Abstract of Cost of Dam Safety
Abstract of Cost of Dam Safety
Abstract of Cost of Dam Safety
Dam Division,Tenughat
APPENDIX IV-A
Cost Estimates of Rehabilitation Proposal
Sl.No. Work Description Amount in Rupees Remarks
1
(ii)All the reports, findings and video recording after
ROV mapping should be submitted to Office of the
2 E.O.I
Executive Engineer Tenughat Dam Division
Tenughat.
(iii)However, if the mapping indicates presence of
more cracks / cavities, required remedial measures
with advance technology is recommended to prevent EOI has been
prepared and
such seepages. The application of CCGM/CCGC
3 E.O.I sent to
(Cementitious Geo-synthetic Concrete
department vide
Mattress/Carpet) as per Standards of EN 13253 &
letter number CE
13254 as used in Reservoir & Dams be adopted in the
WRD HAZARIBAG
u/s face of the spillway. 1016/DATED
(iv)The cavities occurred in the piers be filled up 08/12/2023
4 E.O.I
with CC M-30 to make the surface smooth.
d General cleaning
As already suggested, for proper operation of
spillways, sluiceways, approach channels, inlet and
outlet structures, stilling basin/ energy dissipation
arrangements, discharge conduit, dam slopes, trash
E.O.I
racks, debris control devices etc., regular and thorough
cleaning and removal of debris is necessary. Cleaning
is especially important after large floods, which tend
to send more debris into the reservoir.
EOI has been
prepared and
sent to
department vide
e Drains and Seepage letter number CE
WRD HAZARIBAG
(i)Remove debris in and around the Tenughat Dam 1016/DATED
to prevent clogging. 08/12/2023
(ii)Remove debris and repair the small drainage
channels leading to the Tenughat Dam so that water is E.O.I
properly directed and contained within the channels.
(iii)Clean algae and dirt from the Tenughat Dam
staff gauges to allow easy reading.
D Non-structural Measures
4
Survey of Tenughat dam u/s land for acquisition and
1 E.O.I
rehabilitation problem
Periodic chemical analysis of Tenughat Dam
2 Reservoir water from different location (Quotation E.O.I
item). EOI has been
prepared and
Calibrated V notches be provided at the end of the sent to
3 drain in both sides of the river to measure seepage E.O.I department vide
discharge through the Earth dam, letter number CE
WRD HAZARIBAG
E Basic Facilities Improvement 1016/DATED
1 Maintenance of cleanliness aroud dam area, E.O.I 08/12/2023
Maintenance of Electrical items and electrification of
2 E.O.I
Tenughat Dam top road and Dam Gallery.