dffiq 6}6 Mq fuTrrr

orqlaq Srqq
No. DG/ Manual-2o22119
ISSUED BY AUTHORITY OF DIRECTOR GENERAL, CPWD
NIRMAN BHAWAN NEW DELHI Datedi 26.04.2024
Sub: Modifications in Para 12 for CPWD Works Manual 2022

Followin modifications are made in ara 121or CPWD Works Manual2022


Existing Provision Modified Provision
CHAPTER I2 CHAPTER 12
ONTRACT MANAGEMEN ONTRACT MANAGEMENT

12.2 No Provision 12.2 Requisition of work i.e. Upgradation,


Addition/ Alteration and Major Repair I
Renovation.

i) To take up the work of Upgradation,


Addition/Alteration and Major Repair I
Renovation, the process of requisition and
execution shall be followed as per SOP No.
't2t't.
ii) After vacation of quarter, the photographs with
geo-tagging of all the rooms, toilets, kitchen
etc; showing the present condition, shallbe
taken and uploaded on E-Sewa/ERP by JE/AE.
12.3 No Provision '12.3 Review of Requisitions by Higher Offices

i) A team comprising EE(P) / AE(P) from CE/SE


office and minimum 01 AE from other Division
under jurisdiction of CE/SE shall inspect the
sub-division atleast once in 03 months to
inspect the records mentioned in SOP No. 12l1
including any other records related to works
and will submit report to the CE/SE.
ii) The team can take the feedback from the
allottee, if re uired.
This issues with the approval of DG CPWD

L6 .to4
(fi $ra
sr*€rq lrft{fdr f$.w w)
lssued from file No. CSQ/CM|16(1)12024 e-file- 9173997

d-dthh dsr iiftft ffi d wfr sr o\ eirqrq-6 qs-fl \rs orf-qfr tg r

(ffirfrtu i_*tTr{e d qrtaq t) g o\' 29


K SING H
,
EE(Manual)