Professional Documents
Culture Documents
Approved 2018
Approved 2018
A B C C1 D D1 E F G H I J K L M M1 M2 N O A B C C1 D D1 E F G H I J K L M M1 M2 N O
1800 1800
30 30 ﺑﻠﺪﻳﺔ ﻣﺴﻘﻂ
10 150 66 134 127 13 180 452531 120 170 10 951 70 75 15 110 100 250 10 10 150 66 134 127 13 180 452531 120 170 10 951 70 75 15 110 100 250 10
اﻟﻤﺪﻳﺮﻳﺔ اﻟﻌﺎﻣﺔ ﻟﻠﺸﺆون اﻟﻔﻨﻴﺔ
ادارة ﺗﺮاﺧﻴﺺ اﻟﺒﻨﺎء
ﻳﻌﺘﻤﺪ ﺣﺴﺐ ا¼ﺑﺎﺣﺔ اﻟﺼﺎدرة
HO
LD
I ﻳﺠﺐ اﻻﻟﺘﺰام ﺑﻄﻼء اﻟﻮاﺟﻬﺎت ﺑﺎﻟﻠﻮن اﺑﻴﺾ ﻓﻘﻂ
91 5910
91 5910
91 5910
91 5910
20 20 20 NG 20
TA
NK
19 19 19 19 -ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ ﻟﻠﻤﺸﺮوع واﻻﺳﺘﺸﺎري
اﻟﻤﺸﺮف اﻻﻟﺘﺰام ﺑﺎﻟﺘﻨﻔﻴﺬ ﺣﺴﺐ اﻟﻤﺨﻄﻄﺎت اﻟﻤﻌﺘﻤﺪة
18 18 18 18
واﻟﺘﻘﻴﺪ ﺑﺒﻨﻮد اﻻﺑﺎﺣﺔ اﻟﻤﺸﺮوﻃﺔ .وﺑﺎﻻﺷﺘﺮاﻃﺎت اﻟﻤﺤﻠﻴﺔ
140 واﻟﺪوﻟﻴﺔ اﻟﻤﻌﺘﻤﺪة ﻋﻨﺪ اﻟﺘﻨﻔﻴﺬ
180
180
180
180
-ﻳﺘﺤﻤﻞ اﻟﻤﻜﺘﺐ اﻻﺳﺘﺸﺎري اﻟﻤﺼﻤﻢ واﻟﻤﺸﺮف ﻋﻠﻰ
T&B اﻟﺘﻨﻔﻴﺬ واﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ – ﻛﻞ ﻓﻲ ﻣﺠﺎل اﺧﺘﺼﺎﺻﻪ –
17 17 17
463 17 اﻟﻤﺴﺆوﻟﻴﺔ اﻟﻜﺎﻣﻠﺔ ﺗﺠﺎه ﺳﻼﻣﺔ اﻟﻤﺒﺎﻧﻲ وﺗﺠﺎه ﺻﺤﺔ
450
207
80
80
80
80
DRIVERS ROOM اﻟﺒﻴﺎﻧﺎت اﻟﻤﺬﻛﻮرة ﺑﻬﺬا اﻻﻋﺘﻤﺎد ،وﺻﺤﺔ ﺟﻤﻴﻊ
322
اﻟﻤﺴﺘﻨﺪات واﻟﺘﺼﺎﻣﻴﻢ اﻟﻤﺮﻓﻘﺔ وﺗﻮﻓﻘﻬﺎ ﻣﻊ اﻣﺮ
305
16 16 16 16
134 140
111
111
111
111
TOILET اﻟﻤﺤﻠﻲ رﻗﻢ ٩٢/٢٣واﻟﻘﻮاﻧﻴﻦ واﻟﺘﻌﺎﻣﻴﻢ واﺷﺘﺮاﻃﺎت
FEMALE STAFF PRAY AREA
15a LOCKER ROOM T&B 15a 15a
LOADING
15a اﻟﺮﺳﻢ اﻟﻤﺴﺎﺣﻲ وﺿﻤﺎن اﺳﺘﻴﻔﺎء ﺟﻤﻴﻊ اﻟﻤﻮاﻓﻘﺎت
& T&B 300 180 ±0.00L.V.L اﻟﻤﻄﻠﻮﺑﺔ ﻟﻠﻤﺸﺮوع واﻻﻟﺘﺰام ﺑﻜﺎﻓﺔ اﻟﻤﻮاﺻﻔﺎت
69
69
69
69
15 15 15 STAFF ENTRY 15 واﻻﺷﺘﺮاﻃﺎت واﻻرﺷﺎدات اﻟﻤﻌﺘﻤﺪة ﻣﻦ ﺟﻤﻴﻊ ﺟﻬﺎت
MALE STAFF
50 110
50 110
50 110
50 110
+0.05L.V.L UP S.LIFT LOCKER ROOM ±0.00L.V.L +0.05L.V.L
DN UP S.LIFT اﻻﺧﺘﺼﺎص اﻻﺧﺮى وﺑﻤﺎ ﻻ ﻳﺘﻌﺎرض ﻣﻊ اﻟﺨﺮاﺋﻂ اﻟﻤﺼﺪﻗﺔ
LOBBY
& T&B
14a
-1.30L.V.L 1.80X1.35
278 14a 14a
UP 1.80X1.35
14a ﻣﻦ ﻫﺬه اﻻدارة.
260
LOBBY STORE
14 PUMP ROOM 14 14 14 -ﻳﻠﺘﺰم اﻟﻤﻜﺘﺐ اﻻﺳﺘﺸﺎري اﻟﻤﺸﺮف واﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ
ﺑﺘﻮﻓﻴﺮ اﻟﺤﻤﺎﻳﺔ اﻟﻼزﻣﺔ ﻟﻠﻤﺸﺮوع وﺳﻼﻣﺔ اﻟﻤﺒﺎﻧﻲ
120
120
120
120
D1
650
واﻟﺨﺪﻣﺎت اﻟﻤﺠﺎورة ﻣﻊ اﻻﺧﺬ ﺑﺎﻻﻋﺘﺒﺎر ﻃﺒﻴﻌﺔ اﻟﺘﺮﺑﺔ
13
D1
13 13 13 واﻟﺘﺄﺛﻴﺮات اﻻﻧﺸﺎﺋﻴﺔ ﻟﻠﺒﻴﺌﺔ اﻟﻤﺤﻴﻄﺔ.
286 SERVICE TABLE
130
130
130
130
310
-ﻓﻲ ﺣﺎﻟﺔ اﻟﻘﻄﻊ اﻟﻘﺮﻳﺒﺔ ﻣﻦ اﻟﺠﺒﺎل أو اودﻳﺔ ﻓﺈﻧﻪ
12b 12b 12b 12b
ﻳﺘﻄﻠﺐ ﻋﻠﻰ اﻻﺳﺘﺸﺎري اﻟﻤﺸﺮف ﺗﻘﺪﻳﻢ دراﺳﺔ
290
DISH WASH
360
370
370
500
120 284 560 -ﻳﺠﺐ اﻻﻟﺘﺰام ﺑﺎﺳﺘﺨﺪام اﻟﻠﻮن اﺑﻴﺾ ﺑﺎﻟﻮاﺟﻬﺎت او
COOKING
RESTAURANT COFFE SHOP
اﻟﺘﻨﺴﻴﻖ ﻣﻊ اﻟﻤﺪﻳﺮﻳﺎت ﺑﺎﻟﻤﻨﺎﻃﻖ ﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒﺔ ﺑﺨﻼف
690
440
440
440
440
ذﻟﻚ.
STORE
3.00 X 2.00
CUTTING TABLE -ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ ﻟﻠﻤﺸﺮوع واﻻﺳﺘﺸﺎري
TOILET
616 S/U
اﻟﻤﺸﺮف اﻟﺮﺟﻮع اﻟﻰ ﻫﺬه اﻻدارة ﻗﺒﻞ ﺗﻨﻔﻴﺬ اﻟﻤﺒﻨﻰ ﻓﻲ
LADIES ﺣﺎﻟﺔ وﺟﻮد ﻣﺸﻜﻠﺔ ﻓﻨﻴﺔ ﺗﺤﻮل دون اﻟﺒﻨﺎء وﺣﺴﺐ
250
TOILET
LADIES PRAYER HALL
TOILET اﻟﺨﺮاﺋﻂ اﻟﻤﺘﻌﻤﺪة ﻓﻲ ﺣﺎﻟﺔ ﻋﺪم ﺗﻄﺎﺑﻖ اﻟﺨﺮاﺋﻂ ﻣﻊ ﺑﻌﻀﻬﺎ
12a 12a 12a 12a
120 844 او ﻣﻊ اﻟﻤﻮﻗﻊ ﻓﻲ اﻟﻄﺒﻴﻌﺔ
120
120
120
120
350
130
130
130
210
3370
3370
3370
3370
180
PRE-FUNCTION ROOM
590
100 50 90
100 50 90
100 50 90
TOILET
10a 10a 10a 10a
390 670
120
TOILET TOILET
9a 9a 9a 9a
PWD TOILET
9 180 9 9 9
80
80
80
80
LIFT PIT LIFT
8 2.00X1.85 8 8 8
75
75
75
75
110 100 DN
7 7 7 RECEPTION D1 7
MENS PRAYER HALL & ADMINISTRATION
290
LUGGAGE UP
PWD TOILET LOBBY LOBBY
205
205
205
205
LIFT PIT LIFT
2.00X1.85 UP Designing & Supervision & Interior design
420 320
200 P.O.BOX NO.151/P.C. 316,ALBEDIYAH-ALSEWAQ MUSCAT,SULTHANATE OF OMAN
COUNTER
6 6 6 6
60 50 100 40
198
SHOPS PANTRY
5d 5d 5d 1200 5d
5c 5c 5c LUGGAGE 5c
ENTRANCE
5b 5b 5b 5b
110
110
110
110
620
LOBBY
3.50X6.00
5a 5a 5a 5a
MEETING ROOM MEETING ROOM
70
70
70
70
810
810
810
COFFEE SHOP
5 8.70 X 8.10 8.70 X 8.10 5 5 5
190
190
190
190
WAITING HALL
550
SLOP 1:9
BUSINESS CENTER
210
210
210
210
665
ENT
60
60
60
2 2 2 2
PLAN BOX
LEV.+0.888
150
150
150
226
LEV.+0.444
PLAN BOX
LEV.+0.000 SLOP 1:9
1 1 1 1
30
30
30
30
400 ±0.00L.V.L
10 150 66 134 127 13 180 452333 120 170 10 951 70 75 15 110 100 250 10 10 150 66 134 127 13 180 452333 120 170 10 951 70 75 15 110 100 250 10
30 30
1800 1800
A B C C1 D D1 E F G H I J K L M M1 M2 N O A B C C1 D D1 E F G H I J K L M M1 M2 N O
FOURTH FLOOR
+15.100 FFL
THIRD FLOOR
+11.900 FFL
E-MAIL : OMAN3D@yahoo.com
SECOND FLOOR
+8.700 FFL
800 MM SLAB PROJECTION
320
FIRST FLOOR
+5.500 FFL
SMOOTH PLASTER PAINTED FINISH
GROUND FLOOR
+1.500 FFL
150
INTERLOCK LEVEL
±0.00 WFL
PROPOSED AREA
ﺑﻠﺪﻳﺔ ﻣﺴﻘﻂ
اﻟﻤﺪﻳﺮﻳﺔ اﻟﻌﺎﻣﺔ ﻟﻠﺸﺆون اﻟﻔﻨﻴﺔ
ادارة ﺗﺮاﺧﻴﺺ اﻟﺒﻨﺎء
ﻳﻌﺘﻤﺪ ﺣﺴﺐ ا¼ﺑﺎﺣﺔ اﻟﺼﺎدرة
ﻳﺠﺐ اﻻﻟﺘﺰام ﺑﻄﻼء اﻟﻮاﺟﻬﺎت ﺑﺎﻟﻠﻮن اﺑﻴﺾ ﻓﻘﻂ
TOP OF PARAPET -ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ ﻟﻠﻤﺸﺮوع واﻻﺳﺘﺸﺎري
+28.100 FFL
اﻟﻤﺸﺮف اﻻﻟﺘﺰام ﺑﺎﻟﺘﻨﻔﻴﺬ ﺣﺴﺐ اﻟﻤﺨﻄﻄﺎت اﻟﻤﻌﺘﻤﺪة
50
1700
PENTHOUSE FLOOR اﻟﺮﺳﻢ اﻟﻤﺴﺎﺣﻲ وﺿﻤﺎن اﺳﺘﻴﻔﺎء ﺟﻤﻴﻊ اﻟﻤﻮاﻓﻘﺎت
PAINT FINISH
+24.700 FFL اﻟﻤﻄﻠﻮﺑﺔ ﻟﻠﻤﺸﺮوع واﻻﻟﺘﺰام ﺑﻜﺎﻓﺔ اﻟﻤﻮاﺻﻔﺎت
واﻻﺷﺘﺮاﻃﺎت واﻻرﺷﺎدات اﻟﻤﻌﺘﻤﺪة ﻣﻦ ﺟﻤﻴﻊ ﺟﻬﺎت
اﻻﺧﺘﺼﺎص اﻻﺧﺮى وﺑﻤﺎ ﻻ ﻳﺘﻌﺎرض ﻣﻊ اﻟﺨﺮاﺋﻂ اﻟﻤﺼﺪﻗﺔ
ﻣﻦ ﻫﺬه اﻻدارة.
-ﻳﻠﺘﺰم اﻟﻤﻜﺘﺐ اﻻﺳﺘﺸﺎري اﻟﻤﺸﺮف واﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ
320
FOURTH FLOOR
+15.100 FFL
THIRD FLOOR
+11.900 FFL
E-MAIL : OMAN3D@yahoo.com
SECOND FLOOR
+8.700 FFL
320
FIRST FLOOR
+5.500 FFL
1260
Mr . ABDULRAHMAN & KHALID & AHMED
SON'S SULAIMAN ABDULRAHMAN BA'OMAR
400
GROUND FLOOR
+1.500 FFL
150
INTERLOCK LEVEL
±0.00 WFL
PROPOSED AREA
SCHEDULE FOR GROUND & TYPICAL FLOORS SCHEDULE FOR GROUND & TYPICAL FLOORS
SCHEDULE OF SLABS M30, Fe 460 SCHEDULE OF BEAMS M35, Fe 460
BOTTOM STEEL TOP STEEL
TYPE THICK SHORT BARS LONG BARS REMARKS TYPE SIZE STIRRUPS REMARKS
STRAIGHT CURTAIL STRAIGHT
Muscat municipality
EXTRA AT TOP SUPP
80
50D
B12 30X80 4Y25 3Y20 2Y20 4Y20 Y10 @ 15 c/c 2Y12 F.B consultant and the project contractor takes
D
A
B13 30X80 3Y25 3Y25 2Y20 2Y20 Y10 @ 15 c/c 2Y12 F.B full responsibility, each on their scope,
towards the safety of the building, the data
150
B14 30X80 4Y25 4Y25 3Y20 3Y20 Y10 @ 15 c/c 2Y12 F.B
provided in this approval, the attachment of
B B15 20X60 3Y20 - 2Y18 2Y18 Y10 @ 15 c/c --- correct documents, the compliance of the
B16 30X80 4Y25 4Y25 3Y25 2Y20 Y10 @ 15 c/c 4Y12 F.B attached designs with the local order
180
OPENING B17 30X70 3Y20 2Y20 3Y25 2Y20 Y10 @ 15 c/c 2Y12 F.B number 23/92, laws, regulations, circulars,
2Y25 and krooki requirements, and the provision
B18 30X70 3Y20 3Y20 2Y25 Y10 @ 15 c/c 2Y12 F.B
C of other authorities approvals, specifica-
B19 30X70 3Y25 - 4Y25 - Y10 @ 15 c/c 2Y14 F.B tions and guidelines without conflict with
110
C2 B20 30X70 3Y25 2Y20 3Y25 2Y25 Y10 @ 15 c/c 4 LEGGED the approved drawings from this directo-
D
B21 20X80 3Y25 2Y25 2Y25 2Y25 Y10 @ 15 c/c 4 LEGGED rate.
B6
150
B22 20X80 3Y25 - 2Y25 2Y25 Y10 @ 15 c/c 4 LEGGED - The project contractor and the supervision
B5 consultant are committed to provide the
E required safety of the buildings, the neigh-
C13 EXISTING SLAB SHALL BE boring services as well as considering the
146
B11 S4 B11
I not match with other approved drawings or
with the existing plot conditions.
175
J
138
C2
K
68
B6 S2 B6
S4 B5 S4 B18
60
364
60
40
90
C14 B6 (INV.) C1 B6(INV.) C13 By Eng.Amal Said AlBahri at 12:58 pm, Nov 12, 2018
M B11
76
B5(INV.)
B5 (INV.)
N 60
B11 S4
S1 S2 B10
204
B11
120
CB2
50 S1 40 B10
S4
CB2
P S1
CB2
40
70
3Y16 T&B
AROUND OPENING (TYP.)
211
B8 B8 C1
B5
Q
99
R
383
A B C C1 D D1 E F G H I J K L M M1 M2 N O A B C C1 D D1 E F G H I J K L M M1 M2 N O
91 5910
91 5910
91 5910
20 20 20 20
اﻟﻤﺸﺮف اﻻﻟﺘﺰام ﺑﺎﻟﺘﻨﻔﻴﺬ ﺣﺴﺐ اﻟﻤﺨﻄﻄﺎت اﻟﻤﻌﺘﻤﺪة
19 19 19 19 واﻟﺘﻘﻴﺪ ﺑﺒﻨﻮد اﻻﺑﺎﺣﺔ اﻟﻤﺸﺮوﻃﺔ .وﺑﺎﻻﺷﺘﺮاﻃﺎت اﻟﻤﺤﻠﻴﺔ
504 504 واﻟﺪوﻟﻴﺔ اﻟﻤﻌﺘﻤﺪة ﻋﻨﺪ اﻟﺘﻨﻔﻴﺬ
18 18 18 18
-ﻳﺘﺤﻤﻞ اﻟﻤﻜﺘﺐ اﻻﺳﺘﺸﺎري اﻟﻤﺼﻤﻢ واﻟﻤﺸﺮف ﻋﻠﻰ
400
400
BED ROOM BED ROOM
اﻟﺘﻨﻔﻴﺬ واﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ – ﻛﻞ ﻓﻲ ﻣﺠﺎل اﺧﺘﺼﺎﺻﻪ –
100
100
180
180
180
180
اﻟﻤﺴﺆوﻟﻴﺔ اﻟﻜﺎﻣﻠﺔ ﺗﺠﺎه ﺳﻼﻣﺔ اﻟﻤﺒﺎﻧﻲ وﺗﺠﺎه ﺻﺤﺔ
40
40
STORE TOILET STORE TOILET اﻟﺒﻴﺎﻧﺎت اﻟﻤﺬﻛﻮرة ﺑﻬﺬا اﻻﻋﺘﻤﺎد ،وﺻﺤﺔ ﺟﻤﻴﻊ
17 30
17 17 30
17
60 60 اﻟﻤﺴﺘﻨﺪات واﻟﺘﺼﺎﻣﻴﻢ اﻟﻤﺮﻓﻘﺔ وﺗﻮﻓﻘﻬﺎ ﻣﻊ اﻣﺮ
80
80
80
80
اﻟﻤﺤﻠﻲ رﻗﻢ ٩٢/٢٣واﻟﻘﻮاﻧﻴﻦ واﻟﺘﻌﺎﻣﻴﻢ واﺷﺘﺮاﻃﺎت
80
80
80
80
16 16 16 16
اﻟﺮﺳﻢ اﻟﻤﺴﺎﺣﻲ وﺿﻤﺎن اﺳﺘﻴﻔﺎء ﺟﻤﻴﻊ اﻟﻤﻮاﻓﻘﺎت
111
111
111
111
80 80
TOILET TOILET
30
6.80SQM
120 30
6.80SQM
120 اﻟﻤﻄﻠﻮﺑﺔ ﻟﻠﻤﺸﺮوع واﻻﻟﺘﺰام ﺑﻜﺎﻓﺔ اﻟﻤﻮاﺻﻔﺎت
386
386
15a 15a 15a 15a واﻻﺷﺘﺮاﻃﺎت واﻻرﺷﺎدات اﻟﻤﻌﺘﻤﺪة ﻣﻦ ﺟﻤﻴﻊ ﺟﻬﺎت
60
60
69
69
69
69
150 50 150 50
30
30
BED ROOM BED ROOM اﻻﺧﺘﺼﺎص اﻻﺧﺮى وﺑﻤﺎ ﻻ ﻳﺘﻌﺎرض ﻣﻊ اﻟﺨﺮاﺋﻂ اﻟﻤﺼﺪﻗﺔ
15 15 15 15
ﻣﻦ ﻫﺬه اﻻدارة.
50 110
50 110
50 110
50 110
LIFT LIFT
UP 700 UP 700
1.80X1.35 1.80X1.35
-ﻳﻠﺘﺰم اﻟﻤﻜﺘﺐ اﻻﺳﺘﺸﺎري اﻟﻤﺸﺮف واﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ
14a 14a 14a 14a
ﺑﺘﻮﻓﻴﺮ اﻟﺤﻤﺎﻳﺔ اﻟﻼزﻣﺔ ﻟﻠﻤﺸﺮوع وﺳﻼﻣﺔ اﻟﻤﺒﺎﻧﻲ
14 14 14 14 واﻟﺨﺪﻣﺎت اﻟﻤﺠﺎورة ﻣﻊ اﻻﺧﺬ ﺑﺎﻻﻋﺘﺒﺎر ﻃﺒﻴﻌﺔ اﻟﺘﺮﺑﺔ
120
120
120
120
DN DN
واﻟﺘﺄﺛﻴﺮات اﻻﻧﺸﺎﺋﻴﺔ ﻟﻠﺒﻴﺌﺔ اﻟﻤﺤﻴﻄﺔ.
13 60 13 13 60 13 -ﻓﻲ ﺣﺎﻟﺔ اﻟﻘﻄﻊ اﻟﻘﺮﻳﺒﺔ ﻣﻦ اﻟﺠﺒﺎل أو اودﻳﺔ ﻓﺈﻧﻪ
ﻳﺘﻄﻠﺐ ﻋﻠﻰ اﻻﺳﺘﺸﺎري اﻟﻤﺸﺮف ﺗﻘﺪﻳﻢ دراﺳﺔ
130
130
130
130
100
100
400
400
BEDROOM BEDROOM
ﻣﻔﺼﻠﺔ ﻋﻦ ﻛﻴﻔﻴﺔ ﻗﻄﻊ اﻟﺠﺒﺎل او اﻟﺤﻤﺎﻳﺎت اﻟﻼزﻣﺔ ﺟﻬﺔ
12b 12b 12b 12b اﻟﻮادي ﻗﺒﺐ اﻟﺸﺮوع ﺑﺎﻟﻌﻤﻞ.
50
50
BEDROOM
80 TOILET
490 BEDROOM
80 TOILET
490
60
60
30 30
376
376
TOILET 100 100 TOILET 100 100
-ﻳﺠﺐ اﻻﻟﺘﺰام ﺑﺎﺳﺘﺨﺪام اﻟﻠﻮن اﺑﻴﺾ ﺑﺎﻟﻮاﺟﻬﺎت او
اﻟﺘﻨﺴﻴﻖ ﻣﻊ اﻟﻤﺪﻳﺮﻳﺎت ﺑﺎﻟﻤﻨﺎﻃﻖ ﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒﺔ ﺑﺨﻼف
70
70
120 120
120
120
500 500 ذﻟﻚ.
30
30
80
80
45 45
440
440
440
440
100
100
-ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ ﻟﻠﻤﺸﺮوع واﻻﺳﺘﺸﺎري
30
30
P A S S A G E 1.50 M WIDE
80
40
40
120 120
ﺣﺎﻟﺔ وﺟﻮد ﻣﺸﻜﻠﺔ ﻓﻨﻴﺔ ﺗﺤﻮل دون اﻟﺒﻨﺎء وﺣﺴﺐ
اﻟﺨﺮاﺋﻂ اﻟﻤﺘﻌﻤﺪة ﻓﻲ ﺣﺎﻟﺔ ﻋﺪم ﺗﻄﺎﺑﻖ اﻟﺨﺮاﺋﻂ ﻣﻊ ﺑﻌﻀﻬﺎ
30 30
60
60
403
403
100 BEDROOM 100 BEDROOM
TOILET TOILET
100
60
60
80 80
BEDROOM BEDROOM
361
361
12a 12a 12a 12a
19SQM 19SQM
120
120
120
120
12 12 12 12
500 500
130
130
130
130
490 490
3370
3370
3370
3370
11 11 11 11
100 50 90
100 50 90
100 50 90
100 50 90
720 720 80
100
100
412
412
10a HANDICAP ROOM 10a 10a HANDICAP ROOM 10a
355
355
BED ROOM 60 H/C BED ROOM 60 TOILET
10 TOILET 10 10 10
90
9a 9a 9a 9a
55
45
100
80
80
80
80
LIFT LIFT
8 60 80
8 8 60 80
8
75
75
75
75
DN DN
90
90
7 410 7 7 410 7
45
45
TOILET TOILET
LIFT LIFT
205
205
205
205
30 30
UP UP Designing & Supervision & Interior design
BED ROOM BED ROOM
464
464
90
90
P.O.BOX NO.151/P.C. 316,ALBEDIYAH-ALSEWAQ MUSCAT,SULTHANATE OF OMAN
6 6 6 6
60 50 100 40
80
PASSAGE 1.40 M WIDE 30 PASSAGE 1.40 M WIDE 30
110 110
80
TOILET TOILET
50
44
30
30
30
153 153
60
60
45 45
5c 5c 5c 5c
60
60
100 100
80 60 80 60
120 110 TOILET 120 110 TOILET
5b TOILET 100 5b 5b TOILET 100 5b
80
80
120
120
140
140
110
110
110
110
80
80
80
80
70 70
60
60
40
40
30 30
TOILET 30 TOILET TOILET 30 TOILET
5a 80 100 5a 5a 80 100 5a
120
120
40
40
70
70
70
70
60
60
40
40
30
30
5 5 5 5
405 405
190
190
190
190
549
549
BEDROOM BEDROOM BEDROOM BEDROOM BEDROOM BEDROOM
460
459
460
459
4 BED ROOM 4 4 BED ROOM 4
360
360
345 345
395 395
210
210
210
210
555 555
60
60
60
2 2 2 2
150
150
150
1 1 1 1
30
30
30
30
10 150 66 134 127 13 180 452333 120 170 10 951 70 75 15 110 100 250 10 10 150 66 134 127 13 180 452333 120 170 10 951 70 75 15 110 100 250 10
30 30
1800 1800
A B C C1 D D1 E F G H I J K L M M1 M2 N O A B C C1 D D1 E F G H I J K L M M1 M2 N O
OUTDOOR
SEATING
24700
3.00
واﻟﺘﺄﺛﻴﺮات اﻻﻧﺸﺎﺋﻴﺔ ﻟﻠﺒﻴﺌﺔ اﻟﻤﺤﻴﻄﺔ.
BLD 1
L ANE -ﻓﻲ ﺣﺎﻟﺔ اﻟﻘﻄﻊ اﻟﻘﺮﻳﺒﺔ ﻣﻦ اﻟﺠﺒﺎل أو اودﻳﺔ ﻓﺈﻧﻪ
IDE
585/
4
M
M W 5.72 M ﻳﺘﻄﻠﺐ ﻋﻠﻰ اﻻﺳﺘﺸﺎري اﻟﻤﺸﺮف ﺗﻘﺪﻳﻢ دراﺳﺔ
3.00
5
WID
ﻣﻔﺼﻠﺔ ﻋﻦ ﻛﻴﻔﻴﺔ ﻗﻄﻊ اﻟﺠﺒﺎل او اﻟﺤﻤﺎﻳﺎت اﻟﻼزﻣﺔ ﺟﻬﺔ
G
اﻟﻮادي ﻗﺒﺐ اﻟﺸﺮوع ﺑﺎﻟﻌﻤﻞ.
HOLDING
E LA
-ﻳﺠﺐ اﻻﻟﺘﺰام ﺑﺎﺳﺘﺨﺪام اﻟﻠﻮن اﺑﻴﺾ ﺑﺎﻟﻮاﺟﻬﺎت او
5M
2 3.0
1 5 . 4 اﻟﺘﻨﺴﻴﻖ ﻣﻊ اﻟﻤﺪﻳﺮﻳﺎت ﺑﺎﻟﻤﻨﺎﻃﻖ ﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒﺔ ﺑﺨﻼف
ذﻟﻚ.
NE
TANK
-ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ ﻟﻠﻤﺸﺮوع واﻻﺳﺘﺸﺎري
0M
اﻟﻤﺸﺮف اﻟﺮﺟﻮع اﻟﻰ ﻫﺬه اﻻدارة ﻗﺒﻞ ﺗﻨﻔﻴﺬ اﻟﻤﺒﻨﻰ ﻓﻲ
R
ﺣﺎﻟﺔ وﺟﻮد ﻣﺸﻜﻠﺔ ﻓﻨﻴﺔ ﺗﺤﻮل دون اﻟﺒﻨﺎء وﺣﺴﺐ
8M
50
اﻟﺨﺮاﺋﻂ اﻟﻤﺘﻌﻤﺪة ﻓﻲ ﺣﺎﻟﺔ ﻋﺪم ﺗﻄﺎﺑﻖ اﻟﺨﺮاﺋﻂ ﻣﻊ ﺑﻌﻀﻬﺎ
3
16.5
200
FIRST
O
200
F
1
GYM
L
A
OO R
I ED
P
By KHADIJA ABDULLAH AL-BIMANI at 9:03 am, Nov 08, 2018
ROJE
D
18.33 M
D M O G :ﻣﺭﻓﻘﺎﺕ
CTION
RO V EL B
(
P P O T 0
1
A H O.79 TN
PLO
5
200
. 0
400
180
0
0
M
E-MAIL : OMAN3D@yahoo.com
3 200
261
W I
22.0
D
0M
E
6
)
200
250
0 M
30.0 AREA STATEMENT
BUILT UP AREA SUMMARY
APPROVED AREA
BLD
789
PROPOSED AREA
KROOKI IMAGE
ﺑﻠﺪﻳﺔ ﻣﺴﻘﻂ
اﻟﻤﺪﻳﺮﻳﺔ اﻟﻌﺎﻣﺔ ﻟﻠﺸﺆون اﻟﻔﻨﻴﺔ
ادارة ﺗﺮاﺧﻴﺺ اﻟﺒﻨﺎء
ﻳﻌﺘﻤﺪ ﺣﺴﺐ ا¼ﺑﺎﺣﺔ اﻟﺼﺎدرة
ﻳﺠﺐ اﻻﻟﺘﺰام ﺑﻄﻼء اﻟﻮاﺟﻬﺎت ﺑﺎﻟﻠﻮن اﺑﻴﺾ ﻓﻘﻂ
-ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ ﻟﻠﻤﺸﺮوع واﻻﺳﺘﺸﺎري
1 2 3 4 5 6 7 8 9 10 11 12 13 1 اﻟﻤﺸﺮف اﻻﻟﺘﺰام ﺑﺎﻟﺘﻨﻔﻴﺬ ﺣﺴﺐ اﻟﻤﺨﻄﻄﺎت اﻟﻤﻌﺘﻤﺪة
1781 واﻟﺘﻘﻴﺪ ﺑﺒﻨﻮد اﻻﺑﺎﺣﺔ اﻟﻤﺸﺮوﻃﺔ .وﺑﺎﻻﺷﺘﺮاﻃﺎت اﻟﻤﺤﻠﻴﺔ
150 71 209 110 35 98 218 100 70 215 140 132 233 واﻟﺪوﻟﻴﺔ اﻟﻤﻌﺘﻤﺪة ﻋﻨﺪ اﻟﺘﻨﻔﻴﺬ
-ﻳﺘﺤﻤﻞ اﻟﻤﻜﺘﺐ اﻻﺳﺘﺸﺎري اﻟﻤﺼﻤﻢ واﻟﻤﺸﺮف ﻋﻠﻰ
اﻟﺘﻨﻔﻴﺬ واﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ – ﻛﻞ ﻓﻲ ﻣﺠﺎل اﺧﺘﺼﺎﺻﻪ –
اﻟﻤﺴﺆوﻟﻴﺔ اﻟﻜﺎﻣﻠﺔ ﺗﺠﺎه ﺳﻼﻣﺔ اﻟﻤﺒﺎﻧﻲ وﺗﺠﺎه ﺻﺤﺔ
اﻟﺒﻴﺎﻧﺎت اﻟﻤﺬﻛﻮرة ﺑﻬﺬا اﻻﻋﺘﻤﺎد ،وﺻﺤﺔ ﺟﻤﻴﻊ
اﻟﻤﺴﺘﻨﺪات واﻟﺘﺼﺎﻣﻴﻢ اﻟﻤﺮﻓﻘﺔ وﺗﻮﻓﻘﻬﺎ ﻣﻊ اﻣﺮ
A اﻟﻤﺤﻠﻲ رﻗﻢ ٩٢/٢٣واﻟﻘﻮاﻧﻴﻦ واﻟﺘﻌﺎﻣﻴﻢ واﺷﺘﺮاﻃﺎت
اﻟﺮﺳﻢ اﻟﻤﺴﺎﺣﻲ وﺿﻤﺎن اﺳﺘﻴﻔﺎء ﺟﻤﻴﻊ اﻟﻤﻮاﻓﻘﺎت
150
اﻟﻤﻄﻠﻮﺑﺔ ﻟﻠﻤﺸﺮوع واﻻﻟﺘﺰام ﺑﻜﺎﻓﺔ اﻟﻤﻮاﺻﻔﺎت
واﻻﺷﺘﺮاﻃﺎت واﻻرﺷﺎدات اﻟﻤﻌﺘﻤﺪة ﻣﻦ ﺟﻤﻴﻊ ﺟﻬﺎت
B اﻻﺧﺘﺼﺎص اﻻﺧﺮى وﺑﻤﺎ ﻻ ﻳﺘﻌﺎرض ﻣﻊ اﻟﺨﺮاﺋﻂ اﻟﻤﺼﺪﻗﺔ
ﻣﻦ ﻫﺬه اﻻدارة.
180
-ﻳﻠﺘﺰم اﻟﻤﻜﺘﺐ اﻻﺳﺘﺸﺎري اﻟﻤﺸﺮف واﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ
ﺑﺘﻮﻓﻴﺮ اﻟﺤﻤﺎﻳﺔ اﻟﻼزﻣﺔ ﻟﻠﻤﺸﺮوع وﺳﻼﻣﺔ اﻟﻤﺒﺎﻧﻲ
C
واﻟﺨﺪﻣﺎت اﻟﻤﺠﺎورة ﻣﻊ اﻻﺧﺬ ﺑﺎﻻﻋﺘﺒﺎر ﻃﺒﻴﻌﺔ اﻟﺘﺮﺑﺔ
110
واﻟﺘﺄﺛﻴﺮات اﻻﻧﺸﺎﺋﻴﺔ ﻟﻠﺒﻴﺌﺔ اﻟﻤﺤﻴﻄﺔ.
D -ﻓﻲ ﺣﺎﻟﺔ اﻟﻘﻄﻊ اﻟﻘﺮﻳﺒﺔ ﻣﻦ اﻟﺠﺒﺎل أو اودﻳﺔ ﻓﺈﻧﻪ
ﻳﺘﻄﻠﺐ ﻋﻠﻰ اﻻﺳﺘﺸﺎري اﻟﻤﺸﺮف ﺗﻘﺪﻳﻢ دراﺳﺔ
150
ROOF ﻣﻔﺼﻠﺔ ﻋﻦ ﻛﻴﻔﻴﺔ ﻗﻄﻊ اﻟﺠﺒﺎل او اﻟﺤﻤﺎﻳﺎت اﻟﻼزﻣﺔ ﺟﻬﺔ
E 85 اﻟﻮادي ﻗﺒﺐ اﻟﺸﺮوع ﺑﺎﻟﻌﻤﻞ.
-ﻳﺠﺐ اﻻﻟﺘﺰام ﺑﺎﺳﺘﺨﺪام اﻟﻠﻮن اﺑﻴﺾ ﺑﺎﻟﻮاﺟﻬﺎت او
146
24700 اﻟﺘﻨﺴﻴﻖ ﻣﻊ اﻟﻤﺪﻳﺮﻳﺎت ﺑﺎﻟﻤﻨﺎﻃﻖ ﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒﺔ ﺑﺨﻼف
F ذﻟﻚ.
134
-ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ ﻟﻠﻤﺸﺮوع واﻻﺳﺘﺸﺎري
اﻟﻤﺸﺮف اﻟﺮﺟﻮع اﻟﻰ ﻫﺬه اﻻدارة ﻗﺒﻞ ﺗﻨﻔﻴﺬ اﻟﻤﺒﻨﻰ ﻓﻲ
G ﺣﺎﻟﺔ وﺟﻮد ﻣﺸﻜﻠﺔ ﻓﻨﻴﺔ ﺗﺤﻮل دون اﻟﺒﻨﺎء وﺣﺴﺐ
اﻟﺨﺮاﺋﻂ اﻟﻤﺘﻌﻤﺪة ﻓﻲ ﺣﺎﻟﺔ ﻋﺪم ﺗﻄﺎﺑﻖ اﻟﺨﺮاﺋﻂ ﻣﻊ ﺑﻌﻀﻬﺎ
او ﻣﻊ اﻟﻤﻮﻗﻊ ﻓﻲ اﻟﻄﺒﻴﻌﺔ
286
270 820
620
110
660
I
175
25700
GYM
J
98.00SQM By KHADIJA ABDULLAH AL-BIMANI at 9:06 am, Nov 08, 2018
138
3124
K
68
180
L
197
1660 200 466
364
240
196
P.O.BOX NO.151/P.C. 316,ALBEDIYAH-ALSEWAQ MUSCAT,SULTHANATE OF OMAN
N 650
LIFT
LOBBY
204
24700
270
O
140
180
P 315
211
Q
99
R
OUTDOOR
560
SEATING
24700
383
S
3
A/200
1 2 3 4 5 6 7 8 9 10 11 12 13 1
ﺑﻠﺪﻳﺔ ﻣﺴﻘﻂ
1781 اﻟﻤﺪﻳﺮﻳﺔ اﻟﻌﺎﻣﺔ ﻟﻠﺸﺆون اﻟﻔﻨﻴﺔ
150 71 209 110 35 98 218 100 70 215 140 132 233 ادارة ﺗﺮاﺧﻴﺺ اﻟﺒﻨﺎء
ﻳﻌﺘﻤﺪ ﺣﺴﺐ ا¼ﺑﺎﺣﺔ اﻟﺼﺎدرة
ﻳﺠﺐ اﻻﻟﺘﺰام ﺑﻄﻼء اﻟﻮاﺟﻬﺎت ﺑﺎﻟﻠﻮن اﺑﻴﺾ ﻓﻘﻂ
-ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ ﻟﻠﻤﺸﺮوع واﻻﺳﺘﺸﺎري
اﻟﻤﺸﺮف اﻻﻟﺘﺰام ﺑﺎﻟﺘﻨﻔﻴﺬ ﺣﺴﺐ اﻟﻤﺨﻄﻄﺎت اﻟﻤﻌﺘﻤﺪة
واﻟﺘﻘﻴﺪ ﺑﺒﻨﻮد اﻻﺑﺎﺣﺔ اﻟﻤﺸﺮوﻃﺔ .وﺑﺎﻻﺷﺘﺮاﻃﺎت اﻟﻤﺤﻠﻴﺔ
A
واﻟﺪوﻟﻴﺔ اﻟﻤﻌﺘﻤﺪة ﻋﻨﺪ اﻟﺘﻨﻔﻴﺬ
150
-ﻳﺘﺤﻤﻞ اﻟﻤﻜﺘﺐ اﻻﺳﺘﺸﺎري اﻟﻤﺼﻤﻢ واﻟﻤﺸﺮف ﻋﻠﻰ
اﻟﺘﻨﻔﻴﺬ واﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ – ﻛﻞ ﻓﻲ ﻣﺠﺎل اﺧﺘﺼﺎﺻﻪ –
B
BED ROOM
اﻟﻤﺴﺆوﻟﻴﺔ اﻟﻜﺎﻣﻠﺔ ﺗﺠﺎه ﺳﻼﻣﺔ اﻟﻤﺒﺎﻧﻲ وﺗﺠﺎه ﺻﺤﺔ
اﻟﺒﻴﺎﻧﺎت اﻟﻤﺬﻛﻮرة ﺑﻬﺬا اﻻﻋﺘﻤﺎد ،وﺻﺤﺔ ﺟﻤﻴﻊ
180
اﻟﻤﺴﺘﻨﺪات واﻟﺘﺼﺎﻣﻴﻢ اﻟﻤﺮﻓﻘﺔ وﺗﻮﻓﻘﻬﺎ ﻣﻊ اﻣﺮ
STORE TOILET
اﻟﻤﺤﻠﻲ رﻗﻢ ٩٢/٢٣واﻟﻘﻮاﻧﻴﻦ واﻟﺘﻌﺎﻣﻴﻢ واﺷﺘﺮاﻃﺎت
C
اﻟﺮﺳﻢ اﻟﻤﺴﺎﺣﻲ وﺿﻤﺎن اﺳﺘﻴﻔﺎء ﺟﻤﻴﻊ اﻟﻤﻮاﻓﻘﺎت
110
اﻟﻤﻄﻠﻮﺑﺔ ﻟﻠﻤﺸﺮوع واﻻﻟﺘﺰام ﺑﻜﺎﻓﺔ اﻟﻤﻮاﺻﻔﺎت
D TOILET واﻻﺷﺘﺮاﻃﺎت واﻻرﺷﺎدات اﻟﻤﻌﺘﻤﺪة ﻣﻦ ﺟﻤﻴﻊ ﺟﻬﺎت
6.80SQM
اﻻﺧﺘﺼﺎص اﻻﺧﺮى وﺑﻤﺎ ﻻ ﻳﺘﻌﺎرض ﻣﻊ اﻟﺨﺮاﺋﻂ اﻟﻤﺼﺪﻗﺔ
150
386
ﻣﻦ ﻫﺬه اﻻدارة.
BED ROOM
E -ﻳﻠﺘﺰم اﻟﻤﻜﺘﺐ اﻻﺳﺘﺸﺎري اﻟﻤﺸﺮف واﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ
LIFT ﺑﺘﻮﻓﻴﺮ اﻟﺤﻤﺎﻳﺔ اﻟﻼزﻣﺔ ﻟﻠﻤﺸﺮوع وﺳﻼﻣﺔ اﻟﻤﺒﺎﻧﻲ
700
146
UP
1.80X1.35
واﻟﺨﺪﻣﺎت اﻟﻤﺠﺎورة ﻣﻊ اﻻﺧﺬ ﺑﺎﻻﻋﺘﺒﺎر ﻃﺒﻴﻌﺔ اﻟﺘﺮﺑﺔ
F واﻟﺘﺄﺛﻴﺮات اﻻﻧﺸﺎﺋﻴﺔ ﻟﻠﺒﻴﺌﺔ اﻟﻤﺤﻴﻄﺔ.
-ﻓﻲ ﺣﺎﻟﺔ اﻟﻘﻄﻊ اﻟﻘﺮﻳﺒﺔ ﻣﻦ اﻟﺠﺒﺎل أو اودﻳﺔ ﻓﺈﻧﻪ
134
DN
ﻳﺘﻄﻠﺐ ﻋﻠﻰ اﻻﺳﺘﺸﺎري اﻟﻤﺸﺮف ﺗﻘﺪﻳﻢ دراﺳﺔ
G ﻣﻔﺼﻠﺔ ﻋﻦ ﻛﻴﻔﻴﺔ ﻗﻄﻊ اﻟﺠﺒﺎل او اﻟﺤﻤﺎﻳﺎت اﻟﻼزﻣﺔ ﺟﻬﺔ
اﻟﻮادي ﻗﺒﺐ اﻟﺸﺮوع ﺑﺎﻟﻌﻤﻞ.
400
BEDROOM
286
TOILET
490
BEDROOM اﻟﺘﻨﺴﻴﻖ ﻣﻊ اﻟﻤﺪﻳﺮﻳﺎت ﺑﺎﻟﻤﻨﺎﻃﻖ ﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒﺔ ﺑﺨﻼف
376
TOILET ذﻟﻚ.
-ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ ﻟﻠﻤﺸﺮوع واﻻﺳﺘﺸﺎري
H 500 اﻟﻤﺸﺮف اﻟﺮﺟﻮع اﻟﻰ ﻫﺬه اﻻدارة ﻗﺒﻞ ﺗﻨﻔﻴﺬ اﻟﻤﺒﻨﻰ ﻓﻲ
110
ﺣﺎﻟﺔ وﺟﻮد ﻣﺸﻜﻠﺔ ﻓﻨﻴﺔ ﺗﺤﻮل دون اﻟﺒﻨﺎء وﺣﺴﺐ
175
403
BEDROOM
TOILET
TOILET
BEDROOM
361
J 19SQM
138
3124
K 500
68 490
L
By KHADIJA ABDULLAH AL-BIMANI at 2:01 pm, Nov 08, 2018
720
100
BEDROOM
412
4
364
60 H/C
394
2 BED ROOM
TOILET
A/200
A/200
45
LIFT
90
M
76
DN
40
60
N 80
100
TOILET
60
CLOSET TOILET
Designing & Supervision & Interior design
LIFT
204
100
120
TEL.NO.: 24217851/99876662 ,FAX:24217852
85
E-MAIL : OMAN3D@yahoo.com
O
140
60
30
TOILET
80
P 45
30
60
60
80
100 100
211
TOILET TOILET140
120
100
60
Q SUITES BEDROOM
350
99
550
BEDROOM BEDROOM BEDROOM
471
470
383
1
A/200
APPROVED AREA
50X150 BENDED G.I
TUBULAR IN PAINTED
FINISH OR EQUIVALENT ﺑﻠﺪﻳﺔ ﻣﺴﻘﻂ
TOP OF PARAPET اﻟﻤﺪﻳﺮﻳﺔ اﻟﻌﺎﻣﺔ ﻟﻠﺸﺆون اﻟﻔﻨﻴﺔ
+28.100 FFL ادارة ﺗﺮاﺧﻴﺺ اﻟﺒﻨﺎء
ﻳﻌﺘﻤﺪ ﺣﺴﺐ ا¼ﺑﺎﺣﺔ اﻟﺼﺎدرة
50
+27.600 FFL
TERRACE ﻳﺠﺐ اﻻﻟﺘﺰام ﺑﻄﻼء اﻟﻮاﺟﻬﺎت ﺑﺎﻟﻠﻮن اﺑﻴﺾ ﻓﻘﻂ
-ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ ﻟﻠﻤﺸﺮوع واﻻﺳﺘﺸﺎري
اﻟﻤﺸﺮف اﻻﻟﺘﺰام ﺑﺎﻟﺘﻨﻔﻴﺬ ﺣﺴﺐ اﻟﻤﺨﻄﻄﺎت اﻟﻤﻌﺘﻤﺪة
290 واﻟﺘﻘﻴﺪ ﺑﺒﻨﻮد اﻻﺑﺎﺣﺔ اﻟﻤﺸﺮوﻃﺔ .وﺑﺎﻻﺷﺘﺮاﻃﺎت اﻟﻤﺤﻠﻴﺔ
واﻟﺪوﻟﻴﺔ اﻟﻤﻌﺘﻤﺪة ﻋﻨﺪ اﻟﺘﻨﻔﻴﺬ
200 MM BLOCK -ﻳﺘﺤﻤﻞ اﻟﻤﻜﺘﺐ اﻻﺳﺘﺸﺎري اﻟﻤﺼﻤﻢ واﻟﻤﺸﺮف ﻋﻠﻰ
200 MM BLOCK WORK
1700
PENTHOUSE FLOOR WORK PROJECTION اﻟﺘﻨﻔﻴﺬ واﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ – ﻛﻞ ﻓﻲ ﻣﺠﺎل اﺧﺘﺼﺎﺻﻪ –
+24.700 FFL IN TEXTURED PROJECTION IN TEXTURED اﻟﻤﺴﺆوﻟﻴﺔ اﻟﻜﺎﻣﻠﺔ ﺗﺠﺎه ﺳﻼﻣﺔ اﻟﻤﺒﺎﻧﻲ وﺗﺠﺎه ﺻﺤﺔ
PAINT FINISH PAINT FINISH اﻟﺒﻴﺎﻧﺎت اﻟﻤﺬﻛﻮرة ﺑﻬﺬا اﻻﻋﺘﻤﺎد ،وﺻﺤﺔ ﺟﻤﻴﻊ
اﻟﻤﺴﺘﻨﺪات واﻟﺘﺼﺎﻣﻴﻢ اﻟﻤﺮﻓﻘﺔ وﺗﻮﻓﻘﻬﺎ ﻣﻊ اﻣﺮ
اﻟﻤﺤﻠﻲ رﻗﻢ ٩٢/٢٣واﻟﻘﻮاﻧﻴﻦ واﻟﺘﻌﺎﻣﻴﻢ واﺷﺘﺮاﻃﺎت
اﻟﺮﺳﻢ اﻟﻤﺴﺎﺣﻲ وﺿﻤﺎن اﺳﺘﻴﻔﺎء ﺟﻤﻴﻊ اﻟﻤﻮاﻓﻘﺎت
اﻟﻤﻄﻠﻮﺑﺔ ﻟﻠﻤﺸﺮوع واﻻﻟﺘﺰام ﺑﻜﺎﻓﺔ اﻟﻤﻮاﺻﻔﺎت
320
FOURTH FLOOR
+15.100 FFL
2810
320
THIRD FLOOR
+11.900 FFL Designing & Supervision & Interior design
P.O.BOX NO.151/P.C. 316,ALBEDIYAH-ALSEWAQ MUSCAT,SULTHANATE OF OMAN
TEL.NO.: 24217851/99876662 ,FAX:24217852
E-MAIL : OMAN3D@yahoo.com
320
SECOND FLOOR
+8.700 FFL
600
320
FIRST FLOOR
+5.500 FFL
Mr . ABDULRAHMAN & KHALID & AHMED
3296
SON'S SULAIMAN ABDULRAHMAN BA'OMAR
400
GROUND FLOOR
+1.500 FFL
INTERLOCK LEVEL
±0.00 WFL
PROPOSED AREA
TOP OF PARAPET
+28.100 FFL
50
+27.600 FFL
TERRACE
ﺑﻠﺪﻳﺔ ﻣﺴﻘﻂ
اﻟﻤﺪﻳﺮﻳﺔ اﻟﻌﺎﻣﺔ ﻟﻠﺸﺆون اﻟﻔﻨﻴﺔ
290
ادارة ﺗﺮاﺧﻴﺺ اﻟﺒﻨﺎء
ﻳﻌﺘﻤﺪ ﺣﺴﺐ ا¼ﺑﺎﺣﺔ اﻟﺼﺎدرة
PENTHOUSE FLOOR ﻳﺠﺐ اﻻﻟﺘﺰام ﺑﻄﻼء اﻟﻮاﺟﻬﺎت ﺑﺎﻟﻠﻮن اﺑﻴﺾ ﻓﻘﻂ
+24.700 FFL
-ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ ﻟﻠﻤﺸﺮوع واﻻﺳﺘﺸﺎري
اﻟﻤﺸﺮف اﻻﻟﺘﺰام ﺑﺎﻟﺘﻨﻔﻴﺬ ﺣﺴﺐ اﻟﻤﺨﻄﻄﺎت اﻟﻤﻌﺘﻤﺪة
واﻟﺘﻘﻴﺪ ﺑﺒﻨﻮد اﻻﺑﺎﺣﺔ اﻟﻤﺸﺮوﻃﺔ .وﺑﺎﻻﺷﺘﺮاﻃﺎت اﻟﻤﺤﻠﻴﺔ
واﻟﺪوﻟﻴﺔ اﻟﻤﻌﺘﻤﺪة ﻋﻨﺪ اﻟﺘﻨﻔﻴﺬ
-ﻳﺘﺤﻤﻞ اﻟﻤﻜﺘﺐ اﻻﺳﺘﺸﺎري اﻟﻤﺼﻤﻢ واﻟﻤﺸﺮف ﻋﻠﻰ
320
اﻟﺘﻨﻔﻴﺬ واﻟﻤﻘﺎول اﻟﻤﻨﻔﺬ – ﻛﻞ ﻓﻲ ﻣﺠﺎل اﺧﺘﺼﺎﺻﻪ –
اﻟﻤﺴﺆوﻟﻴﺔ اﻟﻜﺎﻣﻠﺔ ﺗﺠﺎه ﺳﻼﻣﺔ اﻟﻤﺒﺎﻧﻲ وﺗﺠﺎه ﺻﺤﺔ
اﻟﺒﻴﺎﻧﺎت اﻟﻤﺬﻛﻮرة ﺑﻬﺬا اﻻﻋﺘﻤﺎد ،وﺻﺤﺔ ﺟﻤﻴﻊ
SIXTH FLOOR اﻟﻤﺴﺘﻨﺪات واﻟﺘﺼﺎﻣﻴﻢ اﻟﻤﺮﻓﻘﺔ وﺗﻮﻓﻘﻬﺎ ﻣﻊ اﻣﺮ
+21.500 FFL اﻟﻤﺤﻠﻲ رﻗﻢ ٩٢/٢٣واﻟﻘﻮاﻧﻴﻦ واﻟﺘﻌﺎﻣﻴﻢ واﺷﺘﺮاﻃﺎت
اﻟﺮﺳﻢ اﻟﻤﺴﺎﺣﻲ وﺿﻤﺎن اﺳﺘﻴﻔﺎء ﺟﻤﻴﻊ اﻟﻤﻮاﻓﻘﺎت
100 MM PROJECTION IN اﻟﻤﻄﻠﻮﺑﺔ ﻟﻠﻤﺸﺮوع واﻻﻟﺘﺰام ﺑﻜﺎﻓﺔ اﻟﻤﻮاﺻﻔﺎت
TEXTURED PAINT FINISH واﻻﺷﺘﺮاﻃﺎت واﻻرﺷﺎدات اﻟﻤﻌﺘﻤﺪة ﻣﻦ ﺟﻤﻴﻊ ﺟﻬﺎت
اﻻﺧﺘﺼﺎص اﻻﺧﺮى وﺑﻤﺎ ﻻ ﻳﺘﻌﺎرض ﻣﻊ اﻟﺨﺮاﺋﻂ اﻟﻤﺼﺪﻗﺔ
ﻣﻦ ﻫﺬه اﻻدارة.
320
SECOND FLOOR
+8.700 FFL
320
FIRST FLOOR
+5.500 FFL
Mr . ABDULRAHMAN & KHALID & AHMED
SON'S SULAIMAN ABDULRAHMAN BA'OMAR
400
GROUND FLOOR
+1.500 FFL
INTERLOCK LEVEL
±0.00 WFL
PROPOSED AREA