Professional Documents
Culture Documents
Rlco - Company Profile
Rlco - Company Profile
COMPANY PROFILE
SAUDI ARABIA
WWW.RLCO.COM.SA
ORGANIZATION SRTUCTURE
INTEGRATED LIGHTING
COMPANY (ILC)
GENERAL MANAGER
GM
IT
PRESCRIPTION ASSEMBLY
ACTIVITIES DEPARTMENT
PARTNERS FABRICATION
DEVELOPMENT DEPARTMENT
PAINT
TECHNICAL DEPARTMENT
SUPPORT
PURCHASES
ABOUT US
Since its establishment in 2008 , under the name (Al Noor Al Hadi
Energy Company Factory) until 2017, as this year witnesses our
development and the launch of our new identity and brand (Renewable
Lighting Factory – RLCO ) Our activity focused on the manufacture of
outdoor lighting - street lighting poles - power transmission poles -
decorative columns - cosmetic poles - spotlights - Islamic lanterns -
Bollard - Up Light - wall lighting and Smart light .
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
VISION:
TO GLOBAL MARKETS
WE PROMOTE THE LOCAL INDUSTRY
Our vision is to provide high quality standards and standards
in the manufacture of lighting poles
MISSION:
Our mission is to develop the lighting poles industry, and
to launch the smart poles industry in the Kingdom and
the Gulf countries
RLCO IN NUMBERS
The expected production capacity of RLCO in 2021
RLCO Timeline
Al-Nour Al-Hadi al Noor Al Hadi Adding a new
Corporation to Power Company production line,
import lighting Factory smart lighting poles
2015 2020
2008 2021
2010 2017
Our start
Al Noor Al Hadi Renewable Lighting Start production.
Establishment for Factory for Industry rlco-LED lighting
Lighting Poles fixture
rlco
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
OUR PARTNERS
Lighting Design requires architecturally creative Lamp posts
and bollards, sophisticated tunnel solutions, smart roadway
systems, energy efficient LED luminaires, professional
stadium lighting, highly elegant garden lighting, innovative
down light development, etc. RLCO will be offering it all you.
Positively and sustainably RLCO Progressive Lighting is
growing and leading in the local and international market by
supplying, exclusively from leading partners from all over the
world:
POLAND BULGARIA
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
OUR CLIENTS General Authority for Jubail and Yanbu
الهيئة العامه للجبيل وينبع
NEOM
General Authority of Civil Aviation
الهيئة العامة للطيران المدني
Ministry of Interior
وزارة الداخلية
Ministry of Defense
وزارة الدفاع
Royal Air Force
القوات الجوية الملكية
Saudi Armed Forces
القوات المسلحة السعودية
special forces
القوات الخاصة
Ministry of Finance
وزارة المالية
Ministry of Health
وزارة الصحة
Ministry of housing
وزارة االسكان
Ministry of education
وزارة التعليم
Ministry of Justice
وزارة العدل
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
OUR CLIENTS Ministry of Social Affairs
وزارة الشئون اإلجتماعية
Ministry of Environment, Water and Agriculture
وزارة البيئة و المياة و الزراعة
Ministry of Municipal and Rural Affairs
وزارة الشئون البلدية و القروية
AL-Qassim Municipality
أمانة القصيم
Municipality AL-Taif
امانة الطائف
Municipality AL-Ahsa
امانة األحساء
Hail Municipality
امانة حائل
AL-Jouf Municipality
امانة الجوف
Municipality AL-Baha
امانة الباحة
Medina Municipality
امانة المدينة المنورة
Riyadh Municipality
أمانة الرياض
Saudi Customs
الجمارك السعودية
Saudi Authority for Industrial Cities and Technology zones
الهيئة السعودية للمدن الصناعية
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
OUR CLIENTS The Public Institution for Social Security
الموسسة العامة للتأمينات اإلجتماعية
General Auditing Bureau
ديوان المراقبة العامة
The General Authority for Ports, Jizan Port
الهيئة العامة للموانئ ميناء جازان
Public Pension Agency
الموسسة العامة للتقاعد
King Abdullah bin Abdulaziz University for Science and Technology
جامعة الملك عبدهللا بن عبدالعزيز للعلوم و التكنلوجيا
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
OUR CLIENTS Jazan University
جامعة جازان
Taif University
جامعة الطائف
Northern Border University
جامعة الحدود الشمالية
Aljouf University
جامعة الجوف
AL-Baha University
جامعة الباحة
Tabouk University
جامعة تبوك
Najran University
جامعة نجران
Prince Satatam bin Abdulaziz University
جامعة األمير سطام بن عبدالعزيز
Municipality AL-Fawarah
بلدية الفوارة
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
NTRODUCTION // PRODUCTION LINES
H.M WELDING MACHINE ELECTROSTATIC PAINT OVEN CNC ELECTROSTATIC PAINT OVEN
FOR LIGHTING FICTURES
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
NTRODUCTION // PRODUCTION LINES
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
NTRODUCTION // PRODUCTION LINES
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
NTRODUCTION // OUR PROJECTS
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
NTRODUCTION // OUR PROJECTS
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
NTRODUCTION // OUR PROJECTS
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
NTRODUCTION // OUR PROJECTS
WWW.RLCO.COM.SA
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
اﺳﻢ اﻟﻤﻨﺸﺄة :ﺷﺮﻛﺔ ﻣﺼﻨﻊ اﻻﻧﺎرة اﻟﻤﺘﺠﺪدة ﻟﻠﺼﻨﺎﻋﺔ ﺗﺎرﻳﺦ اﻹﺻﺪار 26-02-2021 :رﻗﻢ اﻟﺸﻬﺎدة2110128528 :
ﺗﺸﻬﺪ اﻟﻬﻴﺌﺔ اﻟﻌﺎﻣﺔ ﻟﻠﻤﻨﺸﺂت اﻟﺼﻐﻴﺮة واﻟﻤﺘﻮﺳﻄﺔ "ﻣﻨﺸﺂت" ﺑﺄن اﻟﻤﻨﺸﺄة اﻟﻤﺬﻛﻮرة أﻋﻼہ ﺗﻨﺪرج
وﻓﻘﺎ ﻟﻠﺘﻌﺮﻳﻒ اﻟﻤﻌﺘﻤﺪ ﻟﺪى "ﻣﻨﺸﺂت"
ﻣﻦ ﺿﻤﻦ اﻟﻤﻨﺸﺂت اﻟﺼﻐﻴﺮة واﻟﻤﺘﻮﺳﻄﺔ ً
https://profile.monshaat.gov.sa/validate
ﺗﻌﺪ ﻫﺬہ اﻟﺸﻬﺎدة ﻣﻦ اﻟﻮﺛﺎﺋﻖ اﻟﺤﻜﻮﻣﻴﺔ اﻟﺮﺳﻤﻴﺔ ،وﻳﺤﻈﺮ ﻗﻄﻌﻴًﺎ ﺗﻘﻠﻴﺪﻫﺎ أو ادﺧﺎل أي ﺗﻌﺪﻳﻼت ﻋﻠﻴﻬﺎ ،ﻛﻤﺎ ﺗﻌﺮض ﺻﺎﺣﺒﻬﺎ إﱃ اﻟﻤﻼﺣﻘﺔ اﻟﻨﻈﺎﻣﻴﺔ أﻣﺎم اﻟﺠﻬﺎت اﻟﻤﺨﺘﺼﺔ ،وﺗﻌﺘﺒﺮ ﻻﻏﻴﺔ ﻓﻲ ﺣﺎل
وﺟﻮد أي ﻛﺸﻂ أو ﺗﻌﺪﻳﻞ ،دون أدﻧﻰ ﻣﺴﺆوﻟﻴﺔ ﻋﲆ ﻣﻨﺸﺂت وﻣﺎ ﻳﺘﺮﺗﺐ ﻣﻦ أﺛﺮ ﻋﻠﻴﻬﺎ .وﺗﻌﺘﺒﺮ ﻣﻨﺸﺂت ﻏﻴﺮ ﻣﺴﺆوﻟﺔ ﻋﻦ أي آﺛﺎر أﺧﺮى ﻣﺘﺮﺗﺒﺔ ﻋﲆ اﻟﺸﻬﺎدة أو أي ﻋﻤﻠﻴﺔ ﺗﻌﺪﻳﻞ أو ﺗﺰوﻳﺮ ﻋﲆ
اﻟﺒﻴﺎﻧﺎت اﻟﻮاردة ﻓﻴﻬﺎ
١٤٤٣/٠٦/١٧ ﺍﻟﺘﺎﺭﻳﺦ
٢٠/٠١/٢٠٢٢ ﺍﻟﻤﻮﺍﻓﻖ
ﺭﻣﺰ ﺍﻟﺸﻬﺎﺩﺓ ٤٣٥٧٣٩٩٤
ﺷﻬﺎﺩﺓ
ﺍﻟﺮﻳﺎﺽ
٠
٥٥٧٣٨٤٢٠٠ ﺭﻗﻢ ﺍﻹﺷﺘﺮﺍﻙ :
ﻣﺼﺪﺭﻩ :ﺍﻟﺮﻳﺎﺽ ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ١٠١٠٤٦٤٢٠١ :
ﻛﺘﺎﺑﺔ ﺭﻗﻤﺎ
ﺍﺣﺪ ﻋﺸﺮﻩ ﻣﺸﺘﺮﻛﺎ ١١ ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ
ﻋﺸﺮﻭﻥ ﻣﺸﺘﺮﻛﺎ ٢٠ ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﻏﻴﺮ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ
ﻭﺍﺣﺪ ﻭ ﺛﻼﺛﻮﻥ ﻣﺸﺘﺮﻛﺎ ٣١ ﺍﻟﻤﺠﻤﻮﻉ
ﺗﺸﻬﺪ ﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﺑﺄﻥ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺃﻋﻼﻩ ﻣﻨﺘﻈﻤﺔ ﻓﻲ ﺍﻟﻮﻗﺖ ﺍﻟﺤﺎﻟﻲ ﺑﺴﺪﺍﺩ ﻣﺪﻳﻮﻧﻴﺘﻬﺎ ﻋﻠﻰ ﺃﻗﺴﺎﻁ ﺷﻬﺮﻳﺔ
ﻭﻓﻖ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻤﻘﺪﻣﺔ ﻣﻨﻬﺎ ﺣﺘﻰ ﺗﺎﺭﻳﺦ ﺇﺻﺪﺍﺭ ﺍﻟﺸﻬﺎﺩﺓ ﻭﺍﻟﺘﻲ ﺗﻢ ﻣﻨﺤﻬﺎ ﻟﺘﻘﺪﻳﻤﻬﺎ ﻷﻳﺔ ﺟﻬﺔ ﺗﻄﻠﺒﻬﺎ ،ﻭﻫﻲ ﺻﺎﻟﺤﺔ ﻟﺠﻤﻴﻊ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ
ﻧﺺ ﻋﻠﻴﻬﺎ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻓﻲ ﺍﻟﻤﺎﺩﺓ ) (١٩/٦ﻣﻨﻪ.
ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﺳﺎﺭﻳﺔ ﺍﻟﻤﻔﻌﻮﻝ ﺣﺘﻰ ١٤٤٣/٠٧/١٧ﻫـ.
ﺗﻌﺪ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﻣﻦ ﺍﻟﻮﺛﺎﺋﻖ ﺍﻻﻟﻜﺘﺮﻭﻧﻴﺔ ﺍﻟﺤﻜﻮﻣﻴﺔ ﺍﻟﺮﺳﻤﻴﺔ ،ﻭﻳﺤﻈﺮ ﻗﻄﻌﻴﺎ ﺗﻘﻠﻴﺪﻫﺎ ﺃﻭ ﺇﺩﺧﺎﻝ ﺃﻱ ﺗﻌﺪﻳﻼﺕ ﻋﻠﻴﻬﺎ ﺳﻮﺍﺀ ﺑﺎﻹﺿﺎﻓﺔ ﺃﻭ ﺍﻟﺤﺬﻑ
ﺃﻭ ﺍﻟﺘﻐﻴﻴﺮ ﻓﻲ ﺑﻴﺎﻧﺎﺗﻬﺎ ﺃﻭ ﻏﻴﺮ ﺫﻟﻚ ﻣﻦ ﺍﻧﻮﺍﻉ ﺍﻟﺘﻌﺪﻳﻞ ،ﻭﺗﻌﺪ ﺍﻟﺸﻬﺎﺩﺓ ﻻﻏﻴﺔ ﺇﺫﺍ ﺷﺎﺑﻬﺎ ﺷﻲﺀ ﻣﻦ ﺫﻟﻚ ،ﻛﻤﺎ ﺗﻌﺮﺽ ﺻﺎﺣﺒﻬﺎ ﻟﻠﻤﻼﺣﻘﺔ ﺍﻟﻨﻈﺎﻣﻴﺔ
ﺃﻣﺎﻡ ﺍﻟﺠﻬﺎﺕ ﺍﻟﻤﺨﺘﺼﺔ ﺑﺎﻹﺿﺎﻓﺔ ﺇﻟﻰ ﻣﺎﻳﻔﺮﺿﻪ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻣﻦ ﻋﻘﻮﺑﺎﺕ ،ﻭﻻﻳﺠﻮﺯ ﺗﺪﺍﻭﻝ ﺍﻟﺸﻬﺎﺩﺓ ﺇﻻ ﻓﻲ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ
ﺃﺻﺪﺭﺕ ﻷﺟﻠﻬﺎ ﻭﻓﻘﺎ ﻷﺣﻜﺎﻡ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ،ﻭﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻏﻴﺮ ﻣﺴﺆﻭﻟﻪ ﻋﻦ ﺃﻱ ﺁﺛﺎﺭ ﺃﺧﺮﻯ ﻣﺘﺮﺗﺒﺔ
ﻗﺒﻞ ﺍﻟﻐﻴﺮ ﻋﻦ ﺍﻟﺸﻬﺎﺩﺓ ﻭﻏﻴﺮ ﻣﺴﺆﻭﻟﺔ ﻋﻦ ﺃﻱ ﻋﻤﻠﻴﺔ ﺗﺰﻭﻳﺮ ﺃﻭ ﺗﻌﺪﻳﻞ ﺗﺘﻢ ﻋﻠﻰ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻮﺍﺭﺩﺓ ﻓﻴﻬﺎ .
2/13/22, 3:23 PM Aconex
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Cc (2) NEOM ETSD Document Control - NEOM - Engineering & Technical Services Dept (+1 more...)
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
The attached documents have completed the "10-661160-1100001342-MAG-ELE-MAT-000004_WO 04-Material Submittal for Foundation and Battery Chamber
from RLCO -RD 16" workflow with the following results :
10-661160-1100001342-MAG-
EPM DCC B Document Management A - Work May Proceed
ELE-CRS-000009
10-661160-1100001342-MAG-
EPM DCC B Document Management A - Work May Proceed
ELE-MAT-000004
https://ksa1.aconex.com/Logon 1/1
2/13/22, 3:32 PM Aconex
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Cc (2) NEOM ETSD Document Control - NEOM - Engineering & Technical Services Dept (+1 more...)
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
The attached documents have completed the "10-661120-1100001342-MAG-CIV-MAT-000026_WO 03-Material Submittal for Foundation and Battery Chamber
from RLCO -RD12" workflow with the following results :
10-661120-1100001342-MAG-
EPM DCC B Document Management A - Work May Proceed
CIV-CRS-000044
10-661120-1100001342-MAG-
EPM DCC B Document Management A - Work May Proceed
CIV-MAT-000026
https://ksa1.aconex.com/Logon 1/1
1/15/22, 11:54 AM Aconex
14 Outer Regions
Riyadh, KSA
Riyadh
Saudi Arabia
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
The attached documents have completed the "14-4800000322/000-IN-Project Management - IFR-PQD" workflow with the following results :
14-662000-4800000322-
NEOM/AECOM_Review A Negm A - Work May Proceed No Objection
MOB-ELE-PQD-000019
https://ksa1.aconex.com/Logon 1/2
1/15/22, 11:54 AM Aconex
MOB-ELE-CRS-000077
https://ksa1.aconex.com/Logon 2/2
5R\DO&RPPLVVLRQIRU-XEDLODQG<DQEX
'LUHFWRUDWH*HQHUDORIWKH5R\DO&RPPLVVLRQLQ-XEDLO
&RQVWUXFWLRQ'HSDUWPHQW
5&75$160,77$/
5( $EGL$EGLZDKDE
3/($6($&.12:/('*(5(&(,37$1'5(7851,00(',$7(/< '$7( 2FW
ŽĐƵŵĞŶƚdLJƉĞ͗ ŽĚĞ͗ &RQWUDFW1R &
9 DĞƚŚŽĚ^ƚĂƚĞŵĞŶƚ D^ŝ dĞĐŚŶŝĐĂů 5&7UDQVPLWWDO1R 7
9 ^ŚŽƉƌĂǁŝŶŐ ^ dĞĐŚŶŝĐĂů
'DWH
Abdullah email=KHALDIABD@RCJubail.gov
.sa, c=<n
Date: 2021.10.18 16:05:44 +03'00' 'DWH 2FW
0XVWDID$ONKDWHHE 6,*1$785(
3URMHFW0DQDJHU &216758&7,213'0&'(3$570(17
0RIDUUHK0DU]RXJ$O+DUEL 3DUWQHUV&R/WG 5&%/(9(/5DV$O.KDLU2IILFH
&RQWUDFW1R &
&6 :RUN0D\3URFHHG &6 5HYLVHDQG5HVXEPLW:RUN
&2175$&72568%0,77$/12 'RF1R 0D\1RW3URFHHG
5&75$160,77$/1R &6
x 5HYLVHDQG5HVXEPLW &6 5HYLHZ1RW5HTXLUHG
:RUN0D\3URFHHG
7,7/( 7HFKQLFDO6XEPLWWDORI$UHD6WUHHW/LJKWLQJ3ROHVE\ VXEMHFWWRLQFRUSRUDWLRQRI :RUN
5/&2 FKDQJHVDQGFRPPHQWV
&6 0D\3URFHHG
&6 0D\1RW3URFHHG
Note: Permission to proceed does not constitute acceptance or approval of
design details, calculation analyses, test methods or materials developed or
selected by the supplier does not relieve the contractor from his contractual
obligations.
1RWH
Comments must be written on the Comments sheet and attached. Comments which can only be possible on the contractor's
submittal must be indexed on this form
Document status applies to technical content only. Use of foreign materials, equipment and services is subject to royal
commission's approval. Once this technical submittal is given code 1 or 2 status, contractor shall submit vendor approval(with
technical submittal package) for royal commission's review. Procurement prior to this approval is done at the contractor's own risk.
# To complete and clearly compare on comparison sheet the RC specification requirements to the manufacturer's performance data.Any deviation shall be identified and a justification will be given.
7XHVGD\2FWREHU
12/11/21, 11:56 AM Aconex
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Cc (2) NEOM ETSD Document Control - NEOM - Engineering & Technical Services Dept
MESSAGE
The attached documents have completed the "10-662155-1100001334-AAC-ELE-MAT-000002 WO.007 – Material Submittal of Solar
Lightening Material Renewable Lightening Factory for Industry LLC ‘RLCO’-RD-15 E ( C ) (41-45 KM)" workflow with the following results :
10-662155-1100001334- B - Incorporate
EPM DCC B Document Management
AAC-ELE-CRS-000002 Comments - Proceed
10-662155-1100001334- B - Incorporate
EPM DCC B Document Management
AAC-ELE-MAT-000002 Comments - Proceed
https://ksa1.aconex.com/Logon 1/1
12/29/21, 10:21 AM Aconex
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Cc (2) NEOM ETSD Document Control - NEOM - Engineering & Technical Services Dept
MESSAGE
The attached documents have completed the "AlAyuni DCC to EPM DCC-1100001334_WO 05- Road 15W_R02" workflow with the following
results :
https://ksa1.aconex.com/Logon 1/1
12/29/21, 10:17 AM Aconex
Mr 110000133
10 Spine DCC
Cross Project Search
Infrast. Al Ayuni Investmen
Contracting
Tasks Models Documents Mail Field Packages
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Cc (2) NEOM ETSD Document Control - NEOM - Engineering & Technical Services Dept (+1 more...)
MESSAGE
The attached documents have completed the "AlAyuni DCC to EPM DCC-1100001334_WO 05- Road 15W_R02" workflow with the following
results :
https://ksa1.aconex.com/Logon 1/1
ü
No objection for the proposed 12 m height pole for time lapse camera, subject to the following
1. Submission and approval of pole structural design and design of pole foundation
2. No maintenance access provision shown in the proposal, Contractor to provide proposal for accessing
the camera location for maintenance / repairs.
3. Contractor to ensure above comments are addressed before commencement of pole installation
4. Final location of the time lapse camera to be agreed before installation
Siddique Israr Resident Engineer 21/12/2021
Firefox https://ksa1.aconex.com/rsrc/20211215.0853/en_AU_DOC/mail/view/in...
11 Regional Infrastructure
Regional Infrastructure
NEOM
Saudi Arabia
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
1 of 2 12/23/2021, 11:19 AM
Firefox https://ksa1.aconex.com/rsrc/20211215.0853/en_AU_DOC/mail/view/in...
2 of 2 12/23/2021, 11:19 AM
Bechtel Document Management Final (WF-018677) 10-662171-0000100324-FTC-CIV-MA… 1:48 PM
BECHTEL KSA WORKFLOW TRANSMITTAL BEC-WTRAN-033303
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
B-
10-662171- 100324-031 – Material Submittal for LED Lighting
Incorporate
0000100324-FTC- 01 12/12/2021 Fixture, Solar Panel, Battery and Charge
Comments -
CIV-CRS-000088 Controller By: RLCO._ CRS
Proceed
B-
10-662171- 100324-031 – Material Submittal for LED Lighting
Incorporate
0000100324-FTC- 01 12/12/2021 Fixture, Solar Panel, Battery and Charge
Comments -
CIV-MAT-000020 Controller By: RLCO.
Proceed
MESSAGE
The attached documents have completed the "10-662171-0000100324-FTC-CIV-MAT-000020_100324-031 – Material Submittal for LED
Lighting Fixture, Solar Panel, Battery and Charge Controller By: RLCO." workflow with the following results :
This transmittal was automatically generated.
Status N/A
(0 selected)
Planned
Revision
File Document No Revision Title Status Submission
Date
Date
https://ksa1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1351009856%26CORRESPONDENCE_MAILBO… 1/3
10/23/21, 8:48 PM Aconex
ATTRIBUTES
MESSAGE
The attached documents have completed the "20211020-MAH-MATERIAL TECHNICAL SUBMITTAL FOR 25-METER HIGH MAST POLE & 6
METER LIGHTING POLE FROM RLCO SUPPLIERS-4MADN03-MADN-07-MAH-EL-MAT-00001_01" workflow with the following results :
4MADN03-MADN-07-
Step 1 - MAH Upload M Najim A - Approved
MAH-EL-MAT-00001
Step 3 SEVEN Review R Almanie Approved with Comments Approve RLCO as supplier
ONLY. To get the final
approval, MAH have to
submit the Design
https://ksa1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1351009856%26CORRESPONDENCE_MAILBO… 2/3
10/23/21, 8:48 PM Aconex
calculation transmittal,
LUX calculation and brand/
type of the lights that will
be used In addition to that
the ref. No (4TBUK04-
TBUK-07-MAH-CI-DED-
00019), that been
mentioned in the RLCO
PQ is not existing.
https://ksa1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1351009856%26CORRESPONDENCE_MAILBO… 3/3
12/11/21, 11:56 AM Aconex
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Cc (2) NEOM ETSD Document Control - NEOM - Engineering & Technical Services Dept
MESSAGE
The attached documents have completed the "10-662155-1100001334-AAC-ELE-MAT-000002 WO.007 – Material Submittal of Solar
Lightening Material Renewable Lightening Factory for Industry LLC ‘RLCO’-RD-15 E ( C ) (41-45 KM)" workflow with the following results :
10-662155-1100001334- B - Incorporate
EPM DCC B Document Management
AAC-ELE-CRS-000002 Comments - Proceed
10-662155-1100001334- B - Incorporate
EPM DCC B Document Management
AAC-ELE-MAT-000002 Comments - Proceed
https://ksa1.aconex.com/Logon 1/1
14 Outer Regions
Riyadh, KSA
Riyadh
Saudi Arabia
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
A-
14-187100- 4800000229/000-Hot deep galvanized - Octagonal Lighting
Work
4800000229-MAH- 01 29/11/2021 Pole - 12.85m high -Dia. (310/110mm) - Thk 4mm with
May
ELE-CRS-000008 Base Plate 500x500x25 and Solar Bracket
Proceed
A-
14-187100- 4800000229/000-Hot deep galvanized - Octagonal Lighting
Work
4800000229-MAH- 03 29/11/2021 Pole - 12.85m high -Dia. (310/110mm) - Thk 4mm with
May
ELE-MAT-000002 Base Plate 500x500x25 and Solar Bracket
Proceed
MESSAGE
The attached documents have completed the "14-4800000229/000-IN-Construction - IFR_" workflow with the following results :
14-187100-4800000229-
NEOM/AECOM_Review P Rozpedowski A - Work May Proceed
MAH-ELE-CRS-000008
14-187100-4800000229- NEOM/AECOM_Review P Rozpedowski A - Work May Proceed
MAH-ELE-MAT-000002
10/23/21, 8:48 PM Aconex
Status N/A
(0 selected)
Planned
Revision
File Document No Revision Title Status Submission
Date
Date
https://ksa1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1351009856%26CORRESPONDENCE_MAILBO… 1/3
10/23/21, 8:48 PM Aconex
ATTRIBUTES
MESSAGE
The attached documents have completed the "20211020-MAH-MATERIAL TECHNICAL SUBMITTAL FOR 25-METER HIGH MAST POLE & 6
METER LIGHTING POLE FROM RLCO SUPPLIERS-4MADN03-MADN-07-MAH-EL-MAT-00001_01" workflow with the following results :
4MADN03-MADN-07-
Step 1 - MAH Upload M Najim A - Approved
MAH-EL-MAT-00001
Step 3 SEVEN Review R Almanie Approved with Comments Approve RLCO as supplier
ONLY. To get the final
approval, MAH have to
submit the Design
https://ksa1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1351009856%26CORRESPONDENCE_MAILBO… 2/3
10/23/21, 8:48 PM Aconex
calculation transmittal,
LUX calculation and brand/
type of the lights that will
be used In addition to that
the ref. No (4TBUK04-
TBUK-07-MAH-CI-DED-
00019), that been
mentioned in the RLCO
PQ is not existing.
https://ksa1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1351009856%26CORRESPONDENCE_MAILBO… 3/3
9/25/21, 10:58 PM https://ksa1.aconex.com/rsrc/20210805.1103/en_AU_DOC/mail/view/index.html#/1342179436/1350405414
To (4) Mr Gernel Jones Dumpa - MOFARREH ALHARBI AND PARTNERS (+3 more...)
Status N/A
(0 selected)
Planned
Revision
File Document No Revision Title Status Submission
Date
Date
RLCO
4TBUK04-TBUK-07-MAH- B - Approved
01 07/08/2021 Prequalification
EL-PRQ-00004 with Comments
Documents
ATTRIBUTES
MESSAGE
The attached documents have completed the "RLCO Prequalification Documents" workflow with the following results :
4TBUK04-TBUK-07-
Step 1 - MAH Upload G Dumpa A - Approved
MAH-EL-PRQ-00004
https://ksa1.aconex.com/rsrc/20210805.1103/en_AU_DOC/mail/view/index.html#/1342179436/1350405414 1/3
9/25/21, 10:58 PM https://ksa1.aconex.com/rsrc/20210805.1103/en_AU_DOC/mail/view/index.html#/1342179436/1350405414
https://ksa1.aconex.com/rsrc/20210805.1103/en_AU_DOC/mail/view/index.html#/1342179436/1350405414 2/3
9/25/21, 10:58 PM https://ksa1.aconex.com/rsrc/20210805.1103/en_AU_DOC/mail/view/index.html#/1342179436/1350405414
The contractor/supplier
should submit the below
missing document:- 1-
Safety Procedure 2-
quality Procedure in
addition to that this PQD is
applicable for supplier /
B - Approved with brand only, not valid to
Step 3 SEVEN Review M Almajed
Comments purchase/ order the
materials, contractor
should submit a separate
technical material
according to the project
specification & Contract to
get the approval of the
materials
https://ksa1.aconex.com/rsrc/20210805.1103/en_AU_DOC/mail/view/index.html#/1342179436/1350405414 3/3
Bechtel Document Management Final (WF-010959) 4800000283 - Prequalification Docum… 8:03 AM
BECHTEL KSA WORKFLOW TRANSMITTAL BEC-WTRAN-017474
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
The attached documents have completed the "4800000283 - Prequalification Documents RLCO (Solar Lighting Pole) ‐ Design & Build of Spine
Site Offices" workflow with the following results :
10-721500-4800000283-
EPM DCC B Document Management Work May Proceed
MAH-ELE-PQD-000002
9/14/21, 8:07 AM Aconex
Bechtel Document Management Final (WF-008310) WO 26- Pre-Qualification for Renew… YESTERDAY
BECHTEL KSA WORKFLOW TRANSMITTAL BEC-WTRAN-016413
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Status N/A
(2 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
The attached documents have completed the "WO 26- Pre-Qualification for Renewable Lighting Factory (RLCO) Supplier of Solar Street
Lighting System-RD-17 West 2(4-10km)&RD-11A" workflow with the following results :
https://ksa1.aconex.com/Logon 1/2
9/14/21, 8:07 AM Aconex
10-662171-0000100201-
EPM DCC B Document Management Work May Proceed
MAH-ELE-PQD-000002
https://ksa1.aconex.com/Logon 2/2
JJ'i,.1'
4J.r-y
,:.lrri.! iJ.:t! al} /i!fi r+{t.! :1 lt-!r
arJarr i+.tr (rrra! ,Jj,
H.+t &JE
..a.i ilcL--$
-"!Jr ..Jti)l 6u.-lrll ...,6 LJiUI +].lt o-.,lr.ii
Ci* 4_dl .)J-L $-Ji
Ji- o eEJl
+tjJ -..!-i.tr ;JLyt (ltisul
..r.i ei- .!dl ...,* OiL-n aJ- s!.+l !-te .! 'Jr
.r. tlnrt
^
i Sa#F# r.'ir ! ejjYl ,.i-.
1Bc q *i6 -*
r E-.trJ9LEn'd+J -.Jtl)r .l-
L,ti-lils.:L!Jr +.rJ ir. ..Jr.i.j
JL
JJ,Jc
^ tLirJl
.-tdl
+rr al\
J& !t
tri.. JL o tEJl .rJF rl \.1_j+: r}l! t4ir !-Ji
,W
azzi rn at.Snareet
_.J+ji ;'ui "I,,i*l J.ii*lr .J-
irr,irll
,.+FrF hI I *r 6U.ti-j.l t"lj t^ljilt rj:L ilridl Ot+ cJ3liJt \ - r, drtiJl 6LL-,).
JJidl r:llelii-l
thhJlr:ilq[itrI /e.Jilr /ei-ill ol.il.Il.-/.r yr
40311146=80ri.' LUJ
^ Lnt:
c ii*!l ilr-
*:
. .3
't
:,t* -,'il1:. a..:..W. 2 z- i. .. .........
!a!*.,7* U.-a
U-p. !.
......,....!...... -{-a. t :.-...).t. 1 :. r..t,. 6...........
.d1;,*tf?.*{4:hfJY.*aJi:a;iii
I [ni/: i ; .rt. .V..
j;;i;ieL l
.*4a_.e........
.. {F-"dL*+r. ZJ, !-.L.ai*!.!=.!..A ty.! I
clr4t..qr-.......
jlt
/
t /dr
J+():'rr...
g.}l-,r-)ll ia+
JrBrt
Li.r/l +i Ji J,.oU ?tf 'r;=-* ;;Ull3,i.,ialt i..LJl :.11:11
1
r\!ttlo./Y'
r'1 I .-l!) A.A.tt,!Yt
r11t!/AIYY .1 ..olltl/V,/Y'
.!
T
t lJ..
J t- -lJ
c J-L..
..-,*.,tf f ... .rg.*!l.y.rlaar :jrrlc y,<.- ;3 + r-;
Y J-ta :. I crl
iJ" LP 0
LBrl gssQ: ,1 13J+.?.i {.L e.lbji3
,IrJ,
u
!
1
L; t, E-l!
ijr3 .rlJLa JE . Ji ;3e:ri.oll -tG* 'le *. ** *:i JrJi
)-r-e
<':l e'93
. .-r.
fJ +i"Ub1,:>
sllall fa.lEe
.r-*.lE ;r^ O*.s<'-I L^t -Ai ;g lL r)lr'i 'J-Jll.lt p1.ra i'c.;-" # i!:Jbtl
2-- j
. .,Je i4otLa:tl ;it-r,iJt J*aitl fi3'-
d.U! f U;I,I .lr,Jt-
e4lE*f*.
,,, g$4f? f,If
ijr!1r-r .. ::.ii,:"si
--,. -"1',r
-
.s--1 ff
, . ''r.;i :r r *-
$liA. : '1.,
",, r _r.r. Vt. :i-s
.i':'iI
,rl* i-+r gl
! r.^,i"t: jtr-:,t! +l
-r- --:-, !r lr sL: r .r&.: ,_\)z' IJ,r4 e4! ,- r,
;jGrt -!rs-i ::t-5 .!i5 : !t-Jr 1-l . 11/. rr " rlr..!.ra".. -rYY!tr r. ,:ll .i.
Bechtel Document Management Final (WF-009159) WO 22- Material Approval for Solar St… 10:17 PM
BECHTEL KSA WORKFLOW TRANSMITTAL BEC-WTRAN-015488
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Final (WF-009159) WO 22- Material Approval for Solar Street lighting System by
RLCO-RD-15E B(25-41KM)
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
Work
10-662154-0000100201- WO 22- Material Approval for Solar Street lighting
02 24/08/2021 May
MAH-ELE-CRS-000011 System by RLCO-RD-15E B(25-41KM)_CRS
proceed
Work
10-662154-0000100201- WO 22- Material Approval for Solar Street lighting
02 24/08/2021 May
MAH-ELE-MAT-000004 System by RLCO-RD-15E B(25-41KM)
proceed
MESSAGE
The attached documents have completed the "WO 22- Material Approval for Solar Street lighting System by RLCO-RD-15E B(25-41KM)"
workflow with the following results :
https://ksa1.aconex.com/Logon 1/2
9/6/2021 Aconex
10-662154-0000100201-
EPM DCC B Document Management Work May Proceed
MAH-ELE-MAT-000004
https://ksa1.aconex.com/Logon 2/2
8/4/2021 Aconex
Bechtel Document Management Final (WF-006846) WO 22- Material Approval for Solar … YESTERDAY
BECHTEL KSA WORKFLOW TRANSMITTAL BEC-WTRAN-011542
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Final (WF-006846) WO 22- Material Approval for Solar Street lighting System by
RLCO-RD-15E B(25-41KM)
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
The attached documents have completed the "WO 22- Material Approval for Solar Street lighting System by RLCO-RD-15E B(25-41KM)"
workflow with the following results :
https://ksa1.aconex.com/Logon 1/2
8/4/2021 Aconex
https://ksa1.aconex.com/Logon 2/2
Makkah Public Transport Program - MPTP
Bus Network Civil Infrastructure Works Phase - 1
Document Title: PQD for Renewable Lighting Factory for Industry L.L.C – RLCO (Supply and Installation of Bus Flag
Page Review
Item Report/Document Ref. Review Comments Rev. Response from Contractor Status
No. er
Disclaimer: This document Review corrections or comments made relative to submittals during this review is not exclusive and does not relieve the contractor from his responsibilities and particularly compliance with the requirements of his Contract,
drawings and specifications.
BP1CIWC-SKAA-CIV00-CRS-000735-A Legends for Status: OPEN CLOSED Page 1 of 1
8/8/2021 Aconex
Bechtel Document Management Final (WF-006844) WO 22- Material Approval for solar St… 10:04 AM
BECHTEL KSA WORKFLOW TRANSMITTAL BEC-WTRAN-011981
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Final (WF-006844) WO 22- Material Approval for solar Street lighting column by
RLCO-RD-15E B(25-41KM)
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
Work
10-662154-0000100201- WO 22- Material Approval for solar Street lighting
02 25/07/2021 May
MAH-ELE-CRS-000005 column by RLCO-RD-15E B(25-41KM)_CRS
proceed
Work
10-662154-0000100201- WO 22- Material Approval for solar Street lighting
02 25/07/2021 May
MAH-ELE-MAT-000001 column by RLCO-RD-15E B(25-41KM)
proceed
MESSAGE
The attached documents have completed the "WO 22- Material Approval for solar Street lighting column by RLCO-RD-15E B(25-41KM)"
workflow with the following results :
https://ksa1.aconex.com/Logon 1/2
8/8/2021 Aconex
10-662154-0000100201-
EPM DCC B Document Management Work May Proceed
MAH-ELE-MAT-000001
https://ksa1.aconex.com/Logon 2/2
Chris J Myers Final (WF-001535) 14-4800000229/000-IN-Project Manag… 5:34 PM
AECOM WORKFLOW TRANSMITTAL ACM-WTRAN-002130
14 Outer Regions
Riyadh, KSA
Riyadh
Saudi Arabia
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
The attached documents have completed the "14-4800000229/000-IN-Project Management - IFR" workflow with the following results :
14-187100-4800000229- NEOM/AECOM_Review C Myers Work May Proceed This PQD is applicable for
MAH-ELE-PQD-000003 supplier/Brand only but not
applicable to
purchase/order the
materials, Contractor to
submit separate technical
material submittal for
technical review and
approval in order to get
approval of the materials.
8/4/2021 Aconex
Bechtel Document Management Final (WF-006846) WO 22- Material Approval for Solar … YESTERDAY
BECHTEL KSA WORKFLOW TRANSMITTAL BEC-WTRAN-011542
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Final (WF-006846) WO 22- Material Approval for Solar Street lighting System by
RLCO-RD-15E B(25-41KM)
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
The attached documents have completed the "WO 22- Material Approval for Solar Street lighting System by RLCO-RD-15E B(25-41KM)"
workflow with the following results :
https://ksa1.aconex.com/Logon 1/2
8/4/2021 Aconex
https://ksa1.aconex.com/Logon 2/2
7/28/2021 Aconex
Bechtel Document Management Final (WF-004726) WO 22- Pre-qualification for Solar Ligh… 5:47 PM
BECHTEL KSA WORKFLOW TRANSMITTAL BEC-WTRAN-010915
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
Work
10-662154-0000100201- WO 22- Pre-qualification for Solar Lighting
01 16/06/2021 May
MAH-ELE-CRS-000008 System (RLCO)-RD-15E B(25-41KM)_CRS
proceed
Work
10-662154-0000100201- WO 22- Pre-qualification for Solar Lighting
01 16/06/2021 May
MAH-ELE-PQD-000004 System (RLCO)-RD-15E B(25-41KM)
proceed
MESSAGE
The attached documents have completed the "WO 22- Pre-qualification for Solar Lighting System (RLCO)-RD-15E B(25-41KM)" workflow with
the following results :
https://ksa1.aconex.com/Logon 1/2
7/28/2021 Aconex
10-662154-0000100201-
EPM DCC B Document Management Work May Proceed
MAH-ELE-PQD-000004
https://ksa1.aconex.com/Logon 2/2
6/5/2021 Aconex
Bechtel Document Management Final (WF-003386) WO 022 - Prequalification for Solar Po… 1:04 PM
BECHTEL KSA WORKFLOW TRANSMITTAL BEC-WTRAN-006222
10 Spine Infrastructure
Spine Infrastructure
NEOM
Saudi Arabia
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
Work
10-660000-0000100201- WO 022- Prequalification for Solar Pole
01 22/05/2021 May
MAH-ELE-CRS-000002 Supplier (RLCO FACTORY) RD 15E B_CRS
proceed
Work
10-660000-0000100201- WO 022 - Prequalification for Solar Pole
01 22/05/2021 May
MAH-ELE-PQD-000002 Supplier (RLCO FACTORY) RD 15E B
proceed
MESSAGE
The attached documents have completed the "WO 022 - Prequalification for Solar Pole Supplier (RLCO FACTORY) RD 15E B" workflow with
the following results :
https://ksa1.aconex.com/Logon 1/2
6/5/2021 Aconex
10-660000-0000100201- EPM DCC B Document Management Work May Proceed Full Material submittal
MAH-ELE-PQD-000002 required for the product
https://ksa1.aconex.com/Logon 2/2
Chris J Myers Final (WF-001609) 14-4800000229/000-IN-Project Mana… 23/06/2021
AECOM WORKFLOW TRANSMITTAL ACM-WTRAN-002229
14 Outer Regions
Riyadh, KSA
Riyadh
Saudi Arabia
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
The attached documents have completed the "14-4800000229/000-IN-Project Management - IFR-PQD" workflow with the following results :
00 NEOM Wide
NEOM Wide
NEOM
Saudi Arabia
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
The attached documents have completed the "00-0000100747/000-IN-Construction - IFR" workflow with the following results :
Review
Doc No Step Participant Comments
Outcome
*The submitted 6.0 m lighting pole manufactured by "RLCO" is accepted as noted: *Concrete
00-150000-
Incorporate compressive strength = 35 MPa *A suitable waterproofing system shall be provided. * All metal parts
0000100747- NEOM
M Ahmad Comments & accessories shall be galvanized. *Earthing/grounding system shall be provided. * For precast
NAP-CIV- Review
- Proceed footing: provide underneath polyethylene vapor barrier sheet. *For cast-in place footing: provide
MAT-000036
underneath blinding & polyethylene vapor barrier sheet.
/
RENEWABLE LIGHTING FACTORY FOR INDUSTRY L.L.C
WWW.RLCO.COM.SA
INFO@RLCO.COM.SA
FACTORY ADDRESS :
ALKHARJ ROAD ,EXIT 11( FAWZAN INDUSTRIAL
CITY )
RIYADH ,KSA .
HEAD OFFICE ADDRESS :
AZ-ZUBAIR IBN AL AWAM , AR-RAWABI
RIYADH KSA ,
+966-564223572
P.O.BOX: 3754-8343