOW
DN DN DN
MEZZANINE
09 09
FLOOR PLAN
SHOP-07 SHOP-06 SHOP-05
76M
83.x0 96M
83.x0 27M
80
3.x DN DN DN DN
AREA2-71S0Q
.M . AREA2-60S5Q
.M
. AREA2-1S0Q.M
.
ELE4
ARCHITECT JAFFAR SALMAN
SHOP-04 SHOP-03 SHOP-02 SHOP-01
5M 89
3.x0 65M80
3.x ELE2
06M
80
3.x 26M
80
4.x5
AREA1-26S4Q .M
. AREA1-46S0Q.M
.
AREA1-57S0Q
.M . AREA2-0S9Q
.M .
CHECKED JAFFAR SALMAN
11
11
ELE1
SECTION
A
T +973 17550062
01 01 F +973 17550063
E info@mass-bh.com
W1 W6 W6 W6 W3 W7 W7 W3
www.mass-bh.com
02 02 C.R.No.129676-1
License No. BN/220
03 BEDROOM BEDROOM 42M
60
1.x
BATH
42M
60
1.x
BATH
BEDROOM
03
KTICHEN
W2
83M
0
4.x7 83M
04.x0 83M
04.x0
PROJECT
83M
0
1.x
D4 D4
PROPOSED TWO
D3 D3 D3 STOREY BUILDING WITH
D3
04 04 MEZZANINE @ JIDHAFS
LV
IN
I G+DN
IN
IG
BATH D4 65M
80.x
FLAT-3
LAUNDRY
61M
70
2.x7
AREA1-04S0Q
.M
. DN SERVC
IESAREA
FLAT-4 LV
IN
I G+DN
IN
IG
05 W7 D1 UP AREA1-103S0Q
.M
. 83M
0
9.x 05
CLIENT
06 D3 D3 BATH W1 06
DRESS 4120M
.x
21M
80.x STORE
D2 81M
0.x
LFIT 2M
30
2.x
SECTION
ABDULJALIL ABDULLA
KTICHEN D4
W2
D4 23M
0.x2. D2 B ALI MAKI ALBAQALI
D4
07 BEDROOM
83M
0
4.x7 BATH
ROOFDECK 07
42M
80
1.x
LAUNDRY MECHAN CIAL CORRD
I OR
81M
60.x VENLA
TIO
TIN
08 961M
.0x
08
SHEET CONTENT
D2 W1
D2
FLAT-2 D4
VOD
I TOLIET
03M
0
2.x 41M
60.x AREA1-101S0Q
.M
. STORE FLAT-1
BATH
09 BEDROOM 42M
80
1.x D4
BATH
2M
30
2.x AREA1-30S0Q
.M
. 09 FIRST FLOOR PLAN
W2 83M
0
4.x7 D4 WASH 4120M
.x
LV
IN
I G+DN
IN
IG
04M
80
9.x
ROOFDECK
ELE4 SERVC
IESAREA D3
LAUNDRY
D3
LV
IN
I G+DN
IN
IG ARCHITECT JAFFAR SALMAN
83M
90
7.x
BEDROOM ELE2
D3 D3 D3 43M
80
5.x
CHECKED JAFFAR SALMAN
D3 WASH
61M
0.x
D4 STORE
12M
81.x0 DRAWN O.M.V
BEDROOM
KTICHEN
10 BATH
63M
52
4.x6
D4
SCALE A3 1:150 DATE NOV 2023
63M1.x0
82
KTICHEN
43M
60
1.x D4 BEDROOM W4
BATH D4
24M
0.x0
93M
BATH
80
1.x
62M
0
1.x
DRESS
4180M
.x
62M
0.x0 PROJECT NO. ME-23014
BATH
62M
0
1.x
REV NO.
W7
W3 W7 W5
DWG NO. AR-04 ---
W1 W5 10
20M
0M
THD
KECORAV
TPIEROEJCO
TIN W3
W7 REV. DESCRIPTION DATE BY
W7
1
20M
0M
THD
KECORAV
TPIEROEJCO
TIN 2
11
11
ELE1
SECTION
A
T +973 17550062
01 01 F +973 17550063
E info@mass-bh.com
www.mass-bh.com
W6 W6 W6 W8
C.R.No.129676-1
02 02 License No. BN/220
BATH
03 WATCHMANRM.
4102M
.0x
03
5203M
.0x
PROJECT
D4
DN
PANTRY PROPOSED TWO
4160M
.x
STOREY BUILDING WITH
D6 MEZZANINE @ JIDHAFS
04 INSULATED ROOF/ INSULATED ROOF/
04
REFER TO DWG. TH005/S-1 REFER TO DWG. TH005/S-1
05 05
ROOFDECK ROOFDECK CLIENT
06 06
LFIT ABDULJALIL ABDULLA
81M
0.x SECTION
B ALI MAKI ALBAQALI
07 D6
LOWERROOF 07
08 08 SHEET CONTENT
VOD
I
09 09 ROOF FLOOR PLAN
INSULATED ROOF/
LOWERROOF
DRAWN O.M.V
REV NO.
DWG NO. AR-05 ---
10
REV. DESCRIPTION DATE BY
11
11
ELE1
SECTION
A
T +973 17550062
01 01 F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
02 02 License No. BN/220
03 03
PROJECT
INSULATED ROOF/
REFER TO DWG. TH005/S-1 PROPOSED TWO
STOREY BUILDING WITH
04 TOPROOF
04 MEZZANINE @ JIDHAFS
05 05
ROOFDECK ROOFDECK CLIENT
06 06
SECTION
ABDULJALIL ABDULLA
B ALI MAKI ALBAQALI
07 LOWERROOF 07
08 08 SHEET CONTENT
VOD
I
09 09 TOP ROOF PLAN
LOWERROOF
ELE4
ARCHITECT JAFFAR SALMAN
ROOFDECK ELE2
CHECKED JAFFAR SALMAN
DRAWN O.M.V
REV NO.
DWG NO. AR-06 ---
10
REV. DESCRIPTION DATE BY
11
11
ELE1
A B B* C* D E F G H I J K O L M N
+14550
L.V.L
+6750 +6750
L.V.L L.V.L PROJECT
PROPOSED TWO
STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
CLIENT
GW1 GW1 GW1 GW1 GW1 GW1 GW1 GW2
1.2 M HIGH BOUNDARY WALL ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
SHEET CONTENT
FRONT ELEVATION-01 FRONT ELEVATION-01
SCALE 1:150 m. RIGHT SIDE ELEVATION-02
11 10 09 08 07 06 05 04 03 02 01
ARCHITECT JAFFAR SALMAN
+14550
L.V.L CHECKED JAFFAR SALMAN
DRAWN O.M.V
+11750 +11750
L.V.L L.V.L PROJECT NO. ME-23014
REV NO.
DWG NO. AR-07 ---
1
W1 W1
2
+6750 +6750
L.V.L L.V.L
+14550
L.V.L
W8 W6
W6
+11750 W6 +11750
L.V.L L.V.L
T +973 17550062
F +973 17550063
W3 W7 W7 W3 W6 W1
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
License No. BN/220
+6750 W6 +6750
L.V.L L.V.L
W6 PROJECT
PROPOSED TWO
STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
W8 W9
CLIENT
ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
01 02 03 04 05 06 07 08 09 10 11
ARCHITECT JAFFAR SALMAN
+14550
L.V.L CHECKED JAFFAR SALMAN
DRAWN O.M.V
+11750 +11750
L.V.L L.V.L PROJECT NO. ME-23014
REV NO.
DWG NO. AR-08 ---
1
W2 W7 W2 W2
2
+6750
L.V.L
GW1 GW1
1.2 M HIGH BOUNDARY WALL
+14150
L.V.L
DET-01
+11750
L.V.L
T +973 17550062
F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
License No. BN/220
LIVING+DINING FLAT-2
PROJECT
PROPOSED TWO
STOREY BUILDING WITH
SHOP-4 SHOP-10
MEZZANINE @ JIDHAFS
CLIENT
DETAIL-01 ABDULJALIL ABDULLA
SCALE 1:20 m.
SHOP-4 SHOP-10 ALI MAKI ALBAQALI
SECTION-A
LIFT
SHEET CONTENT
SCALE 1:150 m.
C SECTION A,B &
DETAILS
A B B* C* D E F G H I J K O L M N
ARCHITECT JAFFAR SALMAN
+14550 CHECKED
L.V.L JAFFAR SALMAN
DRAWN O.M.V
+6750
L.V.L
GW1
SECTION 'X'
SHOP-8 SHOP-10 SHOP-12
SECTION-B
SCALE 1:150 m.
THIS DRAWING IS THE PROPERTY OF MASS ENGINEERING, IT SHALL NOT BE
COPIED OR REPRODUCED IN ANY MANNER WITHOUT THEIR WRITTEN CONSENT.
50mm Clearance Varies: 0.80,0.90 & 1.00 m 50mm
200mm
Tongue &Groove Hardwood Cap Steel Bolt
Stainless Steel inlay
60mm
(sample to be approved)
4mm thick laminated veneer
200mm
Hard Carton Fill
150 150
D1 D2 D3 D4 D5 D5
WOODEN ARCHITRAVE
REFER TO SCHEDULE
APPROVED DOOR HANDLE
1000
4mm Thk.
STAINLESS STEEL STRIP INLAY
F.F.L
10
TYPICAL WOODEN DOOR FACIA DETAIL
CLIENT
ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
SHEET CONTENT
LINTEL
DRAWN O.M.V
BLOCKWORK
15 THK PLASTER
PROJECT NO. ME-23014
REV NO.
Typical Window Head DWG NO. AR-10 ---
WOODEN DOORS 1
NOTES
2
ALUMINIUM DOORS
W3 W4 W5 W6 W7 W8 W9
T +973 17550062
01 01 F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
02 02
C4 C4 C4 C4 C4 License No. BN/220
03 C4 C4
03
PROJECT
PROPOSED TWO
STOREY BUILDING WITH
04 C4 C4
04 MEZZANINE @ JIDHAFS
05 C4 05
C4
CLIENT
06 C1 C1 06
ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
07 C4 C1 C1 C4
C4
07
C4
08 08
C4 C4 C4
SHEET CONTENT
COLUMN SETTING
09 09
C4 C4 C4 C4
C4 C4 LAYOUT
DRAWN O.M.V
11
11
A B B* C* D E F G H I J K O L M N
T +973 17550062
01 01 F +973 17550063
E info@mass-bh.com
www.mass-bh.com
02 02 C.R.No.129676-1
100mm THK. SLAB WITH C4 C4
C4 C4 C4
BRC FABRIC A-142
License No. BN/220
03 C4 C4
03
100mm THK. SLAB WITH
BRC FABRIC A-142
PROJECT
PROPOSED TWO
STOREY BUILDING WITH
04 04 MEZZANINE @ JIDHAFS
C4 C4
05 C4 C4
05
CLIENT
06 C1 C1 06
400
1000
ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
07 1000
C1 C4 07
400
C4 C1
C4 C4
08 C4 C4 C4
08
SHEET CONTENT
DRAWN O.M.V
11
11
A B B* C* D E F G H I J K O L M N
FOUNDATION PLAN
SCALE 1:150 m.
T +973 17550062
01 01 F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
02 C4
02
C4 C4 C4 C4 License No. BN/220
03 C4 C4
03
PROJECT
PROPOSED TWO
STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
04 C4
04
C4
05 05
C4 CLIENT
06 C1 C1 06
LIFT
1.80 x 1.80 M
ABDULJALIL ABDULLA
C1 C1
ALI MAKI ALBAQALI
07 C4
C4
C4
07
C4
08 08
C4 C4
C4
SHEET CONTENT
MEZZANINE FLOOR
09 09
C4 C4 C4 C4 C4
C4 SLAB FRAMING PLAN
DRAWN O.M.V
11
11
A B B* C* D E F G H I J K O L M N
T +973 17550062
01 01 F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
02 PC1 C4 PC4 C4
02 License No. BN/220
C4
03 03
PROJECT
PROPOSED TWO
STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
04 C4
04
05 05
CLIENT
06 C4 PC1 06
LIFT ABDULJALIL ABDULLA
1.80 x 1.80 M
ALI MAKI ALBAQALI
07 C4
C4
ROOF DECK 07
08 08 SHEET CONTENT
PC1
VOID
2.00 x 3.00 M
FIRST FLOOR
09 09 SLAB FRAMING PLAN
C4
C4
ROOF DECK
C4
PC1
PC1
DRAWN O.M.V
PC2
10 SCALE A3 1:150 DATE NOV 2023
PC1
C4 C4
PROJECT NO. ME-23014
C4
REV NO.
C4
C4 DWG NO. ST-04 ---
10
REV. DESCRIPTION DATE BY
11
11
A B B* C* D E F G H I J K O L M N
T +973 17550062
01 01 F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
02 PC1
02 License No. BN/220
03 03
PROJECT
PROPOSED TWO
PC1 STOREY BUILDING WITH
04 04 MEZZANINE @ JIDHAFS
05 05
ROOF DECK ROOF DECK CLIENT
06 06
LIFT
1.80 x 1.80 M
ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
07 LOWER ROOF 07
08 08 SHEET CONTENT
VOID
ROOF FLOOR
09 09 SLAB FRAMING PLAN
LOWER ROOF
DRAWN O.M.V
REV NO.
DWG NO. ST-05 ---
10
REV. DESCRIPTION DATE BY
11
11
A B B* C* D E F G H I J K O L M N
PROJECT
PROPOSED TWO
STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
CLIENT
ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
SHEET CONTENT
STRUCTURAL DETAILS
DRAWN O.M.V
REV NO.
DWG NO. ST-06 ---
3
S4 S3 S2 S1
PS -
REINFORCEMENT AT OPENING
REINFORCEMENT AT CORNER
REINFORCEMENT FOR SLEEVE DIAZ. < 0.20 m.
50
CONCRETE BARS SPACING REGIONS:
E info@mass-bh.com
COVER A = Lc/4 -50
www.mass-bh.com
200 x 600 12 16mm Y8 150mm c/c
A
C4 B = Lc/2 C.R.No.129676-1
STIRRUPS License No. BN/220
PROPOSED TWO
400 x 800 18 16mm Y8 150mm c/c
Lc (CLEAR HT.)
C6 10
1 STOREY BUILDING WITH
CRANK
MEZZANINE @ JIDHAFS
50xØ LAP
C7 See Details 8 16mm Y8 150mm c/c DETAIL
CLIENT
C8 See Details 8 16mm Y8 150mm c/c TYP. DETAILS OF COLUMNS SECTION.
SEE STIRRUPS ABDULJALIL ABDULLA
SCHEDULE
12 16mm Y8 150mm c/c ALI MAKI ALBAQALI
PC1 200 x 600
A
FIRST FLR LVL
50
PC2 SHEET CONTENT
BM AS SCHEDULED
Membrane Membrane
200 PROVIDE ATLEAST 3 BARS
AT COLUMN-BEAM
INTERSECTION
SCHEDULES
VERTICAL VERTICAL VERTICAL
Plaster Plaster
500
400
300
08 Y 16mm 08 Y 16mm 06 Y 12mm
Filling block Filling block ARCHITECT JAFFAR SALMAN
2Y8-150C/C 2Y8-150C/C 1Y8-150C/C COLUMN BARS
PROJECT NO.
50xØ LAP
ME-23014
INSIDE OUTSIDE
REV NO.
DWG NO. ST-07 ---
VERTICAL VERTICAL
SEPTIC TANK SEC.(OPTION 2) 3
600
800
700
100 50
W/BRC. A 142
(2 STIRRUPS) (3 STIRRUPS) (3 STIRRUPS) 1000G. POLYTHENE SHEET
CRUSHER FINE
Birtumin paint Birtumin paint PAVEMENT LEV.
VARIES
Plaster Plaster Details of C4 & PC1 Details of C5 Details of C6
12 @ 150 mm 12 @ 150 mm
100
12 @ 150 mm 12 @ 150 mm
1000 MICRONS THICKNESS
BITUMINOUS PAINT (TYP.)
200
200200 D=300
WITH 1000 GUAGE POLYTHENE
SHEET
COMPACTED DESERT FILL
1T8
VERTICAL (ALL ROUND)
D
400
08 Y 16mm
100
2Y8-150C/C SEE SCHEDULE BLINDING CONC.
(2 STIRRUPS)
100 W 100
R8Ø 150C/C
Details of C7 Details of C8 TYP. COLUMNS DETAIL
100
PROJECT
250
BRC A-142
150
1000G POLYTHENE SHEET PROPOSED TWO
45°
12mm 200mm c/c. STOREY BUILDING WITH
4-10mm TEMP. BARS MEZZANINE @ JIDHAFS
400
Stripped Footing Detai (SFD) Cantilever Stripped Footing Detail (CSFD) TYP. WALL FOOTING DETAIL WF1 CLIENT
ABDULJALIL ABDULLA
TOP REINFORCEMENT BOTTOM REINFORCEMENT
ALI MAKI ALBAQALI
SIZE OF FOOTINGS SHORT LONG SHORT LONG
VF230022K DIRECTION DIRECTION DIRECTION DIRECTION
REVF230022KS
WIDTH LENGTH THK. SIZE SPC'G. SIZE SPC'G. SIZE SPC'G. SIZE SPC'G.
16 150 16 150 16 150 16 150 LIFT FOOTING 4 Y 12 SHEET CONTENT
200
SFD 1000 SEE PLAN 400 SEE SFD DETAILS
CSDF 600 SEE PLAN 400 SEE CSFD DETAILS R8 - 200
STRUCTURAL
SCHEDULES
TYP. STRIP FOOTING SCHEDULE
VARIES
ARCHITECT JAFFAR SALMAN
BLOCKWORK
PROJECT NO. ME-23014
STRATA (FIRST THREE LAYERS TO
BE FILLED WITH MORTAR)
SCALE 1 : 15
REV NO.
3- HARD CORE TYPE CLASS-7 DWG NO. ST-08 ---
150
PLATE LOAD TEST
250
2
LAYER STIRRUPSR8 200 c/c
FIN. GRADE LINE 3
6- PLATE LOAD TEST 8-Y12Ø BARS
300
DESERT FILL TYPE
EXCAVATION
75 600
SCALE 1:20 M.
OF HOUSING KINGDOM OF
BAHRAIN) SPECIFICATIONS.
DETAILS OF BOUNDARY WALL
+ COMPACTION TEST TO APPLY WITH MINIMUM RESULTS 95%
DETAILS OF FILLING
B
2Y 8 125 mm. C/C SCHEDULE OF COLUMNS
R8Ø 200 C/C
SEE SCHEDULE
FILLED BLOCK
REINFORCEMENT
SIZE
C2-C3 MARK
AxB VERTICAL BARS RINGS
C4
C1 SEE DRAWING
C2 200x500 10-Y16mm R8200
C3 200x300 4-Y12mm R8200 T +973 17550062
200
C4 200x600 12-Y16mm R8200 F +973 17550063
200 C5 SEE DRAWING E info@mass-bh.com
D=300 PC1 200x300 6-Y16mm R8200
www.mass-bh.com
500
PC2 200x400 8-Y16mm R8200
200
C.R.No.129676-1
R8Ø 200 C/C
200
SEE SCHEDULE License No. BN/220
400
R8Ø 200 C/C
20
SEE SCHEDULE
0
R8Ø 200 C/C SEE SCHEDULE
PROJECT
C1 C5 C6
PROPOSED TWO
STOREY BUILDING WITH
COLUMN DETAILS MEZZANINE @ JIDHAFS
NOTES:
SCALE-1:20 M.
* STANDARD HOOKS & BENDS
STANDARD HOOKS FOR PRIVF230022Y REINF. CLIENT
ABDULJALIL ABDULLA
NOTES:
ALI MAKI ALBAQALI
NOTE:
PRECAST MUST BE DESIGNED TO CARRY THE SHEET CONTENT
WATER TANK LOAD.(BY THE SUPPLIER) STANDARD HOOKS FOR STIRRUPS & TIE REINF. STRUCTURAL
COLLAR PLATE WITH FIXING SCHEDULES
BOLTS
DRAWN O.M.V
REV NO.
DWG NO. ST-09 ---
WALL 1
PLAN DRIVEWAY
ROAD
Y
4. All steel reinforcement shall conform to B.S. 4461 or B.S.4449
Min. dimension of
50 CLOSED STIRRUPS FROM SCHEDULE 50 50 CLOSED STIRRUPS FROM SCHEDULE 50 column 450mm (High Yield) shall have a yield strength of 415 N/mm2 and shall
whichever is greater be cut and bent in accordance to B.S.4466. E info@mass-bh.com
SPLICE
40
5. Reinforcement fabricated in place should be checked by the www.mass-bh.com
consultant before concreting.
SEMI-CONTINOUS BEAM 6. The foundation have been designed for a safe bearing capacity of
C.R.No.129676-1
150 KN/mm2. Any soft spots at formation are to be filled with License No. BN/220
mass concrete 1:3:6.
7. Concrete below and including ground slab must have a charac-
b teristic cube strength of 45 N/mm2 at 28 days, minimum cement
b content of 370 kg/m2 and maximum water ratio of 0.45. PROJECT
TS (TOP STRAIGHT BARS) 8. Concrete above ground level must have a minimum cube
TS (TOP STRAIGHT BARS)
ETS (EXTRA STEEL BARS) strength of 30 N/mm2, minimum cement content of 330 kg/m2 and
maximum water ratio of 0.50.
PROPOSED TWO
d
SB (STIFFINER BARS) STIRRUPS
STOREY BUILDING WITH
d
STIRRUPS SB (STIFFINER BARS) 9. Cement to be sulphate resisting class V to B.S. 4027.
BS (BOTTOM STRAIGHT BARS) CS (CURTAIL BOTTOM BARS)
10. Minimum clear cover to main steel bar should be not less MEZZANINE @ JIDHAFS
than 50 mm , except as follows:
BS (BOTTOM STRAIGHT BARS)
SEC. S a.) Top of Slab = 40 mm
SECTION SUPPORT SEC. M b.) Bottom of Slab = 30 mm
BLOCKWORKS SECTION MID-SPAN c.) Stirrups of Beams = 40 mm CLIENT
d.) Links or Ties of Columns = 50 mm
LOOSE CONC. d e.) Footing in Contact with the Soil = 75 mm
PRE-CAST SLAB
WATERPROOFING FILT PAPER
TS (TOP STRAIGHT BARS)
b f.) Concrete in contact with Sea Water = 100 mm
ABDULJALIL ABDULLA
11. Lintel beams up to 2.00m span shall be 200 x 200 mm or 150
ALI MAKI ALBAQALI
b
STIRRUPS TS (TOP STRAIGHT BARS)
x 200 with 2 dia. 12 rebars top & bottom & web rebars of dia.8
BS (BOTTOM STRAIGHT BARS) ETS (EXTRA STEEL BARS)
at 150 c.c.
DROP
t
d
250
SB (STIFFINER BARS) 12. Lintel beams more than 2.00m span but not exceeding 4.00m
FB-1 STIRRUPS should be 200 x 300mm with 2 dia. 14 top & bottom and web rebars
of dia.8 at 150 c.c.
BS (BOTTOM STRAIGHT BARS)
150
SEE PLAN
13. Splices of continuous upper reinforcement in beams or slabs
shall be located at or near the middle of the span.
SHEET CONTENT
BEAM DESIGNATION
Y12 200 C/C BOTHWAYS SECTION OF BEAMS SEC. C 14. Splices of continuous lower reinforcement in beams or slabs
shall be located at or near the support.
SECTION SUPPORT 15. Surfaces of all concrete below under sides of ground slabs to STRUCTURAL
received two coats of approved bituminuous paint.
VERIFY SPAN 16. Ground slab should be damped proofed using 1000 G.A. 500 SCHEDULES
micron polyethylene sheet or similar material.
17. Fabric reinforcement to be of B.S. 4483 wirth minimum lap
DETAIL OF DROP SLAB FOR PRE-CAST FLOOR SYSTEM of 200 mm in each direction.
SCALE 1: 20 M. L/4 L/4 18. Precast slab shall have a minimum bearing of 70 mm. ARCHITECT JAFFAR SALMAN
750
NOTE:
DRAWN O.M.V
REV NO.
LENGHT (L) DWG NO. ST-10 ---
2
DIMENSION (mm) TOP BARS BOTTOM BARS 3
MARK STIFFENERS STIRRUPS
b d (TS) (ETS) (BS) (CS)
FB-1 200 600 4 - Y16 2 - Y16 4 - Y16 2 - Y16 2 - Y16 R8 150 C/C
FB-2 200 500 4 - Y16 2 - Y16 4 - Y16 2 - Y16 2 - Y16 R8 150 C/C
FB-3 200 600 4 - Y20 2 - Y16 4 - Y20 2 - Y16 2 - Y16 R8 150 C/C
FB-4 250 600 5 - Y20 2 - Y20 5 - Y20 2 - Y20 2 - Y16 R8 150 C/C
20
www.mass-bh.com
C.R.No.129676-1
LINTEL BEAM SCHEDULE
License No. BN/220
400MM MINIMUM 400MM MINIMUM
CLIENT
150 X 200 MM CONCRETE
STIFFENER WITH12 MMØ
VERT. BAR AND 10 MMØ 150 DOOR OPENING 150
TIES 200 MM O.C ABDULJALIL ABDULLA
50-70 mm SCREED OR TILES ALI MAKI ALBAQALI
PLAN AT CORNER
TYPICAL DETAIL OF DOOR OPENING
SHEET CONTENT
300
REINFORCING
BARS
20
STRUCTURAL DETAILS
250 MM
MINIMUM
MAIN.
150
ARCHITECT JAFFAR SALMAN
G.I. TIE WIRE
200 **
G.
(MIN)
BOTTOM OF RC BEAM
R
1
150 MINIMUM
R8 - 200
PE
AS
2
US
4 Y 12
3
3
DI
RA
200
ARC SOFIT
R8 - 200
VARIES
DIAGONAL EXTRA BARS
VARIES
BLOCKWORKS OR R.C. WALL
1.5 x L
L2 AT MIDSPAN
Stirrups
AT MIDSPAN Stirrups T +973 17550062
Stirrups
L F +973 17550063
E info@mass-bh.com
L is the bigger span from L1 & L2
www.mass-bh.com
C.R.No.129676-1
Details of Simple Beam Details of Continuous Beam Details of Cantilever Beam License No. BN/220
PROJECT
PROPOSED TWO
STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
D
LAP OR SPLICE 200 MM
MINIMUM
LAP OR SPLICE
ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
SHEET CONTENT
DRAWN O.M.V
C
°
90
SCALE A3 1:150 DATE NOV 2023
D
PROJECT NO. ME-23014
REV NO.
ANCHOR TO COLUMN DWG NO. ST-12 ---
CONCRETE BEAM
CL
CONCRETE BEAM
COLUMN & BEAM
PLAN CONCRETE COLUMN
REINFORCEMENT
STAGGERED BEAM CONNECTION DETAIL
SHEET CONTENT
WALL
STANDARD HOOKS FOR STIRRUPS & TIE REINF.
STRUCTURAL
DETAILS
PLAN
ARCHITECT JAFFAR SALMAN
DRAWN O.M.V
PIPE PAINTED WITH 32MM. DIA TYPICAL EXPANSION JOINT DETAIL FOR BOUNDARY WALL
SCALE A3 1:150 DATE NOV 2023
RUNGS 300MM. C/C.
ROOF SLAB PROJECT NO. ME-23014
DRIVEWAY
ROAD
t
L/4
NOTE:
1. MINIMUM REINFORCEMENT OF STAIR ARE SPECIFIED HEREIN U.N.O.
T12-150
20
2. FOR STAIR LENGTH MORE THAN 6.00m AND SPIRAL MORE THAN 180°,
BEAM
T12-150 (D)
170
(TYP.)
SEE BEAM
T16-150 (A)
TOP BARS SHALL BE SPLICED WITH A MINIMUM OF 300mm LAP LENGTH,
DETAIL T12-200
T12-150 AS SHOWN ABOVE. LOCATION OF LAP SPLICE SHALL BE AT THE MIDDLE
T12-150 T12-150 THIRD OF SLAB LENGTH, L. PLACEMENT SHALL BE ALTERNATE.
L/4 3. ALL TRANSVERSE BARS SHALL BE T12 - 150 U.N.O.
T16-150 (C) T16-150 (B)
SCHEDULE
SEE BEAM
C
2T16
VARIES
Y12 125 c/c
VARIES
C 50
T8-200 LINKS
T16-150 (C) FILLED BLOCKS
2T16
T +973 17550062
C
T12-150 FLOOR FINISH
C
2T16
100
T12-150
T16-150 (A) 1000 MICRONS THICKNESS
L/4 BITUMINOUS PAINT (TYP.)
D
PROJECT
SCHEDULE
SEE BEAM
WITH 1000 GUAGE POLYTHENE
VARIES
L SHEET
50
1Y8
BLINDING CONC. (ALL ROUND)
T12-200
T12-150 (D)
50 300 50
PROPOSED TWO
T12-150
T12-150 STOREY BUILDING WITH
T12-150
BLINDING CONC. MEZZANINE @ JIDHAFS
T16-150 (B) L/4
T12-200 T16-150 (C)
100 W 100
2T12 STAIRCASE LANDING
SLAB AT FLOOR LEVEL 2T12 CLIENT
50
TYP. ENTRANCE DETAIL
20
BEAM
T12-200
ABDULJALIL ABDULLA
170
(TYP.)
SEE BEAM
T12-150 (E) T8-200-UB
DETAIL
ALI MAKI ALBAQALI
TYP. SECTION AT STAIR FOOTING REINF'T AS PER
BEAM DETAILS
(TYP.) L
L/3 L/3
SHEET CONTENT
2T12
L/4
STRUCTURAL DETAILS
T12-150
20
BEAM
T12-150
170
(TYP.)
SEE BEAM
T16-150 (A) T12-200
DETAIL
T12-150
Y12Ø 150 c/c
T12-150 T12-150
Y16Ø 150 c/c
L/4 T16-150 (B)
ARCHITECT JAFFAR SALMAN
30 20 T16-150 (C)
SCHEDULE
SEE BEAM
VARIES
C T16-150 (C)
DRAWN O.M.V
50
T12-150 SCALE A3 1:150 DATE NOV 2023
R.C.BEAM
REV NO.
DWG NO. ST-14
TYP. STAIR LANDING DETAIL ---
T12-150 1
T16-150 (A)
2
L/4
SCHEDULE
SEE BEAM
VARIES
3
170
(TYP.)
T12-150
T12-150
T12-200
T16-150 (A)
16
(TY
T12-150 IN)
0
M
0(
P.)
0
T12-150 10
T16-150
STAIRCASE DETAILS
100 W 100 TYP. HANDRAIL DETAIL
PROJECT
PROPOSED TWO
STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
CLIENT
ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
SHEET CONTENT
plan STRUCTURAL
DETAILS
DRAWN O.M.V
REV NO.
DWG NO. ST-15 ---
section 'a'
section of wall
-REFER TO THE SUPPLIER COMPANY FOR MORE DETAILS OF THE LIFT THIS DRAWING IS THE PROPERTY OF MASS ENGINEERING, IT SHALL NOT BE
COPIED OR REPRODUCED IN ANY MANNER WITHOUT THEIR WRITTEN CONSENT.
T +973 17550062
F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
License No. BN/220
PROJECT
PROPOSED TWO
STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
CLIENT
ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
SHEET CONTENT
plan STRUCTURAL
GENERAL NOTES
DRAWN O.M.V
REV NO.
DWG NO. ST-16 ---
section 'a'
section of wall
-REFER TO THE SUPPLIER COMPANY FOR MORE DETAILS OF THE LIFT THIS DRAWING IS THE PROPERTY OF MASS ENGINEERING, IT SHALL NOT BE
COPIED OR REPRODUCED IN ANY MANNER WITHOUT THEIR WRITTEN CONSENT.
GENERAL NOTES
H - EXPANSION JOINT
A - GENERAL 6-CARE SHALL BE TAKEN WHEN RE-USING THE FORMWORK, THAT ITS F - CONCRETE 2-C.V. OF SITE AGENT AND SITE ENGINEERS AND ORANIZATION CHART OF STAFF BY
1-THE CONTRACTOR SHALL USE FLEXEL BOARD TOPPED WITH MASTIC SEALANT,
SURFACE FULL SUBJECT TO THE CONSULTANTS APPROVAL .
1-CONCRETE GRADES SHALL BE AS FOLLOWS :
1- STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH SHALL BE FREE FROM WARPING, TWISTING OR OTHER DEFORMATIONS. NAMES AND QUALIFICATIONS AND JOB DESCRIPTION, AS WELL AS, PROPOSED PLAN
ELECTRICAL, MECHNICAL AND ARCHITECTURAL DRAWINGS, THE THE SURFACE SHALL BE SMOOTH AND CLEAN. ON SITE THE CONTRACTOR SHALL COMPLY WITH THE FOLLOWING TABLE UNLESS
CONCRETE MAX. SIZE MIN. CEMENT SLUMP MAX. WATER
CONDITIONS OF CONTRACT 3 SHALL BE SUBMITTED FOR APPROVAL . OTHERWISE IS SPECIFIED BY THE CONSULTANT :
AND THE SPECIFICATION . 7-APPROVAL OF THE FORMWORK BEFORE ANY CONCRETING IS GRADE OF AGG. (mm) CONTENT Kg/m (mm) CEMENT RATIO
ESSENTIAL, THE CONSULTANT RESERVES THE RIGHT TO REJECT ANY 3-EXACT LAYOUT AND POSITION FOR THE PROPOSED SITE OFFICES, PLANT LOCATION,
20 370 75 0.45
2- ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE FORMWORK THAT IS NOT SUITABLE . NEW FORMWORK IS TO BE STORES AND WORKSHOPS SHALL BE APPROVED BY THE CONSULTANT BEFORE INTERVAL
GENERAL SPECIFICATIONS OF THE CONSTRUCTION PROJECTS & PLACED ON THE CONTRACTORS OWN EXPENSE . 45 COMMENCING WORK. FLEXEL
20 370 75 0.45
BOARD
MAINTENANCE DIRECTORATE, LOCATION
8-DETAILS OF ANY OPENINGS, HOLES, CHASES, ETC. REQUIRED TO BE 20 330 75 0.50 THICKNESS (M)
THE RELAVENT BRITISH STANDARDS (BS) AND BRITISH STANDARD CODE OF 4-ALL MATERIALS SUBMITTED FOR APPROVAL SHALL BE GIVEN WITH PROPER
(mm)
PRACTICE, AND THE PARTICULAR SPECIFICATIONS IN TENDER DOCUMENTS . FORMED OR CUT IN THE STRUCTURE, SHALL BE APPROVED BY THE 35 MATERIAL
CONSULTANT PRIOR TO THE WORK BEING CARRIED OUT ON SITE . 10 360 50 0.50 APPROVAL FORM, ORIGINAL PLUS THREE COPIES, SAMPLES AND MANUALS SHOULD 12 mm - 3x3 m² BAYS OF SCREED, ROOF SCREED & 3
3-THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ERRORS ARISING FROM 20 260 75 0.60 BE
FLOOR FINISHES (i.e.VF230022BLE,TERRAZZO TILES,
HIS 9-FORMWORK SHALL BE REMOVED IN SUCH A MANNER AS NOT TO CAUSE 20 SUBMITTED WITH THE FORM . APPROVAL SHOULD BE GIVEN WITH IN ONE WEEK .
10 290 50 0.60 ETC...)
OWN INACCURATE SETTING OUT AND SHALL, ENTIRELY ON HIS OWN COST, ANY DAMAGE TO THE CONCRETE . THE CONTRACTOR MUST FOLLOW - PARAPETS EXCEEDING 20 M AS DIRECTED
THE PERIODS SPECIFIED IN THE CONCRETE SECTION OR AS 5- ANY CORRESPONDANCE SHOULD INCLUDE ORIGINAL PLUS THREE COPIES 20
AMEND BY CONSULTANT
ANY ERRORS, UNLESS OTHERWISE INSTRUCTED BY THE CONSULTANT. OTHERWISE INSTRUCTED BY THE CONSULTANT . BLINDING - 220 - - TOSUBMITTED 18/20mm - BAYS OF 6x6 M² (OR AS DIRECTED BY 6
D - REINFORCEMENT TO THE CONSULTANTS OFFICE . THE CONSULTANT) AS
4-THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN OF ALL TEMPORARY
WORKS 1- ALL REINFORCEMENT SHALL BE CLEAN AND FREE FROM MATERIALS NOTE : SRC TO BE USED BELOW OR IN CONTACT WITH GROUND LEVEL . 6- CONTRACTOR SHOULD SUBMIT PLANT AND LABOUR PROGRESS REPORTS, IF
WELL AS PERIPHERALS OFSLABS
LAID ON COMPACTED FILL. T +973 17550062
- BOUNDARY WALLS AS DIRECTED BY THE CONSULTANT. 6
AND MUST ENSURE THE STABILITY OF THE STRUCTURE DURING ALL PHASES
OF CONSTRUCTION IN ACCORDANCE WITH BS 8110.
THAT MAY
CAUSE CORROSION AND DISINTEGRATION OF THE CONCRETE .
OPC TO BE USED ABOVE GROUND LEVEL . INSTRUCTED BY THE CONSULTANT .
- BUILDINGS EXCEEDING 30 M IN LENGTH, AS
F +973 17550063
2- UNLESS THE CONTRACTOR PROPOSES TO USE CONCRETE FROM AN
REINFORCEMENT TO BE CLEANED BY SAND BLASTING OR OTHER APPROVED READY-MIX SOURCE, SHALL PERFORM TRIAL MIXES ON SITE IN
7-ANY SETTING OUT LINES AND LEVELS SHOULD BE CHECKED AND APPROVED BY THE
CONSULTANT BEFORE WORK CONTINUES .
THE CONSULTANT .
DIRECTED 30 E info@mass-bh.com
5-STRUCTURAL DRAWINGS MAY NOT SHOW THE SIZE AND LOCATION OF APPROVED THE PRESENCE OF THE CONSULTANT. ONLY APPROVED MIXES COULD BE BY
SERVICE PIPES, REFERNCE TO THE APPROPRIATE DRAWINGS SHALL BE TECHNIQUE. USED AS IN-SITU CONCRETE. www.mass-bh.com
DONE. 8-THE CONTRACTOR SHALL SEND SAMPLES OF BLOCKS, SAND, CEMENT, AGGREGATE
2- SHEETS OF MESH FABRIC SHALL BE FLAT UNLESS SPECIFIED AS BENT 3- WHEN THE CONTRACTOR PROPOSES TO USE READY MIX CONCRETE, HE
AND C.R.No.129676-1
6-THE CONTRACTOR IS RESPONSIBLE FOR THE STABILITY AND INTEGRITY OF AND WATER ETC. FOR TESTING ONCE EVERY MONTH . SAMPLES TO BE CHOSEN BY
EXISTING STRUCTURES, UNDERGROUND AND OVERHEAD SERVICES. ANY CURVE OR TWIST MUST BE CORRECTED BEFORE FIXING.
SHALL SUBMIT THE FULL MIX DESIGN FOR APPROVAL .
CONSULTANT ON SITE . License No. BN/220
4- MIXERS WHCH HAVE BEEN OUT OF USE FOR MORE THAN 30 MINUTES SHALL
7- ALL DIMENSIONS ARE IN MILLIMETERS (mm). ALL LEVELS ARE IN METERS (m), 3- WELDING OF REINFORCEMENT WILL ONLY BE ALLOWED WITH THE 9-LABORATORY TEST AND RECORDS SUBMITTED FOR APPROVAL . THE CONSULTANT
BE THOROUGHLY CLEANED BEFORE ANY FRESH CONCRETE IS MIXED
UNLESS OTHERWISE SPECIFIED. THE CONTRACTOR SHALL NOT SCALE SPECIFIC MUST APPROVE THE SOOURCE OF LABORATORY TESTING, COST OF TESTING TO BE
IN THAT MACHINE.
FROM THE DRAWINGS . WRITTEN PERMISSION OF THE CONSULTANT. BEARED
BY THE CONTRACTOR .
PROJECT
5- CONTROLS SHALL BE PROVIDED TO ENSURE THAT NO ADDITIONAL WATER
8-
BCONSTRUCTION
- EXCAVATION SITE
ANDSHALL BE CLEAN AT ALL TIMES . CONTRACTOR MUST
EARTHWORK 4- BARS IN CONTACT SHALL BE FIRMLY SECURED TO EACH OTHER WITH CAN BE ADDED DURING MIXING EXCEPT WITH THE APPROVAL OF THE
ARRANGE, ON HIS OWN EXPENSE, TO REMOVE RUBBISH AND UNWANTED APPROVED BINDING WIRE 16 -18 GSEPE SOFT IRON WIRE FREE FROM CONSULTANT.
10-CONTRACTOR SHOULD SUBMIT AN INSPECTION REQUEST SHEET FOR EVERY ITEM PROPOSED TWO
MATERIALS RUST OR OTHER CONTAMENANTS . OF WORK
1- REGULARLY
THE CONTRACTOR MUST
FROM THE ALLOW
SITE FOR EXCAVATIONS
AND SHOULD IN ALL TYPESFOR
BEAR RESPONSIBILITY OF
6- THE CONCRETE SHALL BE PLACED IN ITS FINAL POSITION WITHIN 90
WHEN READY FOR CONSULTANTS INSPECTION AND APPROVAL . STOREY BUILDING WITH
MATERIALITINCLUDING
DUMPING . HARD ROCK AND RUNNING SAND . 5- THE CORRECT COVER SHALL BE MAINTAINED BY THE USE OF PLASTIC
SPACERS OR OTHER APPROVED MEANS.
MINUTES OF THE TIME WHEN THE CEMENT WAS FIRST CAME INTO CONTACT
WITH WATER OR WETTED AGGREGATES . THE REMIXING AND THE
11-THE INSPECTION SHEET SHOULD BE SUBMITTED 48 HOURS PRIOR TO ANY WORK. MEZZANINE @ JIDHAFS
2- ALL EXCAVATIONS ARE TO BE KEPT DRY AT ALL TIMES BY AN APPROVED INSPECTION WILL BE DONE WITHIN 24 HOURS AFTER SUBMITTING INSPECTION
RETEMPERING OF THE STIFFENED CONCRETE IS NOT PERMITTED .
SYSTEM . 6- THE TOP REINFORCEMENT IN THE SLABS SHALL BE RIGIDLY SHEET.
SUPPORTED BY 7- APPROVAL FOR THE NAME AND ADDRESS OF THE CONCRETE SUPPLIER IS
3-EXCAVATION SHALL BE ACCURATELY CUT TO THE LINES AND THE MILD STEEL CHAIRS FROM THE BOTTOM REINFORCEMENT. CHAIR 12-CONSULTANT MAY SUBMIT A SITE INSTRUCTION SHEET TO THE CONTRACTOR ON
ESSENTIAL BEFORE CONCRETING .
SITE. THE CONTRACTOR SHALL EXECUTE ALL ITEMS MENTIONED ON THE SHEET
LEVELS SHOWN ON THE DRAWING, OR TO SUCH DEPTHS AND
DIMENSIONS SPECIFIED BY THE CONSULTANT .
SPACING
SHALL BE AT 1.5 m CENTERS IN BOTH DIRECTIONS, OR LESS IF SO IS AND IMMEDIATELY REPORT BACK TO THE CONSULTANT . CLIENT
8- IF FOR UNFORESEEN REASONS IT IS NECESSARY TO STOP CONCRETING
REQUIRED BY THE CONSULTANT. BEFORE COMPLETION OF THE POUR, THEN CONSTRUCTION JOINTS SHALL
4- THE CONTRACTOR SHALL BEAR THE COST OF ANY EXCESS EXCAVATION. 13-THE CONTRACTOR IS TO PROVIDE THE CONTRACTOR WITH SUFFICIENT FACILITIES
BE FORMED AND FURTHER CONCRETING SHALL BE SUSPENDED FOR AT
THE EXCESS VOLUME SHALL BE REPLACED WITH ANY MATERIAL
INCLUDING CONCRETE APPROVED BY THE CONSULTANT.
7- REINFORCEMENT SHALL BE STORED PROPERLY ON CONSTRUCTED
RACKS AT
LEAST 24 HOURS.
AND ACCESS FOR THE INSPECTION .
ABDULJALIL ABDULLA
5- IF AFTER EXCAVATION OR COMPACTION,THE SURFACE WAS DISTURBED BY
LEAST 150mm ABOVE GROUND AND SHALL BE PROTECTED WITH
PLASTIC
9-CUTTING AND CHASING OF HARDENED CONCRETE SHALL NOT BE PERMITTED
14-THE MEASURABLE ITEMS ARE TO BE RECORDED AND SIGNED BY BOTH THE
CONTRACTOR AND THE CONSULTANT IMMEDIATELY AFTER THE INSPECTION.
ALI MAKI ALBAQALI
WITHOUT THE CONSULTANT'S APPROVAL .
ANY MEANS, THE CONTRACTOR SHALL RE-EXCAVATE OR RE-COMPACT SHEETING.
WITH THE DIRECTIONS OF THE CONSULTANT . COST TO BE BEARED BY 15-COPIES OF ANY MATERIAL DELIVERIES SHOULD BE SIGNED BY THE CONSULTANT.
10-THE CONSULTANT WILL REJECT ANY CONCRETE WHICH HE CONSIDERS TO
THE CONTRACTOR. 8- THE CONTRACTOR MUST SUBMIT BAR BENDING SCHEDULES FOR HAVE BEEN INADEQUITLY MIXED OR IN WHICH INGREDIENTS HAVE
APPROVAL. 16-MEETINGS ARE TO BE HELD ON REGULAR BASIS PLACE AND TIME TO BE
SEGREGATED OR WHICH IS NO LONGER CAPABLE OF BEING EFFECTIVLY
6- IN ROCK EXCAVATION, A MINIMUM EXCAVATION OF 150 mm IS REQUIRED. DETERMINED
PLACED OR COMPACTED .
ANY LOOSE OR BROKEN ROCK SHALL BE REMOVED TO REACH SOLID 9- LAPPING OF BARS SHALL NOT BE PERMITTED EXCEPT WHERE SHOWN
AND
BY THE CONSULTANT .
SHEET CONTENT
BEARING BEFORE THE BUILDING IS CONSTRUCTED. IN CASE OF EXCESS 11-ALL CONCRETE SHALL BE COMPACTED BY USING INTERNAL VIBRATORS .
EXCAVATION, NO DESERT FILL IS TO BE USED, EXCESS VOLUME TO BE INDICATED ON THE DRAWINGS OR APPROVED BY THE CONSULTANT. 17-THE CONTRACTOR AND ALL APPROVED SUB-CONTRACTORS SHOULD ATTEND THE
THE SIZE AND TYPE OF VIBRATOR MUST BE APPROVED BY THE
FILLED WITH CONCRETE . NO MEETINGS
CONSULTANT AND THEY
ADDITIONAL PAYMENT WILL BE MADE FOR EXTRA STEEL REQUIRED. TO DISCUSS PROGRESS AND DETAILS .
7- IN LOOSE SOIL EXCAVATION, EXISTING SOIL TO BE EXCAVATED FOR A
SHALL BE USED BY EXPERIENCED OPERATORS .
STRUCTURAL
DEPTH OF 2000mm AND FILL WITH COMPACTED SELECTED WELL GRADED 10- STARTER BARS TO COLUMNS AND WALLS SHALL BE SECURELY FIXED 18-A REGULAR PROGRESS REPORT SHOULD BE SUBMITTED BY THE CONTRACTOR,
ENGINEERING FILL, IN LAYERS OF 200/300mm THICKNESS EACH, EACH E -TOBLOCK WORK 12-THE CONSULTANT SHALL APPROVE ALL VIBRATOR OPERATIONS AND ALL
VIBRATORS MUST BE TESTED PRIOR TO CONCRETING.
AS WELL AS , THE SUB-CONTRACTORS. GENERAL NOTES
LAYER TO ATTAIN 95% DRY DENSITY AT OPTIMUM MOISTURE CONTENT . THE REINFORCEMENT IN THE PARENT CONCRETE, AND ACCURATELY
THE CONSULTANT RESERVES THE RIGHT TO ASK FOR A COMPACTION 1- CEMENT/SAND
LOCATED MORTAR MIX SHALL BE APPROVED BY THE CONSULTANT 19-ALL CORRESPONDANCE OR INSTRUCTIONS, ARE EXPECTED TO BE ACTIONED BY A
13-ANY CURING METHOD SHALL BE APPROVED BY THE CONSULTANT BEFORE
TEST. BEFORE USE . THE SPECIFIED COVER.
TO MAINTAIN WRITTEN INSTRUCTION .
ITS APPLICATION .
W
MALETOLI. 15. DOOR INTERCOM MONITOR 00 PROJECT
UP
( LIGHTS )
UP
PROPOSED TWO
16. 2X40W FLUORESCENT FITTING 00
SHOP-14 STOREY BUILDING WITH
17. 1X40W FLUORESCENT FITTING 00
MEZZANINE @ JIDHAFS
WASH
UP FEMALETOLI. CHANDELIER
18. 00
SHOP-09 SHOP-11
19. SUSPENDED LIGHT 00
W
20. DOWN LIGHT 00
UP 21. SPOT LIGHT 00 CLIENT
22. WALL BRACKET LIGHT 00
UP
UP 23. OUT DOOR WALL BRACKET LIGHT 00 ABDULJALIL ABDULLA
CORRIDOR
SHOP-13
24. GARDEN LIGHT 00
ALI MAKI ALBAQALI
25. EXTERNAL BOUNDARY WALL LIGHT 00
SHOP-08 LFIT
26. EMERGENCY LIGHT 00
( MISCELLANEOUS )
27. METER & MCCB 00
UP UP SHEET CONTENT
28. DISTRIBUTION BOARD ( MCB TYPE ). 00
29. CEILING FAN 00
SHOP-10 SHOP-12
OPENABOVE
UP UP UP 30. EXHAUST FAN 00 GROUND FLOOR
31. EXHAUST FAN. ( CEILING MOUNTED) 00 ELECTRICAL LAYOUT
32. SPLIT UNIT. A/C 00
33. SPLIT OUT UNIT. A/C 00
UP
34. SPLIT UNIT A/C PIPES 00
SHOP-07 SHOP-06 SHOP-05 UP UP UP ARCHITECT JAFFAR SALMAN
CORRIDOR
35. WINDOW TYPE A/C UNIT. 00
36. WATER HEATER WITH 20 AMP OUTLET. 00 CHECKED JAFFAR SALMAN
SHOP-04 SHOP-03 SHOP-02 SHOP-01 37. WATER COOLER. 00
38. WATER PUMP 00 DRAWN O.M.V
( MISCELLANEOUS )
27. METER & MCCB 00
SHEET CONTENT
28. DISTRIBUTION BOARD ( MCB TYPE ). 00
KTICHEN
16. 2X40W FLUORESCENT FITTING 00
BEDROOM 17. 1X40W FLUORESCENT FITTING 00 STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
IN
BEDROOM W W
18. CHANDELIER 00
BEDROOM 19. SUSPENDED LIGHT 00
LAUNDRY
DN
D.B
LV
IN
I G+DN
IN
IG 22. WALL BRACKET LIGHT 00
UP
23. OUT DOOR WALL BRACKET LIGHT 00
ABDULJALIL ABDULLA
W
FLAT-3 BATH
DRESS 24. GARDEN LIGHT 00
STORE ALI MAKI ALBAQALI
W
25. EXTERNAL BOUNDARY WALL LIGHT 00
LFIT FLAT-4
BEDROOM
W
26. EMERGENCY LIGHT 00
D.B ( MISCELLANEOUS )
ROOFDECK 27. METER & MCCB 00
KTICHEN SHEET CONTENT
BATH 28. DISTRIBUTION BOARD ( MCB TYPE ). 00
MECHAN CIAL CORRD
I OR
LAUNDRY VENLA
TIO
TIN
29. CEILING FAN 00
D.B
LV
IN
I G+DN
IN
IG
30. EXHAUST FAN 00 FIRST FLOOR
D.B
STORE FLAT-1
31. EXHAUST FAN. ( CEILING MOUNTED) 00 ELECTRICAL LAYOUT
VOD
I
W
W
BATH IN 34. SPLIT UNIT A/C PIPES 00
WASH ARCHITECT JAFFAR SALMAN
35. WINDOW TYPE A/C UNIT. 00
ROOFDECK
LAUNDRY
40. BELL 00
W
IN
KTICHEN
W
DRESS
1
BATH
2
ROOFDECK ROOFDECK 23. OUT DOOR WALL BRACKET LIGHT 00 ABDULJALIL ABDULLA
24. GARDEN LIGHT 00
ALI MAKI ALBAQALI
25. EXTERNAL BOUNDARY WALL LIGHT 00
LFIT
26. EMERGENCY LIGHT 00
( MISCELLANEOUS )
LOWERROOF 27. METER & MCCB 00
SHEET CONTENT
28. DISTRIBUTION BOARD ( MCB TYPE ). 00
29. CEILING FAN 00
30. EXHAUST FAN 00 ROOF FLOOR
31. EXHAUST FAN. ( CEILING MOUNTED) 00 ELECTRICAL LAYOUT
VOD
I
32. SPLIT UNIT. A/C 00
33. SPLIT OUT UNIT. A/C 00
T +973 17550062
F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
License No. BN/220
TYPICAL CONNECTION
1 DETAILS FOR WINDOW A/C UNIT 2 LOCATION OF OUTLET BOXES PROJECT
NOT TO SCALE NOT TO SCALE FRAME
PROPOSED TWO
STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
ELEVATION
CLIENT
ABDULJALIL ABDULLA
SECTION - A
ALI MAKI ALBAQALI
PLAN
SHEET CONTENT
2 TYPICAL METER BOX DETAIL
NOT TO SCALE
TYPICAL
ELECTRICAL DETAILS
DRAWN O.M.V
REV NO.
DWG NO. EL-05 ---
PLAN
SECTION
(MAX. EARTH RESISTANCE = 2 Ω)
PART ELEVATION
SECTION
3 SINGLE WAY DUCT 38MM
NOT TO SCALE 4 E.D. CABLE ENTRY DETAIL
4 EARTHING PIT NOT TO SCALE
NOT TO SCALE
PROJECT
MALETOLI.
UP
UP
PROPOSED TWO
SHOP-14 LEGEND STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
WASH
UP FEMALETOLI. SNo. PLUMPING SYMBOLS
SHOP-09 SHOP-11
1. BATH TUB
UP CLIENT
2. BIDET
UP
UP ABDULJALIL ABDULLA
CORRIDOR
3. WATER CLOSET
SHOP-13 ALI MAKI ALBAQALI
SHOP-08 LFIT 4. WASH BASIN
5. KITCHEN SINK
UP UP SHEET CONTENT
6. SHOWER TRAY
SHOP-10 SHOP-12
UP UP UP OPENABOVE GROUND FLOOR
7. WT WATER TANK PLUMBING LAYOUT
8.
PRESSURE PUMP SET
UP
SHOP-07 ARCHITECT JAFFAR SALMAN
SHOP-06 SHOP-05 UP UP UP
CORRIDOR
9. WATER HEATER
CHECKED JAFFAR SALMAN
MANIFOLD BOX WITH ISOLATING VALVE
SHOP-04 SHOP-03 SHOP-02 SHOP-01 10. FOR EACH LINE
MB DRAWN O.M.V
T +973 17550062
F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
License No. BN/220
PROJECT
DN
SHOP-14
PROPOSED TWO
LEGEND STOREY BUILDING WITH
DN
SNo. PLUMPING SYMBOLS MEZZANINE @ JIDHAFS
SHOP-09
SHOP-11
DN 1. BATH TUB
CLIENT
DN 2. BIDET
DN
5. KITCHEN SINK
SHEET CONTENT
DN DN 6. SHOWER TRAY
SHOP-10 SHOP-12
MEZZANINE FLOOR
WT
DN DN DN
7. WATER TANK PLUMBING LAYOUT
8.
PRESSURE PUMP SET
T +973 17550062
F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
License No. BN/220
BATH
PROJECT
BATH
PROPOSED TWO
KTICHEN
LEGEND
BEDROOM STOREY BUILDING WITH
BEDROOM SNo. PLUMPING SYMBOLS MEZZANINE @ JIDHAFS
BEDROOM
1. BATH TUB
BATH LV
IN
I G+DN
IN
IG SERVC
IESAREA CLIENT
LAUNDRY
DN 2. BIDET
LV
IN
I G+DN
IN
IG
UP
DRESS
FLAT-3 BATH 3. WATER CLOSET ABDULJALIL ABDULLA
STORE
ALI MAKI ALBAQALI
LFIT FLAT-4 4. WASH BASIN
BEDROOM
LAUNDRY
REV NO.
KTICHEN
1
BATH
2
T +973 17550062
F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
License No. BN/220
WATCHMANRM. BATH
PROJECT
PROPOSED TWO
DN LEGEND STOREY BUILDING WITH
SNo. PLUMPING SYMBOLS MEZZANINE @ JIDHAFS
PANTRY 1. BATH TUB
CLIENT
2. BIDET
ROOFDECK ROOFDECK
3. WATER CLOSET
ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
LFIT 4. WASH BASIN
T +973 17550062
F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
License No. BN/220
PROJECT
PROPOSED TWO
LEGEND STOREY BUILDING WITH
SNo. PLUMPING SYMBOLS MEZZANINE @ JIDHAFS
1. BATH TUB
TOPROOF
CLIENT
2. BIDET
PROJECT
PROPOSED TWO
STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
SHEET CONTENT
TYPICAL INTERNAL
PLUMBING SYSTEM
DRAWN O.M.V
REV NO.
DWG NO. PL-06 ---
FROM MAIN
WATER SOURCE
SPECIFICATION
T +973 17550062
F +973 17550063
E info@mass-bh.com
www.mass-bh.com
LEGEND C.R.No.129676-1
IC IC IC IC IC SNo. DRAINAGE SYMBOLS License No. BN/220
UP SW SW SW
1. BATH TUB
MALETOLI.
FD
PROJECT
UP 2. BIDET
UP PROPOSED TWO
3.
SHOP-14 WATER CLOSET
STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
WASH
UP FEMALETOLI.
4. WASH BASIN
SHOP-09 SHOP-11 FD FD
5. KITCHEN SINK
UP CLIENT
6. SHOWER TRAY
UP
UP ABDULJALIL ABDULLA
CORRIDOR
IC 7. WT WATER TANK
SHOP-13 ALI MAKI ALBAQALI
SHOP-08 LFIT
8. SEPTIC SEPTIC TANK
TANK
UP UP SHEET CONTENT
SW 9. IC INSPECTION CHAMBER
SHOP-10
UP UP UP OPENABOVE SHOP-12 GROUND FLOOR
10. G GULLY TRAP
DRAINAGE LAYOUT
11. W WASTE WATER PIPE
UP
12. S SOIL PIPE
SHOP-07 SHOP-06 SHOP-05 UP UP UP ARCHITECT JAFFAR SALMAN
CORRIDOR
13. FD FLOOR DRAIN
IC CHECKED JAFFAR SALMAN
SHOP-04 SHOP-03 SHOP-02 SHOP-01
14. V VENT PIPE DRAWN O.M.V
SW
RD
15. RAIN DRAINAGE SCALE A3 1:150 DATE NOV 2023
REV NO.
SW 17. SAP
DWG NO. DR-01 ---
SOAK AWAY PIT
SW
SW WASTE WATER LINE REV. DESCRIPTION DATE BY
UP 18.
50mmØ UPVC pipe 1
SAP SOIL LINE
19. 2
100mmØ UPVC pipe
IC 3
SEWAGE LINE
IC SEPTIC
20.
150mmØ UPVC pipe
IC TANK
IC
FUTURE CONNECTION
T +973 17550062
F +973 17550063
E info@mass-bh.com
www.mass-bh.com
LEGEND
C.R.No.129676-1
SNo. DRAINAGE SYMBOLS License No. BN/220
1. BATH TUB
BIDET
PROJECT
2.
DN
SHOP-14
PROPOSED TWO
3. WATER CLOSET
STOREY BUILDING WITH
DN
4. WASH BASIN MEZZANINE @ JIDHAFS
SHOP-09
SHOP-11
DN
5. KITCHEN SINK
CLIENT
DN 6. SHOWER TRAY
DN
SHEET CONTENT
9. IC INSPECTION CHAMBER
DN DN
SHOP-12
SHOP-10
10. G GULLY TRAP
MEZZANINE FLOOR
DN DN DN
DRAINAGE LAYOUT
11. W WASTE WATER PIPE
RD
15. RAIN DRAINAGE SCALE A3 1:150 DATE NOV 2023
REV NO.
17. SAP SOAK AWAY PIT
DWG NO. DR-02 ---
T +973 17550062
F +973 17550063
E info@mass-bh.com
www.mass-bh.com
LEGEND C.R.No.129676-1
SNo. DRAINAGE SYMBOLS License No. BN/220
SW SW SW
1. BATH TUB
BATH
FD
PROJECT
2. BIDET
BATH
FD
PROPOSED TWO
KTICHEN
FD
BEDROOM
3. WATER CLOSET STOREY BUILDING WITH
BEDROOM MEZZANINE @ JIDHAFS
4. WASH BASIN
BEDROOM
5. KITCHEN SINK
BATH LV
IN
I G+DN
IN
IG SERVC
IESAREA CLIENT
LAUNDRY
DN 6. SHOWER TRAY
FD
LV
IN
I G+DN
IN
IG
UP
BATH
ABDULJALIL ABDULLA
FLAT-3
SW
7. WT WATER TANK
DRESS
STORE ALI MAKI ALBAQALI
LFIT FD
FLAT-4
BEDROOM
8. SEPTIC SEPTIC TANK
TANK
FD
FD
ROOFDECK
KTICHEN SHEET CONTENT
BATH
LAUNDRY
MECHAN
VENLA
TIO
CIAL
TIN
CORRD
I OR 9. IC INSPECTION CHAMBER
SW LV
IN
I G+DN
IN
IG FIRST FLOOR
10. G GULLY TRAP
FD
DRAINAGE LAYOUT
VOD
I STORE FLAT-1
BATH TOLIET FLAT-2 11. W WASTE WATER PIPE
BEDROOM FD
FD
SW
SW
JAFFAR SALMAN
SERVC
IESAREA
BEDROOM
14. V VENT PIPE DRAWN O.M.V
WASH
LV
IN
I G+DN
IN
IG RD SCALE A3 1:150 DATE NOV 2023
15. RAIN DRAINAGE
STORE
FD
BEDROOM A/C P PROJECT NO. ME-23014
BEDROOM 16. AIR CONDITIONER PIPE
SW
KTICHEN
FD
BATH FD
DWG NO. DR-03 ---
17. SAP SOAK AWAY PIT
BATH FD
FD
FD
T +973 17550062
F +973 17550063
E info@mass-bh.com
www.mass-bh.com
LEGEND C.R.No.129676-1
SNo. DRAINAGE SYMBOLS License No. BN/220
SW
1. BATH TUB
RD RD
SLOPE
WATCHMANRM. BATH SLOPE
PROJECT
FD 2. BIDET
PROPOSED TWO
SLOPE
SLOPE
VA
EY
LL
LL
VA
EY
3.
DN
WATER CLOSET
STOREY BUILDING WITH
4. WASH BASIN
MEZZANINE @ JIDHAFS
PANTRY
5. KITCHEN SINK
CLIENT
6. SHOWER TRAY
ROOFDECK ROOFDECK
WT
ABDULJALIL ABDULLA
7. WATER TANK
ALI MAKI ALBAQALI
LFIT
8. SEPTIC SEPTIC TANK
TANK
LOWERROOF
SHEET CONTENT
RIDGE 9. IC INSPECTION CHAMBER
ROOF FLOOR
10. G GULLY TRAP
DRAINAGE LAYOUT
VOD
I
11. W WASTE WATER PIPE
ROOFDECK
14. V VENT PIPE DRAWN O.M.V
REV NO.
DWG NO. DR-04 ---
17. SAP
SLOPE
SOAK AWAY PIT
VA
LL
RD SLOPE
EY
REV. DESCRIPTION DATE BY
18. WASTE WATER LINE
50mmØ UPVC pipe 1
SLOPE RD
SOIL LINE 2
19.
100mmØ UPVC pipe
3
SEWAGE LINE
20.
150mmØ UPVC pipe
T +973 17550062
F +973 17550063
E info@mass-bh.com
www.mass-bh.com
LEGEND C.R.No.129676-1
SNo. DRAINAGE SYMBOLS License No. BN/220
1. BATH TUB
RD SLOPE SLOPE RD
PROJECT
Y
VA
BIDET
LE
2.
L
LE
VA
Y
PROPOSED TWO
RIDGE
SLOPE
SLOPE
3. WATER CLOSET STOREY BUILDING WITH
4. WASH BASIN
MEZZANINE @ JIDHAFS
ROOFDECK ROOFDECK
WT
ABDULJALIL ABDULLA
7. WATER TANK
ALI MAKI ALBAQALI
8. SEPTIC SEPTIC TANK
TANK
LOWERROOF
SHEET CONTENT
9. IC INSPECTION CHAMBER
TOP ROOF
10. G GULLY TRAP
DRAINAGE LAYOUT
VOD
I
11. W WASTE WATER PIPE
ROOFDECK
14. V VENT PIPE DRAWN O.M.V
RD
15. RAIN DRAINAGE SCALE A3 1:150 DATE NOV 2023
REV NO.
17. SAP
DWG NO. DR-05 ---
SOAK AWAY PIT
200
License No. BN/220
1000 max
INTERNAL CONC. SURFACES TO BE
COVERED WITH 2 COATS OF COAL
TAR EPOXY PAINT
EXTERNAL SURFACES TO BE PAINTED
WIDTH
WITH 3 COATS OF BITUMINOUS
RUBBER EMULSION
PROJECT
D
0.80 MIN.
10 THICK EPOXY MORTAR
HALF ROUND CLAYWARE CHANNEL
A A
225
1000 G. POLYTHENE SHEET
CONC. BLINDING (C10P) 50 THICK PROPOSED TWO
INLET OUTLET STOREY BUILDING WITH
50 150 600 150 50
MEZZANINE @ JIDHAFS
CLIENT
200
B PLAN ABDULJALIL ABDULLA
TYPICAL SEPTIC TANK TYPE (B) ALI MAKI ALBAQALI
TOP STRAIGHT BARS
EXTRA SUPPORT BARS
STIRRUPS
D
BOT. STRAIGHT BARS
SHEET CONTENT
SECTION-A
AT SUPPORT
ENGINEERING BRICKWORK
ARCHITECT JAFFAR SALMAN
INTERNAL CONC. SURFACES TO BE A
COVERED WITH 2 COATS OF COAL
A
TAR EPOXY PAINT
600
50
DRAWN O.M.V
10 THICK EPOXY MORTAR
HALF ROUND CLAYWARE CHANNEL
1000 G. POLYTHENE SHEET B SCALE A3 1:150 DATE NOV 2023
CONC. BLINDING (C10P) 50 THICK
CHAMBER TYPE - A
PROJECT NO. ME-23014
50 150 600 150
MAXIMUM DEPTH TO INVERT 1000
200
2
75 DIA. VENT. 4Y16 Ø
PIPE OUTLET 3
Y12 Ø @ 400 c/c
OUTLET
INLET
50
200
EXTERNAL SURFACES TO BE PAINTED
WITH 3 COATS OF BITUMINOUS
RUBBER EMULSION
DEPTH
MALETOLI.
UP
UP
T +973 17550062
SHOP-14 F +973 17550063
E info@mass-bh.com
WASH
UP FEMALETOLI.
SHOP-09 SHOP-11 www.mass-bh.com
C.R.No.129676-1
UP License No. BN/220
UP
UP PROJECT
CORRIDOR
SHOP-13
SHOP-08 LFIT PROPOSED TWO
STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
UP UP
UP UP UP
SHOP-10
OPENABOVE SHOP-12 CLIENT
ABDULJALIL ABDULLA
UP ALI MAKI ALBAQALI
SHOP-07 SHOP-06 SHOP-05 UP UP UP
CORRIDOR
SHOP-04 SHOP-03 SHOP-02 SHOP-01 SHEET CONTENT
DRAWN O.M.V
REV NO.
DWG NO. NET-01 ---
AREA STATEMENT 2
3
PLOT NO: 04043319
PLOT AREA 840.00 sqm
GROUND FLOOR PLAN
SCALE 1:150 m. GROSS AREA/sqm NET AREA/sqm
FLOOR
DN
PROJECT
SHOP-14
DN PROPOSED TWO
SHOP-09
STOREY BUILDING WITH
SHOP-11
DN MEZZANINE @ JIDHAFS
DN
DN CLIENT
SHOP-13
DN ABDULJALIL ABDULLA
LFIT
SHOP-08 ALI MAKI ALBAQALI
DN
SHOP-10 SHOP-12
DN SHEET CONTENT
DN DN DN
NET AREA DETAILS
(PLAN)
SHOP-07 SHOP-06 SHOP-05
DN DN DN DN
ARCHITECT JAFFAR SALMAN
SHOP-04 SHOP-03
SHOP-02 SHOP-01
CHECKED JAFFAR SALMAN
DRAWN O.M.V
REV NO.
DWG NO. NET-02 ---
BATH
PROJECT
KTICHEN
BEDROOM PROPOSED TWO
BEDROOM STOREY BUILDING WITH
BEDROOM MEZZANINE @ JIDHAFS
BATH LV
IN
I G+DN
IN
IG SERVC
IESAREA
LAUNDRY
DN
LV
IN
I G+DN
IN
IG
UP CLIENT
FLAT-3 BATH
DRESS
STORE ABDULJALIL ABDULLA
LFIT
BEDROOM FLAT-4 ALI MAKI ALBAQALI
ROOFDECK
KTICHEN
BATH MECHAN CIAL CORRD
I OR
LAUNDRY VENLA
TIO
TIN SHEET CONTENT
LV
IN
I G+DN
IN
IG
BATH
VOD
I
FLAT-2
STORE FLAT-1 NET AREA DETAILS
TOLIET
BEDROOM (PLAN)
BATH
WASH
ROOFDECK
LAUNDRY
SERVC
IESAREA
BEDROOM CHECKED JAFFAR SALMAN
WASH
LV
IN
I G+DN
IN
IG DRAWN O.M.V
STORE
KTICHEN
PROJECT NO. ME-23014
BATH
BATH
REV NO.
DWG NO. NET-03 ---
DRESS
PROJECT
DN PROPOSED TWO
STOREY BUILDING WITH
PANTRY
MEZZANINE @ JIDHAFS
CLIENT
ROOFDECK ROOFDECK
ABDULJALIL ABDULLA
LFIT
ALI MAKI ALBAQALI
LOWERROOF
SHEET CONTENT
VOD
I NET AREA DETAILS
(PLAN)
LOWERROOF
ROOFDECK
CHECKED JAFFAR SALMAN
DRAWN O.M.V
REV NO.
DWG NO. NET-04 ---
WASH
UP FEMALETOLI.
SHOP-09 SHOP-11 STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
UP
UP CLIENT
UP
CORRIDOR
SHOP-13
LFIT
ABDULJALIL ABDULLA
SHOP-08
ALI MAKI ALBAQALI
UP UP
SHOP-10
SHEET CONTENT
OPENABOVE SHOP-12
UP UP UP
THERMAL INSULATION
DETAILS (PLAN)
UP
SHOP-07 SHOP-06 SHOP-05 UP UP UP
CORRIDOR
ARCHITECT JAFFAR SALMAN
DRAWN O.M.V
REV NO.
DWG NO. TH-01 ---
INSULATED EXTERNAL WALLS/ UP
REFER TO DWG. TH005/W1/T-1 REV. DATE BY
DESCRIPTION
1
INSULATED EXTERNAL WALLS/
REFER TO DWG. TH005/W1/T-1 2
DN PROJECT
SHOP-14
DN PROPOSED TWO
SHOP-09 STOREY BUILDING WITH
SHOP-11
DN MEZZANINE @ JIDHAFS
DN
DN CLIENT
SHOP-13
DN
LFIT
ABDULJALIL ABDULLA
SHOP-08 ALI MAKI ALBAQALI
DN DN SHEET CONTENT
SHOP-10 SHOP-12
DN DN DN THERMAL INSULATION
DETAILS (PLAN)
DRAWN O.M.V
REV NO.
DWG NO. TH-02 ---
INSULATED EXTERNAL WALLS/
REFER TO DWG. TH005/W1/T-1 REV. DESCRIPTION DATE BY
INSULATED EXTERNAL WALLS/
1
REFER TO DWG. TH005/W1/T-1
2
BATH PROJECT
KTICHEN
BEDROOM PROPOSED TWO
BEDROOM STOREY BUILDING WITH
BEDROOM
MEZZANINE @ JIDHAFS
BATH LV
IN
I G+DN
IN
IG SERVC
IESAREA
LAUNDRY
DN
UP
LV
IN
I G+DN
IN
IG CLIENT
FLAT-3 BATH
DRESS
STORE ABDULJALIL ABDULLA
LFIT FLAT-4
BEDROOM ALI MAKI ALBAQALI
ROOFDECK
KTICHEN
BATH MECHAN CIAL CORRD
I OR
LAUNDRY VENLA
TIO
TIN SHEET CONTENT
LV
IN
I G+DN
IN
IG
THERMAL INSULATION
VOD
I STORE FLAT-1
BEDROOM
BATH TOLIET FLAT-2 DETAILS (PLAN)
BATH
WASH
ROOFDECK
LAUNDRY
SERVC
IESAREA
BEDROOM CHECKED JAFFAR SALMAN
WASH
LV
IN
I G+DN
IN
IG DRAWN O.M.V
STORE
KTICHEN
PROJECT NO. ME-23014
BATH
BATH REV NO.
DWG NO. TH-03 ---
DRESS
PROJECT
DN
PROPOSED TWO
STOREY BUILDING WITH
PANTRY
MEZZANINE @ JIDHAFS
INSULATED ROOF/
REFER TO DWG. TH005/S-1
ROOFDECK ROOFDECK
CLIENT
VOD
I THERMAL INSULATION
DETAILS (PLAN)
INSULATED ROOF/
REFER TO DWG. TH005/S-1
LOWERROOF
DRAWN O.M.V
REV NO.
DWG NO. TH-04 ---
SLAB/ROOF FLOOR INSULATION TYPICAL WALLS INSULATION DETAILS CEILING / SOFFIT THERMAL INSULATION
ROOF FLOOR THERMAL INSULATION WITH SPRAYED SANDWICH BLOCKS(400*200*200) T +973 17550062
POLYURETHANE (PU) FOAM F +973 17550063
E info@mass-bh.com
www.mass-bh.com
C.R.No.129676-1
License No. BN/220
OPEN ROOF FLOOR AREA
OPEN AREA / BALCONY ENCLOSED ROOM
PROJECT
PROPOSED TWO
STOREY BUILDING WITH
MEZZANINE @ JIDHAFS
INSIDE OUTSIDE
CLIENT
GARAGE / OPEN AREA
ABDULJALIL ABDULLA
ALI MAKI ALBAQALI
THERMAL INSULATION
DETAILS-CROSS
SECTIONS
BEAMS INSULATION COLUMNS INSULATION
BEAMS WITH INTERNAL INSULATION COLUMNS WITH INTERNAL INSULATION ARCHITECT JAFFAR SALMAN
DRAWN O.M.V
3
EXTERNAL PLASTER
TYPICAL SECTION
SHEARWALLS INSULATION
NTS
B1 CROSS SECTION C1 CROSS SECTION
T-2 NTS T-1 NTS
GENERAL NOTES: